Search NASA⌕ Search

SEARCH · Search NASA

Results for “installed power”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Regional Representation of Wind Stakeholders' End-of-Life Behaviors and Their Impact on Wind Blade Circularity

Wind plant power has seen tremendous growth in the US and worldwide, representing the most significant renewable energy installed capacity besides hydropower. While wind power enables decarbonizing the electricity grid, the rising amount of end-of-life (EOL) wind blades - which are arduous to recycle - present a challenge for landfills if disposed of whole and a missed opportunity to recover valuable composite materials. The circular economy (CE) concept proposes strategies to rethink, reuse and recover products, components, and materials. However, transitioning to a CE implies changing how business models, supply chains, and behaviors deal with products and waste; changes arduously captured with traditional methods used to assess circularity such as life cycle assessment or material flow analysis (MFA). Here we present an agent-based model (ABM) that captures behavioral aspects impacting wind blade circularity in the US. The ABM also accounts for wind plant projects and landfills heterogeneity - a characteristic not easily included in top-down approaches such as MFA, input-output analysis, or system dynamics. Results show that recycling is divided as most recycling facilities are on the eastern side of the country, a challenge that could be alleviated by shredding blades before transportation. Recycling programs from the wind industry could also seed recycling behaviors within wind plant owners. Better yet, new blade designs could increase circularity if original equipment manufacturers accept the risks involved with the investments needed to adapt the production lines.

17 WIND ENERGY↗

Propfan test assessment propfan propulsion system static test report

The propfan test assessment (PTA) propulsion system successfully completed over 50 hours of extensive static ground tests, including a 36 hour endurance test. All major systems performed as expected, verifying that the large-scale 2.74 m diameter propfan, engine, gearbox, controls, subsystems, and flight instrumentation will be satisfactory with minor modifications for the upcoming PTA flight tests on the GII aircraft in early 1987. A test envelope was established for static ground operation to maintain propfan blade stresses within limits for propfan rotational speeds up to 105 percent and power levels up to 3880 kW. Transient tests verified stable, predictable response of engine power and propfan speed controls. Installed engine TSFC was better than expected, probably due to the excellent inlet performance coupled with the supercharging effect of the propfan. Near- and far-field noise spectra contained three dominant components, which were dependent on power, tip speed, and direction. The components were propfan blade tones, propfan random noise, and compressor/propfan interaction noise. No significant turbine noise or combustion noise was evident.

Orourke, D. M.↗

Measurement of the steady surface pressure distribution on a single rotation large scale advanced prop-fan blade at Mach numbers from 0.03 to 0.78

The aerodynamic pressure distribution was determined on a rotating Prop-Fan blade at the S1-MA wind tunnel facility operated by the Office National D'Etudes et de Recherches Aerospatiale (ONERA) in Modane, France. The pressure distributions were measured at thirteen radial stations on a single rotation Large Scale Advanced Prop-Fan (LAP/SR7) blade, for a sequence of operating conditions including inflow Mach numbers ranging from 0.03 to 0.78. Pressure distributions for more than one power coefficient and/or advanced ratio setting were measured for most of the inflow Mach numbers investigated. Due to facility power limitations the Prop-Fan test installation was a two bladed version of the eight design configuration. The power coefficient range investigated was therefore selected to cover typical power loading per blade conditions which occur within the Prop-Fan operating envelope. The experimental results provide an extensive source of information on the aerodynamic behavior of the swept Prop-Fan blade, including details which were elusive to current computational models and do not appear in the two-dimensional airfoil data.

Bushnell, Peter↗

Test Results from a Simulated High Voltage Lunar Power Transmission Line

The Alternator Test Unit (ATU) in the Lunar Power System Facility (LPSF) located at the NASA Glenn Research Center (GRC) in Cleveland, OH was modified to simulate high voltage transmission capability. The testbed simulated a 1 km transmission cable length from the ATU to the LPSF using resistors and inductors installed between the distribution transformers. Power factor correction circuitry was used to compensate for the reactance of the distribution system to improve the overall power factor. This test demonstrated that a permanent magnet alternator can successfully provide high frequency AC power to a lunar facility located at a distance.

Birchenough, Arthur↗

DECOVALEX-2023: Task D Final Report

Task D of DECOVALEX-2023 is focused on the simulation of the coupled thermal hydraulic-mechanical (THM) behaviour in the full-scale engineered barrier system (EBS). The Horonobe EBS experiment is the demonstration of the full-scale EBS in the underground research laboratory (URL) (performed by JAEA in the Horonobe URL in Japan). Task D consisted of the three steps, a preliminary step (Step 0), simulation of the laboratory tests (Step 1) and simulation of the in-situ full-scale EBS experiment (Step 2). Since the Horonobe EBS experiment demonstrates the vertical emplacement option of the EBS, the experiment gallery is also backfilled with the backfill material. Therefore, interaction between the EBS and the backfill material can also be demonstrated, such as deformation (change of density) of the buffer material. The underground water in the Horonobe URL is saline. This fact adds chemical processes to THM behaviour. For example, mechanical properties (such as swelling pressure of the buffer material and backfill material) and hydraulic properties (such as permeability of the buffer material and backfill material) change depending on the water chemistry. Task D was therefore a challenging Task focused on not only the relatively simple THM behaviour but also complex THM behaviour including chemical processes. Six research teams (BGR, CAS, JAEA, KAERI, SNL and Taipower) participated the Task D. BGR, CAS, JAEA, KAERI and Taipower research teams selected a THM approach, while the SNL research team selected a TH approach. Step 1 involved the simulation of laboratory test results and was important to check the numerical codes developed by the research teams. Step 1 was divided into four sub steps. The simulation results through the Step 1 identified the parameters for simulation of the Step 2. Basic parameters of the materials (buffer material, backfill material, rock mass, concrete, sand) were provided by JAEA. Special parameters which research team needed were identified by back analysis of Step 1. Most notably the mechanical behaviour of swelling and displacement depended on the applied model (elastic model or elastoplastic model). Parameters such as Young’s modulus were found to need smaller values than characterised in the fundamental laboratory test results (Step 1-1, 1-2) for the elastic model. Although laboratory experiments are usually simple, test results contained some error. For example, if the saturation level is 100 % or higher, it should be considered an error. This situation was presented in the Step 1-3. A possible reason is that the buffer material is a mixture of bentonite and silica sand. When a specimen is cut to measure volume or weight, sand grains will affect the measurement data. In Step 2, boundary conditions such as temperature on the surface of the simulated overpack, heater power of the electrical heaters installed in the simulated overpack, injection pressure and inflow rate of the test water, were applied. The outer boundary conditions can be selected using measured data (injection pressure and inflow rate of the test water that is controlled by the injection systems installed in the sand layer around the buffer material and in the boundary between backfill material and concrete support). Since such measured data has some noise, research teams developed their own simplified boundary conditions. Inner boundary conditions can be selected using measured data as heater power and temperature on the surface of the simulated overpack. These data also contain some noise, so research teams developed their own simplified developed boundary conditions. Task D validated various approaches thorough the simulation of the in-situ full scale EBS system including backfill of the gallery: variations in the coupling processes (THM or THC), analysis codes, and boundary conditions. Temperature distribution in the buffer material was simulated well by all research teams. This means thermal behaviour is not sensitive to the simulation approaches. Although the water content distribution on the outside of the buffer material was well simulated by all research teams, the simulation results differ from the measured values inside the buffer material (at the centre and inside, near the simulated overpack). The buffer material is made from tap water, but in the in-situ experiment, saline groundwater infiltrates the buffer material. Therefore, the selection of the hydraulic parameters of the buffer material greatly affects the simulation results of the re saturation behaviour of the buffer material. In the Horonobe EBS experiment, measured values suitable for validating the simulation results were not obtained near the simulated overpack. When simulating the pressure and deformation of the buffer material, the measurement data is easily affected by the installation conditions of the measurement sensors, so verifying the measurement data itself remains an issue. Mechanical simulation results differ depending on whether they are considered as elastic or elastoplastic phenomena. The accuracy of measured in-situ data can be assessed by detailed analysis comparing sampling specimen analysis and measured data. The Horonobe EBS experiment is scheduled to be dismantled in the future (FY2026 and 2027). This detailed dismantling investigation will finally confirm the measured data.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Test Results From a Simulated High-Voltage Lunar Power Transmission Line

The Alternator Test Unit (ATU) in the Lunar Power System Facility (LPSF) located at the NASA Glenn Research Center (GRC) in Cleveland, Ohio was modified to simulate high-voltage transmission capability. The testbed simulated a 1 km transmission cable length from the ATU to the LPSF using resistors and inductors installed between the distribution transformers. Power factor correction circuitry was used to compensate for the reactance of the distribution system to improve the overall power factor. This test demonstrated that a permanent magnet alternator can successfully provide high-frequency ac power to a lunar facility located at a distance.

Birchenough, Arthur↗

Using Resin to Reduce Silica in Borated Fluid - 20072

The Electric Power Research Institute (EPRI) strongly recommends the concentration of silica in the reactor coolant be limited, potential ingress be carefully controlled, and frequently monitored to assess potential silica deposits on fuel cladding surfaces. Boraflex is a product with silicone rubber encasing a neutron absorber for criticality control, and it was installed in the majority of nuclear power plant spent fuel pools. Over time and in the presence of radiation, the silicone rubber lining degrades into silica (SiO{sub 2}) and hydrogen gas. Silica is somewhat soluble in water and spent fuel pool water communicates with other plant systems during refueling outages, leading to a buildup of silica in the reactor coolant and connected systems. Due to the prevalence of Boraflex racks in spent fuel pools, the presence of silica is a chronic nuclear industry concern. To address this concern, many nuclear plants have installed reverse osmosis skid systems to remove the silica from their spent fuel pools and, by extension, from reactor coolant. These skids are expensive to install and maintain. Arcadis personnel demonstrated that an iron-impregnated resin could be used to remove silica from borated systems without impacting the water quality. The resin was readily available, inexpensive, and easy to install in existing plant equipment. During a nuclear power plant's refueling outage the iron-impregnated resin proved to be effective in reducing the need for feed and bleed operations, with concurrent cost savings and reduction in required outage water management activities. Thus, the following savings were realized: - Eliminated the need to purchase, install, and maintain a reverse osmosis system avoiding more than $10 million in up-front capital cost and ongoing operating and maintenance costs. - Removed 9.57 kilograms (21 pounds) of silica dioxide from the primary system fluid. - Reduced the volume of feed and bleed from 70,000 gallons (2.65 E+05 liters) to 35,000 gallons (1.32 E+05 liters). - Saved $380,000 in water production and disposal costs. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

43 PARTICLE ACCELERATORS↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

Barbier, Charlotte↗

Optimization of Archimedes Screw for Use in Hydroelectric Projects

In 2017, the Department of Energy’s (DOE) Water Power Technologies Office (WPTO) made federal funding available to several awardees to investigate and provide innovative technological solutions to reduce capital costs of installed hydroelectric facilities at non-powered dam’s (NPD’s) across the United States, while maintaining a high level of efficiency. Awardees were to develop specific technologies that showed promise of reducing installed capital cost (ICC) by at least 20% over a given baseline and maintain a water-to-wire efficiency of at least 80% at head levels of 50 feet or less and flows of 1000 cubic feet per second (cfs) or less. Canyon Hydro (Canyon) was selected as an awardee for this funding and worked to refine the implementation of the Archimedes screw turbine for use at these site conditions. Canyon and its project partners analyzed several dam inventory datasets to determine the most common head and flow range of current NPD’s in order to best select design conditions for a turbine that would perform successfully at common heads and flows. Computational Fluid Dynamic (CFD) analyses were conducted after site conditions had been selected to optimize the turbine geometry for efficiency. Through this effort we were able to estimate water-to-wire efficiency over a range of flows. Equipment design focused on concepts of modularity and pre-fabricated construction. These methodologies were used where possible to reduce costly on-site construction and shorten deployment timelines. Cost modeling was conducted with input from industry experts in general construction, pre-fabricated concrete construction, and composite fabrication. As a hydroelectric turbine manufacturer of 35 years, Canyon drew upon its own knowledge base in steel fabrication, water-to-wire component specification and ancillary systems to develop the remaining cost matrix for the project. As a result of these efforts, Canyon was able to present findings that indicated a modular Archimedes screw turbine system could be designed that reduced ICC by 23.9% and maintain a maximum water-to-wire efficiency of 82.3%, meeting the goals of the project.

13 HYDRO ENERGY↗

T55 power turbine rotor multiplane-multispeed balancing study

A rotordynamic analysis of the T55-L-11C engine was used to evaluate the balancing needs of the power turbine and to optimize the balancing procedure. As a result, recommendations were made for implementation of a multiplane-multispeed balancing plan. Precision collars for the attachment of trial weights to a slender rotor were designed enabling demonstration balancing on production hardware. The quality of the balance was then evaluated by installing a high speed balanced power turbine in an engine and running in a test cell at the Corpus Christi Army depot. The engine used had been tested prior to the turbine changeout and showed acceptable overall vibration levels for the engine were significantly reduced, demonstrating the ability of multiplane-multispeed balancing to control engine vibration.

Martin, M. R.↗

The infrared imaging video bolometer at Wendelstein 7-X

The radiated power distribution is a crucial aspect of heat transport, heat load mitigation, and plasma exhaust performance. An imaging video bolometer camera has been installed to measure the plasma radiated power in the divertor region of the Wendelstein 7-X (W7-X) stellarator. This diagnostic offers a wide-angle (40° × 68°) sampling of the plasma volume in both the poloidal and toroidal directions. The field-of-view is covered with a large number (> 500) of bolometer channels, providing imaging capability. The diagnostic design is introduced here together with its data analysis procedure. A set of laboratory experiments is performed to assess the thermal properties of the gold absorber foil and their spatial uniformity. Following installation, a heat source originating from the inertially cooled front of the diagnostic is identified and filtered out. The discharge data indicate a satisfactory signal-to-noise ratio as well as spatiotemporal resolution. These represent the first toroidally resolved images of the line-integrated radiated power in the W7-X island divertor. The diagnostic was then upgraded with a thinner platinum absorber and adjusted mirrors. Early data from the most recent experimental campaign employing the upgraded design show a considerable improvement in the diagnostic performance with more bolometer channels (> 1400), extended coverage, and increased spatial resolution.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Exceedance Probabilities and Recurrence Intervals for Extended Power Outages in the United States

Power outages cause significant economic and societal impacts. An increasing likelihood of extreme weather coupled with aging grid infrastructure is leading to a higher prevalence of extended power outages, which can leave customers without power for multiple days or even weeks. Planners at the facility, local, state, and federal levels are interested in resilience solutions to reduce the impacts of extended power outages. Resilience solutions—such as installing backup systems, integrating microgrid solutions, weatherizing buildings, and hardening distribution and transmission components—can reduce the consequences of extended power outages, but these solutions come with increased capital costs. Conducting cost-benefit analyses is important for determining which steps to take to mitigate the impact of power outages without investing in ineffective and cost-prohibitive resilience solutions. The expected benefits of resilience investments depend on the frequency of power outages of various durations, particularly extended outages lasting several hours, days, or weeks. A significant barrier to resilience planning is the lack of publicly available data on the frequency and duration of extended power outages. The absence of outage duration information severely limits the ability to conduct quantitative cost-benefit analyses of resilience investments. This report provides estimates of recurrence intervals and conditional exceedance probabilities for major power outages by U.S. region between 2015 and 2021. Additionally, we provide estimates for grid management, particularly outages caused by California’s public safety power shutoffs (PSPS), and for natural outages caused by major hurricanes. Outage recurrence intervals are the average number of years between outage events, and conditional exceedance probabilities are the likelihoods that a customer who experiences a major power outage will experience an outage exceeding a given duration. Major outage events are those that affect 10,000 or more customers, as defined by the U.S. Department of Energy’s (DOE’s) Electric Emergency Incident and Disturbance Report, called OE-417 (DOE 2020). These results can be applied to determine the likelihood of experiencing long-duration outages, which can be integrated into cost-benefit analyses of resilience solutions and broader energy resilience studies. We developed a methodology to estimate customer outage durations for extended outage events using publicly available data on customer outages. Shorter-duration power outages are relatively common, with customers experiencing on average more than one power outage each year lasting fewer than 12 hours. An outage event lasting between 1 day and 1 week is expected to occur between once every 16 years and once every 42 years, depending on the region, with an average recurrence rate of once every 32 years across the contiguous United States.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Space transportation system options for extended duration and power

A modification kit for the Space Transportation System (STS) Orbiter is proposed to provide more power and mission duration for payloads. The power extension package (PEP) - a flexible-substrate solar array deployed on the Space Shuttle Orbiter remote manipulator system - can provide as much as 29 kW total power for durations of 10 to 48 days. The kit is installed only for those flights which require enhanced power or duration. Modifications to the Orbiter thermal control and life support systems to improve heat balance and to reduce consumables are proposed. The changes consist of repositioning the Orbiter forward radiators and replacing the lithium hydroxide scrubber with a regenerable solid amine.

Loftus, J. P., Jr.↗

Space Shuttle power extension package

A modification kit for the Space Transportation System (STS) Orbiter is proposed to provide more power and mission duration for payloads. The power extension package (PEP), a flexible-substrate solar array deployed on the Space Shuttle Orbiter remote manipulator system, can provide as much as 29 kW total power for durations of 10 to 48 days. The kit is installed only for those flights which require enhanced power or duration. The PEP is made possible by development of the flexible-substrate array technology and, in itself, contributes to the technology base for the use of large area solar cells. Modifications to the Orbiter thermal control and life support systems to improve heat balance and to reduce consumables are proposed. The changes consist of repositioning the Orbiter forward radiators and replacing the lithium hydroxide scrubber with a regenerable solid amine.

Loftus, J. P., Jr.↗

Grid connection barriers to renewable energy deployment in the United States

Bulk-power grid connection is an emerging bottleneck to the entry of wind, solar, and storage but has been understudied due to a lack of data. We create and analyze two novel interconnection datasets with more than 38,000 project-level observations that provide new information documenting interconnection challenges in the United States. Active grid connection requests are more than double the total installed capacity of the US power plant fleet (2,600 vs. 1,280 GW). The time required to secure a connection has increased by 70% over the last decade, and withdrawal rates remain high at 80%, suggesting a constrained transmission system that jeopardizes energy transition targets. Wide distributions of interconnection costs indicate the inherent uncertainty of the interconnection process. Interconnection requests that identify large transmission upgrades tend to withdraw from the process. These findings suggest the need for interconnection reforms, tighter links between long-term transmission planning and project-level interconnection processes, and more interconnection outcome transparency.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Software defined grid energy storage

Today, consumer battery installations are isolated, physical devices. Virtual power plants (VPPs) allow consumer devices to aggregate for grid services, but they are are vertically integrated, vendor controlled systems (e.g., Tesla’s VPP). Consumer batteries are therefore unable to participate in energy markets or other grid services outside what their vendor provides. We describe a software system that provides software control of multiple, networked battery energy storage systems in the electric grid. The system introduces two new ideas that enable flexible and dependable management of energy storage. The first is a virtual battery, which can either partition a battery or aggregate multiple batteries. The second is a reservation-based API which allows asynchronous control of batteries to meet contractual guarantees in a safe and dependable manner. Virtual batteries and a reservation-based API address the unique challenges of achieving high and efficient utilization of energy storage systems, including heterogeneity of battery systems such as varying C-rates, participation in energy markets, utility bill management systems, community resource sharing, and reliability. Using a testbed comprised of sonnen Inc. storage units installed in several homes and a lab, we demonstrate that virtualized batteries can seamlessly replace physical batteries, flexibly manage energy storage resources, isolate multiple clients using a shared battery, and create new energy storage applications.

25 ENERGY STORAGE↗

Solar Air Sampler

Nation's first solar-cell-powered air monitoring station was installed at Liberty State Park, New Jersey. Jointly sponsored by state agencies and the Department of Energy, system includes display which describes its operation to park visitors. Unit samples air every sixth day for a period of 24 hours. Air is forced through a glass filter, then is removed each week for examination by the New Jersey Bureau of Air Pollution. During the day, solar cells provide total power for the sampling equipment. Excess energy is stored in a bank of lead-acid batteries for use when needed.

Source record↗