Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

High Altitude Launch for a Practical SSTO

Existing engineering materials allow the construction of towers to heights of many kilometers. Orbital launch from a high altitude has significant advantages over sea-level launch due to the reduced atmospheric pressure, resulting in lower atmospheric drag on the vehicle and allowing higher rocket engine performance. High-altitude launch sites are particularly advantageous for single-stage to orbit (SSTO) vehicles, where the payload is typically 2 percent of the initial launch mass. An earlier paper enumerated some of the advantages of high altitude launch of SSTO vehicles. In this paper, we calculate launch trajectories for a candidate SSTO vehicle, and calculate the advantage of launch at launch altitudes 5 to 25 kilometer altitudes above sea level. The performance increase can be directly translated into increased payload capability to orbit, ranging from 5 to 20 percent increase in the mass to orbit. For a candidate vehicle with an initial payload fraction of 2 percent of gross lift-off weight, this corresponds to 31 percent increase in payload (for 5-kilometer launch altitude) to 122 percent additional payload (for 25-kilometer launch altitude).

Landis, Geoffrey A.↗

Recommended Screening Practices for Launch Collision Aviodance

The objective of this document is to assess the value of launch collision avoidance (COLA) practices and provide recommendations regarding its implementation for NASA robotic missions. The scope of this effort is limited to launch COLA screens against catalog objects that are either spacecraft or debris. No modifications to manned safety COLA practices are considered in this effort. An assessment of the value of launch COLA can be broken down into two fundamental questions: 1) Does collision during launch represent a significant risk to either the payload being launched or the space environment? 2) Can launch collision mitigation be performed in a manner that provides meaningful risk reduction at an acceptable level of operational impact? While it has been possible to piece together partial answers to these questions for some time, the first attempt to comprehensively address them is documented in reference (a), Launch COLA Operations: an Examination of Data Products, Procedures, and Thresholds, Revision A. This report is the product of an extensive study that addressed fundamental technical questions surrounding launch collision avoidance analysis and practice. The results provided in reference (a) will be cited throughout this document as these two questions are addressed. The premise of this assessment is that in order to conclude that launch COLA is a value-added activity, the answer to both of these questions must be affirmative. A "no" answer to either of these questions points toward the conclusion that launch COLA provides little or no risk mitigation benefit. The remainder of this assessment will focus on addressing these two questions.

recommended screening practicies luanch collision ↗

NASA's Space Launch System: Deep-Space Delivery for Smallsats

Designed for human exploration missions into deep space, NASA's Space Launch System (SLS) represents a new spaceflight infrastructure asset, enabling a wide variety of unique utilization opportunities. While primarily focused on launching the large systems needed for crewed spaceflight beyond Earth orbit, SLS also offers a game-changing capability for the deployment of small satellites to deep-space destinations, beginning with its first flight. Currently, SLS is making rapid progress toward readiness for its first launch in two years, using the initial configuration of the vehicle, which is capable of delivering 70 metric tons (t) to Low Earth Orbit (LEO). On its first flight test of the Orion spacecraft around the moon, accompanying Orion on SLS will be small-satellite secondary payloads, which will deploy in cislunar space. The deployment berths are sized for "6U" CubeSats, and on EM-1 the spacecraft will be deployed into cislunar space following Orion separate from the SLS Interim Cryogenic Propulsion Stage. Payloads in 6U class will be limited to 14 kg maximum mass. Secondary payloads on EM-1 will be launched in the Orion Stage Adapter (OSA). Payload dispensers will be mounted on specially designed brackets, each attached to the interior wall of the OSA. For the EM-1 mission, a total of fourteen brackets will be installed, allowing for thirteen payload locations. The final location will be used for mounting an avionics unit, which will include a battery and sequencer for executing the mission deployment sequence. Following the launch of EM-1, deployments of the secondary payloads will commence after sufficient separation of the Orion spacecraft to the upper stage vehicle to minimize any possible contact of the deployed CubeSats to Orion. Currently this is estimated to require approximately 4 hours. The allowed deployment window for the CubeSats will be from the time the upper stage disposal maneuvers are complete to up to 10 days after launch. The upper stage will fly past the moon at a perigee of approximately 100km, and this closest approach will occur about 5 days after launch. The limiting factor for the latest deployment time is the available power in the sequencer system. Several NASA Mission Directorates were involved in the development of programs for the competition, selection, and development of EM-1 payloads that support directorate priorities. CubeSat payloads on EM-1 will include both NASA research experiments and spacecraft developed by industry, international and potentially academia partners. The Human Exploration and Operations Mission Directorate (HEOMD) Advanced Exploration Systems (AES) Division was allocated five payload opportunities on the EM-1 mission. Near Earth Asteroid (NEA) Scout is designed to rendezvous with and characterize a candidate NEA. A solar sail, an innovation the spacecraft will demonstrated for the CubeSat class, will provide propulsion. Lunar Flashlight will use a green propellant system and will search for potential ice deposits in the moon's permanently shadowed craters. BioSentinel is a yeast radiation biosensor, planned to measure the effects of space radiation on deoxyribonucleic acid (DNA). Lunar Icecube, a collaboration with Morehead State University, will prospect for water in ice, liquid, and vapor forms as well as other lunar volatiles from a low-perigee, highly inclined lunar orbit using a compact Infrared spectrometer. Skyfire, a partnership with Lockheed Martin, is a technology demonstration mission that will perform a lunar flyby, collecting spectroscopy, and thermography data to address questions related to surface characterization, remote sensing, and site selection. NASA's Space Technology Mission Directorate (STMD) was allocated three payload opportunities on the EM-1 mission. These slots will be filled via the Centennial Challenges Program, NASA's flagship program for technology prize competitions, which directly engages the public, academia, and industry in open prize competitions to stimulate innovation. The NASA Science Mission Directorate (SMD) was allocated two payload opportunities on the EM-1 mission. The CubeSat Mission to Study Solar Particles (CuSP) payload will study the sources and acceleration mechanisms of solar and interplanetary particles in near-Earth orbit, support space weather research by determining proton radiation levels during Solar Energetic Particle (SEP) events and identifying suprathermal properties that could help predict geomagnetic storms. The LunaH-Map payload will help scientists understand the quantity of H-bearing materials in lunar cold traps (~10 km), determine the concentration of H-bearing materials with 1m depth, and constrain the vertical distribution of H-bearing materials. The final three payload opportunities for the EM-1 mission were allocated for NASA's international space agency counterparts. The flight opportunities are intended to benefit the international space agency and NASA as well as further the collective space exploration goals. ArgoMoon is sponsored by ESA/ASI and will fly along with the ICPS on its disposal trajectory to perform proximity operations with the ICPS post-disposal, take external imagery of engineering and historical significance, and perform an optical communications demonstration. EQUULEUS, sponsored by JAXA, will fly to a libration orbit around the Earth-Moon L2 point and demonstrate trajectory control techniques within the Sun-Earth- Moon region for the first time by a nano spacecraft. The mission will also contribute to the future human exploration scenario by understanding the radiation environment in geospace and deep space, characterizing the flux of impacting meteors on the far side of the moon, and demonstrating the future deep space exploration scenario using the "deep space port" at Lagrange points. OMOTENASHI, also sponsored by JAXA, will land the smallest lunar lander to date on the lunar surface to demonstrate the feasibility of the hardware for distributed cooperative exploration system. Small landers will enable multi-point exploration, which is complimentary with large-scale human exploration. Once on the lunar surface, the OMOTENASHI spacecraft will observe the radiation and soil environments of the lunar surface by active radiation measurements and soil shear measurements. Following EM-1, Space Launch System will evolve to the more-powerful Block 1B configuration, which uses a new Exploration Upper Stage to increase the vehicle's LEO payload capability from 70 t to 105 t. With that transition, the Orion Stage Adapter, which will carry the secondary payloads on EM-1, will be phased out, and a new Universal Stage Adapter will be introduced, creating opportunities for flying larger secondary payloads. This paper will provide a brief status of SLS progress toward first launch; an overview of smallsat accommodations, integration, and operations on EM-1; information about the specific payloads flying on that launch; and a discussion of future accommodations and opportunities for secondary payloads on SLS for Exploration Mission-2 and beyond.

Robinson, Kimberly F.↗

NASA's Space Launch System: Deep-Space Opportunities for SmallSats

Designed for human exploration missions into deep space, NASA's Space Launch System (SLS) represents a new spaceflight infrastructure asset, enabling a wide variety of unique utilization opportunities. While primarily focused on launching the large systems needed for crewed spaceflight beyond Earth orbit, SLS also offers a game-changing capability for the deployment of small satellites to deep-space destinations, beginning with its first flight. Currently, SLS is making rapid progress toward readiness for its first launch in two years, using the initial configuration of the vehicle, which is capable of delivering 70 metric tons (t) to Low Earth Orbit (LEO). On its first flight test of the Orion spacecraft around the moon, accompanying Orion on SLS will be small-satellite secondary payloads, which will deploy in cislunar space. The deployment berths are sized for "6U" CubeSats, and on EM-1 the spacecraft will be deployed into cislunar space following Orion separate from the SLS Interim Cryogenic Propulsion Stage. Payloads in 6U class will be limited to 14 kg maximum mass. Secondary payloads on EM-1 will be launched in the Orion Stage Adapter (OSA). Payload dispensers will be mounted on specially designed brackets, each attached to the interior wall of the OSA. For the EM-1 mission, a total of fourteen brackets will be installed, allowing for thirteen payload locations. The final location will be used for mounting an avionics unit, which will include a battery and sequencer for executing the mission deployment sequence. Following the launch of EM-1, deployments of the secondary payloads will commence after sufficient separation of the Orion spacecraft to the upper stage vehicle to minimize any possible contact of the deployed cubesats to Orion. Currently this is estimated to require approximately 4 hours. The allowed deployment window for the cubesats will be from the time the upper stage disposal maneuvers are complete to up to 10 days after launch. The upper stage will fly past the moon at a perigee of approximately 100km, and this closest approach will occur about 5 days after launch. The limiting factor for the latest deployment time is the available power in the sequencer system. Several NASA Mission Directorates were involved in the development of programs for the competition, selection, and development of EM-1 payloads that support directorate priorities. CubeSat payloads on EM-1 will include both NASA research experiments and spacecraft developed by industry, international and potentially academia partners. The Human Exploration and Operations Mission Directorate (HEOMD) Advanced Exploration Systems (AES) Division was allocated five payload opportunities on the EM-1 mission. Near Earth Asteroid (NEA) Scout is designed to rendezvous with and characterize a candidate NEA. A solar sail, an innovation the spacecraft will demonstrated for the CubeSat class, will provide propulsion. Lunar Flashlight will use a green propellant system and will search for potential ice deposits in the moon's permanently shadowed craters. BioSentinel is a yeast radiation biosensor, planned to measure the effects of space radiation on deoxyribonucleic acid (DNA). Lunar Icecube, a collaboration with Morehead State University, will prospect for water in ice, liquid, and vapor forms as well as other lunar volatiles from a low-perigee, highly inclined lunar orbit using a compact Infrared spectrometer. Skyfire, a partnership with Lockheed Martin, is a technology demonstration mission that will perform a lunar flyby, collecting spectroscopy, and thermography data to address questions related to surface characterization, remote sensing, and site selection. NASA's Space Technology Mission Directorate (STMD) was allocated three payload opportunities on the EM-1 mission. These slots will be filled via the 2 Centennial Challenges Program, NASA's flagship program for technology prize competitions, which directly engages the public, academia, and industry in open prize competitions to stimulate innovation. The NASA Science Mission Directorate (SMD) was allocated two payload opportunities on the EM-1 mission. The CubeSat Mission to Study Solar Particles (CuSP) payload will study the sources and acceleration mechanisms of solar and interplanetary particles in near-Earth orbit, support space weather research by determining proton radiation levels during Solar Energetic Particle (SEP) events and identifying suprathermal properties that could help predict geomagnetic storms. The LunaH-Map payload will help scientists understand the quantity of H-bearing materials in lunar cold traps (~10 km), determine the concentration of H-bearing materials with 1m depth, and constrain the vertical distribution of H-bearing materials. The final three payload opportunities for the EM-1 mission were allocated for NASA's international space agency counterparts. The flight opportunities are intended to benefit the international space agency and NASA as well as further the collective space exploration goals. ArgoMoon is sponsored by ESA/ASI and will fly along with the ICPS on its disposal trajectory to perform proximity operations with the ICPS post-disposal, take external imagery of engineering and historical significance, and perform an optical communications demonstration. EQUULEUS, sponsored by JAXA, will fly to a libration orbit around the Earth-Moon L2 point and demonstrate trajectory control techniques within the Sun-Earth-Moon region for the first time by a nano spacecraft. The mission will also contribute to the future human exploration scenario by understanding the radiation environment in geospace and deep space, characterizing the flux of impacting meteors on the far side of the moon, and demonstrating the future deep space exploration scenario using the "deep space port" at Lagrange points. OMOTENASHI, also sponsored by JAXA, will land the smallest lunar lander to date on the lunar surface to demonstrate the feasibility of the hardware for distributed cooperative exploration system. Small landers will enable multi-point exploration, which is complimentary with large-scale human exploration. Once on the lunar surface, the OMOTENASHI spacecraft will observe the radiation and soil environments of the lunar surface by active radiation measurements and soil shear measurements. Following EM-1, Space Launch System will evolve to the more-powerful Block 1B configuration, which uses a new Exploration Upper Stage to increase the vehicle's LEO payload capability from 70 t to 105 t. With that transition, the Orion Stage Adapter, which will carry the secondary payloads on EM-1, will be phased out, and a new Universal Stage Adapter will be introduced, creating opportunities for flying larger secondary payloads. This paper will provide a brief status of SLS progress toward first launch; an overview of smallsat accommodations, integration, and operations on EM-1; information about the specific payloads flying on that launch; and a discussion of future accommodations and opportunities for secondary payloads on SLS for Exploration Mission-2 and beyond.

Robinson, Kimberly F.↗

NASA’s Space Launch System: Building A Capability for Science and Exploration

NASA’s Space Launch System, designed for human exploration of deep space and offering enabling benefits for a variety of science missions, is entering the final stages of preparation for its first launch, while simultaneously making progress toward future missions. SLS offers robust payload mass, volume, and characteristic energy that can be used not only for human exploration but for a variety of science missions, including probes to the outer solar system and beyond. In addition, while the vehicle is optimized to be a super-heavy lifter for lunar orbit as a staging area for the lunar surface or Mars, the addition of commercially available propulsion systems as third and/or fourth stages allows SLS to deliver unmatched performance for ultra-high C3 missions. Studies show that while the baseline SLS Block 2 vehicle can deliver about 8 t directly to the Jovian system at a C3 of 83, the addition of a Centaur upper stage would raise that mass to more than 15 t. The New Horizons spacecraft, with mass less than 0.5 t, launched toward Pluto with a record C3 of 158 km2/sec2. By comparison, an SLS Block 2 with an Orion 30B and Star 48BV payload stages could launch equivalent mass to a C3 more than double that of the New Horizons launch. (While the study has been conducted based on contemporary cryo stages and solid stages, this analysis provides real-world data for the range of performance this capability enables even as the specific stages available evolve.) Studies have shown it may be possible to reach 80-90 AU within a decade. The initial Block 1 vehicle for the first launch, Artemis I, is completely manufactured and all the elements are at NASA’s Kennedy Space Center (KSC) with the exception of the core stage, and manufacturing is in progress for the next several flights. Following the completion of the Green Run test series at NASA’s Stennis Space Center, the Artemis I core stage will be refurbished and delivered to KSC for stacking for launch in the second half of 2021. With the Artemis I vehicle fully manufactured and assembly of solid rocket boosters beginning, NASA and its industry partners have made significant progress manufacturing successive vehicles. Hardware for the next two launches is currently in production. NASA is committed to SLS as a key component of its launch architecture. Agency planning manifests outline the launch vehicle’s role in human lunar exploration over the next decade as it moves from its Block1 configuration to its intermediate Block 1B configuration and its ultimate Block 2 configuration.In addition, NASA has issued contracts with prime contractors for SLS hardware for delivery well into the 2030s.

Robert W. Stough↗

Predicting SLS Launch Environment using a Novel Multiphase Formulation

Powerful acoustic waves generated during ignition of launch vehicles may be dangerous to the vehicle, its payload, or the surrounding structures. The water-based Ignition Overpressure and Sound Suppression (IOP/SS) system at Kennedy Space Center’s (KSC) Launch Complex 39B (LC-39B) will be used to protect the Space Launch System (SLS) from the acoustic vibrations generated during launch. The IOP/SS system uses enormous amounts of water to dampen and attenuate these sound waves. To better understand the launch environment risks and to study the effectiveness of the IOP/SS system it is desirable to have time-accurate unsteady simulations of the vehicle ignition with water-based sound suppression. This paper presents results obtained with a novel, high-order accurate, and robust numerical method designed for simulating compressible multiphase flows. A positivity-preserving finite difference scheme is utilized which is formally high-order accurate and also provably robust. Robustness is critical due to the extreme nature of the flow which exhibits highly nonlinear shock and rarefaction waves interacting with liquid-gas interfaces with density ratios of the order of 1000:1. Furthermore, the high-order accuracy (and the high resolution property) is desirable for predicting wave phenomena like IOP waves since the signal can be resolved accurately and propagated long distances with fewer grid points. This finite-difference method was developed using NASA’s Launch, Ascent, and Vehicle Aerodynamics (LAVA) Cartesian immersed boundary framework. We present a validation case by applying our solver to the SLS Scale Model Acoustic Test (SMAT). The SLS SMAT is a well-instrumented 5% scale model test meant to represent the SLS at NASA KSC’s LC-39B pad. Scale IOP tests were performed with and without the sound suppression water and included many sensors which recorded the pressure waves produced during ignition. For this validation case we conduct two simulations, likewise with and without sound suppression water, and compare the SLS SMAT pressure sensor signals with our numerical signals at identical locations. Following this validation case we present a study of the SLS launch environment to examine engineering safety concerns about the mobile launch pad. Engineers at KSC redesigned the main flame deflector at LC-39B anticipating the increased loads from the SLS and to repair damage from prior Shuttle missions. This deflector redesign made use of surface pressure and temperature data from LAVA full-scale SLS simulations without the sound suppression system. The engineers were questioning the possibility of increased pressure loads on the underside of the mobile launcher due to the water in the flame trench. Based on the results established in our simulations of the SLS SMAT, we performed updated calculations for SLS at LC-39B with and without water systems active to assess the readiness of the launch pad for Artemis I launch. Our results show that the IOP/SS system is effective at reducing the overpressure signal and overall sound pressure levels felt by the vehicle and additionally that the pressure loads experienced by the mobile launcher (ML) during engine startup is not increased by the presence of water.

EGS↗

Low-Cost Propellant Launch to Earth Orbit from a Tethered Balloon

Propellant will be more than 85% of the mass that needs to be lofted into Low Earth Orbit (LEO) in the planned program of Exploration of the Moon, Mars, and beyond. This paper describes a possible means for launching thousands of tons of propellant per year into LEO at a cost 15 to 30 times less than the current launch cost per kilogram. The basic idea is to mass-produce very simple, small and relatively low-performance rockets at a cost per kilogram comparable to automobiles, instead of the ~25X greater cost that is customary for current launch vehicles that are produced in small quantities and which are manufactured with performance near the limits of what is possible. These small, simple rockets can reach orbit because they are launched above ~95% of the atmosphere, where the drag losses even on a small rocket are acceptable, and because they can be launched nearly horizontally with very simple guidance based primarily on spin-stabilization. Launching above most of the atmosphere is accomplished by winching the rocket up a tether to a balloon. A fuel depot in equatorial orbit passes over the launch site on every orbit (approximately every 90 minutes). One or more rockets can be launched each time the fuel depot passes overhead, so the launch rate can be any multiple of 6000 small rockets per year, a number that is sufficient to reap the benefits of mass production.

Earth orbits↗

The Impact of Lower Launch Cost on Space Life Support

The development of commercial launch systems has substantially reduced the cost of space launch. NASA's Space Shuttle had a cost of about $1.5 billion to launch 27,500 kg to Low Earth Orbit (LEO), $54,500/kg. SpaceX's Falcon 9 now advertises a cost of $62 million to launch 22,800 kg to LEO, $2,720/kg. Space launch costs were very high for decades, typically about $20,000/kg, and it was understood that this high launch cost made it necessary for long human missions to recycle water and oxygen to reduce logistics mass. Short missions such as Apollo or Shuttle used stored and resupplied life support materials, but for a much longer mission such as the International Space Station (ISS), recycling saves logistics mass and reduces launch cost. The Life Cycle Cost (LCC) will be computed for resupply logistics and for a recycling system similar to that on the ISS. The LCC includes the costs of development, launch, and operations. The new low launch cost makes open loop life support much cheaper than before. Direct logistics resupply would be less costly than recycling for future human missions, such as a long term moon base, a Mars mission, or a future space station in LEO.

life support↗

Menagerie: an Automated Approach to Launch Vehicle Design

The Advanced Concepts Office (ACO) at NASA Marshall Space Flight Center (MSFC)has been performing conceptual design of launch vehicles since the Space Transportation System Program. As part of its duties ACO has been tasked with investigating the effects of known and potential threats and opportunities to a myriad of launch vehicle concepts, launch sites, and mission profiles known as the launch space. As the launch space becomes more crowded and busy with launch providers and their vehicles, the legacy method of prescribing each design discipline to a single human Subject Matter Expert (SME) has become infeasible. Rapidly changing launch, economical, and political constraints require rapid evaluation of their effects. While moving into this future of rapid response does require streamlining of data and processes, it does not however lead directly to reinventing the wheel. Flight-validated analysis tools, procedures, and lessons learned can be effectively leveraged to bring the experience from decades of government and commercial flight programs to the new paradigm. In this publication we describe the aggregation of all previous launch vehicle design efforts of ACO into an automated and integrated toolchain called menagerie. The toolchain utilizes a suite of NASA, Air Force Research Lab (AFRL), and ACO-developed tools and processes to evaluate launch vehicle concepts, mission profiles, and trades in a fraction of the time previously required.

launch vehicle↗

Evaluation of the national launch system as a booster for the HL-20

The capability of a proposed national launch system (NLS) to boost the personnel launch system (PLS) manned vehicle has been examined. A reference NLS configuration, the NLS-2 1.5 stage vehicle, and a reference HL-20 PLS configuration were used for the study. Performance has been analyzed for several PLS insertion orbits to support the Space Station Freedom resupply mission. The reliability of the NLS launch vehicle and its contribution to crew safety requirements have been determined. The launch-processing and launch facility requirements of these combined systems were also analyzed. Previous studies of these two systems have focused on either the PLS manned element or NLS launch vehicle. This paper combines the results of prior studies in an analysis of the integrated NLS/PLS configuration. This analysis has found the proposed NLS 1.5 stage launch vehicle to be an excellent booster for the PLS. Predicted performance margins for this launch-vehicle configuration are more than adequate, and acceptable reliability and safety levels are anticipated. Integration of this NLS/PLS configuration into NASA mixed-fleet launch architectures is feasible.

Duffy, James B.↗

Athena: Advanced air launched space booster

The infrastructure for routine, reliable, and inexpensive access of space is a goal that has been actively pursued over the past 50 years, but has yet not been realized. Current launch systems utilize ground launching facilities which require the booster vehicle to plow up through the dense lower atmosphere before reaching space. An air launched system on the other hand has the advantage of being launched from a carrier aircraft above this dense portion of the atmosphere and hence can be smaller and lighter compared to its ground based counterpart. The goal of last year's Aerospace Engineering Course 483 (AE 483) was to design a 227,272 kg (500,000 lb.) air launched space booster which would beat the customer's launch cost on existing launch vehicles by at least 50 percent. While the cost analysis conducted by the class showed that this goal could be met, the cost and size of the carrier aircraft make it appear dubious that any private company would be willing to invest in such a project. To avoid this potential pitfall, this year's AE 483 class was to design as large an air launched space booster as possible which can be launched from an existing or modification to an existing aircraft. An initial estimate of the weight of the booster is 136,363 kg (300,000 lb.) to 159,091 kg (350,000 lb.).

Booker, Corey G.↗

The U.S. Commercial Space Launch Program and the Department of Defense Dilemma

The U.S. space launch program no longer dominates the world and is now playing 'catch-up' with the world's first commercial launch company, Arianespace. A healthy U.S. commercial launch program is essential and will assure continued low-cost military access to space. The effort to regain the lead in commercial space launch market has been hindered by declining Department of Defense budgets. President Clinton's space policy prohibits expensive new launch vehicles and limits the Department of Defense to low cost upgrades of existing launch vehicles. The U.S. government created the space sector and must ensure a smooth and effective split from the emerging commercial space program in order to regain world dominance. Until U.S. government and commercial ties are severed, the Department of Defense must consider commercial space launch interests when making military decisions. Ariane provides an excellent 'bench mark' for the U.S. to base future launch vehicle upgrades. Ariane advantages were identified and low-cost recommendations have been made. If the U.S. sets the target of first equaling and then surpassing Ariane by incorporating these recommendations, then the U.S. could once again dominate the world commercial launch market and ensure low cost military access to space.

Clapp, William G.↗

Benefits of Government Incentives for Reusable Launch Vehicle Development

Many exciting new opportunities in space, both government missions and business ventures, could be realized by a reduction in launch prices. Reusable launch vehicle (RLV) designs have the potential to lower launch costs dramatically from those of today's expendable and partially-expendable vehicles. Unfortunately, governments must budget to support existing launch capability, and so lack the resources necessary to completely fund development of new reusable systems. In addition, the new commercial space markets are too immature and uncertain to motivate the launch industry to undertake a project of this magnitude and risk. Low-cost launch vehicles will not be developed without a mature market to service; however, launch prices must be reduced in order for a commercial launch market to mature. This paper estimates and discusses the various benefits that may be reaped from government incentives for a commercial reusable launch vehicle program.

Shaw, Eric J.↗

Bantam: A Systematic Approach to Reusable Launch Vehicle Technology Development

The Bantam technology project is focused on providing a low cost launch capability for very small (100 kilogram) NASA and University science payloads. The cost goal has been set at one million dollars per launch. The Bantam project, however, represents much more than a small payload launch capability. Bantam represents a unique, systematic approach to reusable launch vehicle technology development. This technology maturation approach will enable future highly reusable launch concepts in any payload class. These launch vehicle concepts of the future could deliver payloads for hundreds of dollars per pound, enabling dramatic growth in civil and commercial space enterprise. The National Aeronautics and Space Administration (NASA) has demonstrated a better, faster, and cheaper approach to science discovery in recent years. This approach is exemplified by the successful Mars Exploration Program lead by the Jet Propulsion Laboratory (JPL) for the NASA Space Science Enterprise. The Bantam project represents an approach to space transportation technology maturation that is very similar to the Mars Exploration Program. The NASA Advanced Space Transportation Program (ASTP) and Future X Pathfinder Program will combine to systematically mature reusable space transportation technology from low technology readiness to system level flight demonstration. New reusable space transportation capability will be demonstrated at a small (Bantam) scale approximately every two years. Each flight demonstration will build on the knowledge derived from the previous flight tests. The Bantam scale flight demonstrations will begin with the flights of the X-34. The X-34 will demonstrate reusable launch vehicle technologies including; flight regimes up to Mach 8 and 250,000 feet, autonomous flight operations, all weather operations, twenty-five flights in one year with a surge capability of two flights in less than twenty-four hours and safe abort. The Bantam project will build on this initial capability to expand the capability of a reusable first stage, including ground launch, powered return to the launch site, and a fully reusable rocket propulsion system. A Bantam technology goal is to demonstrate twenty-five flights with no unplanned rocket engine maintenance and only minor planned maintenance or inspections. The design goal of the propulsion system is a mission life of one hundred.

Griner, Carolyn↗

Second Generation Reusable Launch Vehicle Development and Global Competitiveness of US Space Transportation Industry: Critical Success Factors Assessment

In response to the unrelenting call in both public and private sectors fora to reduce the high cost associated with space transportation, many innovative partially or fully RLV designs (X-34-37) were initiated. This call is directed at all levels of space missions including scientific, military, and commercial and all aspects of the missions such as nonrecurring development, manufacture, launch, and operations. According to Wertz (2000), over thirty years, the cost of space access has remained exceedingly high. For example, London (1996, 1994), Wertz (1996) and Hammond (1999) have discussed in details the reasons for the skyrocket launch costs. The consensus in the popular press is that to decrease the current astronomical cost of access to space, more safer, reliable, and economically viable SGRLVs must be developed. This current skyrocket cost of space launch poses a major constraint to broadening and expanding U.S. economic activities in LEO. As a result, affecting global competitiveness of U. S. CST industry. Foreign firms control greater share of the launch market once dominated by U.S. For example, in the mid 1980s U.S. service providers had approximately 100% of the commercial space launch market revenues, but today U.S. has less than 50% of that market (Graham, 2001). Further, because of the growth potential in the international launch market, countries such as Brazil, India, Japan and Israel are gearing up to enter the global launch market with their own commercial space launch vehicles. Considering this fact, NASA and U.S. space launch industry cannot afford to lag behind. Therefore developing SGRLVs will immeasurably improve the U.S. space transportation capabilities by helping the U.S. to regain the global commercial space markets while supporting the transportation capabilities of NASA's space mission.

Chris I. Enyinda↗

Integrated Vehicle Ground Vibration Testing in Support of NASA Launch Vehicle Loads and Controls Analysis

The National Aeronautics and Space Administration (NASA) Ares Projects Office (APO) is continuing to make progress toward the final design of the Ares I crew launch vehicle and Ares V cargo launch vehicle. Ares I and V will form the space launch capabilities necessary to fulfill NASA's exploration strategy of sending human beings to the Moon, Mars, and beyond. As with all new space vehicles there will be a number of tests to ensure the design can be Human Rated. One of these is the Integrated Vehicle Ground Vibration Test (IVGVT) that will be measuring responses of the Ares I as a system. All structural systems possess a basic set of physical characteristics unique to that system. These unique characteristics include items such as mass distribution, frequency and damping. When specified, they allow engineers to understand and predict how a structural system like the Ares I launch vehicle behaves under given loading conditions. These physical properties of launch vehicles may be predicted by analysis or measured through certain types of tests. Generally, these properties are predicted by analysis during the design phase of a launch vehicle and then verified through testing before the vehicle is Human Rated. The IVGVT is intended to measure by test the fundamental dynamic characteristics of Ares I during various phases of operational/flight. This testing includes excitations of the vehicle in lateral, longitudinal, and torsional directions at vehicle configurations representing different trajectory points. During the series of tests, properties such as natural frequencies, mode shapes, and transfer functions are measured directly. These data will then be used to calibrate loads and Guidance, Navigation, and Controls (GN&C) analysis models for verifying analyses of Ares I. NASA launch vehicles from Saturn to Shuttle have undergone Ground Vibration Tests (GVTs) leading to successful launch vehicles. A GVT was not performed on the unmanned Delta III. This vehicle was lost during launch. Subsequent analyses indicated that had a GVT been conducted on the vehicle, problems with vehicle modes and control may have been discovered and corrected, avoiding loss of the vehicle/mission. This paper will address GVT planning, set-up, conduction and analyses, for the Saturn and Shuttle programs, and also focus on the current and on-going planning for the Ares I and V IVGVT.

Tuma, Margaret L.↗

Space Operations for a New Era of Exploration Launch Vehicles

NASA's Constellation Program is depending on the Ares Projects to deliver the crew and cargo launch capabilities needed to send human explorers to the Moon and beyond. Ares I and V will provide the core space launch capabilities needed to continue providing crew and cargo access to the International Space Station (ISS), and to build upon the U.S. history of human space exploration. Since 2005, Ares has made substantial progress on designing, developing, and testing the Ares I crew launch vehicle and has continued its in-depth studies of the Ares V cargo launch vehicles. The combined Ares I/Ares V architecture has been designed to reduce the complexity and labor intensity of ground operations for America's next journeys beyond low-Earth orbit (LEO). A deliberate effort is being made to ensure a high level of system operability to significantly increase safety and system availability as well as reduce recurring costs for this new launch vehicle. The Ares Projects goal is to instill operability as part of the vehicles requirements development, design, and operations. This simplicity will come from using simpler, proven engine designs, as in the case of the J-2X upper stage engine and RS-68 engine; improving existing hardware, as in the case of the Shuttle-heritage 5-segment solid rocket motor; and using common propulsion and instrument unit elements between Ares I and Ares V. Furthermore, lessons learned while developing Ares I will be applied directly to Ares V operations. In 2009, the Ares Projects plan to conduct the first flight test of Ares I, designated Ares I-X. Ares I-X preparations have already prompted changes to the vehicle stacking and launch infrastructure at Kennedy Space Center (KSC), including removing Shuttle-specific fixtures from the Vehicle Assembly Building (VAB) to accommodate Ares I-style stacking operations, new firing room computers and infrastructure in the VAB Launch Control Center, and new lightning protection system towers at Launch Complex 39B to accommodate the greater height of Ares I-X. In addition to lessons learned from the stacking of Ares I-X, the flight test itself promises to yield important data and operations lessons for assembling, launching, and flying Ares I.

Cook, Stephen A.↗

Use of Smoothed Measured Winds to Predict and Assess Launch Environments

This paper describes an approach which was used to predict Ares I-X launch vehicle structural airloads and controllability prior to launch. This prediction along with the proper application of protection for variations in key environment and trajectory parameters was used to predict the potential for the launch trajectory to stay within the integrated vehicle certification envelopes. This data was applied by the launch team as a key element of the launch day go/no-go recommendation. NASA s Space Shuttle and the heavy lift versions of the Evolved Expendable Launch Vehicles assessments require the use of a high fidelity wind measurement which limits the number of wind measurement sources which can be used for a pre-launch go/no-go assessment. The approach described in this paper has the potential to allow the pre-launch assessment team to use wind measurements from a number of additional sources which will enhance launch availability and also has the potential to improve mission assurance and enhance safety

Cordova, Henry S.↗