Search NASA⌕ Search

SEARCH · Search NASA

Results for “environmental requirements program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Low NO(x) heavy fuel combustor program

The 'low nitrogen oxides heavy fuel combustor' program is described. Main program objectives are to generate and demonstrate the technology required to develop durable gas turbine combustors for utility and industrial applications, which are capable of sustained, environmentally acceptable operation with minimally processed petroleum residual fuels. The program will focus on 'dry' reductions of oxides of nitrogen, improved combustor durability, and satisfactory combustion of minimally processed petroleum residual fuels. Other technology advancements sought include: fuel flexibility for operation with petroleum distillates, blends of petroleum distillates and residual fuels, and synfuels (fuel oils derived from coal or shale); acceptable exhaust emissions of carbon monoxide, unburned hydrocarbons, sulfur oxides and smoke; and retrofit capability to existing engines.

Lister, E.↗

Low NO/x/ heavy fuel combustor program

The paper deals with the 'Low NO/x/ Heavy Fuel Combustor Program'. Main program objectives are to generate and demonstrate the technology required to develop durable gas turbine combustors for utility and industrial applications, which are capable of sustained, environmentally acceptable operation with minimally processed petroleum residual fuels. The program will focus on 'dry' reductions of oxides of nitrogen (NO/x/), improved combustor durability and satisfactory combustion of minimally processed petroleum residual fuels. Other technology advancements sought include: fuel flexibility for operation with petroleum distillates, blends of petroleum distillates and residual fuels, and synfuels (fuel oils derived from coal or shale); acceptable exhaust emissions of carbon monoxide, unburned hydrocarbons, sulfur oxides and smoke; and retrofit capability to existing engines.

Lister, E.↗

Space station systems analysis study. Part 2, Volume 3: Appendixes, Book 1. Program requirements documentation

The objective elements representative of the kinds of space activities that will be supported by the space construction base (SCB) are discussed in (1) a brief mission overview including the primary purpose and general objectives; (2) descriptions of the processes involved (where applicable), the mission hardware, the principal activities to be undertaken, the test requirements, and the principal tests; and (3) the SCB requirements including such items as special devices (e.g., fabrication modules, assembly or construction fixtures, cranes, and airlocks), power, data management and communications, waste management, environmental control, safety, and logistics. Each program option is then described in terms of the objective elements it supports, its orbit, the general makeup of the SCB, the transportation approach, and the program schedule goals. The specific requirements that are imposed on the SCB in order to support program option L are given.

Source record↗

Annual Site Environmental Report: 2019 (ASER) for the SLAC National Accelerator Laboratory

To satisfy the requirements of the United States Department of Energy (DOE) SLAC Site Office approved Site Compliance Plan for DOE Order 231.1B, “Environment, Safety and Health Reporting,” the Environment, Safety and Health Division (ES&H) of the SLAC National Accelerator Laboratory prepares an annual report describing its environmental programs and activities. This Annual Site Environmental Report: 2019 summarizes the SLAC National Accelerator Laboratory compliance with standards and requirements, describes the management and monitoring systems in place, and highlights significant accomplishments for the year.

54 ENVIRONMENTAL SCIENCES↗

Annual Site Environmental Report: 2018 (ASER) for the SLAC National Accelerator Laboratory

To satisfy the requirements of the United States Department of Energy (DOE) SLAC Site Office approved Site Compliance Plan for DOE Order 231.1B, “Environment, Safety and Health Reporting,” the Environment, Safety and Health Division (ES&H) of the SLAC National Accelerator Laboratory prepares an annual report describing its environmental programs and activities. This Annual Site Environmental Report: 2018 summarizes the SLAC National Accelerator Laboratory compliance with standards and requirements, describes the management and monitoring systems in place, and highlights significant accomplishments for the year.

54 ENVIRONMENTAL SCIENCES↗

2015 Annual Site Environmental Report for Sandia National Laboratories Tonopah Test Range and Kaua'i Test Facility Hawai'i

Sandia National Laboratories (SNL) is a multiprogram laboratory managed and operated by Sandia Corporation (Sandia), a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA) under contract DE-AC04-94AL85000. The DOE/NNSA Sandia Field Office administers the contract and oversees contractor operations at the SNL, Tonopah Test Range (SNL/TTR) in Nevada and the SNL, Kaua‘i Test Facility (SNL/KTF) in Hawai‘i. Sandia manages and conducts operations at SNL/TTR in support of the DOE/NNSA’s Weapons Ordnance Program and has operated the site since 1957. Navarro Research and Engineering subcontracts with Sandia to administer most of the environmental programs at SNL/TTR. The DOE/NNSA/Nevada Field Office retains responsibility for cleanup and management of SNL/TTR Environmental Restoration sites. Sandia operates SNL/KTF as a rocket preparation launching and tracking facility. This Annual Site Environmental Report (ASER) summarizes data and the compliance status of Sandia’s sustainability, environmental protection, and monitoring programs at SNL/TTR and SNL/KTF during calendar year 2015. Major environmental programs include air quality, water quality, groundwater protection, terrestrial surveillance, waste management, pollution prevention, environmental restoration, oil and chemical spill prevention, and implementation of the National Environmental Policy Act. Sandia is responsible only for those environmental program activities related to its operations. This ASER is prepared in accordance with and as required by DOE O 231.1B, Admin Change 1, Environment, Safety, and Health Reporting .

54 ENVIRONMENTAL SCIENCES↗

Operational Planning Strategy for a Sequim Bay Underwater UXO Test Site (SBU2)

The Department of Defense (DoD) has identified more than 400 underwater sites that are potentially contaminated with munitions. Most areas are in shallow water (0-35 m) where the munitions pose a threat to human health and the environment. The Strategic Environmental Research and Development Program (SERDP) and Environmental Security Technology Certification Program (ESTCP) held a workshop in 2018 to establish the requirements, framework, protocols, responsibilities, and time lines for development of a series of underwater UXO Standardized Demonstration sites (“test beds”) for the purpose of testing the efficacy of sensors, equipment, and technologies to detect UXO. The workshop recommended a phased approach to building test beds to capitalize on: 1) incorporation of lessons learned from existing DoD funded projects, 2) leveraging existing underwater test bed environments funded by other programs, and 3) supporting recursive learning from early phases of the test bed development (i.e. efficiently optimizing through a scaling-up approach). This strategy document provides the framework to establish a working operational plan for the Sequim Bay Underwater UXO (SBU2) Test Bed (Phase II). Details of the plan are dependent on earlier phases of the effort as shown in Figure 1. Results from Phase I are being evaluated, and when complete, will inform the next iteration of this plan. As such, it should be considered a living document that will be informed by the lessons learned and updated as new information becomes known and requirements are refined. This approach will allow SBU2 to evolve to meet the needs of the remediation community.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

A methodology for choosing candidate materials for the fabrication of planetary space suit structures

A study of space suit structures and materials is under way at NASA Ames Research Center, Moffett Field, CA. The study was initiated by the need for a generation of lightweight space suits to be used in future planetary Exploration Missions. This paper provides a brief description of the Lunar and Mars environments and reviews what has been done in the past in the design and development of fabric, metal, and composite suit components in order to establish criteria for comparison of promising candidate materials and space suit structures. Environmental factors and mission scenarios will present challenging material and structural requirements; thus, a program is planned to outline the methodology used to identify materials and processes for producing candidate space suit structures which meet those requirements.

Jacobs, Gilda↗

An Exposure Prevention Plan for an Anhydrous Ammonia Handling System

In July of 1996, the Industrial Hygiene Team of the Environmental Management Office at NASA Lewis Research Center was contacted by the Space Station Program Office to conduct ammonia awareness training for a team of engineers and technicians. The team was tasked with assembling and operating an ammonia handling system for testing of a photovoltaic radiator at the NASA Plum Brook Station Space Power Facility. The ammonia handling system supports a radiator designed to radiate excess heat from a photovoltaic array module used to provide power to the International Space Station. The system would consist of a hazardous materials trailer equipped with an anhydrous ammonia tank, heater, accumulator, chiller, and flow bench. Meetings were held with representatives from the Space Station Program Office, the engineers and Plum Brook safety personnel. Guidance was also provided by representatives from Kennedy Space Center. Determinations were made concerning the locations and types of potential exposures and a plan was developed which included training, personal protective equipment, engineering controls and emergency response. Various organizations including the Plum Brook Safety Committee, the Lewis Environmental Management Office, the Test Readiness Review Board and the Program Office all had requirements that had to be met in order to satisfy themselves that all personnel involved in the operation of the system would be safe. What resulted was a comprehensive plan that provided more than adequate safety measures and succeeded in protecting all personnel from the hazards of the ammonia system. Testing of the photovoltaic radiator was successful and although ammonia leaks were detected and maintenance of the system was ongoing, no one was injured. It was felt that the training and controls in place allowed for a comfort level that did not interfere with the operations.

Cathy L Padolewski↗

The EOS Aqua/Aura Experience: Lessons Learned on Design, Integration, and Test of Earth-Observing Satellites

NASA and NOAA earth observing satellite programs are flying a number of sophisticated scientific instruments which collect data on many phenomena and parameters of the earth's environment. The NASA Earth Observing System (EOS) Program originated the EOS Common Bus approach, which featured two spacecraft (Aqua and Aura) of virtually identical design but with completely different instruments. Significant savings were obtained by the Common Bus approach and these lessons learned are presented as information for future program requiring multiple busses for new diversified instruments with increased capabilities for acquiring earth environmental data volume, accuracy, and type.

Nosek, Thomas P.↗

Implementation of the Brazilian National Repository - RBMN Project - 13008

Ionizing radiation in Brazil is used in electricity generation, medicine, industry, agriculture and for research and development purposes. All these activities can generate radioactive waste. At this point, in Brazil, the use of nuclear energy and radioisotopes justifies the construction of a national repository for radioactive wastes of low and intermediate-level. According to Federal Law No. 10308, Brazilian National Commission for Nuclear Energy (CNEN) is responsible for designing and constructing the intermediate and final storages for radioactive wastes. Additionally, a restriction on the construction of Angra 3 is that the repository is under construction until its operation start, attaining some requirements of the Brazilian Environmental Regulator (IBAMA). Besides this NPP, in the National Energy Program is previewed the installation of four more plants, by 2030. In November 2008, CNEN launched the Project RBMN (Repository for Low and Intermediate-Level Radioactive Wastes), which aims at the implantation of a National Repository for disposal of low and intermediate-level of radiation wastes. This Project has some aspects that are unique in the Brazilian context, especially referring to the time between its construction and the end of its institutional period. This time is about 360 years, when the area will be released for unrestricted uses. It means that the Repository must be safe and secure for more than three hundred years, which is longer than half of the whole of Brazilian history. This aspect is very new for the Brazilian people, bringing a new dimension to public acceptance. Another point is this will be the first repository in South America, bringing a real challenge for the continent. The current status of the Project is summarized. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improvements in Container Management of Transuranic and Low-Level Radioactive Waste Stored at the Central Waste Complex at Hanford

The Central Waste Complex (CWC) is the interim storage facility for Resource Conservation and Recovery Act (RCRA) mixed waste, transuranic waste, transuranic mixed waste, low-level and low-level mixed radioactive waste at the Department of Energy's (DOE's) Hanford Site. The majority of the waste stored at the facility is retrieved from the low-level burial grounds in the 200 West Area at the Site, with minor quantities of newly generated waste from on-site and offsite waste generators. The CWC comprises 18 storage buildings that house 13,000 containers. Each waste container within the facility is scanned into its location by building, module, tier and position and the information is stored in a site-wide database. As waste is retrieved from the burial grounds, a preliminary non-destructive assay is performed to determine if the waste is transuranic (TRU) or low-level waste (LLW) and subsequently shipped to the CWC. In general, the TRU and LLW waste containers are stored in separate locations within the CWC, but the final disposition of each waste container is not known upon receipt. The final disposition of each waste container is determined by the appropriate program as process knowledge is applied and characterization data becomes available. Waste containers are stored within the CWC based on their physical chemical and radiological hazards. Further segregation within each building is done by container size (55-gallon, 85-gallon, Standard Waste Box) and waste stream. Due to this waste storage scheme, assembling waste containers for shipment out of the CWC has been time consuming and labor intensive. Qualitatively, the ratio of containers moved to containers in the outgoing shipment has been excessively high, which correlates to additional worker exposure, shipment delays, and operational inefficiencies. These inefficiencies impacted the LLW Program's ability to meet commitments established by the Tri-Party Agreement, an agreement between the State of Washington, the Department of Energy, and the Environmental Protection Agency. These commitments require waste containers to be shipped off site for disposal and/or treatment within a certain time frame. Because the program was struggling to meet production demands, the Production and Planning group was tasked with developing a method to assist the LLW Program in fulfilling its requirements. Using existing databases for container management, a single electronic spreadsheet was created to visually map every waste container within the CWC. The file displays the exact location (e.g., building, module, tier, position) of each container in a format that replicates the actual layout in the facility. In addition, each container was placed into a queue defined by the LLW and TRU waste management programs. The queues were developed based on characterization requirements, treatment type and location, and potential final disposition. This visual aid allows the user to select containers from similar queues and view their location within the facility. The user selects containers in a centralized location, rather than random locations, to expedite shipments out of the facility. This increases efficiency for generating the shipments, as well as decreasing worker exposure and container handling time when gathering containers for shipment by reducing movements of waste containers. As the containers are collected for shipment, the remaining containers are segregated by queue, which further reduces future container movements. (authors)

42 ENGINEERING↗

IMPROVEMENTS IN CONTAINER MANAGEMENT OF TRANSURANIC (TRU) AND LOW LEVEL RADIOACTIVE WASTE STORED AT THE CENTRAL WASTE COMPLEX (CWC) AT HANFORD

The Central Waste Complex (CWC) is the interim storage facility for Resource Conservation & Recovery Act (RCRA) mixed waste, transuranic waste, transuranic mixed waste, low-level and low-level mixed radioactive waste at the Department of Energy's (DOE'S) Hanford Site. The majority of the waste stored at the facility is retrieved from the low-level burial grounds in the 200 West Area at the Site, with minor quantities of newly generated waste from on-site and off-site waste generators. The CWC comprises 18 storage buildings that house 13,000 containers. Each waste container within the facility is scanned into its location by building, module, tier and position and the information is stored in a site-wide database. As waste is retrieved from the burial grounds, a preliminary non-destructive assay is performed to determine if the waste is transuranic (TRU) or low-level waste (LLW) and subsequently shipped to the CWC. In general, the TRU and LLW waste containers are stored in separate locations within the CWC, but the final disposition of each waste container is not known upon receipt. The final disposition of each waste container is determined by the appropriate program as process knowledge is applied and characterization data becomes available. Waste containers are stored within the CWC based on their physical chemical and radiological hazards. Further segregation within each building is done by container size (55-gallon, 85-gallon, Standard Waste Box) and waste stream. Due to this waste storage scheme, assembling waste containers for shipment out of the CWC has been time consuming and labor intensive. Qualitatively, the ratio of containers moved to containers in the outgoing shipment has been excessively high, which correlates to additional worker exposure, shipment delays, and operational inefficiencies. These inefficiencies impacted the LLW Program's ability to meet commitments established by the Tri-Party Agreement, an agreement between the State of Washington, the Department of Energy, and the Environmental Protection Agency. These commitments require waste containers to be shipped off site for disposal and/or treatment within a certain time frame. Because the program was struggling to meet production demands, the Production and Planning group was tasked with developing a method to assist the LLW Program in fulfilling its requirements. Using existing databases for container management, a single electronic spreadsheet was created to visually map every waste container within the CWC. The file displays the exact location (e.g., building, module, tier, position) of each container in a format that replicates the actual layout in the facility. In addition, each container was placed into a queue defined by the LLW and TRU waste management programs. The queues were developed based on characterization requirements, treatment type and location, and potential final disposition. This visual aid allows the user to select containers from similar queues and view their location within the facility. The user selects containers in a centralized location, rather than random locations, to expedite shipments out of the facility. This increases efficiency for generating the shipments, as well as decreasing worker exposure and container handling time when gathering containers for shipment by reducing movements of waste container. As the containers are collected for shipment, the remaining containers are segregated by queue, which further reduces future container movements.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

22 N HPGP Thruster Life Testing

In the ever-changing paradigm of efficient and capable spacecraft design, scientific missions continue pushing the envelope enabling spacecraft subsystems to deliver effective solutions to meet challenging new mission/spacecraft needs. From an in-space storable liquid chemical propulsion perspective, monopropellant hydrazine has been, and continues to be, a dependable propellant with considerable flight heritage, a variety of engine thrust classes available from multiple vendors, with repeatable and reliable performance. Additionally, the space propulsion industry has learned to successfully handle hydrazine, its regulations, the safety protocols, the personnel protective equipment, and the unique training standards–all requisite for loading spacecraft propulsion systems with toxic hypergolic hydrazine. The question now arises as to “what is next for in-space chemical propulsion?” Further, with the evolution and concrete advancements in innovative in-space green propellant technologies, capable of providing realizable benefits to scientific missions, concern over the reliability and availability of this higher performing and safer to handle class of propellants is waning. As science missions move forward with the potential flight in fusion of High Performance Green Propulsion (HPGP), NASA and its industry partners are working to address any gaps in system reliability, performance, or unique operational considerations. Propellant technology that offers both higher performance and significant reduction in personnel hazards compared to hydrazine presents an attractive propulsion subsystem design opportunity. Increased propulsion subsystem performance can result in lower spacecraft launch mass, larger scientific payloads, or extended on-orbit lifetimes. Mission trades using green propulsion technologies have been documented on multiple NASA Goddard Space Flight Center (GSFC) mission classes, examining various parameters and requirements to support mission architectures in Low Earth Orbit (LEO), High Earth Orbit (HEO), geostationary, lunar, planetary, and Quasi-halo orbit around Sun-Earth Lagrange point (L2). The results of these trade studies show promising, attainable benefits. The perceived programmatic risk of flying a newer propulsion technology has, unfortunately, not outweighed the benefits to date. To take advantage of the improved performance and mitigate programmatic risk, HPGP engines must demonstrate life testing at higher propellant throughputs than have currently been demonstrated. In an effort to proactively address the challenges with technology infusion into a risk-averse community, NASA and the Swedish National Space Agency (SNSA) outlined a collaborative Implementing Arrangement (IA) for the respective agencies to pursue increased HPGP technology maturation. This initial IA effort began in 2013, fresh off the heels of the successful PRISMA HPGP technology demonstration mission. The IA targeted objective is to reduce risk to potential future HPGP missions and fully characterize the LMP-103S propellant and associated engine performance. Over the past eight years, HPGP has flown in propulsion systems on twenty-five(25) spacecraft from seven(7) different Launch Ranges around the globe and on seven (7) different Launch Vehicles. Six(6) of these launches involved multiple loading operations for multiple spacecraft. For U.S. Range operations, nine (9) HPGP systems have been processed at Vandenberg Space Force Base(VSFB):six(6) in 2017, and three (3) in 2018. Six (6) more have been processed at Cape Canaveral Air Force Station (CCAFS)in May 2020, with three (3) systems launched in June 2020 and the remaining three (3) system were left loaded and ready until their launch in August of 2020. Three (3) more systems have been processed at Wallops Flight Facility(WFF)and launched in June 2021. In addition, these propulsion subsystems employed heritage propulsion subsystem component such as valves, filters, and pressure transducers, and have further demonstrated nominal functionality in both diaphragm and Propellant Management Device (PDM) propellant tanks. Based on these successes, HPGP technology continues to be considered for NASA Science Mission Directorate missions at GSFC. The work presented herein represents many years of development and collaborative efforts to successfully align higher performance, low toxicity hydrazine alternatives into scientific missions. NASA GSFC Propulsion Engineering, in collaboration with Bradford ECAPS, has developed mission specific thruster design and testing requirements to establish GSFC’s desired test conditions and firing sequences.In2017, the first flight-like 22N HPGP thruster Engineering Qualification Model (EQM-1)was designed and built by Bradford ECAPS to prove out the thruster design, materials, build process, and test campaign with respect to NASA GSFC critical component and mission requirements. This test program was developed to comprehensively test the thruster, the technology, and ultimately increase the 22N HPGP Technology Readiness Level(TRL). EQM-1was tested to environmental qualification levels prior to hot fire performance testing to represent the relevant end-to-end environment (launch to on-orbit operation)with required margin. This thruster demonstrated steady-state and pulse mode operational capability with propellant thruster throughput up to~53kg.At this throughput level, the EQM-1 engine began to present off-nominal performance and the test campaign was halted to allow for non-destructive testing and identify the root cause for the an omalous performance. Capitalizing on the successful elements of the EQM-1 campaign, an upgraded 22N HPGP EQM-2 has been manufactured by Bradford ECAPS to meet the complete GSFC requirements. The EQM-2 thruster’s test campaign has further demonstrated the robustness of the HPGP propulsion technology and increased the Technology Readiness Level (TRL) by undergoing a full acceptance test program, then proceeding into qualification, including environmental testing (vibration and shock to qualification levels),as well as hot-fire life testing, operating at steady-state and pulse modes with increased propellant thruster throughput to~150kg. The HPGP thruster performance testing enables effective HPGP thruster readiness evaluation to meet NASA candidate mission requirements in the future.

High↗

Parachute Swivel Mechanism for planetary entry

A parachute swivel mechanism (PSM) for planetary entry missions such as a Mars probe (MARSNET) or return of cometary material samples (ROSETTA mission) has been developed. The purpose of the PSM is to decouple the spin of the probe from the parachute, with low friction torque, during both the deployment and descent phases. Critical requirements are high shock loads, low friction, low temperatures, and several years of storage in the deep space environment (during the cruise phase of the probe, prior to operation). The design uses a main thrust ball bearing to cope with the load requirement and a smaller thrust ball bearing for guiding of the shaft. Except for use on the Viking and Galileo swivels, it appears that this type of bearing has very rarely been employed in space mechanisms, so that little is known of its friction behavior with dry lubrication. A slip ring assembly allows the transfer of electrical power for post-reefing of the parachute. A test program has been conducted covering the environmental conditions of Mars entry and Earth reentry. This paper describes requirement constraints, model missions of planetary entries, a bearing trade-off, analyses performed, design details, the lubrication system, and test results (friction torque versus load/spin rate). In addition, the design of the test rig is addressed.

Birner, R.↗

Nevada Test Site Radiation Protection Program - Revision 1

Title 10 Code of Federal Regulations (CFR) Part 835, 'Occupational Radiation Protection,' establishes radiation protection standards, limits, and program requirements for protecting individuals from ionizing radiation resulting from the conduct of U.S. Department of Energy (DOE) activities. 10 CFR 835.101(a) mandates that DOE activities be conducted in compliance with a documented Radiation Protection Program (RPP) as approved by DOE. This document promulgates the RPP for the Nevada Test Site (NTS), related (on-site or off-site) U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) operations, and environmental restoration off-site projects. This NTS RPP promulgates the radiation protection standards, limits, and program requirements for occupational exposure to ionizing radiation resulting from NNSA/NSO activities at the NTS and other operational areas as stated in 10 CFR 835.1(a). NNSA/NSO activities (including design, construction, operation, and decommissioning) within the scope of this RPP may result in occupational exposures to radiation or radioactive material. Therefore, a system of control is implemented through specific references to the site-specific NV/YMP RCM. This system of control is intended to ensure that the following criteria are met: (1) occupational exposures are maintained as low as reasonably achievable (ALARA), (2) DOE's limiting values are not exceeded, (3) employees are aware of and are prepared to cope with emergency conditions, and (4) employees are not inadvertently exposed to radiation or radioactive material.

61 RADIATION PROTECTION AND DOSIMETRY↗

Annual Site Environmental Report: 2020 (ASER) for the SLAC National Accelerator Laboratory

To satisfy the requirements of the United States Department of Energy (DOE) SLAC Site Office approved Site Compliance Plan for DOE Order 231.1B (Change 1, 2012, “Environment, Safety and Health Reporting,” the Environment, Safety and Health Division (ES&H) of the SLAC National Accelerator Laboratory prepares an annual report describing its environmental programs and activities. This Annual Site Environmental Report: 2020 summarizes the SLAC National Accelerator Laboratory compliance with standards and requirements, describes the management and monitoring systems in place, and highlights significant accomplishments for the year.

54 ENVIRONMENTAL SCIENCES↗

Air Monitoring Stations Preliminary Real Estate Plan

LANL is required to utilize an air monitoring system at the LANL boundaries to ensure the safety of the public. This system constitutes the LANL Airnet Program compliance network and is a collection of air monitoring stations positioned in specific locations per Environmental Protection Agency (EPA) regulatory requirements. A number of these Airnet stations reside on property outside the LANL boundaries. For example, existing stations exist on Los Alamos County (County) property, Los Alamos Public School (LAPS) property, a local business and on private property. This Preliminary Real Estate Plan is required for the renewal of existing agreements to the County, the LAPS a local business and to a private property land owner for access to and operation of Airnet stations and associated infrastructure located on their property.

54 ENVIRONMENTAL SCIENCES↗