Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch separation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Air Launched Vehicle Exergy Analysis During Aircraft Boost Phase

The analysis of air launched vehicles carrying payloads to low earth orbit is complex. The integration of the aircraft flight phase and the launch vehicle flight phase requires the integration of systems functioning from different energy relationships. System exergy balance provides a relationship to integrate the efficiency of the aircraft launcher and the efficiency of the launch vehicle in a single, integrated system assessment. The exergy balance of the aircraft flight phase can be calculated with the launch vehicle included as part of the vehicle mass. As exergy balance allows for separate of the masses, different velocities, and different propulsion systems to continue the mission analysis after separation through payload orbital insertion and aircraft landing. This paper presents the initial assessment of the aircraft launch phase up to separation of the launch vehicle. Showing the method of integration afforded by the system exergy balance relationship.

Lane, Joshua↗

Gas Strut Separation Alternative for Ares I

This paper presents a design alternative and the rationale for a stage separation system based on Metering Adiabatic Gas Struts (MAG Struts) for the Ares 1 launch vehicle. The MAG Strut separation system was proposed as an alternative to the current Ares 1 separation system, which relies on small solid rocket motors to provide the main separation force. This paper will describe technical issues that were addressed during the trade study and present a conceptual design of the strut system that best resolved the issues. Needed development testing and programmatic considerations will be addressed as part of the paper.

Floyd, Brian↗

STS-29: Pre-Launch Preparations/Launch and Landing

Live footage shows the crewmembers of STS-29, Commander Michael L. Coats, Pilot John E. Blaha, and Mission Specialists James P. Bagian, James F. Buchli, and Robert C. Springer, seated in the White Room with the traditional cake. The crew is seen performing various pre-launch activities including suit-up, and walk out to the Astro-van. This early morning launch shows countdown, main engine start, liftoff, booster separation, and various isolated footage of the launch from different cameras. Also presented are footage of the approach, gear touchdown, rollout at Edwards Air Force Base, and various isolated views of the landing.

Source record↗

Trajectory Design and Orbit Determination for the Lunar CRater Observation and Sensing Satellite (LCROSS)

The Lunar CRater Observation and Sensing Satellite (LCROSS) was competitively selected by the National Aeronautical and Space Administration (NASA) Exploration Systems Mission Directorate (ESMD) as a low-cost (< $80M) 1000 kg secondary payload to be launched with the Lunar Reconnaissance Orbiter (LRO) in October of 2008. LCROSS is a lunar impactor mission that will investigate the presence or absence of water in a permanently shadowed crater. Following launch, trans-lunar injection (TLI) and separation from LRO, LCROSS will remain attached to the launch vehicle's approximately 2300 kg spent Earth Departure Upper Stage (EDUS) and will guide it toward an impact of a permanently shadowed crater at the lunar South Pole. Hours prior to impact, LCROSS will separate from the EDUS and perform a braking maneuver that will allow the spacecraft to take measurements of the resulting EDUS impact ejecta cloud for several minutes, before impacting the crater as well. As a cost-capped secondary mission that must accommodate specific LRO launch dates, LCROSS faces unique challenges and constraints that must be carefully reconciled in order to satisfy an ambitious set of science observation requirements. This paper examines driving mission requirements and constraints and describes the trajectory design and navigation strategy that shape the LCROSS mission.

Galal, Ken↗

Ares I Stage Separation System Design Certification Testing

NASA is committed to the development of a new crew launch vehicle, the Ares I, that can support human missions to low Earth orbit (LEO) and the moon with unprecedented safety and reliability. NASA's Constellation program comprises the Ares I and Ares V launch vehicles, the Orion crew vehicle, and the Altair lunar lander. Based on historical precedent, stage separation is one of the most significant technical and systems engineering challenges that must be addressed in order to achieve this commitment. This paper surveys historical separation system tests that have been completed in order to ensure staging of other launch vehicles. Key separation system design trades evaluated for Ares I include single vs. dual separation plane options, retro-rockets vs. pneumatic gas actuators, small solid motor quantity/placement/timing, and continuous vs. clamshell interstage configuration options. Both subscale and full-scale tests are required to address the prediction of complex dynamic loading scenarios present during staging events. Test objectives such as separation system functionality, and pyroshock and debris field measurements for the full-scale tests are described. Discussion about the test article, support infrastructure and instrumentation are provided.

Mayers, Stephen L.↗

Finding Acceptable James Webb Space Telescope Mission Orbits From a Fixed Ariane Flight Profile

The James Webb Space Telescope (JWST) will be launched into orbit about the Sun/Earth L2 libration point. Trajectory design was recently completed which included expected separation states from the Ariane launch vehicle, constraints such as eclipses, maximum orbit size, maximum Sun-Vehicle-Earth/Moon angles, and launch opportunities. The results of this trajectory design give a set of possible trajectories for JWST with bounded stray light zones and provide a complete launch window. This data is also used to design the initial trajectory correction maneuver such that a maneuver towards the Sun is not required.

Beckman, Mark↗

Artemis Innovative Assembly and Integration Operations of the Launch Abort Systemat KSC

This paper describes the Artemis program assembly and integration approach that enables affordable and low risk processing operations for the Launch Abort System at KSC. NASA is currently developing the Artemis 1 spacecraft to meet the test objectives of an uncrewed orbital mission to the moon and return to earth in 2021. The Artemis Orion spacecraft consists of a Crew Module (CM), a Service Module (SM), and a Launch Abort System (LAS) to safely transport a crew of 4 to the moon and return to earth. The LAS enables the CM to have an abort capability for the crew during the launch phase of the mission from the launch pad throughout the ascent phase. The LAS includes motor elements for abort, attitude control, and stage separation is assembled at the Launch Abort System Facility (LASF) adjacent to the CM/SM (CSM) assembly operations in the Neil Armstrong Operations and Checkout Building (O&C) at KSC. The LAS integration to the CSM is completed in the LASF and the completed Artemis spacecraft is integrated to the Space Launch System (SLS) in the Vehicle Assembly Building (VAB) at KSC. A significant LAS development flight test milestone was recently completed in 2019 for the Ascent Abort (AA-2) flight test at Cape Canaveral Air Force Station where a high-altitude abort test was successfully achieved using a Peacekeeper booster stage exercising all of the LAS systems including propulsion, avionics, and pyrotechnics demonstrating he LAS readiness for crewed flight. The first operational flight of the LAS will be for the Artemis 2 mission which is the first crewed mission for the Orion program planned in 2023.

William J Koenig↗

Geostationary Operational Environmental Satellite (GOES)-8 mission flight experience

The Geostationary Operational Environmental Satellite (GOES)-8 spacecraft was launched on April 13, 1994, at 06:04:02 coordinated universal time (UTC), with separation from the Atlas-Centaur launch vehicle occurring at 06:33:05 UTC. The launch was followed by a series of complex, intense operations to maneuver the spacecraft into its geosynchronous mission orbit. The Flight Dynamics Facility (FDF) of the Goddard Space Flight Center (GSFC) Flight Dynamics Division (FDD) was responsible for GOES-8 attitude, orbit maneuver, orbit determination, and station acquisition support during the ascent phase. This paper summarizes the efforts of the FDF support teams and highlights some of the unique challenges the launch team faced during critical GOES-8 mission support. FDF operations experience discussed includes: (1) The abort of apogee maneuver firing-1 (AMF-1), cancellation of AMF-3, and the subsequent replans of the maneuver profile; (2) The unexpectedly large temperature dependence of the digital integrating rate assembly (DIRA) and its effect on GOES-8 attitude targeting in support of perigee raising maneuvers; (3) The significant effect of attitude control thrusting on GOES-8 orbit determination solutions; (4) Adjustment of the trim tab to minimize torque due to solar radiation pressure; and (5) Postlaunch analysis performed to estimate the GOES-8 separation attitude. The paper also discusses some key FDF GOES-8 lessons learned to be considered for the GOES-J launch which is currently scheduled for May 19, 1995.

Noonan, C. H.↗

Results of tests in the NASA/LARC 31-inch CFHT on an 0.010-scale model (32-OT) of the space shuttle configuration 3 to determine the RCS jet flowfield interaction effects on aerodynamic characteristics (IA60/OA105), volume 1

Tests were conducted in the NASA Langley Research Center 31-inch continuous Flow Hypersonic Wind Tunnel to determine RCS jet interaction effect on the hypersonic aerodynamic and stability and control characteristics prior to return to launch site (RTLS) abort separation. The model used was an 0.010-scale replica of the Space Shuttle Vehicle Configuration 3. Hypersonic stability data were obtained from tests at Mach 10.3 and dynamic pressure of 150 psf for the integrated Orbiter and external tank and the Orbiter alone. RCS modes of pitch, yaw, and roll at free flight dynamic pressure simulation of 7, 20, and 50 psf were investigated. The effects of speedbrake, bodyflap, elevon, and aileron deflections were also investigated.

Thornton, D. E.↗

Dynamics Explorer launch

Simultaneously launched from the WSMC, two satellites are to be placed into polar, copolar orbit in order to acquire data on the coupling phenomena between Earth's lower thermosphere and the magnetosphere, as part of the Solar-Terrestrial Program. The mission sequence, instruments, and science data processing system are described as well as the characteristics of the Delta 3913 launch vehicle, and payload separation staging.

Source record↗

The AMPTE CCE Spacecraft

The flight segment of the Active Magnetospheric Particle Tracer Explorers (AMPTE) Program consisted of three separate spacecraft which were launched 'piggyback' into orbit aboard a Delta 3924 launch vehicle, from Cape Canaveral, FL, on August 16, 1984. The three spacecaft are the Charge Composition Explorer (CCE), built for NASA by the Applied Physics Laboratory of the Johns Hopkins University (APL/JHU); the Ion Release Module (IRM), built in the Federal Republic of Germany; and the United Kingdom Subsatellite (UKS), built in the United Kingdom. This paper describes the CCE Spacecraft design, development, and early performance in orbit.

Dassoulas, J.↗

Geostationary Operational Environmental Satellite (GOES) mission profile

The GOES mission profile used to achieve geostationary orbit following separation from the Delta launch vehicle is described. The mission profile was constrained by the solid-propellant apogee kick motor which was undersized relative to the spacecraft weight. The resulting deficiency in delivered delta-V had to be made up by the spacecraft hydrazine propulsion system. The mission profile which best utilizes the on-board hydrazine requires that the transfer orbit apogee height be biased 13,800 km above geosynchronous altitude. This maximizes the effectiveness of the apogee motor in performing the plane change necessary to achieve near-equatorial orbit. The highly eccentric drift orbit which results from the apogee motor firing has an average drift rate of 60 deg/day. Circularizing this orbit requires maneuvers designed to achieve geostationary position within a tightly constrained hydrazine allocation. The sequence takes advantage of the orbit changes resulting from attitude maneuvers and combined inplane/out-of-plane maneuvers to achieve hydrazine savings.

Bryant, W. C.↗

Design of an autonomous teleoperated cargo transporting vehicle for lunar base operations

At the turn of the century NASA plans to begin construction of a lunar base. The base will likely consist of developed areas (i.e., habitation, laboratory, landing and launching sites, power plant) separated from each other due to safety considerations. The Self-Repositioning Track Vehicle (SRTV) was designed to transport cargo between these base facilities. The SRTV operates by using two robotic arms to raise and position segments of track upon which the vehicle travels. The SRTV utilizes the semiautonomous mobility (SAM) method of teleoperation; actuator-controlled interlocking track sections; two robotic arms each with five degrees of freedom; and these materials: titanium for structural members and aluminum for shell members, with the possible use of light-weight, high-strength composites.

Holt, James↗

STS-82 Post Flight Presentation

The STS-82 crew, Commander Kenneth D. Bowersox, Pilot Scott J. Horowitz, Payload Commander Mark C. Lee, and Mission Specialists Gregory J. Harbaugh, Steven L. Smith, Joseph R. Tanner, and Steven A. Hawley present a video and still picture overview of their mission. Included in the presentation are the following: the pre-launch activities such as eating the traditional breakfast, being suited up, and riding out to the launch pad, various panoramic views of the shuttle on the pad, the countdown, engine ignition, launch, shuttle roll maneuver, separation of the Solid Rocket Boosters (SRB) from the shuttle, survey of the payload bay with the Shuttle's 50-foot remote manipulator system (RMS), the successful retrieve of the Hubble Space Telescope (HST), EVAs to repair HST, release of HST, and the shuttle's landing.

Source record↗

Deployment Mechanism for the Space Technology 5 Micro Satellite

Space Technology 5 (ST5) is a technology mission that will send three spin-stabilized, 25-kg satellites into a highly elliptical Earth orbit. Each of these satellites must be deployed separately from the same launch vehicle with a spin rate of 3.4 rads (32.4 rpm). Because of the satellite's small size and the requirement to achieve its mission spin rate on deploy, typical spin table, pyrotechnic deployment devices or spin up thrusters could not be used. Instead, this new mechanism design employs a "Frisbee" spin up strategy with a shape memory alloy actuated Pinpuller to deploy each satellite. The mechanism has undergone several design and test iterations and has been successfully qualified for flight.

Rossoni, Peter↗

Deployment Mechanism for the Space Technology 5 Micro Satellite

Space Technology 5 (ST5) is a technology mission that will send three spin-stabilized, 25-kg satellites into a highly elliptical Earth orbit. Each of these satellites must be deployed separately from the same launch vehicle with a spin rate of 3.4 rad/s (32.4 rpm). Because of the satellite's small size and the requirement to achieve its mission spin rate on deploy, typical spin table, pyrotechnic deployment devices or spin up thrusters could not be used. Instead, this new mechanism design employs a 'Frisbee' spin up strategy with a shape memory alloy actuated Pinpuller to deploy each satellite. The mechanism has undergone several design and test iterations and has been successfully qualified for flight.

Rossoni, Peter↗

Trajectory Design for MoonRise: A Proposed Lunar South Pole-Aitken Basin Sample Return Mission

This paper presents the mission design for the proposed MoonRise New Frontiers mission: a lunar far side lander and return vehicle, with an accompanying communication satellite. Both vehicles are launched together, but fly separate low-energy transfers to the Moon. The communication satellite enters lunar orbit immediately upon arrival at the Moon, whereas the lander enters a staging orbit about the lunar Lagrange points. The lander descends and touches down on the surface 17 days after the communication satellite enters orbit. The lander remains on the surface for nearly two weeks before lifting off and returning to Earth via a low-energy return.

NASA's New Frontie↗