Search NASA⌕ Search

SEARCH · Search NASA

Results for “geosynchronous orbits”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Controlling Laser Spot Size in Outer Space

Three documents discuss a method of controlling the diameter of a laser beam projected from Earth to any altitude ranging from low orbit around the Earth to geosynchronous orbit. Such laser beams are under consideration as means of supplying power to orbiting spacecraft at levels of the order of tens of kilowatts apiece. Each such beam would be projected by use of a special purpose telescope having an aperture diameter of 15 m or more. Expanding the laser beam to such a large diameter at low altitude would prevent air breakdown and render the laser beam eyesafe. Typically, the telescope would include an adaptive-optics concave primary mirror and a convex secondary mirror. The laser beam transmitted out to the satellite would remain in the near field on the telescope side of the beam waist, so that the telescope focal point would remain effective in controlling the beam width. By use of positioning stages having submicron resolution and repeatability, the relative positions of the primary and secondary mirrors would be adjusted to change the nominal telescope object and image distances to obtain the desired beam diameter (typically about 6 m) at the altitude of the satellite. The limiting distance D(sub L) at which a constant beam diameter can be maintained is determined by the focal range of the telescope 4 lambda f(sup 2) where lambda is the wavelength and f the f/number of the primary mirror. The shorter the wavelength and the faster the mirror, the longer D(sub L) becomes.

Bennett, Harold E.↗

United Kingdom Infrared Telescope's Spectrograph Observations of Human-Made Space Objects

Presented here are the results of the United Kingdom Infrared Telescope (UKIRT) spectral observations of human-made space objects taken from 2014 to 2015. The data collected using the UKIRT 1-5 micron Imager Spectrometer (UIST) cover the wavelength range 0.7-2.5 micrometers. Overall, data were collected on 18 different orbiting objects at or near geosynchronous orbit (GEO). Two of the objects are controlled spacecraft, twelve are non-controlled spacecraft, one is a rocket body, and three are cataloged as debris. The remotely collected data are compared to the laboratory-collected reflectance data on typical spacecraft materials; thereby general materials are identified but not specific types. These results highlight the usefulness of observations in the infrared by focusing on features from hydrocarbons and silicon. The spacecraft, both the controlled and non-controlled, show distinct features due to the presence of solar panels whereas the rocket bodies do not. Signature variations between rocket bodies, due to the presence of various metals and paints on their surfaces, show a clear distinction from those objects with solar panels, demonstrating that one can distinguish most spacecraft from rocket bodies through infrared spectrum analysis. Finally, the debris pieces tend to show featureless, dark spectra. These results show that the laboratory data in its current state give well-correlated indications as to the nature of the surface materials on the objects. Further telescopic data collection and model updates to include noise, surface roughness, and material degradation are necessary to make better assessments of orbital object material types. A comparison conducted between objects observed previously with the NASA Infrared Telescope Facility (IRTF) shows similar materials and trends from the two telescopes and different times. However, based on the current state of the model, infrared spectroscopic data are adequate to classify objects in GEO as spacecraft, rocket bodies, or debris.

Buckalew, Brent↗

Integrated Multi-Satellite Retrievals for GPM (IMERG)

The Integrated Multi-satellitE Retrievals for GPM (IMERG) product from the U.S. Science Team of the NASA-JAXA Global Precipitation Measurement (GPM) mission provides global satellite precipitation estimates for a wide range of scientific research and societal applications. By adopting a constellation approach using low-Earth orbit passive microwave and geosynchronous-orbit infrared observations from domestic and international partners, IMERG is able to achieve a high resolution of 0.1° every half-hour globally, with three Runs to cater to applications with different latency requirements. With the completion of the reprocessing of the latest version, IMERG V07 now provides improved global satellite precipitation estimates for a period of more than 20 years. This presentation summarizes background on retrievals, the IMERG algorithm, and access to the data. As well, it showcases select results from the data, which might give participants ideas about how they can analyze the data themselves. The presentation ends with a prospectus for the timeline for the upcoming Version 08 and provides a list of references.

IMERG↗

The assembly of large structures in space

Techniques developed for orbital assembly of the support structure for a 1000 meter diameter microwave power transmission system antenna are described. The operation is performed in two phases using the shuttle remote manipulator system in low earth orbit, and a mobile assembler in geosynchronous orbit.

Smith, G. W.↗

A towing concept for orbital transfer of large space structures

Many studies are being made to determine the most efficient method for the transfer of large space structures from low earth orbits (LEO) to higher altitudes, principally geosynchronous orbits. In this paper, towing is proposed as a possible means of orbital transfer of large space structures. A potential towing arrangement is identified and some of the systems sized for the transfer of a 2460-ft (750 meter) diameter antenna weighing approximately 154,000 lbs (70 metric tons). A savings of approximately 23 metric tons in propellants and structure resulted from the use of a towing arrangement using six towlines in parallel when compared to the use of a single tug hard mounted to the structure being towed. The towing concept appears practical and affords a means of applying loads using multiple towlines to a wide variety of structures without special adaptors.

Macconochie, I. O.↗

TDRS-A - The pioneering payload

The first launch of a Tracking Data Relay Satellite (TDRS-A) on board the Shuttle Orbiter 'Challenger' of the Space Transportation System (STS) provided many pioneering events as a payload/user. The TDRS-A was launched as a payload of the STS as well as a payload of the Inertial Upper Stage (IUS) on April 4, 1983. This paper traces the payload processing flow of the TDRS-A from its arrival at the Kennedy Space Center (KSC), through its launch on Challenger and its trans-orbit flight on the IUS to geosynchronous orbit. The TDRS-A, as a customer/user of these launch systems, is examined and reviewed and lessons learned are noted.

Browning, R. K.↗

Conceptual spacecraft and arcjet propulsion system design for the SP-100 interim reference mission

An arcjet propulsion system, delivering 7.5 N thrust, was defined for the SP-100 Space Reactor Power System Interim Reference Mission. Conceptual design trades and configuration studies of a spacecraft suitable for the mission were performed to the extent necessary to define propulsion system requirements and interfaces. The propulsion system design is based on the use of 30-kW, constricted arc, ammonia arcjet engines operating in parallel during orbit boost from low earth to geosynchronous orbit.

Zafran, S.↗

Charge efficiency of Ni/H2 cells during transfer orbit of Telstar 4 satellites

The TELSTAR 4 communication satellites being manufactured by Martin Marietta Astro Space (Astro Space) for AT&T are three axis stabilized spacecraft scheduled to be launched on expendable vehicles such as the Atlas or Ariane rockets. Typically, these spacecraft consist of a box that holds the electronics and supports the antenna reflectors and the solar array wings. The wings and reflectors are folded against the sides of the box during launch and the spacecraft is spun for attitude control in that phase; they are then deployed after achieving the final orbit. The launch phase and transfer orbits required to achieve the final geosynchronous orbit typically take 4 to 5 days during which time the power required for command, telemetry, attitude control, heaters, etc., is provided by two 50 AH nickel hydrogen batteries augmented by the exposed outboard solar panels. In the past, this situation has presented no problem since there was a considerable excess of power available from the array. In the case of large high powered spacecraft such as TELSTAR 4, however, the design power levels in transfer orbit approach the time-averaged power available from the exposed surface area of the solar arrays, resulting in a very tight power margin. To compound the difficulty, the array output of the spinning spacecraft in transfer orbit is shaped like a full wave rectified sine function and provides very low charging rates to the batteries during portions of the rotation. In view of the typically low charging efficiency of alkaline nickel batteries at low rates, it was decided to measure the efficiency during a simulation of the TELSTAR 4 conditions at the expected power levels and temperatures on three nickel hydrogen cells of similar design. The unique feature of nickel hydrogen cells that makes the continuous measurement of efficiency possible is that hydrogen is one of the active materials and thus, cell pressure is a direct measure of the state of charge or available capacity. The pressure is measured with a calibrated strain gage mounted on the outside of the pressurized cell.

Fang, W. C.↗

In-Space Production of Storable Propellants

Our exploration of the feasibility of in-space production of storable propellants from resourcesavailable on asteroids, and also on Mars and the Moon, has considered the process of sampleacquisition; the energy requirements for heating and volatile release; the thermodynamic behaviorof gas release from minerals and organic polymers containing hydrogen, oxygen, carbon, sulfur,and nitrogen; purification of the released water and carbon dioxide; the storage and transportation of these materials in the condensed state; synthesis of fuels including methanol and dimethyl ether(DME); and the co-production, concentration, stability, and storage of the complementary oxidizer high-test hydrogen peroxide (HTP). We call attention to the ability of the storable propellant/oxidizer combination of DME and HTP to carry out deep-space missions and to perform retrieval and relocation of any and all space-derived resources, such as retrieving asteroidal metal to high Earth orbit. This study's analyses are based on returning resources to a storage/processing/dispensing facility in a Highly Eccentric Earth Orbit (HEEO) with a perigee above geosynchronous orbit and an apogee approach or beyond the Moon's orbit.The methane/LOX option, notable for good engine performance, has not been included in this study because our scope includes only fully storable propellants.

Lewis, John S.↗

Attitude Control and Orbital Dynamics Challenges of Removing the First 3-Axis Stabilized Tracking and Data Relay Satellite from the Geosynchronous ARC

Launched on April 4, 1983 onboard STS 6 (Space Shuttle Challenger), the First Tracking and Data Relay Satellite (TDRS 1) was retired above the Geosynchronous Orbit (GEO) on June 27, 2010 after having provided real-time communications with a variety of low-orbiting spacecraft over a 26-year period. To meet NASA requirements limiting orbital debris 1, a team of experts was assembled to conduct an End-Of-Mission (EOM) procedure to raise the satellite 350 km above the GEO orbit. Following the orbit raising via conventional station change maneuvers, the team was confronted with having to deplete the remaining propellant and passivate all energy storage or generation sources. To accomplish these tasks within the time window, communications (telemetry and control links), electrical power, propulsion, and thermal constraints, a spacecraft originally designed as a three-axis stabilized satellite was turned into a spinner. This paper (a companion paper to Innovative Approach Enabled the Retirement of TDRS 1, paper # 1699, IEEE 2011 Aerospace Conference, March 5-12, 2011 sup 2) focuses on the challenges of maintaining an acceptable spinning dynamics, while repetitively firing thrusters. Also addressed are the effects of thruster firings on the orbit characteristics and how they were mitigated by a careful scheduling of the fuel depletion operations. Periodic thruster firings for spin rate adjustment, nutation damping, and precession of the momentum vector were also required in order to maintain effective communications with the satellite. All operations were thoroughly rehearsed and supported by simulations thus lending a high level of confidence in meeting the NASA EOM goals.

Benet, Charles A.↗

Typical teleoperator time delay profiles, phase 2

The results of the second phase of a study on time delays in communications systems applicable to the teleoperator program are presented. Estimates of the maximum time delays that will be encountered and presents time delay profiles are given for (1) ground control to teleoperator in low earth orbit, (2) ground control to teleoperator in geosynchronous orbit, and (3) low earth orbit control to teleoperator in low earth orbit.

Wetherington, R. D.↗

Trajectory analysis for solar electric propulsion stage /SEPS/ out-of-ecliptic mission

It is planned to use the SEPS as the upper stage of a transportation system capable of delivering either a separable payload spacecraft or an attached science package to a host of planetary targets including inner and outer planets, asteroids, and comets. It may also be employed in earth orbit to deliver and retrieve payloads in geosynchronous orbit. An investigation is conducted regarding the use of the SEPS for a relatively high energy out-of-ecliptic mission planned for 1980. Parametric performance data for the mission are considered along with trajectory characteristics, launch vehicle performance, and SEPS performance.

Dazzo, E. J.↗

Synchronous orbit power technology needs

The needs are defined for future geosynchronous orbit spacecraft power subsystem components, including power generation, energy storage, and power processing. A review of the rapid expansion of the satellite communications field provides a basis for projection into the future. Three projected models, a mission model, an orbit transfer vehicle model, and a mass model for power subsystem components are used to define power requirements and mass limitations for future spacecraft. Based upon these three models, the power subsystems for a 10 kw, 10 year life, dedicated spacecraft and for a 20 kw, 20 year life, multi-mission platform are analyzed in further detail to establish power density requirements for the generation, storage and processing components of power subsystems as related to orbit transfer vehicle capabilities. Comparison of these requirements to state of the art design values shows that major improvements, by a factor of 2 or more, are needed to accomplish the near term missions. However, with the advent of large transfer vehicles, these requirements are significantly reduced, leaving the long lifetime requirement, associated with reliability and/or refurbishment, as the primary development need. A few technology advances, currently under development, are noted with regard to their impacts on future capability.

Slifer, L. W., Jr.↗

Progress of manned space flight from Apollo to Space Shuttle

The technology employed for the Apollo lunar missions is examined, taking into account developments which represented, at the time, advances in the state of the art. Differences between the technology required for the Space Shuttle and Apollo are partly related to the fact that the Shuttle mission is 'more forgiving' than Apollo with its lunar landings. On the other side, the Orbiter is a much more complicated vehicle, and has to function as a launch vehicle, a spacecraft, and an aircraft. Technological advances needed in connection with the Shuttle development are described in detail, and requirements for a manned permanent presence in space are discussed. A manned orbital transfer vehicle which can go to geosynchronous orbit will have to be developed, while a regenerative life support system will be needed for the space station itself along with a power generation and energy storage system, and improvements related to living and working conditions in space.

Cohen, A.↗

Impact of atmospheric uncertainties and viscous interaction effects on the performance of aeroassisted orbital transfer vehicles

Simulations of aerobraking trajectories of aeroassisted orbital transfer vehicles (AOTV's) returning from geosynchronous orbit were analyzed to examine the effects of high-altitude viscous interactions and off-nominal atmospheres on AOTV return weight, heating, and loads performance. Viscous interaction effects encountered at high altitudes had little detrimental effect on the return weight capabilities for AOTV's representing a range of lift/drag ratios. Most of the AOTV return weight increase over an all-propulsive OTV occurred for a low lift/drag ratio. Smaller increases in return weight were observed for higher lift/drag ratios, at the expense of significantly higher heating and aerodynamic loads. Off-nominal atmospheres based on Shuttle-derived data and multipliers on a U.S. Standard Atmosphere were considered. AOTV's intended for entry under standard atmospheric conditions either deorbited during the pass through the off-nominal atmospheres or missed the target phasing orbit by wide margins. The AOTV's could successfully negotiate these atmospheres when new bank-angle histories were implemented with little loss and sometimes with a gain in return weight.

Talay, T. A.↗

Assessment of medical risk in space flight

Among the various manned space missions expected during the next 10 years are flights of up to 6 months duration in low earth orbit as well as short excursions to geosynchronous orbit. Research activities are described which cover the full spectrum of physiological and psychological problems presented by such flights as well as by ongoing Shuttle flights. This paper includes a summary of the major technical thrusts needed for habitation in space. It concludes that there is a high probability of developing countermeasures that will alleviate the neurophysiological and cardiovascular effects encountered during Shuttle flights and that the resolution of musculoskeletal, psychological and radiobiological problems will also prove possible.

Nicogossian, A.↗

Management of the orbital environment

Data regarding orbital debris are presented to shed light on the requirements of environmental management in space, and strategies are given for active intervention and operational strategies. Debris are generated by inadvertent explosions of upper stages, intentional military explosions, and collisional breakups. Design and operation practices are set forth for minimizing debris generation and removing useless debris from orbit in the low-earth and geosynchronous orbits. Self-disposal options include propulsive maneuvers, drag-augmentation devices, and tether systems, and the drag devices are described as simple and passive. Active retrieval and disposition are considered, and the difficulty is examined of removing small debris. Active intervention techniques are required since pollution prevention is more effective than remediation for the problems of both earth and space.

Loftus, Joseph P., Jr.↗