Search NASA⌕ Search

SEARCH · Search NASA

Results for “electrical infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Integrated Models for Electrical Distribution Network Planning and District-Scale Building Energy Use

The increase of greenhouse emissions caused by a rise in global energy consumption is pushing the scientific community to develop tools that address key environmental, techno-economic and social issues. One specific area of focus is to create tools that enable the design of high-performance energy districts, including grid-interactive efficient buildings and electrical distribution infrastructure. This paper outlines the approach of integrating a synthetic distribution network tool (RNM-US) with URBANopt™, a modular and customizable software development kit for thermal and electrical modelling of buildings and energy systems at a district scale. First, we describe the algorithms implemented to integrate RNM-US with URBANopt to automatically generate the distribution network for the district considered. Following, we present a case study for the potential uses of the RNM-US integrations with URBANopt, highlighting the capabilities for economic and technical analysis of the distribution network built in relation to the electricity needs of the modelled buildings.

30 DIRECT ENERGY CONVERSION↗

Refueling infrastructure planning in intercity networks considering route choice and travel time delay for mixed fleet of electric and conventional vehicles

The range anxiety has been a major factor that affects the market acceptance of electric vehicles. Even with the recent development of battery technologies, a lack of charging stations and range anxiety are still significant concerns, specifically for intercity trips. This calls for more investments in building charging stations and advancing battery technologies to increase the market share of electric vehicles and improve sustainability. This study suggests a configuration for plug-in electric vehicle charging infrastructure to support long-distance intercity trips of electric vehicles at the network level. A model is proposed to minimize the total system cost including infrastructure investment (building charging stations/spots) and travel time delays (charging time, waiting time in the queue, and detour time to access charging stations). This study fills existing gaps in the literature by capturing realistic patterns of travel demand and considering flow-dependent charging delays at charging stations. Furthermore, the proposed model, which is formulated as a mixed-integer program with nonlinear constraints, solves the optimization problem at the network level. At the network level, impacts of charging station locations on the traffic assignment problem with a mixed fleet of electric and conventional vehicles need to be considered. To this end, a traffic assignment module is integrated with a simulated annealing algorithm. The numerical experiments show a satisfactory application of the model for a full-scale case study (intercity network in Michigan). The solution quality and efficiency of the proposed solution algorithm are evaluated against those of an enumeration approach for a small case study. The results suggest that even for the current market share and charging stations’ setting, a significant investment is needed to support intercity trips without range anxiety issues and with acceptable delays. Additionally, through sensitivity analyses, the required infrastructure and battery investments to support intercity trips with acceptable delays are established for hypothetical increased market shares and battery size in the future.

42 ENGINEERING↗

County Electric Vehicle Home Charging Access Shares From the 2030 National Charging Network Study

This file contains modeled county-level home electric vehicle charging access shares from the study The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure by Wood et al. (2023). These are based on modeling in There's No Place Like Home: Residential Parking, Electrical Access, and Implications for the Future of Electric Vehicle Charging Infrastructure by Ge et al. (2021).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Finding gaps in the national electric vehicle charging station coverage of the United States

Abstract The United States federal government has invested $7.5 billion into charging infrastructure, including the National Electric Vehicle Infrastructure Program, to build fast charging stations along designated highways for long-distance car travel. We develop a consecutive coverage metric to compute the percent of United States roads (traffic-weighted) that are consecutively accessible within 500 miles of each county. We answer (1) what the state of consecutive coverage is in each county and (2) what the increase in coverage is when designated highways receive fast chargers. In 2023, 10% of counties had at least 75% minimum viable coverage. We find that if all designated highways receive fast-charging stations, 94% of United States counties will reach at least 75% fast charger coverage. However, the remaining counties are rural. This demonstrates that federal funding for fast chargers will help connect most—but not all—counties to the national network of continuously accessible charging stations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Projecting California Light-Duty Vehicle Attributes (2019-2035)

In this report, we estimated a set of future vehicle attribute scenarios for new light-duty vehicles for the California market using the Automotive Deployment Options Projection Tool (ADOPT). ADOPT starts simulations with all existing vehicle makes and models and endogenously creates new vehicle models over time based on assumed technology improvements and market conditions. For this study, we simulated four scenarios with varied technology, policy, and electric vehicle infrastructure assumptions. We aggregated simulation results into up to 30 vehicle classes (covering size and price classifications) for each powertrain, for six powertrains. We simulated model years 2019 to 2035. We present results for four vehicle attributes: vehicle acceleration, fuel economy (including electric and gasoline for plug-in hybrid electric vehicles [PHEVs]), vehicle range, and vehicle purchase price. We also present results showing the estimated number of vehicle models available in each vehicle class over time. In the Mid scenario, which contains conditions between our most conservative and most optimistic assumptions for emerging electric and hydrogen technologies, we observe improvements in acceleration, range (for battery-electric vehicles [BEVs]), and vehicle purchase price for electric and hydrogen powertrains. In some cases, we project that consumer preferences lead to trade-offs between vehicle attributes, such as reduced fuel economy in exchange for improved acceleration. Conventional vehicles show modest improvements in fuel economy in these scenarios due to the high numbers of BEV and PHEV sales, which reduce the improvements required in conventional vehicles to meet fleet fuel economy standards. In scenarios with advanced technology assumptions (including reduced battery price and improved energy density), we observe further improvements in BEV range and price relative to the improvements in the Mid scenario.

33 ADVANCED PROPULSION SYSTEMS↗

IRES Microgrid Energy Integration Report Version 1.0

This report presents technical information and guidance for the planned Integrated Renewable Energy System (IRES) microgrid project. This deployment of the microgrid and its associated assets was initiated in the beginning of 2022 at the Marine and Coastal Research Laboratory (MCRL) facility of Pacific Northwest National Laboratory (PNNL)-Sequim, Washington. The information in the report is organized under two main focus areas: electrical power interface, or interconnection, information of planned IRES assets; and communication and control interface, or interoperability, information of the planned IRES assets. The information will provide technical input for the development of the IRES microgrid controller technical specification, and also provide input for PNNL’s evaluation of adequacy of the electrical service infrastructure at MCRL to support the IRES project and help identify any gaps that will require facility-based upgrades. From an R&D aspect, this study and report will build on PNNL’s research and development work relating to energy storage (ES) codes and standards (C&Ss), including hybrid systems, performed on behalf of the Department of Energy (DOE) Office of Electricity (OE) ES. The current state of C&Ss for advanced technologies and their application, including microgrid-based technology is limited. For cases where formal standards issued by recognized Standards Developing Organizations do not yet exist, guidance is provided based on emerging best practices, including industry-group references that can be leveraged for microgrid technology which is in its early stages of development and use.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluating Electric Vehicle Public Charging Utilization in the United States Using the EV WATTS Dataset: Preprint

The utilization of electric vehicle (EV) charging in the United States is a rapidly evolving puzzle further complicated by changes in travel habits brought on by the global COVID-19 pandemic. The EV WATTS dataset is the largest publicly available dataset on the utilization of EV charging in the United States and provides key insights into the changing patterns of public vehicle charging and vehicle use as EV range increases, commute patterns evolve, and more infrastructure becomes available.

ADVANCED PROPULSION SYSTEMS↗

TCO Analysis Approach and Regional Analysis of dWPT for Class 8 Tractors

Dynamic Wireless Power Transfer (dWPT) is a method by which battery electric vehicles (BEVs) can charge their battery while traveling on the road without the need for a physical conductive connection to the power source. dWPT has been proposed as a strategy to enable a reduction in vehicle battery capacity and associated mass and cost. In this slide deck presented at the EVs@Scale Consortium - Wireless Power Transfer Pillar Deep-Dive Meeting on November 11th, 2023, NREL provides results from an evaluation of dWPT using data from Class 8 tractors driving in the Atlanta Metro Area. NREL selected data for archetypal days representing local, regional, and long-haul trips, defined according to trip length, that included travel on primary roadways. EVI-InMotion (Electric Vehicle Infrastructure - InMotion), a systems planning and optimization tool developed at NREL, was used to evaluate dWPT performance assuming dWPT charging on 120 road segments for a total roadway lane distance of 2,365 miles. The EVI-InMotion results and representative day drive cycles were analyzed with NREL's T3CO (Transportation Technology Total Cost of Ownership) tool to estimate the total cost of ownership (TCO) for scenarios comprising two model years - 2030 and 2040 - and two technology progress cases. TCO was calculated for diesel, fuel cell electric, BEVs with batteries sized assuming no dWPT capabilities, and 200kWh BEVs with dWPT installed. This analysis finds that en-route stationary charging frequency and downtime when not on electrified roadways are the main contributors to TCO for the dWPT vehicles and that these vehicles can achieve cost parity with FCEVs at low electricity costs. Based on the scenario assumptions used here, low electricity costs would further help the cost parity with diesel vehicles in regional and long-haul cases due to stationary fueling downtime. This presentation also concludes that key factors affecting the parity potential of dWPT-capable vehicles include more extensive dWPT road coverage, higher en-route charging power, less expensive power batteries, and higher hydrogen or diesel fuel costs.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Interpretable Machine Learning for Characterizing Electric Vehicle Charging Behavior: Insights from Real-World Data

As electric vehicle (EV) adoption rises globally, concerns about the impact on aging electrical grids grow, particularly regarding the charging behavior of EV drivers. This study analyzes real-world driving and charging data from Ford battery electric vehicles (BEVs) collected between 2018 and 2019 to develop interpretable models that characterize charging behavior and quantify influencing factors. Prior research has relied on assumptions regarding driver behavior, often overlooking actual charging patterns. By employing generalized linear mixed models (GLMMs), this work offers insights into how various elements, such as next trip distance and state of charge (SOC), influence charging decisions. The dataset comprises over three million park-trip pairs from 1,997 vehicles, revealing that features related to driving behavior significantly dictate charging behavior, while infrastructure and regional factors have lesser impacts. The findings suggest that existing simulation models may oversimplify EV charging behavior assumptions. This work utilizes real-world EV driving and charging data to train interpretable models that describe charging behavior and quantify the factors most associated with how drivers use charging infrastructure. This research underscores the need for interpretable, data-driven methodologies to inform future EV infrastructure planning and grid management.

29 - ENERGY PLANNING, POLICY AND ECONOMY↗

National Park Service Bus Electrification Study: 2020 Report

This report summarizes important considerations for implementing BEBs in the three national park fleets, detailing information about current buses at each fleet, electric bus demonstration vehicles, as well as performance evaluations of BEBs in Zion, Bryce, and Yosemite. Results include in-use data collection results reporting metrics such as average bus speed, energy usage per trip, and daily distance traveled, as well as effects of high heating, ventilation, and air conditioning (HVAC) system use to both heat and cool the buses, emissions estimations before and after use of electric buses, operating costs, electric vehicle infrastructure, maintenance, and bus driver user experience survey information. Analysis results from this project will help the NPS understand how BEBs and future expansion of BEBs could assist in meeting their bottom line and operational goals and assist NPS in choosing appropriate locations for future BEB deployments.

33 ADVANCED PROPULSION SYSTEMS↗

FY2021 Isolated Grids and Grid-Connected Turbine Reference Systems

For individuals, businesses, and communities focused on building resilient electrical grid infrastructure, wind energy can provide an affordable, accessible, and compatible distributed energy resource option that also enhances the capabilities of local grid operations. However, there are technical barriers to realizing the market value and resilience benefits of distributed wind, and there is little to no ability to quantify those benefits so that stakeholders can compare grid investment options. The central aims of this report are: (1) to drive technology transfer of the methods and technologies developed under the Microgrids, Infrastructure Resilience, and Advanced Controls Launchpad (MIRACL) project and (2) increase the number of referenceable case studies available to stakeholders interested in additional value-added capabilities of wind systems beyond bulk energy supply. We achieve this aim by applying three major methods developed under MIRACL to two real-world distributed wind reference systems. The two real-world distributed wind reference systems are the isolated grid of St. Mary’s, Alaska, and the two 10.5-megawatt (MW) front-of-the-meter wind turbine deployments owned and operated by Iowa Lakes Electric Cooperative (ILEC).

17 WIND ENERGY↗

Electricity Subsector Transmission Resilience Maturity Model (TRMM) User Guide

The electric transmission sector is facing a range of threats to its functionality that are either new, more severe than experienced in earlier years, or more well understood. Such threats include more frequent and more severe extreme weather events, wildfires, droughts, and human-caused physical and cyberattacks. They also include geological, electromagnetic, and biological events. The novelty or increasing severity of these threats creates a significant need for transmission owners to implement programs to prevent, prepare for, respond to, and recover from such incidents. The national and economic security of the United States depends on the reliable functioning of the Nation’s critical infrastructure in the face of such threats, and the transmission networks are essential components of that infrastructure. The Electricity Subsector Transmission Resilience Maturity Model (TRMM) is a tool that a transmission organization can use to objectively evaluate and benchmark its currently established transmission resilience strategies, programs, policies, and investments, in order to target and prioritize enhancements where needed. The TRMM was developed to address the unique characteristics of the transmission system. The model can enable users to: • evaluate and benchmark their organization’s resilience capabilities, effectively and consistently • prioritize actions and investments to improve the resilience of their systems • share transmission-related knowledge, best practices, and relevant references within their organization and with business partners as a means to improve resilience capabilities • contribute to increasing the overall resilience of the Nation’s transmission systems. The TRMM provides descriptive rather than prescriptive industry-focused guidance. The model content is presented at a high level of abstraction so that it can be interpreted by transmission organizations of various types, structures, and sizes. The model is designed to an be easy-to-use, self-assessment tool.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Survey of Aging and Monitoring Concerns for Cables and Splices Due to Cable Repair and Replacement

The purpose of this report is to survey aging and monitoring concerns for electrical cable splices in nuclear power plants (NPPs) in long term operation. As portions of existing electrical cable runs in nuclear are replaced over time due to localized events, the total number of splices in NPPs is expected to increase. Relative to cables, the body of knowledge regarding aging of splices and splices in combination with aging cables in nuclear service environments in long-term operations is low. A few reports have considered the aging of cable system components other than cables (Jacobus 1990; Nelson 1998; Villaran and Lofaro 2002), but the nuclear industry has two decades of operating experience since these were published to further enlighten this issue. Herein we discuss electrical cables and splices commonly found in U.S. nuclear power plants, their qualification in safety-related application, and methods for monitoring their health condition. Common environmental stresses that can give rise to cable and splice failure are discussed. The Nuclear Regulatory Commission (NRC) Licensee Event Reports (LER) database was used to identify documented issues of cable and splice failure. The trend in the resultant data over time is considered to see if failures are increasing as plants age. Observations and conclusions of this work include: 1. Cables and splices are highly reliable components. Occurrence rates for events of interest were low and nearly constant over the last 20 years. 2. Common-cause failure for evaluated cable events of interest was observed to primarily be associated with loose connections, which may manifest associated with workmanship issues, thermal cycling, and/or vibration. 3. Replacement of cables is more common than repair, leading to an increase in proportion of new generation cables in the plant over time. 4. Splices on degraded cables have been observed to be problematic. Due to aging NPP infrastructure, including electrical cables, it is expected that such issues will continue to increase. 5. Condition monitoring approaches, while shown to be fruitful for cables, have been shown to be insensitive to degradation of splice sleeves, which are critical to the continued performance of splices. Additional condition monitoring (CM) work is needed to evaluate methods which are sensitive to the degradation of splice components. 6. Extended Material Degradation Assessment (EMDA) knowledge gaps for electrical cables (Bernstein et al. 2014) have not been investigated for splices but may represent similar concerns such as for the accelerated aging process historically used in environmental qualification.

42 ENGINEERING↗

Federal Home-to-Work Electric Vehicle Program Guide

This document serves as a comprehensive resource for Federal agencies in developing their own program resources that promote the efficient and effective use of electric vehicles (EVs) for home-to-work travel while ensuring compliance with Federal regulations and sustainability objectives. One mission of the U.S. Department of Energy's Federal Energy Management Program (FEMP) Fleet program is to help federal fleet managers meet or exceed statutory requirements related to energy and environmental performance while improving overall fleet efficiency, reducing costs, and meeting mission requirements. To further this mission, FEMP provides resources to support Federal agencies with increasing alternative fuel vehicle (AFV) acquisitions and reducing petroleum use. EVs are AFVs and help agencies meet federal fleet requirements. Federal fleets include government-owned EVs used for home-to-work travel. The purpose of this document is to serve as a guide for Federal agencies in developing their own internal program documents to manage government-owned EVs used for home-to-work travel. Federal agencies should consult their counsel and consider their own policies and authorities in the implementation of any policies or best practices regarding government-owned EVs used for home-to-work travel. The guide provides key considerations for agencies, including launching a pilot program to fine-tune best practices, conducting a cost-benefit analysis to compare home versus public charging, and exploring cost-effective solutions, such as installing standard outlets instead of dedicated charging stations. The guide underscores the importance of legal and financial considerations, such as verifying agency authority to install home charging infrastructure at an employee's home, ensuring the availability and appropriateness of using agency funds for home charging infrastructure, and understanding the tax implications of reimbursements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluating Direct and Indirect Influence on EV Charging Stations Across the US

The adoption of new technology for electric vehicles (EV) and mobility applications can bring underappreciated vulnerabilities to the power grid. One area of potential fraud and adversarial influence is through the business ecosystem of startups that own and deploy EV technology. Yet, there are no models or analyses that map the network of organizations and people that have direct and indirect influence over technologies currently deployed in the grid. To fill this gap, we develop a multilayer network model to measure direct and indirect influence on EV charging stations. First, we create and adversarial socio-technical network (ASTN) model via a data fusion pipeline for different US regions of interest (ROI). Then, we develop an integrated ASTN for Chicago, Los Angeles, New York, and Philadelphia. We rank EV charging companies direct influence within each geographic region as well as indirect influence via social network analysis. While some companies have strong direct and indirect influence (i.e., ChargePoint) others show a mismatch between their influence over charging stations and their position within the social network. For example, Tesla has strong direct influence on stations and weak indirect influence over competitors. In contrast, 7Charge has weak direct influence over stations, but strong indirect influence over competitors.

29 - ENERGY PLANNING, POLICY AND ECONOMY↗

Sensitivity of Infrastructure Sectors to the Disruption of Commercial Electric Power

Electric power is crucial to the function of other infrastructures, as well as to the stability of the economy and the social order. Disruption of commercial electric power service, even for brief periods of time, can create significant consequences to the function of other sectors, and make living in some environments untenable. This analysis, conducted in 2017 for the United States Department of Energy (DOE) as part of the Grid Modernization Laboratory Consortium (GMLC) Initiative, focuses on describing the function of each of the other infrastructure sectors and subsectors, with an eye towards those elements of these sectors that depend on primary electric power service through the commercial electric power grid. It leverages the experience of Sandia analysts in analyzing historical disruptive events, and from the development of capabilities designed to identify the physical, logical, and geographic connectivity between infrastructures. The analysis goes on to identify alternatives for the provision of primary electric power service, and the redundancy of said alternatives, to provide a picture of the sector’s ability to withstand an extended disruption.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Paths for the Yurok People

The Yurok Tribe has been working for more than two decades to bring adequate, cost-effective energy services to their Tribal members. With the completion of the electric line extension to Wautec, they are well on their way to an effective and sustainable energy future. However, there is still much work to be done; many Tribal households in the Upper Reservation are still without reliable, affordable electric power. Now the Tribe needs to determine the next steps to realize their energy vision. This Yurok Tribe energy strategic planning study examined electricity usage, costs and infrastructure, as well as electricity needs on the Reservation. It also assessed the Tribe’s energy resources. Equipped with this information, the project team conducted an energy options analysis that examined different project opportunities and identified key projects that are both feasible to implement and will help the Tribe reach its stated Energy Vision. There are still numerous households in the Upper Reservation and adjacent lands that are without grid electric power, and it is likely that most of them will remain disconnected from the grid because of their remoteness. To provide these community members with reliable, affordable, modern energy services their homes will need to be electrified via a robust off-grid energy services program that installs and maintains off-grid energy systems. This is the key need that is explored and addressed in this plan.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrated charging infrastructure planning and charging scheduling for battery electric bus systems

We report studies on the electric bus system planning problem have typically focused exclusively on either the deployment of charging infrastructure or the scheduling of charging events; few have examined the impact of charging facility deployment on charging activities. Considering the interdependence of system design and operational strategies, this study proposes a two-phase optimization framework for charging infrastructure planning and charging scheduling for battery electric bus systems. An integrated optimization model is first developed to simultaneously optimize charger deployment, on-board battery capacity, and charging schedules. A charging scheduling model is further proposed and a rolling horizon approach is utilized in the second phase to optimize the real-time charging scheduling of electric buses. Compared to existing electric bus system planning methods, the proposed integrated model can reduce the total system cost by 19.5%. In addition, compared to uncontrolled charging, the proposed rolling horizon-based charging strategy can reduce the total charging cost by 68.3%.

25 ENERGY STORAGE↗