Search NASA⌕ Search

SEARCH · Search NASA

Results for “distributed load sharing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

234 records · Page 13

Design optimization of an ethanol heavy-duty engine using design of experiments and bayesian optimization

Diesel-fueled engines still hold a large market share in the medium and heavy-duty transportation sector. However, the increase in fossil fuel prices and the strict emission regulations are leading engine manufacturers to seek cleaner alternatives without a compromise in performance. Alcohol-based fuels, such as ethanol, offer a promising alternative to diesel fuel in meeting regulatory demands. Ethanol provides cleaner combustion and lower levels of soot due to its chemical properties, in particular its lower level of carbon content. In addition, the stoichiometric operating conditions of alcohol fueled engines enable the mitigation of NOx emissions in aftertreatment stage. With the promise of retrofitting diesel engines to run on ethanol to reduce emissions, the thermal efficiency of these engines remains the primary optimization target. In order to find the optimal ethanol-fueled engine design that maximizes the thermal efficiency, a large design space needs to be investigated using engineering tools. In this study, previous research by the authors on optimizing the design of a single-cylinder ethanol-fueled engine was extended to explore the design space for a heavy-duty multi-cylinder engine configuration. A heavy-duty engine setup with multiple operating conditions at different engine speeds and loads were considered. A design optimization analysis was performed to identify the potential designs that maximize the indicated thermal efficiency in an ethanol-fueled compression ignition engine. First, a computational fluid dynamics (CFD) model of the engine was validated using experimental data for four drive cycle points. Using a design of experiments (DoE) approach and a parameterized piston bowl geometry, the model was then exercised to explore the relationship among geometric features of the piston bowl and spray targeting angle and indicated thermal efficiency across all tested operating conditions. After evaluating 165~candidate designs, a piston bowl geometry was identified that yielded an increase between 1.3 to 2.2 percentage points in indicated thermal efficiency for all tested conditions, while satisfying the operational design constraints for peak pressure and maximum pressure rise rate. The increased performance was attributed to enhanced mixing that led to the formation of a more homogeneous distribution of in-cylinder temperature and equivalence ratio, higher combustion temperatures, and shorter combustion duration. Finally, a Bayesian optimization (BOpt) analysis was employed to find the optimal piston bowl geometry with a fixed spray injector angle for one of the operating conditions. Using BOpt, a piston candidate was identified that resulted in a 1.9~percentage point increase in thermal efficiency from the baseline design, yet only required 65\% of the design samples investigated using the DoE approach.

Tekgul, Bulut↗

Including operational aspects in the planning of power systems with large amounts of variable generation: A review of modeling approaches

In the past, power system planning was based on meeting the load duration curve at minimum cost. The increasing share of variable generation (VG) makes operational constraints more important in the planning problem, and there is more and more interest in considering aspects such as sufficient ramping capability, sufficient reserve procurement, power system stability, storage behavior, and the integration of other energy sectors often through demand response assets. In VG integration studies, several methods have been applied to combine the planning and operational timescales. We present a four-level categorization for the modeling methods, in order of increasing complexity: (1a) investment model only, (1b) operational model only, (2) unidirectionally soft-linked investment and operational models, (3a) bidirectionally soft-linked investment and operational models, (3b) operational model with an investment update algorithm, and (4) co-optimization of investments and operation. The review shows that using a low temporal resolution or only few representative days will not suffice in order to determine the optimal generation portfolio. In addition, considering operational effects proves to be important in order to get a more optimal generation portfolio and more realistic estimations of system costs. However, operational details appear to be less significant than the temporal representation. Furthermore, the benefits and impacts of more advanced modeling techniques on the resulting generation capacity mix significantly depend on the system properties. Thus, the choice of the model should depend on the purpose of the study as well as on system characteristics.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2020

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While many projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2020, as well as data on "completed" and "withdrawn" projects for five of the ISOs (CAISO, ISO-NE, MISO, NYISO, PJM). We find that the total capacity active in the queues is growing year-over-year, with over 750 GW of generation and an estimated 200 GW of storage capacity as of the end of 2020. Solar (462 GW) accounts for a large – and growing – share of generator capacity in the queues. Substantial wind (209 GW) capacity is also in development, 29% of which is for offshore projects (61 GW). In total, about 680 GW of zero-carbon capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 159 GW of solar hybrids (primarily solar+battery) and 13 GW of wind hybrids are currently active in the queues. However, much of this proposed capacity will not ultimately be built. Among a subset of queues for which data are available, only 24% of the projects seeking connection from 2000 to 2015 have subsequently been built. Completion percentages appear to be declining, and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: in four ISOs, the typical duration from connection request to commercial operation increased from ~1.9 years for projects built in 2000-2009 to ~3.5 years for those built in 2010-2020. There are growing calls for queue reform to reduce cost, lead times, and speculation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Final Technical Report

Southern Africa is the world’s largest emitter of biomass burning aerosols. Their westward transport over the remote southeast Atlantic ocean colocates some of the largest atmospheric loadings of absorbing aerosol with the least examined of the Earth’s major subtropical stratocumulus decks. Global aerosol model results highlight that the largest positive top-ofatmosphere forcing in the world occurs in the southeast Atlantic, but this region exhibits large differences in magnitude and sign between reputable models, in part because of high variability in the underlying model cloud distributions. Many uncertainties contribute to the highly variable model radiation fields: the aging of the shortwave-absorbing aerosol during transport, how much of the aerosol mixes into the cloudy boundary layer, and how the low clouds adjust to smokeradiation and smoke-cloud interactions. In addition, the ability of the biomass burning aerosol to absorb shortwave radiation is known to vary seasonally as the fuel type on land changes. LASIC (Layered Atlantic Smoke Interactions with Clouds) is a strategy to improve our understanding of aged carbonaceous aerosol, its seasonal evolution, and the mechanisms by which clouds adjust to the presence of the aerosol. The observational strategy centers on deploying the AMF1 cloud, aerosol, and atmospheric profiling instrumentation to Ascension Island, located within the trade-wind shallow cumulus regime (14.50W, 80S) 3000 km offshore of continental Africa. The location is within the latitude zone of the maximum outflow of aerosol, with the deepening boundary layer known to entrain free-tropospheric smoke. The primary activities for LASIC are: 1) to improve current knowledge on aged biomass burning aerosol and its radiative properties as a function of the seasonal cycle; 2) to use surface-based remote sensing to sensitively interrogate the atmosphere for the relative vertical location of aerosol and clouds; 3) to improve our understanding of the cloud adjustments to the presence of shortwave-absorbing aerosol within the vertical column, both through aerosol-radiation and through aerosol-cloud interactions; 4) to aid low cloud parameterization efforts for climate models. The measurements span June 1, 2016 - October 31, 2017, encompassing two July-October biomass burning seasons. The August-September, 2016, months include an Intensive Observing Period (IOP) with 8x/daily radiosondes. In 2017, from 16 August through 7 September, the UK FAAM Bae- 146 plane was deployed from Ascension, providing complementary data on the atmosphere’s vertical structure as part of the CLARIFY project, with similar scientific goals. The NASA ORACLES aircraft campaign, sharing similar objectives to LASIC, deployed from Namibia in September, 2016, and Sao Tome in August, 2017. The latter included a suitcase flight to Ascension spanning August 18-21. In 2017 a CAPS-SSA instrument belonging to Aerodyne was brought to Ascension, gathering data primarily for August, towards providing a second, independent measurement of aerosol absorption. Ascension Island is also an AERONET site.

54 ENVIRONMENTAL SCIENCES↗

The use of wholesale market purchases by Western U.S. electric utilities

Load Serving Entities (LSEs) can procure electricity from their owned generation or purchase it on bilateral or centrally organized markets. Electric utility procurement decisions have important implications for resource adequacy, which is gaining attention especially in the Western U.S. However, there is little or no research on trends of utility procurement practices, and the role that wholesale market transactions can have for resource adequacy and other applications. This paper leverages information from the U.S. Department of Energy’s Energy Information Administration, Berkeley Lab’s Resource Planning Portal, and structured interviews with regulatory and utility staff. We find that use of market transactions to meet electric energy needs has been increasing across U.S. LSEs. The reasons for this trend include a general stagnation in building owned resources, a preference towards contracting renewable energy resources to meet RPS targets, and the lower relative cost of wholesale market electricity. Among market transactions across different time scales, short-term transactions were prevalent in Western U.S. LSEs until the 2008 recession, and thereafter declined to about a quarter of total purchases. In contrast, long-term market transactions have become more prevalent and resource planning reports project the share of these transactions in the procurement mix may continue to increase. Results suggest resource adequacy obligations may drive preferences for asset ownership more than a profit incentive. We also recommend improving the planning to procurement connection by reflecting in planning assumptions the operational constraints of market transactions. These results provide insights on key issues in electric utility procurement that could improve overall market efficiency, respond to rapidly changing industry conditions, and identify practices that LSEs and regulators should consider incorporating into their long-term transmission and capacity planning processes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mitigating Data Center Impact on Grid Stability: A Coordinated Control Strategy Using Verrus StabiliGrid Architecture

Large data centers, which now represent a significant and growing share of the total U.S. grid load, can inadvertently destabilize the electrical grid when they disconnect simultaneously during brief voltage disturbances. The July 10, 2024, Eastern Interconnection incident, in which a sub-100-millisecond transmission fault triggered the cascading loss of approximately 1,500 MW of data center load, illustrates this vulnerability. While commercial battery energy storage systems (BESS) deployed in data centers provide device-level fault ride-through per IEEE 1547, they lack coordination with facility protection logic and uninterruptible power supplies (UPS), limiting their effectiveness as grid-stabilizing assets. This report presents the Verrus StabiliGrid architecture, a coordinated control framework that integrates BESS, UPS, and point-of-interconnection (POI) protection settings to enable data centers to ride through both undervoltage and overvoltage grid contingencies without disconnecting. The four-step strategy encompasses: (1) high-resolution power quality monitoring to detect the grid state during events such as undervoltage, overvoltage, underfrequency, and overfrequency; (2) POI protection settings that allow for extended ride-through and grid-connected operation during grid contingencies; (3) grid state-driven autonomous dispatch of assets to improve grid resilience by reducing power draw during undervoltage or absorbing more power during overvoltage events; and (4) coordinated post-recovery dispatch of data center assets to restore firm load to pre-contingency levels. Validated through controller-hardware-in-the-loop (C-HIL) simulations at the National Laboratory of the Rockies, results show grid import restoration to pre-fault levels within 100 milliseconds of voltage recovery. This work advances the ability of data centers to transition from passive, disturbance-sensitive loads to active participants in grid stability, a capability increasingly required by emerging NERC and ERCOT regulatory frameworks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2021 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2021, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 1,400 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 90% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (676 GW) and battery storage (~420 GW) are – by far – the fastest growing resources in the queues; combined they accounted for nearly 85% of new capacity entering the queues in 2021. Substantial wind (247 GW) capacity is also seeking interconnection, 31% of which is for offshore projects (77 GW). In total, about 930 GW of zero-carbon generating capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 286 GW of solar hybrids (primarily solar+battery) and 19 GW of wind hybrids are currently active in the queues; nearly half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 23% of the projects seeking connection from 2000 to 2016 have subsequently been built. Completion percentages appear to be declining and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: for the regions with available data, the typical duration from connection request to commercial operation increased from ~2.1 years for projects built in 2000-2010 to ~3.7 years for those built in 2011-2021.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Redefining Resource Adequacy for Modern Power Systems: A Report of the Redefining Resource Adequacy Task Force

Today's rapidly increasing levels of wind, solar, storage, and load flexibility require the industry to rethink reliability planning and resource adequacy methods for modern power systems. Periods with a risk of shortfall often no longer coincide with peak demand - reliability risks are less about peak load and more about the daily setting of the sun, extended cloud cover, wind speeds, cold snaps, and heat waves. In addition, demand is increasingly flexible. Key resources are time-sensitive, as batteries need time to recharge and electricity customers can only be asked to provide demand response for just so long. And reliability failures are often correlated - with one another and with the weather. Two driving factors require the industry to reconsider its analytical approach for resource adequacy: (1) Chronological grid operations: The increasing importance of variable renewable resources (such as wind and solar) and of energy-limited resources (storage and demand response) make it essential to understand the full year of chronological operation of the grid. Specific attention must be paid to hourly, seasonal, and inter-annual resource variability. The sequence of the variability is key, as energy-limited resources such as batteries or demand response require either a preceding period or subsequent period of high production to be useful for grid reliability. (2) Correlated events: Historically, resource adequacy analysis focused on shortfalls caused by random, discrete mechanical failures of large generating units. In contrast, shortfalls today are often caused by multiple, correlated events caused by common weather patterns. Resource adequacy analysis must increasingly shift its focus to these correlated events. The redesign of resource adequacy methods will benefit from a set of guiding principles to better allow for sharing of insights and best practices, interregional resource coordination, and a smoother regulatory process for resource procurement. The objective of this report is to move this redesign forward. It provides an overview of key drivers changing the way resource adequacy needs to be evaluated, identifies shortcomings of conventional approaches, and outlines first principles for practitioners to consider as they adapt their approaches. The central message is: what got us here won't get us there.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Layered Atlantic Smoke Interactions with Clouds (LASIC) Field Campaign Report

Southern Africa is the world’s largest emitter of biomass burning aerosols. Their westward transport over the remote southeast Atlantic Ocean co-locates some of the largest atmospheric loadings of absorbing aerosol with the least examined of the Earth’s major subtropical stratocumulus decks. Global aerosol model results highlight that the largest positive top-of-atmosphere (TOA) forcing in the world occurs in the southeast Atlantic, but this region exhibits large differences in magnitude and sign between reputable models, in part because of high variability in the underlying model cloud distributions. Many uncertainties contribute to the highly variable model radiation fields: the aging of the shortwave-absorbing aerosol during transport, how much of the aerosol mixes into the cloudy boundary layer, and how the low clouds adjust to smoke-radiation and smoke-cloud interactions. In addition, the ability of the biomass burning aerosol to absorb shortwave radiation is known to vary seasonally as the fuel type on land changes. LASIC (Layered Atlantic Smoke Interactions with Clouds) is a strategy to improve our understanding of aged carbonaceous aerosol, its seasonal evolution, and the mechanisms by which clouds adjust to the presence of the aerosol. The observational strategy centers on deploying the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Climate Research Facility first ARM Mobile Facility (AMF1) cloud, aerosol, and atmospheric profiling instrumentation to Ascension Island, located within the trade-wind shallow cumulus regime (14.50W, 80S) 3000 km offshore of continental Africa. The location is within the latitude zone of the maximum outflow of aerosol, with the deepening boundary layer known to entrain free-tropospheric smoke. The primary activities for LASIC are: 1) to improve current knowledge on aged biomass burning aerosol and its radiative properties as a function of the seasonal cycle; 2) to use surface-based remote sensing to sensitively interrogate the atmosphere for the relative vertical location of aerosol and clouds; 3) to improve our understanding of the cloud adjustments to the presence of shortwave-absorbing aerosol within the vertical column, both through aerosol-radiation and through aerosol-cloud interactions; 4) to aid low cloud parameterization efforts for climate models. The measurements span June 1, 2016-October 31, 2017, encompassing two July-October biomass burning seasons. The August-September, 2016, months include an intensive operational period (IOP) with 8x/daily radiosondes. In 2017, from 16 August through 7 September, the United Kingdom Facility for Airborne Atmospheric Measurements (FAAM) BAe-146 plane was deployed from Ascension, providing complementary data on the atmosphere’s vertical structure as part of the Cloud-Aerosol-Radiation Interactions and Forcing (CLARIFY) project, with similar scientific goals. The National Aeronautics and Space Administration (NASA) Observations of Clouds above Aerosols and their Interactions (ORACLES) aircraft campaign, sharing similar objectives to LASIC, deployed from Namibia in September, 2016, and Sao Tome in August, 2017. The latter included a suitcase flight to Ascension spanning August 18-21. In 2017 a cavity-attenuated phase shift single-scattering albedo (CAPS-SSA) instrument belonging to Aerodyne was brought to Ascension, gathering data primarily for August, towards providing a second, independent measurement of aerosol absorption. Ascension Island is also an Aerosol Robotic Network (AERONET) site.

biomass burning, aerosols, black carbon, boundary-↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2022, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 2,000 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (947 GW) and battery storage (~680 GW) are – by far – the fastest growing resources in the queues; combined they accounted for over 80% of new capacity entering the queues in 2022. Substantial wind (300 GW) capacity is also seeking interconnection, 38% of which is for offshore projects (113 GW). In total, about 1,250 GW of zero-carbon generating capacity is currently seeking transmission access, as is 82 GW of natural gas capacity. Hybrids projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 457 GW of solar hybrids (primarily solar+battery) and 24 GW of wind hybrids are currently active in the queues; over half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 21% of the projects (and 14% of capacity) seeking connection from 2000 to 2017 have been built as of the end of 2022. Additionally, interconnection wait times are on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to nearly 4 years for those built in 2018-2022 (with a median of 5 years for projects built in 2022).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Scalable Pattern Matching in Metadata Graphs via Constraint Checking

Pattern matching is a fundamental tool for answering complex graph queries. Unfortunately, existing solutions have limited capabilities: They do not scale to process large graphs and/or support only a restricted set of search templates or usage scenarios. Moreover, the algorithms at the core of the existing techniques are not suitable for today’s graph processing infrastructures relying on horizontal scalability and shared-nothing clusters, as most of these algorithms are inherently sequential and difficult to parallelize. In this article we present an algorithmic pipeline that bases pattern matching on constraint checking. The key intuition is that each vertex and edge participating in a match has to meet a set of constraints implicitly specified by the search template. These constraints can be verified independently and typically are less expensive to compute than searching the full template. The pipeline we propose generates these constraints and iterates over them to eliminate all the vertices and edges that do not participate in any match, thus reducing the background graph to a subgraph that is the union of all template matches—the complete set of all vertices and edges that participate in at least one match. Additional analysis can be performed on this annotated, reduced graph, such as full match enumeration, match counting, or computing vertex/edge centrality. Furthermore, a vertex-centric formulation for constraint checking algorithms exists, and this makes it possible to harness existing high-performance, vertex-centric graph processing frameworks. This technique (i) enables highly scalable pattern matching in metadata (labeled) graphs; (ii) supports arbitrary patterns with 100% precision; (iii) enables tradeoffs between precision and time-to-solution, while always selects all vertices and edges that participate in matches, thus offering 100% recall; and (iv) supports a set of popular data analytics scenarios. We implement our approach on top of HavoqGT, an open-source asynchronous graph processing framework, and demonstrate its advantages through strong and weak scaling experiments on massive scale real-world (up to 257 billion edges) and synthetic (up to 4.4 trillion edges) labeled graphs, respectively, and at scales (1,024 nodes / 36,864 cores), orders of magnitude larger than used in the past for similar problems. This article serves two purposes: First, it synthesises the knowledge accumulated during a long-term project. Second, it presents new system features, usage scenarios, optimizations, and comparisons with related work that strengthen the confidence that pattern matching based on iterative pruning via constraint checking is an effective and scalable approach in practice. The new contributions include the following: (i) We demonstrate the ability of the constraint checking approach to efficiently support two additional search scenarios that often emerge in practice, interactive incremental search and exploratory search. (ii) We empirically compare our solution with two additional state-of-the-art systems, Arabsque and TriAD. (iii) We show the ability of our solution to accommodate a more diverse range of datasets with varying properties, e.g., scale, skewness, label distribution, and match frequency. (iv) We introduce or extend a number of system features (e.g., work aggregation, load balancing, and the ability to cap the generated traffic) and design optimizations and demonstrate their advantages with respect to improving performance and scalability. (v) We present bottleneck analysis and insights into artifacts that influence performance. (vi) We present a theoretical complexity argument that motivates the performance gains we observe.

97 MATHEMATICS AND COMPUTING↗

Existing Methods for Grid Strength Assessment and Role of Hydropower in Future Grids

The power system is undergoing rapid evolution with increasing penetration of inverter-based resources (IBRs), large loads, microgrids, and power electronic devices. Ensuring reliable and stable operation of the modern power grid is a multi-faceted challenge that requires detailed understanding of this complex system. Dynamic stability is a major concern in maintaining the security of power grids as the generation mixes and large loads transitions to include high shares of power electronic devices. The operation of IBRs in regions with low system strength and higher grid impedances has been found to be the main reason behind many of the power system instabilities that manifest themselves in various types of oscillations and interactions that, if not properly addressed and damped, can jeopardize the reliable operation of the power system. Weak grid conditions compound such stability problems, particularly when many IBRs operate in proximity to and connect to weak power grids. Therefore, it is important to assess grid strength for planning, integration and operation of IBRs for a given power system. In this report, we aim to understand and classify existing methodologies for grid strength assessment, along with their limitations and future needs. Further, we aim to utilize the huge untapped potential in utilizing hydro energy resources in addressing some of the pertinent challenges of grid strength and reliable operation of modern power systems. Hydropower, historically valued for its flexibility and dispatchability, now faces new constraints due to reduced share of synchronous machines in the generation mix and seasonal variability of available water resources. Yet, these same plants present untapped potential beyond energy generation - notably, as providers of critical grid services. This report explores how hydropower plants, particularly through operation as synchronous condensers, can play a pivotal role in strengthening the grid amid evolving system dynamics.

13 HYDRO ENERGY↗

Research Roadmap on Grid-Forming Inverters

This research roadmap is intended to fill the knowledge gap by providing a system view of grid-forming inverter-based resource controls and their impact on grid stability, which we believe is central to meeting some of the challenges to operating the future North American electric power system. This includes the roles and requirements of grid-forming inverter-based resources—including solar photovoltaics, wind generators, and energy storage. For this roadmap, we focus on a specific family of grid-forming inverter control approaches that do not rely on an external voltage source (i.e., no phase-locked loop) and that can share load without explicit communications. Although the roadmap is focused narrowly on system challenges for grid-forming controls and power system stability, including interactions with protection, we hope it serves as a foundational element for future system-of-systems roadmapping needed in a broader grid modernization effort with increasing deployments of inverter-based resources. The roadmap first introduces formal definitions for the grid stability topics and then describes the differences between grid-forming and traditional grid-following control approaches for inverter-based resources. The core of the roadmap consists of a review of current research and an outline of research needs related to five grid-forming inverter topics: frequency control, voltage control, system protection, fault ride-through and voltage recovery, and modeling and simulation. The review both delineates contemporary advances and highlights open research questions that must be addressed to enable the widespread adoption of inverter-based resources across the grid. Feedback from industry on these research questions is incorporated, including discussions during the Workshop on Grid-forming Inverters for Low-inertia Power Systems. The workshop included industry presentations and discussion of ongoing research, technology gaps, and piloting needs. This roadmap concludes by offering a multiyear perspective on the gradual field validation of grid-forming inverters. This perspective recognizes that the scale and scope of the types of power systems that inverters will be called on to provide grid-forming services will and should begin modestly. Specifically, this roadmap recognizes that inverter controls today are predominantly grid-following and that future power systems will involve a mix of inverter-based resources with both grid-following and grid-forming control capabilities. Growth over time will depend on how well grid-forming inverters perform and what advantages they bring as penetration levels (instantaneous and average) of inverter-based resources increases. This recognition, in turn, establishes a natural sequence of priorities for the research questions that must be addressed. Following this multiyear perspective, the roadmap offers short descriptions of two specific near-term research priorities: the review of regulatory and technical standards and the development of advanced modeling techniques. These priorities are foundational. We recommend immediate pursuit of them in parallel with and in direct support of the research outlined by our multiyear perspective.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A System Approach to Deep Heating Savings Through Measurement, Management, and Motivation

Across multi-tenant commercial office and multifamily buildings, centrally metered fuel use represents a substantial fraction of whole-building energy use. Energy audit practitioners understand that improving heating distribution efficiency is typically more of an opportunity than combustion efficiency and that differing thermal comfort preferences between tenants are the bane of operators across these building typologies. There is an unmet market need for retrofit technologies that allow for the delivery of the right amount of heat to the right spaces, at the right time. The Energy Management and Information System (EMIS) package fills this gap through enhanced controls and metering, incorporating low-cost sensors and wireless communication infrastructure to provide a platform for ongoing commissioning and tenant feedback, including heat cost allocation. With support from the US DOE Building Technologies Office, Steven Winter Associates, Inc. (SWA) partnered with Sentient Buildings, E Source, building owners, and utility and policy stakeholders, to demonstrate a market viable EMIS that achieves a reduction in space heating energy use by reducing heating load, improving control, and positively impacting behavior while providing an acceptable financial return. In this study, EMIS packages were implemented in two New York City multifamily rental buildings. Both buildings conducted basic mechanical work (e.g., repairing steam traps) to ensure the heating system was operating well before any tenant feedback was layered in. Heating Energy Use Reports (HEUR) were created to provide tenants with social comparisons and energy savings tips to influence their behavior; these were provided monthly to all tenants in both buildings. Additionally, one building allocated heating costs to a portion of the tenants. Heat cost allocation (HCA) has a long history in the European Union (EU), although it is not common in the US or in steam-heated buildings. SWA leveraged existing EU best practices and stakeholder feedback to develop a Heat Cost Allocation algorithm that was considered equitable and intuitive. Energy use and tenant behavior impacts were tracked throughout the study. The basic mechanical repair work saved between 11-20% of heating energy. Those savings rose to 17-24% with the addition of tenant feedback. While it may not be possible to precisely determine the impact of COVID-19 on research studies like this, there may have been additional savings realized had the study taken place in a period of normal occupancy patterns. These types of central heating systems have been a blind spot for utilities, who have traditionally had little visibility into detailed behind-the-meter gas usage. Heating energy savings stayed consistent during the coldest months, indicating the potential for utilities to utilize EMIS packages for peak gas demand reductions or demand response programs. Tenant comfort was also improved. Post installation, room temperatures more closely matched thermostat set points. Perhaps due to this greater level of control, the vast majority of tenants being billed for heating were accepting of the allocation costs. And tenants receiving heat cost allocations were more likely to reduce their thermostat setpoints than tenants receiving behavioral feedback without financial impacts were. Variation in building specifics makes it difficult to provide precise energy and financial savings estimates. But within the range of expected conditions, the study identified a few key variables that can have the greatest impact on financial returns: the cost of fuel, the ability and willingness to allocate heating costs to tenants, and a well-functioning heating system as a starting point. This study focused on two multifamily buildings, but additional use cases, such as commercial buildings and affordable housing, should be explored to better understand the full market potential. While this type of upgrade has the potential for deep energy reductions and cost savings, future projects should take into account the balance of costs and benefits between owners and tenants, especially in the affordable, regulated, or other low-to-moderate income (LMI) segments of the market. Rent credits, utility allowances, or a shared savings program are possible options to accelerate adoption of this strategy in these market segments.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Demonstration of Essential Reliability Services by a 300-MW Solar Photovoltaic Power Plant

The California Independent System Operator (CAISO), First Solar, and the National Renewable Energy Laboratory (NREL) conducted a demonstration project on a large utility-scale photovoltaic (PV) power plant in California to test its ability to provide essential ancillary services to the electric grid. With increasing shares of solar- and wind-generated energy on the electric grid, traditional generation resources equipped with automatic governor control (AGC) and automatic voltage regulation controls -- specifically, fossil thermal -- are being displaced. The deployment of utility-scale, grid-friendly PV power plants that incorporate advanced capabilities to support grid stability and reliability is essential for the large-scale integration of PV generation into the electric power grid, among other technical requirements. A typical PV power plant consists of multiple power electronic inverters and can contribute to grid stability and reliability through sophisticated 'grid-friendly' controls. In this way, PV power plants can be used to mitigate the impact of variability on the grid, a role typically reserved for conventional generators. In August 2016, testing was completed on First Solar's 300-MW PV power plant, and a large amount of test data was produced and analyzed that demonstrates the ability of PV power plants to use grid-friendly controls to provide essential reliability services. These data showed how the development of advanced power controls can enable PV to become a provider of a wide range of grid services, including spinning reserves, load following, voltage support, ramping, frequency response, variability smoothing, and frequency regulation to power quality. Specifically, the tests conducted included various forms of active power control such as AGC and frequency regulation; droop response; and reactive power, voltage, and power factor controls. This project demonstrated that advanced power electronics and solar generation can be controlled to contribute to system-wide reliability. It was shown that the First Solar plant can provide essential reliability services related to different forms of active and reactive power controls, including plant participation in AGC, primary frequency control, ramp rate control, and voltage regulation. For AGC participation in particular, by comparing the PV plant testing results to the typical performance of individual conventional technologies, we showed that regulation accuracy by the PV plant is 24-30 points better than fast gas turbine technologies. The plant's ability to provide volt-ampere reactive control during periods of extremely low power generation was demonstrated as well. The project team developed a pioneering demonstration concept and test plan to show how various types of active and reactive power controls can leverage PV generation's value from being a simple variable energy resource to a resource that provides a wide range of ancillary services. With this project's approach to a holistic demonstration on an actual, large, utility-scale, operational PV power plant and dissemination of the obtained results, the team sought to close some gaps in perspectives that exist among various stakeholders in California and nationwide by providing real test data.

14 SOLAR ENERGY↗

Design, Deployment, and Characterization of the World’s First Flexible Large Power Transformer

GE Research and its partner Prolec GE have designed, built and deployed in the field the world’s first flexible power transformer. The flexible power transformer is a transmission class 3-phase autotransformer configurable in impedance and in voltage which allows it to serve as a universal spare for multiple units in a given fleet. However, the key innovation in this new concept is the online adjustable leakage impedance which allows the transformer to change its impedance without interrupting the transmission line operation. The flexible power transformer can be designed with up to three low voltage transmission class ratings and up to 12 impedance values changeable both online and offline. This report provides an overview of the design, manufacturing, testing, and commissioning of the 165kV, 60MVA prototype built including the results of the field performance validation tests. The prototype was specified in collaboration with Cooperative Energy, the utility host. It was designed and tested in the factory according to IEEE standard C57.12.00 and followed all protocols for transportation, installation, and commissioning of a power transformer. In addition to the prototype, a flexible protection system capable of automatically adjusting its settings upon the transformer impedance was also developed and deployed in the for testing and validation. On September 3, 2021 the prototype was energized in Cooperative Energy’s substation in Columbia, Mississippi to become the world’s first flexible power transformer in operation. Its performances and impact on the grid operation were demonstrated through different field tests. Results obtained confirm that the impedance of the flexible transformer can be varied under load through its full range, from 4.3% to 9.3%, without adverse impacts on the line operation, the protection system, the transformer stability and health condition. Results also proved that the flexible transformer is very effective in controlling power transfer through the line or load sharing between units operating in parallel. Indeed, it was proven that higher impedances decrease the thruput power of the transformer while lower impedances increase it. Up to 26MW was controllable on a line loading of 45MVA. It was also possible to demonstrate that the variation of the transformer impedance has no effect on the circulating current between units in parallel, except a minor transient during the impedance change. It was also proven that the flexible protection relay can update its protection settings automatically when the impedance change was detected. The prototype has operated continuously for more than 12 months now with a peak load exceeding 50MVA corresponding to >80% of its ONAN power rating. No alarm, trip or sign of failure has been reported by the utility. In addition to the development and deployment of the flexible transformer prototype, investigations were carried out on new nanodielectric fluids to replace the mineral oil used in power transformers with the goal of reducing their footprint and weight. The key parameters that were targeted for improvement included the breakdown voltage to reduce clearances between windings and tank hence the footprint; viscosity and thermal conductivity to increase the cooling efficiency and therefore to reduce the winding material. Several nanodielectric mixtures with mineral oil including with alumina (Al2O3), titania (TiO2) and Borum Nitrate (BN) with different surfactants have been analyzed and tested. Unfortunately, despite encouraging results no nanofluid candidate has been found viable to replace mineral oil. With the formulations tested, breakdown voltages are generally similar to mineral oil at lower particle contents and worse at higher particle contents. Viscosity appreciably increased at particles concertation over 2 wt% and thermal conductivity increased slightly at 5wt% and appears to be 10-15% higher at 10 wt% particle content. It is recommended to continue investigations to find solutions that can help increase the power density of future flexible power transformers. Flexible power transformers can significantly help the future power grid by providing more flexibility and resiliency. Indeed, by providing voltage and impedance flexibility, flexible power transformers reduce the need for multiple spares, hence inventory costs for utilities. With their online controllable impedance, they can provide support to the grid and help manage short-circuit currents, power flow, line congestion, and grid stability which will become more important with higher penetrations of intermittent renewable resources. During the field validation tests, it was demonstrated that up to 26MW was controllable on a line loading of 45MVA when the transformer impedance was varied from its minimum to its maximum range. Also, with the impedance range, the short-circuit currents could be reduced by up to 38% at the load side of the transformer. With its controllable impedance, flexible transformers can be used in future strategies of grid resilience to help better prepare the grid to face forecasted severe events including storms, heat waves and contingencies. The flexible power transformers can also find role in other applications including high voltage transmission cables such as offshore wind farms where solutions for energizing the cables and managing the reactive power are of critical importance. The designed flexible power transformer is now fully validated and ready for commercialization. Further analysis on the benefits of flexible power transformers for grid stability and short-circuit management including current limiting capability, reclosure and line restoration, control of inrush current, sizing of flexible AC components (FACTS) would help its rapid adoption by the industry.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

Modular Controllable Transformers (MCT)

Large Power Transformers (LPTs) are at the heart of the electricity infrastructure and are critical pieces in today’s grid. Aging assets, long turn-around times, transportation delays and dependence on foreign manufacturing for these components have created conditions for points of failure across the system. Moreover, there is no available dynamic control on these passive sections of the grid. For all the automation embedded on the low voltage side of the low voltage side of the system there is absolutely no flexibility on the high voltage side. Changes in power flow patterns are brought about by altering dispatch patterns for generators which requires a coordinated effort and is often time consuming. Traditional FACTS based approaches such as UPFC or HVDC light involve massive modifications to the existing infrastructure. Recent instances of physical attacks on LPTs and the slow recovery process associated with fixing or replacing these damaged units has created an increased awareness for this issue. LPT designs are highly customized owing to specific field requirements. Long lead times coupled with transportation delays make procuring and installing LPTs a lengthy process. In an attempt to minimize the recovery time following an LPT failure, transformer manufacturers have developed mobile transformer units. These units typically consist of either a single-phase or three-phase transformer mounted on a truck and characterized by compact form factors. By reducing the assembly time and transport time these units offer a fast and temporary solution to LPT failures. Several efforts led by DOE, Edison Electric Company (EEI) and North American Electric Reliability Corporation (NERC) have led to the RecX program. RecX transformers consist of single phase transformers transported on specialized assemblies to enable fast restoration and minimal installation time. NERC and EEI have instituted transformer sharing programs like Spare Equipment Database (SED) as well as Spare Transformer Equipment Database (STEP) which encourage utilities to maintain and share a fleet of LPTs. Mobile transformers are typically limited to less than 100 MVA to enable transportation on a trailer. Also, the efficiency of mobile transformer units and RecX transformers is lower since they are temporary solutions. The ideal replacement solution would be one that could utilize a set of standardized transformers while incorporating flexibility to influence metrics like power flow, apparent impedance and voltage profiles. In view of these issues the team at Georgia Tech proposed a concept called Modular Controllable Transformers (MCTs). This project was commissioned as a part of DOE’s Transformer Resiliency and Advance Component (TRAC) program. The approach consists of splitting one large unit rated upwards of 100 MVA with smaller modular, standardized units. Each of these smaller units are augmented with a converter to add power flow, voltage and impedance control. Splitting the power level into multiple units has two important implications. By making smaller units, the transportation times can be reduced drastically. Moreover, even though these units have very specific impedance and other parameters, the augmented converters can make it emulate the unit being replaced. Thus, faster replacement times and added controls are achieved making this an extremely resilient approach. In the event of one modular units failure, the other two controllable units can operate in the most resilient fashion keeping the net system overloads to a minimum. Moreover, for the same probability of failure only a fraction of the system capacity is lost. The converter is augmented on to the tertiary winding of the transformer making it retrofittable in the field without massive modifications to the system. The material proposed in this report highlights design considerations to minimize recovery time as well as results displaying overall improvement in resiliency. The cost analysis of this approach shows significant savings compared to UPFC and HVDC lite based approaches. Extensive analysis was conducted on numerous aspects of this project over the course of this project. Simulation studies were conducted to prove the 5MVA converter design. Challenging BIL constraints and transient issues were addressed over the course of this project. Simulations on EMTP platform presented in consequent sections were used to finely tune the control for the same. A final design for a back-to-back 5MVA neutral-point-clamped (NPC) converter was completed in this project. Furthermore, switching components like high power IGBTs from IXYS Westcode Press-Pack series and ABB Stackpack series were identified for this application. These devices exhibit a blocking voltage of 6.5 kV and a nominal collector current of 900 A. Potential housing options as well as existing commercial option were identified for this converter design. A 56 MVA modular transformer unit was designed with Delta Star Inc. with consultation and inputs from all project members. The transformer cooling systems were chosen to be Oil Natural Air Forced (ONAF) to optimize ease of transport. A full Product Requirement Document (PRD) for the converter and the transformer was generated. The team also investigated key aspects of resiliency and how to quantify the same. A metric was developed to analyze resiliency and numerous simulation cases were presented. Increased (N-1) resiliency and outage resistance was showcased through simulation on the Texas Large scale power system. Dynamic control capabilities were also showcased on numerous system level simulations. An IEEE 30 bus system was used to show the ability of the MCT approach to reduce line congestion. Power flow control; a part of the MCTs abilities, showcased a 29% reduction in transformer loading on the same system. Full control over tie line flows was demonstrated on a modified IEEE 13 bus system. Dynamic LTC capabilities were shown through simulation and were compared to traditional LTCs. Furthermore, the ability of the MCTs to alter apparent transformer impedance was simulated to promote standardization of modular transformer units while retaining the ability to emulate a varied range of impedance characteristics. Thus granular control over power flow, voltages, impedances and was presented. Regulatory analysis conducted by Oak Ridge National Laboratory (ORNL) further bolstered the efficacy of the MCT approach and verified the added resiliency achieved due to this approach. As a conclusion, it was proved that the resilience improvement obtained from using the MCT approach is justified by just one failure in a 30-year period. This means that the benefits obtained from using the MCT approach far outweigh the cost of setting this approach up. As a part of the future efforts, the team is proposing building a (12.47-24) kV/400 kVA scaled down unit to control 5MVA of power flows. Emphasis would be laid on using commercial components to speed up the build of these units. Further the actual transport of the modular transformer unit would be a part of this operation and would provide insight into transportation issues. The approach shows much promise and adds key dynamic control on passive sub transmission and transmission sectors.

24 POWER TRANSMISSION AND DISTRIBUTION↗