Search NASA⌕ Search

SEARCH · Search NASA

Results for “drum”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

MODEL 9975 LIFE EXTENSION PACKAGE 1 - FINAL REPORT

Life extension package LE1 (9975-03382) was instrumented and subjected to a temperature/humidity environment that bounds KAMS package storage conditions for 92 weeks. During this time, the maximum fiberboard temperature was {approx}180 F, and was established by a combination of internal heat (12 watts) and external heat ({approx}142 F). The relative humidity external to the package was maintained at 80 %RH. This package was removed from test in November 2010 after several degraded conditions were observed during a periodic examination. These conditions included degraded fiberboard (easily broken, bottom layer stuck to the drum), corrosion of the drum, and separation of the air shield from the upper fiberboard assembly. Several tests and parameters were used to characterize the package components. Results from these tests generally indicate agreement between this full-scale shipping package and small-scale laboratory tests on fiberboard and O-ring samples. These areas of agreement include the rate of fiberboard weight loss, change in fiberboard thermal conductivity, fiberboard compression strength, and O-ring compression set. In addition, this package provides an example of the extent to which moisture within the fiberboard can redistribute in the presence of a temperature gradient such as might be created by a 12 watt internal heat load. Much of the moisture near the fiberboard ID surface migrated towards the OD surface, but there was not a significant axial moisture gradient during most of the test duration. Only during the last inspection period (i.e. after 92 weeks exposure during the second phase) did enough moisture migrate to the bottom fiberboard layers to cause saturation. A side effect of moisture migration is the leaching of soluble compounds from the fiberboard. In particular, the corrosion observed on the drum appears related primarily to the leaching and concentration of chlorides. In most locations, this attack appears to be general corrosion, with shallow attack of the drum surface. The primary areas susceptible to corrosion are weld/heat-affected zones. However, one corrosion location not immediately associated with a weld was tested for, and confirmed as having, throughwall penetration. An increase in the axial gap at the top of the package is also related to the migration of moisture within the fiberboard. As moisture redistributes within the package, a majority of the fiberboard loses moisture (on average) and shrinks axially. In addition, an increased moisture content of the bottom fiberboard layers locally reduces its compression strength, leading to compaction of those layers under the weight of the package internal components. In addition to these moisture-driven phenomena, the fiberboard will shrink due to slow pyrolysis in an elevated temperature/humidity environment. Under the collective influence of these effects, the axial gap in the LE1 package increased from an initial value of 0.58 inch and exceeded the 1 inch (maximum) criterion after approximately 18 weeks conditioning. The axial gap eventually reached 1.86 inches. Despite the degradation seen in several of the package components (drum, fiberboard, shield and O-rings), the package appears to have retained sufficient integrity to meet the functional requirements for storage in KAMS. This demonstrates a degree of robustness in the package design relative to the storage environment.

42 ENGINEERING↗

Corrective Action Decision Document/Closure Report for Corrective Action Unit 374: Area 20 Schooner Unit Crater, Nevada National Security Site, Nevada with ROTC 1 and 2, Revision 0 with ROTCs 1,2, and 3

Corrective Action Unit 374 comprises five corrective action sites (CASs): • 18-22-05, Drum • 18-22-06, Drums (20) • 18-22-08, Drum • 18-23-01, Danny Boy Contamination Area • 20-45-03, U-20u Crater (Schooner) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 374 based on the implementation of corrective actions. The corrective action of closure in place with administrative controls was implemented at CASs 18-23-01 and 20-45-03, and a corrective action of removing potential source material (PSM) was conducted at CAS 20-45-03. The other CASs require no further action; however, best management practices of removing PSM and drums at CAS 18-22-06, and removing drums at CAS 18-22-08 were performed. Corrective action investigation (CAI) activities were performed from May 4 through October 6, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 374: Area 20 Schooner Unit Crater, Nevada Test Site, Nevada. The approach for the CAI was divided into two facets: investigating the primary release of radionuclides and investigating other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 374 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were found to be present in the surface soil that was sampled. It is assumed that radionuclide levels present in subsurface media within the craters and ejecta fields (default contamination boundaries) at the Danny Boy and Schooner sites exceed the FAL. It is also assumed that PSM in the form of lead-acid batteries at Schooner exceeds the FAL. Therefore, corrective actions were undertaken that consist of removing PSM, where present, and implementing a use restriction and posting warning signs at the Danny Boy and Schooner sites. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 374. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 374. • Corrective Action Unit 374 should be moved from Appendix III to Appendix IV of the FFACO.

54 ENVIRONMENTAL SCIENCES↗

DOE 2012 Occupational Radiation Exposure October 2013

The U.S. Department of Energy (DOE) Office of Analysis within the Office of Health, Safety and Security (HSS) publishes the annual DOE Occupational Radiation Exposure Report to provide an overview of the status of radiation protection practices at DOE (including the National Nuclear Security Administration [NNSA]). The DOE 2012 Occupational Radiation Exposure Report provides an evaluation of DOE-wide performance regarding compliance with Title 10, Code of Federal Regulations (C.F.R.), Part 835, Occupational Radiation Protection dose limits and as low as reasonably achievable (ALARA) process requirements. In addition, the report provides data to DOE organizations responsible for developing policies for protection of individuals from the adverse health effects of radiation. The report provides a summary and an analysis of occupational radiation exposure information from the monitoring of individuals involved in DOE activities. Over the past 5-year period, the occupational radiation exposure information is analyzed in terms of aggregate data, dose to individuals, and dose by site. As an indicator of the overall amount of radiation dose received during the conduct of operations at DOE, the report includes information on collective total effective dose (TED). The TED is comprised of the effective dose (ED) from external sources, which includes neutron and photon radiation, and the internal committed effective dose (CED), which results from the intake of radioactive material into the body. The collective ED from photon exposure decreased by 23% between 2011 and 2012, while the neutron dose increased by 5%. The internal dose components of the collective TED decreased by 7%. Over the past 5-year period, 99.99% of the individuals receiving measurable TED have received doses below the 2 roentgen equivalent in man (rems) (20 millisievert [mSv]) TED administrative control level (ACL), which is well below the DOE regulatory limit of 5 rems (50 mSv) TED annually. The occupational radiation exposure records show that in 2012, DOE facilities continued to comply with DOE dose limits and ACLs and worked to minimize exposure to individuals. The DOE collective TED decreased 17.1% from 2011 to 2012. The collective TED decreased at three of the five sites with the largest collective TED. u Idaho Site – Collective dose reductions were achieved as a result of continuing improvements at the Advanced Mixed Waste Treatment Project (AMWTP) through the planning of drum movements that reduced the number of times a container is handled; placement of waste containers that created highradiation areas in a centralized location; and increased worker awareness of high-dose rate areas. In addition, Idaho had the largest decrease in the total number of workers with measurable TED (1,143 fewer workers). u Hanford Site (Hanford) – An overall reduction of decontamination and decommissioning (D&D) activities at the Plutonium Finishing Plant (PFP) and Transuranic (TRU) retrieval activities resulted in collective dose reductions. u Savannah River Site (SRS) – Reductions were achieved through ALARA initiatives employed site wide. The Solid Waste Management Facility used extended specialty tools, cameras and lead shield walls to facilitate removal of drums. These tools and techniques reduce exposure time through improved efficiency, increase distance from the source of radiation by remote monitoring, shield the workers to lower the dose rate, and reduce the potential for contamination and release of material through repacking of waste. Overall, from 2011 to 2012, there was a 19% decrease in the number of workers with measurable dose. Furthermore, due to a slight decrease in both the DOE workforce (7%) and monitored workers (10%), the ratio of workers with measurable doses to monitored workers decreased to 13%. Another primary indicator of the level of radiation exposure covered in this report is the average measurable dose, which normalizes the collective dose over the population of workers who actually received a measurable dose. The average measurable TED increased by 3% from 2011 to 2012. Additional analyses show that the dose distribution in 2012 was similar to the distribution in 2011. In 2012, 13% of the monitored workers received a measurable TED and the average measurable TED, 0.069 rem, was less than 2% of the DOE limit. From 2011 to 2012, the collective TED and the number of individuals with measurable TED decreased 17.1% and 19%, respectively. These decreases were mainly due to an overall reduction of D&D activities at the PFP and TRU retrieval activities at Hanford; a 78% decrease in the number of targeted waste drums that were processed at the Idaho Site’s Accelerated Retrieval Project (ARP) from 5,566 drums in 2011 to a total of 1,211 drums processed in 2012; and ALARA initiatives employed site wide at SRS. In addition, the decreases were the result of decreased American Recovery and Reinvestment Act (ARRA) activities and continuing D&D, particularly at the DOE sites that comprise the majority of DOE collective dose. Over the past 5 years, the size of the monitored workforce has remained at a fairly stable level (within 12%), while the collective dose has varied up to 37%. No reported doses exceeded the DOE occupational limit of 5 rems TED in 2012 and no reported doses exceeded the DOE ACL of 2 rems TED.

61 RADIATION PROTECTION AND DOSIMETRY↗

Sampling Report for August 15, 2014 WIPP Samples

This report outlines the attempted sampling of drum 68660—the breached drum identified in Panel 7 of the WIPP. When Drum 68660 breached, the incident left a gap in the lip of the drum and it is assumed that its contents spewed in the vicinity of the drum and throughout Panel 7. Several rows of waste were affected, based on the disappearance of the MgO over packing of several rows.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Waste Isolation Pilot Plan (WIPP) Underground and MGO Samples by the Savannah River National Laboratory (SRNL)

Analysis of the recent WIPP samples are summarized in this report; WIPP Cam Filters 4, 6, 9 (3, 7, 11 were analyzed with FAS-118 in a separate campaign); WIPP Drum Lip R16 C4; WIPP Standard Waste Box R15 C5; WIPP MgO R16 C2; WIPP MgO R16 C4; WIPP MgO R16 C6; LANL swipes of parent drum; LANL parent drum debris; LANL parent drum; IAEA Swipe; Unused “undeployed” Swheat; Unused “undeployed” MgO; and Masselin cloth “smears”. Analysis showed that the MgO samples were very pure with low carbonate and water content. Other samples showed the expected dominant presence of Mg, Na and Pb. Parent drum debris sample was mildly acidic. Interpretation of results is not provided in this document, but rather to present and preserve the analytical work that was performed. The WIPP Technical Analysis Team is responsible for result interpretation which will be written separately.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Destructive examination of shipping package 9975-02101

Destructive and non-destructive examinations have been performed on the components of shipping package 9975-02101 as part of the comprehensive Model 9975 package surveillance program. This package is one of ten high-wattage packages that were selected for field surveillance in FY15, and was identified to contain several non-conforming conditions. Most of these conditions (mold, stains, drum corrosion, calculated fiberboard dimensions and fiberboard damage) relate to the accumulation of water in the outer and lower portions of the cane fiberboard assembly. In the short term, this causes local but reversible changes in the fiberboard properties. Long-term effects can include the permanent loss of fiberboard properties (thus far observed only in the bottom fiberboard layers) and reduced drum integrity due to corrosion. The observed conditions must be fully evaluated by KAC to ensure the safety function of the package is being maintained. Three of the other nine FY15 high-wattage packages examined in the K-Area Complex showed similar behavior. Corrosion of the overpack drum has been seen primarily in those packages with relatively severe fiberboard degradation. Visual examination of the drums in storage for external corrosion should be considered as a screening tool to identify additional packages with potential fiberboard degradation. Where overpack drum corrosion has been observed, it is typically heaviest adjacent to the stitch welds along the bottom edge. It is possible that changes to the stitch weld design would reduce the degree of corrosion in this area, but would not eliminate it. Several factors can contribute to the concentration of moisture in the fiberboard, including higher than average initial moisture content, higher internal temperature (due to internal heat load and placement with the array of packages), and the creation of additional moisture as the fiberboard begins to degrade.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Criticality Control Overpack Fire Testing (Phase III)

This report will describe the one test conducted during phase III of the Pipe Overpack Container (POC) test campaign, present preliminary results from these tests, and discuss implications for the Criticality Control Overpack (CCO). The goal of this test was to see if aerosol surrogate material inside the Criticality Control Container (CCC) gets released when the drum lid of the CCO comes off during a thirty-minute long, fully-engulfing, fire test. As expected from POC tests conducted in Phase I and II of this test campaign, the CCO drum lid is ejected about one minute after the drum is exposed to fully-engulfing flames. The remaining pressure inside the drum is high enough to eject the top plywood dunnage a considerable distance from the drum. Subsequently, most of the bottom plywood dunnage supporting the CCC burns off during and after the fire. High pressure buildup inside the CCC and inside two primary containers holding the surrogate powder also results in damage to the filter media of the CCC and the filter-house, thread attachment of the primary canisters. No discernable release of surrogate powder material was detected from the two primary containers when pre- and post-test average mass were compared. However, when the average masses are corrected to account for possible uncertainties in mass measurements, error overlap does not preclude the possibility that some surrogate powder mass may have been lost from these primary canisters. Still, post-test conditions of the secondary canisters enclosing these two primary canisters suggest it is very unlikely this mass loss would have escaped into the CCC.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Hydrogen Gas Generation and Permeation in the 9979 Type AF Shipping Package

The 9979 Type AF Shipping Packaging is a cost-effective radioactive material package designed by Savannah River National Laboratory (SRNL) that consists of two primary components: a foamed outer drum for structural protection and an inner containment drum. The packaging was designed to transport Highly Enriched Uranium (HEU), Low Enriched Uranium (LEU), and other isotopes not exceeding a Type A quantity. These contents have the potential to generate flammable hydrogen gas during transport due to the degradation of hydrogenous materials (e.g. water vapor, plastics, etc) by high-energy alpha radiation. Since 10 CFR 71.43(h) prohibits the incorporation of packaging features explicitly designed for continuous venting, alternative justification was required to demonstrate that the requirements of 10 CFR 71.43(d) for negligible reactions between packaging components and contents were satisfied. An analysis was performed to demonstrate that the potential for hydrogen gas generation over a one-year period was limited by the effects of permeation through the packaging materials. The rate of hydrogen collection was evaluated for both the inner containment drum and the outer structural drum under 10 CFR 71.71 Normal Conditions of Transport (NCT). The analysis concludes that the Lower Flammability Limit (LFL) for hydrogen gas will not be reached in a one-year shipping period assuming a minimum void volume is maintained within the drum.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bob Geyer: Coaching wrestling or clearing waste, he puts his team first

When Bob’s team started the project of clearing drums out of the PF-4 basement, there were 1,800 drums inside. Now, there are less than 500. It’s no coincidence that Bob Geyer leads a team that goes by the acronym of MVP — move, validate and prepare — more commonly recognized as “most valuable player.” Bob and the MVP team manage waste drums after they’ve been packaged. Their job is to constantly work a puzzle of drums and locations based on the contents of the drums, where they came from and where they’re headed. All the while, they’re ensuring there’s enough floor space in the Plutonium Facility for the waste materials that come out of daily production operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solar array deployment from a spinning spacecraft

Cylindrical drum, wrapped with flexible solar array of solar cells mounted on Mylar sheet, is held by two end-fittings with cable (under tension) passing through axel of drum. Drum is held to end-fittings by axial cable through drum axel; drum is released for deployment when cable is cut at each end and end-fittings spring outward.

Carlin, A. H.↗

Bidirectional, Automatic Coal-Mining Machine

Proposed coal-mining machine operates in both forward and reverse directions along mine face. New design increases efficiency and productivity, because does not stop cutting as it retreats to starting position after completing pass along face. To further increase efficiency, automatic miner carries its own machinery for crushing coal and feeding it to slurry-transport tube. Dual-drum mining machine cuts coal in two layers, crushes, mixes with water, and feeds it as slurry to haulage tube. At end of pass, foward drum raised so it becomes rear drum, and rear drum lowered, becoming forward drum for return pass.

Collins, Earl R., Jr.↗

Mode I Toughness Measurements of Core/Facesheet Bonds in Honeycomb Sandwich Structures

Composite sandwich structures will be used in many future applications in aerospace, marine and offshore industries due to the fact that the strength and stiffness to mass ratios surpass any other structural type. Sandwich structure also offers advantages over traditional stiffened panels such as ease of manufacturing and repair. During the last three decades, sandwich structure has been used extensively for secondary structure in aircraft (fuselage floors, rudders and radome structure). Sandwich structure is also used as primary structure in rotorcraft, the most common example being the trailing edge of rotor blades. As with other types of composite construction, sandwich structure exhibits several types of failure mode such as facesheet wrinkling, core crushing and sandwich buckling. Facesheet/core debonding has also been observed in the marine and aerospace industry. During this failure mode, peel stresses applied to an existing facesheet/core debond or an interface low in toughness, results in the facesheet being peeled from the core material, possibly leading to a significant loss in structural integrity of the sandwich panel. In an incident during a test on a liquid hydrogen fuel tank of the X-33 prototype vehicle, the outer graphite/epoxy facesheet and honeycomb core became debonded from the inner facesheet along significant areas, leading to failure of the tank. As a consequence of the accident; significant efforts were made to characterize the toughness of the facesheet/core bond. Currently, the only standardized method available for assessing the quality of the facesheet/core interface is the climbing drum peel test (ASTM D1781). During this test a sandwich beam is removed from a panel and the lip of one of the facesheets is attached to a drum, as shown in Fig. 1. The drum is then rotated along the sandwich beam, causing the facesheet to peel from the core. This method has two major drawbacks. First, it is not possible to obtain quantitative fracture data from the test and so the results can only be used in a qualitative manner. Second, only sandwich structure with thin facesheets can be tested (to facilitate wrapping of the facesheet around the climbing drum). In recognition of the need for a more quantitative facesheet/core fracture test, several workers have devised experimental techniques for characterizing the toughness of the facesheet/core interface. In all of these cases, the tests are designed to yield a mode I-dominated fracture toughness of the facesheet/core interface in a manner similar to that used to determine mode I fracture toughness of composite laminates. In the current work, a modified double cantilever beam is used to measure the mode I-dominated fracture toughness of the interface in a sandwich consisting of glass/phenolic honeycomb core reinforced with graphite epoxy facesheets. Two specimen configurations were tested as shown in Fig 2. The first configuration consisted of reinforcing the facesheets with aluminum blocks (Fig. 2a). In the second configuration unreinforced specimens were tested (Fig. 2b). Climbing drum peel tests were also conducted to compare the fracture behavior observed between this test and the modified double cantilever beam. This paper outlines the test procedures and data reduction strategies used to compute fracture toughness values from the tests. The effect of specimen reinforcement on fracture toughness of the facesheet/core interface is discussed.

Nettles, Alan T.↗

Two Devices for Removing Sludge From Bioreactor Wastewater

Two devices a magnetic separator and a special filter denoted a self-regenerating separator (SRS) have been developed for separating sludge from the stream of wastewater from a bioreactor. These devices were originally intended for use in microgravity, but have also been demonstrated to function in normal Earth gravity. The magnetic separator (see Figure 1) includes a thin-walled nonmagnetic, stainless-steel cylindrical drum that rotates within a cylindrical housing. The wastewater enters the separator through a recirculation inlet, and about 80 percent of the wastewater flow leaves through a recirculation outlet. Inside the drum, a magnet holder positions strong permanent magnets stationary and, except near a recirculation outlet, close to the inner drum surface. To enable magnetic separation, magnetite (a ferromagnetic and magnetically soft iron oxide) powder is mixed into the bioreactor wastewater. The magnetite becomes incorporated into the sludge by condensation, onto the powder particles, of microbe flocks that constitute the sludge. As a result, the magnets inside the drum magnetically attract the sludge onto the outer surface of the drum.

Archer, Shivaun↗

Qualitative and Quantitative Assessment of Nuclear Materials Contained in High-Activity Waste Arising from the Operations at the 'SHELTER' Facility

As a result of the nuclear accident at the Chernobyl NPP in 1986, the explosion dispeesed nuclear materials contained in the nuclear fuel of the reactor core over the destroyed facilities at Unit No. 4 and over the territory immediately adjacent to the destroyed unit. The debris was buried under the Cascade Wall. Nuclear materials at the SHELTER can be characterized as spent nuclear fuel, fresh fuel assemblies (including fuel assemblies with damaged geometry and integrity, and individual fuel elements), core fragments of the Chernobyl NPP Unit No. 4, finely-dispersed fuel (powder/dust), uranium and plutonium compounds in water solutions, and lava-like nuclear fuel-containing masses. The new safe confinement (NSC) is a facility designed to enclose the Chernobyl NPP Unit No. 4 destroyed by the accident. Construction of the NSC involves excavating operations, which are continuously monitored including for the level of radiation. The findings of such monitoring at the SHELTER site will allow us to characterize the recovered radioactive waste. When a process material categorized as high activity waste (HAW) is detected the following HLW management operations should be involved: HLW collection; HLW fragmentation (if appropriate); loading HAW into the primary package KT-0.2; loading the primary package filled with HAW into the transportation cask KTZV-0.2; and storing the cask in temporary storage facilities for high-level solid waste. The CDAS system is a system of 3He tubes for neutron coincidence counting, and is designed to measure the percentage ratio of specific nuclear materials in a 200-liter drum containing nuclear material intermixed with a matrix. The CDAS consists of panels with helium counter tubes and a polyethylene moderator. The panels are configured to allow one to position a waste-containing drum and a drum manipulator. The system operates on the ‘add a source’ basis using a small Cf-252 source to identify irregularities in the matrix during an assay. The platform with the source is placed under the measurement chamber. The platform with the source material is moved under the measurement chamber. The design allows one to move the platform with the source in and out, thus moving the drum. The CDAS system and radioactive waste containers have been built. For each drum filled with waste two individual measurements (passive/active) will be made. This paper briefly describes the work carried out to assess qualitatively and quantitatively the nuclear materials contained in high-level waste at the SHELTER facility. These efforts substantially increased nuclear safety and security at the facility.

Cherkas, Dmytro↗

Process Improvements Result in Schedule and Cost Savings for Waste Shipping Campaign

In 2006, the U.S. Department of Energy-led nuclear cleanup project at the West Valley Demonstration Project (WVDP) in New York State initiated a waste processing and shipping campaign to accomplish the disposal of approximately 20,000 drums of low-level radioactive cement waste at the Nevada Test Site (NTS) in the state of Nevada. Although the WVDP had considerable experience in the processing and shipment of low-level waste (LLW), the WVDP had not previously embarked upon a waste shipping of this magnitude. Efforts in 2006 focused on the development of processes and procedures to facilitate the start-up of this project. In 2007, the shipping campaign was redirected toward more efficient waste retrieval, processing and shipment. The last drum was accepted for disposal at NTS in November 2007, nearly one year ahead of the original estimated project completion date. The efficiency of this campaign is mainly attributed to process improvements. In summary: The last drums were shipped from the WVDP Drum Cell in October 2007 with all drums received and accepted for disposal at the NTS in November 2007. The total Project cost of this work-scope, including packaging, transport, and final demobilization was approximately $20.7 M. Process and engineering improvements were key to the success of this project, and resulted in project completion more than one year ahead of schedule and at a sizeable cost savings over preliminary cost estimates. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Repackaging of High Fissile TRU Waste at the Transuranic Waste Processing Center - 13240

Twenty-six drums of high fissile transuranic (TRU) waste from Oak Ridge National Laboratory (ORNL) operations were declared waste in the mid-1980's and placed in storage with the legacy TRU waste inventory for future treatment and disposal at the Waste Isolation Pilot Plant (WIPP). Repackaging and treatment of the waste at the TRU Waste Packaging Center (TWPC) will require the installation of additional equipment and capabilities to address the hazards for handling and repackaging the waste compared to typical Contact Handled (CH) TRU waste that is processed at the TWPC, including potential hydrogen accumulation in legacy 6M/2R packaging configurations, potential presence of reactive plutonium hydrides, and significant low energy gamma radiation dose rates. All of the waste is anticipated to be repackaged at the TWPC and certified for disposal at WIPP. The waste is currently packaged in multiple layers of containers which presents additional challenges for repackaging activities due to the potential for the accumulation of hydrogen gas in the container headspace in quantities than could exceed the Lower Flammability Limit (LFL). The outer container for each waste package is a stainless steel 0.21 m{sup 3} (55-gal) drum which contains either a 0.04 m{sup 3} or 0.06 m{sup 3} (10-gal or 15-gal) 6M drum. The inner 2R container in each 6M drum is ∼12 cm (5 in) outside diameter x 30-36 cm (12-14 in) long and is considered to be a > 4 liter sealed container relative to TRU waste packaging criteria. Inside the 2R containers are multiple configurations of food pack cans, pipe nipples, and welded capsules. The waste contains significant quantities of high burn-up plutonium oxides and metals with a heavy weight percentage of higher atomic mass isotopes and the subsequent in-growth of significant quantities of americium. Significant low energy gamma radiation is expected to be present due to the americium in-growth. Radiation dose rates on inner containers are estimated to be 1-3 mSv/hr (100-300 mrem/hr) with an unshielded dose rate on the waste itself of over 10 mSv/hr (1 rem/hr). Additional equipment to be installed at the TWPC will include a new perma-con enclosure and a shielded/inert glovebox in the process building to repackage and stabilize the waste. All of the waste will be repackaged into Standard Pipe Overpacks. Most of the waste (21 of the 26 drums) is expected to be repackaged at the food-pack can level (i.e. the food-pack cans will not be opened). Five of the incoming waste containers are expected to be repackaged at the primary waste level. Three of the containers exceed the 200 gram Pu-239 Fissile Gram Equivalent (FGE) limit for the Standard Pipe Overpack. These three containers will be repackaged down to the primary waste level and divided into eight Standard Pipe Overpacks for shipment to WIPP. Two containers must be stabilized to eliminate any reactive plutonium hydrides that may be present. These containers will be opened in the inert, shielded glovebox, and the remaining corroded plutonium metal converted to a stable oxide form by using a 600 deg. C tube furnace with controlled oxygen feed in a helium carrier gas. The stabilized waste will then be packaged into two Standard Pipe Overpacks. Design and build out activities for the additional repackaging capabilities at the TWPC are scheduled to begin in Fiscal Year 2013 with repackaging, stabilization, and certification activities scheduled to begin in Fiscal Year 2014. Following repackaging and stabilization activities, the Standard Pipe Overpacks will be certified for disposal at WIPP utilizing Non-Destructive Examination (NDE) to verify the absence of prohibited items and Non-Destructive Assay (NDA) to verify the isotopic content under the TWPC WIPP certification program implemented by the Central Characterization Project (CCP). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Direct Path To WIPP - 12471

Sandia National Laboratories/New Mexico (SNL/NM), designated as a small quantity site (SQS) by the National TRU Program (NTP), generated contact-handled (CH) and remote-handled (RH) transuranic (TRU) waste primarily from the decontamination and clean-out of glove boxes at the Hot Cell Facility (HCF) at Technical Area (TA) V. All of the waste required repackaging, with the CH TRU waste being repackaged from late 2007 through 2011. Three shipments of CH were completed in October 2011, which de-inventoried SNL/NM's legacy TRU waste. In FY11, RH TRU waste was repackaged at the Auxiliary Hot Cell Facility (AHCF) located in TAV with the support of the Central Characterization Project (CCP). The waste was originally packaged in SNL/NM fabricated casks, cement or lead-lined 55-gallon drums, or 30-gallon drums. The AHCF is a small hot cell, with access only through a roof port which presented challenges for inserting and removing waste from the hot cell. The CCP provided visual examination operators (VEOs) to observe and document each waste item repackaged, removal of prohibited items, and radiological sampling. Dose-to-Curie measurements were calculated by CCP after a radiological report was prepared using scaling factors determined by the analysis of swipe samples. Finally, headspace gas samples were taken and sent to the Advanced Mixed Waste Treatment Project (AMWTP) for analysis. Despite the challenges, the RH waste is on track to be shipped to WIPP in early FY12. The processes used and procedures developed to conduct the repackaging operations, the issues identified and mitigated were challenging but the cooperation between SNL/NM and the Central Characterization Program (CCP) enabled SNL/NM to complete the repackaging and support the characterization and shipment. An inventory list, identification of the campaigns, discussion of the challenges and mitigations, and the final loading of the RH 72-B casks at TA-V for direct shipment to the Waste Isolation Pilot Plant (WIPP) will be discussed. Lessons learned from the RH campaigns are: - Some containers that were originally identified as HC-3 have been re-evaluated and became < HC-3 due to the conservative estimates made by the original generators - Operators at the AHCF were not accustomed to the detail required by the VE operators. However, they worked well together and the repackaging was completed ahead of schedule. - The AK was not always accurate as was demonstrated by the solid waste found in the drum during the first visit by EPA. That waste has since been determined to be low-level. - Two drums originally thought to be RH turned out to be CH and arrangement for RTR had to be made quickly. - Six of the original RH repacked drums became low level. - Lessons learned from the CH campaigns were helpful in avoiding many issues. The RH repackaging effort has been a success due to the expertise of the AHCF operators, supervisor, and manager, the conscientious attention to detail of the CCP VE operators, the experience of the CCP DTC and headspace gas sampling staff, and the guidance and support from CCP and CBFO. Sometimes schedules had to be adjusted, processes updated, and issues discussed, but the communication between CCP and SNL/NM was good. SNL/NM hopes to have the legacy RH TRU waste shipped off-site by early 2012. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Wide Range Segmented Gamma Scanner for Measuring Radioactive Wastes Arising in the Chinese Nuclear Industry - 16261

There is a requirement to measure a variety of challenging radioactive waste forms generated by the Chinese nuclear industry. These range from low activity waste to high activity waste with a high content of Cs-137 and waste in high density 200 litre drums. This paper describes the design, development and testing of an updated and automated Wide Range Segmented Gamma Scanner (WR-SGS) specifically configured for Chinese nuclear industry radioactive waste measuring requirements. The instrument retains the capabilities of the original SGS developed by Parker and Martin at the Los Alamos National Laboratory and now widely used for radioactive waste assay. It also incorporates additional features to improve measurement efficiency and reduce cost. These features include continuous helical scanning of the waste drum, and separate lifting pillars to lift the detector and the transmission source. In place of a transmission source shutter mechanism, the source is placed in a shielded safe when not in use. The design also incorporates a variable aperture collimator, and tungsten filters that can be deployed for the measurement of high activity, high dose-rate drums. Updated motion control electronics, based on the use of a programed logic controller have been incorporated to address potential future obsolescence. The WR-SGS employs a 40% high purity Germanium detector with electro-mechanical cooling and state of the art digital spectroscopy counting electronics for gamma ray spectrum data acquisition. Testing of the unit has been performed with both point sources and rod sources, which are traceable to international standards. Typical test drums, each with six distributed re-entrant tubes and with different density matrices, have been employed with the rod sources to validate both the calibration and the measurement performance of the WR-SGS for drums of different density. The measurement results have been compared with the reference decay corrected activity values and very good agreement is achieved, confirming the measurement performance of the instrument. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗