Search NASA⌕ Search

SEARCH · Search NASA

Results for “interval management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Proceedings of the Second Workshop on Voltage Breakdown in Electronic Equipment at Low Air Pressure

The Second Workshop on Voltage Breakdown in Electronic Equipment at Low Air Pressure was sponsored by the Jet Propulsion Laboratory, Pasadena, California. It has been three and one-half years since the convening of the first workshop on voltage breakdown. In this interval, gains are evidenced in the progress and sophistication in solving voltage breakdown problems affecting electronic equip­ment operating at high altitudes or other low air pressure environments. Although space applications predominate the area of concern, other projects such as the SST are becoming increasingly involved with voltage breakdown. High-voltage breakdown in spacecraft continues; however, the incidences of occurrence appear to have decreased in spite of an increase in the number of missions flown. This, it is felt, is due to many project managers now requiring all equipment with voltage in excess of 270-V peak to be designed to operate in the critical pressure region without damage, even though its normal functional environment is sea level pressure and the hard vacuum of space. In addition, designers are becoming more aware of the principle of good high-voltage design by selecting void-free components, proper spacing of conductors, isolating high-­voltage circuitry from lower voltage areas, etc. The consensus seems to be that the slight increase in cost to achieve a provable corona-free design is more than offset by the increase in confidence that the equipment will survive accidental loss of vacuum during high-vacuum tests, inadvertent turn on while passing through the critical air-pressure region of earth after launch or outgassing in flight pressurizing the enclosure into the critical pressure region.

E. R. Bunker, Jr.↗

Estimated Probability of a Cervical Spine Injury During an ISS Mission

Introduction: The Integrated Medical Model (IMM) utilizes historical data, cohort data, and external simulations as input factors to provide estimates of crew health, resource utilization and mission outcomes. The Cervical Spine Injury Module (CSIM) is an external simulation designed to provide the IMM with parameter estimates for 1) a probability distribution function (PDF) of the incidence rate, 2) the mean incidence rate, and 3) the standard deviation associated with the mean resulting from injury/trauma of the neck. Methods: An injury mechanism based on an idealized low-velocity blunt impact to the superior posterior thorax of an ISS crewmember was used as the simulated mission environment. As a result of this impact, the cervical spine is inertially loaded from the mass of the head producing an extension-flexion motion deforming the soft tissues of the neck. A multibody biomechanical model was developed to estimate the kinematic and dynamic response of the head-neck system from a prescribed acceleration profile. Logistic regression was performed on a dataset containing AIS1 soft tissue neck injuries from rear-end automobile collisions with published Neck Injury Criterion values producing an injury transfer function (ITF). An injury event scenario (IES) was constructed such that crew 1 is moving through a primary or standard translation path transferring large volume equipment impacting stationary crew 2. The incidence rate for this IES was estimated from in-flight data and used to calculate the probability of occurrence. The uncertainty in the model input factors were estimated from representative datasets and expressed in terms of probability distributions. A Monte Carlo Method utilizing simple random sampling was employed to propagate both aleatory and epistemic uncertain factors. Scatterplots and partial correlation coefficients (PCC) were generated to determine input factor sensitivity. CSIM was developed in the SimMechanics/Simulink environment with a Monte Carlo wrapper (MATLAB) used to integrate the components of the module. Results: The probability of generating an AIS1 soft tissue neck injury from the extension/flexion motion induced by a low-velocity blunt impact to the superior posterior thorax was fitted with a lognormal PDF with mean 0.26409, standard deviation 0.11353, standard error of mean 0.00114, and 95% confidence interval [0.26186, 0.26631]. Combining the probability of an AIS1 injury with the probability of IES occurrence was fitted with a Johnson SI PDF with mean 0.02772, standard deviation 0.02012, standard error of mean 0.00020, and 95% confidence interval [0.02733, 0.02812]. The input factor sensitivity analysis in descending order was IES incidence rate, ITF regression coefficient 1, impactor initial velocity, ITF regression coefficient 2, and all others (equipment mass, crew 1 body mass, crew 2 body mass) insignificant. Verification and Validation (V&V): The IMM V&V, based upon NASA STD 7009, was implemented which included an assessment of the data sets used to build CSIM. The documentation maintained includes source code comments and a technical report. The software code and documentation is under Subversion configuration management. Kinematic validation was performed by comparing the biomechanical model output to established corridors.

Brooker, John E.↗

Space Station Furnace Facility Management Information System (SSFF-MIS) Development

This report summarizes the chronology, results, and lessons learned from the development of the SSFF-MIS. This system has been nearly two years in development and has yielded some valuable insights into specialized MIS development. General: In December of 1994, the Camber Corporation and Science Applications International Corporation (SAIC) were contracted to design, develop, and implement a MIS for Marshall Space Flight Center's Space Station Furnace Facility Project. The system was to be accessible from both EBM-Compatible PC and Macintosh platforms. The system was required to contain data manually entered into the MIS as well as data imported from other MSFC sources. Electronic interfaces were established for each data source and retrieval was to be performed at prescribed time intervals. The SOW requirement that predominantly drove the development software selection was the dual-platform (IBM-PC and Macintosh) requirement. The requirement that the system would be maintained by Government personnel influenced the selection of Commercial Off-the-shelf software because of its inherent stability and readily available documentation and support. Microsoft FoxPro Professional 2.6 for Windows and Macintosh was selected as the development tool. This is a software development tool that has been in use for many years. It is stable and powerful. Microsoft has since released the replacement for this product, Microsoft Visual FoxPro, but at the time of this development, it was only available on the Windows platform. The initial contract included included the requirement for capabilities relating to the Work- and Organizational Breakdown Structures, cost (plan and actuals), workforce (plan and actuals), critical path scheduling, trend analysis, procurements and contracts, interface to manufacturing, Safety and Mission Assurance, risk analysis, and technical performance indicators. It also required full documentation of the system and training of users. During the course of the contract, the requirements for Safety and Mission Assurance interface, risk analysis, and technical performance indicators were deleted. Additional capabilities were added as reflected in the Contract Chronology below. Modification 4 added the requirement for Support Contractor manpower data, the ability to manually input data not imported from non-nal sources, a general 'health' indicator screen, and remote usage. Mod 6 included the ability to change the level of planning of Civil Service Manpower at any time and the ability to manually enter Op Codes in the manufacturing data where such codes were not provided by the EMPACS database. Modification 9 included a number of changes to report contents and formats. Modification 11 required the preparation of a detailed System Design Document.

Meade, Robert M.↗

2013 Immune Risk Standing Review Panel Research Plan Review for: The Risk of Crew Adverse Health Event Due to Altered Immune Response

The 2013 Immune Risk Standing Review Panel (from here on referred to as the SRP) participated in a meeting with representatives from the Human Research Program (HRP) Human Health Countermeasures (HHC) Element and HRP management on February 3-4, 2014 in Houston, TX to review the updated Research Plan for the Risk of Crew Adverse Health Event Due to Altered Immune Response in the HRP Integrated Research Plan. The SRP is impressed with the work the immune discipline has done since the 2012 SRP review and agrees with the new wording of the Gaps, no longer questions, now statements. The SRP also likes the addition of adding targets for closing the Gaps, but it is not clear how they got to some of the interim stages (interval percentages). A major concern that the SRP has mentioned since the initial 2009 SRP meeting is that there is still not enough emphasis on the interdisciplinary aspect of the immune risk associated with other risks (i.e., nutrition, radiation, etc.). The SRP recommends that a "translational SRP" or advisory group be developed that is composed of members from all of the HRP SRPs. The SRP also thinks that the immune discipline should consider a more systems biology approach. Lastly, the SRP is concerned that the risks observed in research from low Earth orbit (LEO) missions may not accurately reflect all the risks of longer duration flight beyond LEO. Also, there does not seem to be a concern for immune responses that may occur when someone is in space longer than six months, for example, a Mars mission would take three years. The absence of disease in past and current flight scenarios does not mean the risk may not be there in future flight settings.

Steinberg, Susan↗

Machine Learning-Driven Quantification of CO2 Plume Dynamics at Illinois Basin Decatur Project Sites Using Microseismic Data

This study utilizes machine learning to quantify CO2 plume extents by analyzing microseismic data from the Illinois Basin Decatur Project (IBDP). Leveraging a unique dataset of well logs, microseismic records, and CO2 injection metrics, this work aims to predict the temporal evolution of subsurface CO2 saturation plumes. The findings illustrate that machine learning can predict plume dynamics, revealing vertical clustering of microseismic events over distinct time periods within certain proximities to the injection well, consistent with an invasion percolation model. The buoyant CO2 plume partially trapped within sandstone intervals periodically breaches localized barriers or baffles, which act as leaky seals and impede vertical migration until buoyancy overcomes gravity and capillary forces, leading to breakthroughs along vertical zones of weakness. Between different unsupervised clustering techniques, K-Means and DBSCAN were applied and analyzed in detail, where K-means outperformed DBSCAN in this specific study by indicating the combination of the highest Silhouette Score and the lowest Davies–Bouldin Index. The predictive capability of machine learning models in quantifying CO2 saturation plume extension is significant for real-time monitoring and management of CO2 sequestration sites. The models exhibit high accuracy, validated against physical models and injection data from the IBDP, reinforcing the viability of CO2 geological sequestration as a climate change mitigation strategy and enhancing advanced tools for safe management of these operations.

Iyegbekedo, Ikponmwosa↗

Climate Information and Lessons Learned from the NASA Earth eXchange (NEX), Short-term Prediction Research and Transition Center (NASA SPoRT), and the NASA Regional Climate Model Evaluation System (RCMES)

Climate resilience can emerge from a combination of (1) climate projections that enable future-oriented planning and (2) contemporary observations that can be used for adaptation in the face of realized climate. NASA is uniquely positioned to provide global climate projections and satellite-based observations to users who must take a global perspective on climate risk (e.g., supply chain managers). Here, we will share the capabilities and experiences of three NASA projects. The first project, the NASA Earth eXchange (NEX) provides two downscaled climate projections, NEX-GDDP-CMIP6, a global 25 km resolution product, and NEX-DCP30-CMIP6, an 800 m resolution product covering the coterminous U.S. specifically designed for U.S. National Climate Assessment (NCA). NEX also offers land surface products that mirror the twice-daily products provided by the Moderate Resolution Imaging Spectroradiometer (MODIS) but are derived from operational geostationary weather satellite data collected at 5-10 minutes intervals. The second project, the Short-term Prediction Research and Transition Center (SPoRT), was established in 2002 to transition unique NASA satellite products and capabilities to stakeholders to improve decision-making that benefits society. SPoRT provides products and capabilities derived from NASA observations and models to end users in government, academia, and the private sector. SPoRT translates NASA Earth science into actionable solutions reaching over 400 stakeholders across 80 organizations. Finally, the Regional Climate Model Evaluation System (RCMES) is designed to facilitate regional-scale evaluations of climate models by providing standardized access to a vast and comprehensive set of observations, such as satellite, in-situ, and reanalyses, and modeling resources such as CMIP & CORDEX. These three projects form part of the core capabilities at the NASA Centers deliver climate information under the new NASA Earth Science to Action (ES2A) strategy.

NEX↗

Human Factors in Training

Future space missions will be significantly longer than current shuttle missions and new systems will be more complex than current systems. Increasing communication delays between crews and Earth-based support means that astronauts need to be prepared to handle the unexpected on their own. As crews become more autonomous, their potential span of control and required expertise must grow to match their autonomy. It is not possible to train for every eventuality ahead of time on the ground, or to maintain trained skills across long intervals of disuse. To adequately prepare NASA personnel for these challenges, new training approaches, methodologies, and tools are required. This research project aims at developing these training capabilities. By researching established training principles, examining future needs, and by using current practices in space flight training as test beds, both in Flight Controller and Crew Medical domains, this research project is mitigating program risks and generating templates and requirements to meet future training needs. Training efforts in Fiscal Year 08 (FY08) strongly focused on crew medical training, but also began exploring how Space Flight Resource Management training for Mission Operations Directorate (MOD) Flight Controllers could be integrated with systems training for optimal Mission Control Center (MCC) operations. The Training Task addresses Program risks that lie at the intersection of the following three risks identified by the Project: (1) Risk associated with poor task design (2) Risk of error due to inadequate information (3) Risk associated with reduced safety and efficiency due to poor human factors design

Barshi, Immanuel↗

Human Factors in Training

Future space missions will be significantly longer than current shuttle missions and new systems will be more complex than current systems. Increasing communication delays between crews and Earth-based support means that astronauts need to be prepared to handle the unexpected on their own. As crews become more autonomous, their potential span of control and required expertise must grow to match their autonomy. It is not possible to train for every eventuality ahead of time on the ground, or to maintain trained skills across long intervals of disuse. To adequately prepare NASA personnel for these challenges, new training approaches, methodologies, and tools are required. This research project aims at developing these training capabilities. By researching established training principles, examining future needs, and by using current practices in space flight training as test beds, both in Flight Controller and Crew Medical domains, this research project is mitigating program risks and generating templates and requirements to meet future training needs. Training efforts in Fiscal Year 09 (FY09) strongly focused on crew medical training, but also began exploring how Space Flight Resource Management training for Mission Operations Directorate (MOD) Flight Controllers could be integrated with systems training for optimal Mission Control Center (MCC) operations. The Training Task addresses Program risks that lie at the intersection of the following three risks identified by the Project: 1) Risk associated with poor task design; 2) Risk of error due to inadequate information; and 3) Risk associated with reduced safety and efficiency due to poor human factors design.

Barshi, Immanuel↗

Artificial Diversity and Defense Security (ADDSec)

Artificial Diversity and Defense Security (ADDSec) machine learning algorithms are used to classify and cluster threats so that an appropriate response can be initiated as a mitigation strategy. The package includes an ensemble of machine learning algorithms such as Support Vector Machines, naïve bayes, logistic regression, and random forest that evolve with the data to recognize anomalous behavior at the host and network levels. Inputs into the machine learning algorithms include end host system calls, system utilization, packet captures, and syslog messages. The machine learning algorithms can be retrained based on user defined intervals or on the number of packets received. ADDSEC's threat responses include Internet Protocol (IP) Address randomization, application port number randomization, and application library randomization. The IP randomization implementation is built on top of a Software Defined Networking (SDN) framework. The SDN controller installs flows on each of the SDN switches with randomized source and destination IP addresses. The application port numbers are randomized using iptables. The application library randomization is created with a LLVM compiler. All randomization schemes are transparent to the endpoints on the network. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525. SAND2021-3379 O

Cox, RebeccaE.↗

Comparison of removal and spatial mark‐resight models for estimating wild pig density

Density estimation is critical to effectively manage invasive species and elucidate areas of highest concern. For wild pigs (Sus scrofa), the ability to estimate density is complicated because of their variable home range sizes and social structure. Common methods for estimating density (e.g., mark-recapture) may be unsuitable in management applications because additional data needs to be collected before and after management. Removal models offer a suitable alternative to estimate density changes following management and can be applied broadly across areas where management of wild pigs is ongoing. We collected wild pig removal and camera trap data from 25 private properties ranging in size from approximately 0.5 km 2 to 95 km 2 across 3 ecoregions in South Carolina, USA, from 2020–2023. We compared factors affecting consistency and precision of property-level density estimates between removal and spatial mark-resight (SMR) models. In general, excluding 1 large outlier, density estimates from removal models were between 0.60 and 15.85 wild pigs/km 2 (median = 5.34) with a median coefficient of variation (CV) of 0.76 and 95% confidence intervals for the CV between 0.70 and 0.94. Similarly, excluding 1 large outlier, density estimates from SMR were between 0.22 and 30.97 wild pigs/km 2 (median = 5.48) with a median CV of 0.39 and 95% confidence intervals for the CV between 0.38 and 1.20. We found the precision of removal models was affected primarily by the number of wild pigs dispatched in the removal period (3 months) and the ecoregion in which they were removed. None of the covariates, including the number of recaptures (a corresponding measure of sample size), influenced precision of the SMR models, although recaptures did influence the density estimates. At the individual property level, density estimates from our 2 estimators were dissimilar from each other in approximately 80% of instances, although none of the covariates we examined influenced dissimilarity. Our results provide unique insight into how sample size affects density estimates using 2 common methods and into novel SMR models that incorporate both marked and unmarked detections. In addition, the density estimates in this study can be used as a reference for wild pig densities in common land cover types throughout the southeastern United States.

60 APPLIED LIFE SCIENCES↗

Development of a vadose zone advanced monitoring system: Tools to assess groundwater vulnerability

Performing repeat pore-fluid sampling over long time-scales can provide valuable information on unsaturated zone contaminants and their potential flux to ground water. This information can be used to manage groundwater remedies and identify contaminants that need to be sequestered in the vadose zone to minimize flux to ground water. Pore-water samples are commonly used to obtain contaminant concentrations within the vadose zone, but existing methods are limited as they only provide a single sample at one location and time. The vadose zone advanced monitoring system (VZAMS) has been designed to integrate multiple technologies into a single down-borehole system that allows for sampling of pore fluids (liquid and gas) to provide information about contamination and hydraulic conditions at multiple depths (~0.3-m intervals) within a cased borehole. Testing has been completed at the laboratory scale to verify the sampling elements of VZAMS, including geochemical testing for representative contaminants known to exist at the Hanford Site, located in southeastern Washington State. Physical tests focused on the ability of the sampler to draw fluid under unsaturated conditions. Initial geochemical testing showed that the stainless steel material used with the porous cuff may affect the sampled concentrations of redox-sensitive contaminants under very dry conditions. Additional laboratory testing demonstrated that the VZAMS components are able to collect representative samples for substances of interest under expected field conditions. In this paper, the design and functionality of a novel instrument are demonstrated in support of subsequent testing in the field.

54 ENVIRONMENTAL SCIENCES↗

Operational Probabilistic Tools for Solar Uncertainty (OPTSUN) (Final Project Report for DOE Solar Forecasting II Project)

Increasing levels of solar PV can challenge system operations and may require novel methods to operate the power system reliably and efficiently. Power system operating plans generally use deterministic forecasts, in which the variable energy resources are represented by the expected value for each interval of the decision horizon. Probabilistic forecasts are relatively new but have the potential to address the shortfalls of deterministic forecasts. However, understanding how best to use such forecasts is still a key gap in industry and was the focus of this project. The project had three workstreams. In a forecasting workstream, improvements were made to baseline probabilistic forecasts using a number of new approaches such as machine learning methods and improved input data. In a design workstream, advanced simulation tools used these forecasts to investigate newly proposed reserve determination methods. Lastly, in a demonstration workstream a scheduling management platform (SMP) was developed to leverage probabilistic forecasts in a modular and customizable manner. In order to study the benefits that could be accrued, the project team collaborated with three utility partners (Duke Energy, Southern Company and Hawaiian Electric) to deliver improved probabilistic forecasts for each region and to model each region in case studies using advanced production cost modeling tools. Different methods to determine operating reserve requirements from probabilistic forecasts were developed, simulated, and tested across each region. The benefits of using these newly proposed methods varied by utility, but, in general, using probabilistic forecasts as well as historical data to set the reserve requirements seems to improve reliability related results, with less risk of reserve or supply shortfalls. The cost implications were not always straightforward; in some cases the new methods could show a reduction in expected operating costs, but often the increase in reserves associated with better risk mitigation using probabilistic forecasts could result in an increase in operating costs in the simulations. The SMP tool was developed to process probabilistic forecasts from their initial receipt through to scheduling decisions. This open-source tool consists of several modules for scenario development, reserve requirements calculation, and visualization. The SMP tool was demonstrated to a wide range of operators and stakeholders at all three utilities and further improved based on their feedback. The tool will be available on www.epri.com/optsun. The proposed probabilistic information-based reserve determination approaches have the potential to be implemented by different regions to ensure an economic and reliable power system operation on power systems integrating increasing levels of variable renewable resources. The innovative yet practical methods developed in this project demonstrated tangible benefits from using probabilistic forecasts beyond just study-based assessments to include three unique balancing areas. The demonstrated benefits across the multiple utility environments, are expected to provide system operators in all regions the confidence required and a platform to adopt the new forecasting and operating methods.

14 SOLAR ENERGY↗

Parametric Study of Federated Conflict Resolution for UAM Operations

This work presents a federated conflict resolution algorithm and its parametric study for UAM operations. A federated speed-control-based conflict resolution algorithm is introduced first, including its rules of the road, data exchange requirement, and critical parameters. Two experiments were set up for the parametric study. The first investigates five parameters: look ahead time, resolution update interval, maximum allowed speed reduction, traffic flow interval, and crossing angle. The second experiment studies the uncertainty of departure time. Metrics associated with safety, efficiency, and conflict resolution effort were measured for each scenario. A Design Of Experiment (DOE) analysis was used to perform the multi-factor analysis for the first experiment. It revealed that the crossing angle and flow interval were the most critical parameters across all three metrics, followed by maximum allowed speed reduction. Look ahead time and resolution update interval were of minor significance to safety and conflict resolution effort, but had little to no effect on efficiency. The analysis of the second experiment showed that, given a flow rate, the fluctuation in departure time was absorbed by the conflict resolution algorithm, which resulted in a relatively small fluctuation in airborne delay.

Urban air mobility↗

Parametric Study of Federated Conflict Resolution for UAM Operations using DOE Analysis

This work presents a federated conflict resolution algorithm and its parametric study for UAM operations. A federated speed-control-based conflict resolution algorithm is introduced first, including its rules of the road, data exchange requirement, and critical parameters. Two experiments were set up for the parametric study. The first investigates five parameters: look ahead time, resolution update interval, maximum allowed speed reduction, traffic flow interval, and crossing angle. The second experiment studies the uncertainty of departure time. Metrics associated with safety, efficiency, and conflict resolution effort were measured for each scenario. A Design Of Experiment (DOE) analysis was used to perform the multi-factor analysis for the first experiment. It revealed that the crossing angle and flow interval were the most critical parameters across all three metrics, followed by maximum allowed speed reduction. Look ahead time and resolution update interval were of minor significance to safety and conflict resolution effort, but had little to no effect on efficiency. The analysis of the second experiment showed that, given a flow rate, the fluctuation in departure time was absorbed by the conflict resolution algorithm, which resulted in a relatively small fluctuation in airborne delay.

Urban air mobility↗

Launch Complex 39B, SWMU 009 Air Sparging System Expansion Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) for expansion of the Air Sparging (AS) system at Launch Complex 39B (LC39B), presents the design and coordination specifics to expand the existing AS Interim Measure (IM) at LC39B located at Kennedy Space Center (KSC), Florida. The existing AS system at LC39B was installed in 2017 and included 279 AS wells. LC39B has been designated as Solid Waste Management Unit (SWMU) 009 under the KSC Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Expansion of the AS IM will include installation of an additional five AS wells to depths of approximately 13 and 17 feet below land surface (bls) to remediate contaminated groundwater identified northwest of the launch pad, near the liquid oxygen (LOX) tank. The expansion will target concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC) greater than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs) that were identified during direct push technology (DPT) sampling events between 2019-2022 in shallow intervals between 8 and 16 feet bls. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to below NADCs to support transition to monitored natural attenuation (MNA) through a long-term monitoring (LTM) program. This expansion will treat approximately 0.07-acres of residual groundwater contamination. The IWP design for this expansion will utilize the existing AS system trailer that is already onsite and operating. The five new AS expansion wells will be integrated into the existing Zone Z4 distribution manifold to deliver compressed air to the new AS wells. To deliver airflow, three existing lateral lines will be split in the field at a lateral split junction point (using 2-way or 3-way splits). Each split lateral will supply air to AS wells at the same depth interval to minimize preferential pathways. The trenching layout for the new AS wells was developed to minimize ground disturbance due to the amount of utilities in the area. One new monitoring well will also be installed and added to LC39B’s performance monitoring program to evaluate the effectiveness of the AS system expansion. This well will be sampled on a semi-annual basis for volatile organic compounds, with results evaluated to determine if system adjustments may be required. The main components of this IWP were presented to the KSC Remediation Team (KSCRT) at the October 2022 Meeting (Meeting 2210-M05). DPT delineation data from the LOX area were also presented, which included some inferred boundaries due to physical restrictions of the LOX tank and associated concrete pad and infrastructure. Planned monitoring well sampling in this area will help determine if back-diffusion may be occurring from beneath the pad. Additionally, based on potential petroleum odors and staining identified at two DPT locations during the January 2022 DPT event in the 10-16 feet bls range, a KSCRT action item was assigned during the October 2022 meeting to collect soil samples for petroleum compounds if similar odors or staining are identified during IM implementation. Construction completion and performance monitoring will be incorporated into LC39B’s groundwater monitoring reports, which are currently submitted on an annual basis to FDEP to document operation and maintenance activities and results from the AS IM.

Deborah M. Wilson↗

Manual control models of industrial management

The industrial engineer is often required to design and implement control systems and organization for manufacturing and service facilities, to optimize quality, delivery, and yield, and minimize cost. Despite progress in computer science most such systems still employ human operators and managers as real-time control elements. Manual control theory should therefore be applicable to at least some aspects of industrial system design and operations. Formulation of adequate model structures is an essential prerequisite to progress in this area; since real-world production systems invariably include multilevel and multiloop control, and are implemented by timeshared human effort. A modular structure incorporating certain new types of functional element, has been developed. This forms the basis for analysis of an industrial process operation. In this case it appears that managerial controllers operate in a discrete predictive mode based on fast time modelling, with sampling interval related to plant dynamics. Successive aggregation causes reduced response bandwidth and hence increased sampling interval as a function of level.

Crossman, E. R. F. W.↗

Human Factors Assessment of Disturbances to Scheduled Performance-Based Navigation Arrival Operations

The introduction of Performance-Based Navigation (PBN) specifications to air traffic management has resulted in many benefits during nominal operations, including shorter flight paths, reduced fuel costs, and improved terminal area arrival rates. However, these benefits become less noticeable during off-nominal operations where aircraft are routinely interrupted from staying on PBN procedures due to disturbances such as missed approaches. This human-in-the-loop (HITL) study used multiple types of disturbance events to perturb the arrival schedule. Perturbed schedules were managed with different types of schedule adjustments, including a condition with no adjustments. The study collected data on a host of dependent variables, including human factors measures on controller workload and system performance measures such as schedule nonconformance (nc). Initial analyses showed strong correlations between aggregated controller workload and aggregated nc, as well as benefits of both automatic and manual schedule adjustments for increasing system performance, such as reduced PBN procedure interruptions. The goal of this paper is to further test these initial findings. The results indicated that an increase in schedule nonconformance correlated with an increase in controller workload at specific time intervals, and automated schedule adjustments consistently reduced controller workload associated with nonconformance.

Human factors↗

Collateral benefits: River flow normalization for endangered fish enabled riparian rejuvenation

Abstract Like most rivers worldwide, the transboundary North American Kootenay/i River has experienced multiple impacts including watershed developments, river channelization, and floodplain clearing, draining, and diking. Construction of Libby Dam was authorized by the 1964 Columbia River Treaty (CRT) between the United States and Canada, and in 1975 began regulating downstream flows for flood risk management and hydropower generation. Following cumulative impacts, the endemic Kootenai River White Sturgeon population collapsed and was designated as endangered in 1994 (U.S. Endangered Species Act). Subsequent Biological Opinions from the U.S. Fish and Wildlife Service prescribed Libby Dam operations to provide springtime flow pulses for sturgeon spawning. These provided the unanticipated benefit of substantial seedling recruitment of native and introduced riparian cottonwoods and willows. The regulated flow regime was further adaptively managed to provide a more normative (natural) regime, to balance ecological functions with flood risk management and hydropower generation. The broadened ecological considerations would be consistent with the proposed priorities for the modernization of the international CRT. The observed responses revealed that (1) diverse aquatic and riparian organisms are dependent on common river flow characteristics; (2) a normalized flow regime provided substantial ecological benefits; and (3) due to multiple influences, hybrid ecosystems develop along regulated rivers, with a blending of natural and altered processes and communities. For other regulated rivers, we recommend that (1) high springtime flows be allowed, as feasible; (2) followed by the gradual post‐peak recession; and (3) the maintenance of sufficient flows through the warm and dry interval of mid to late summer.

Rood, Stewart B.↗