Search NASA⌕ Search

SEARCH · Search NASA

Results for “optimal scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Process Development and Hot-fire Testing of Additively Manufactured NASA HR-1 for Liquid Rocket Engine Applications

Additive manufacturing (AM) has provided new design and manufacturing opportunities to reduce cost and schedules, consolidate parts, and optimize performance. One technique being evaluated is Laser Powder Directed Energy Deposition (LP-DED), which provides a significant increase in scale compared to Laser Powder Bed Fusion (L-PBF). NASA along with industry partners have been developing the LP-DED process to demonstrate internal channel geometry and development components for use in liquid rocket engine channel cooled nozzles. Optimized materials in the extreme high pressure and hydrogen environment for liquid rocket engines remains a key challenge. NASA has advanced an enabling material called NASA HR-1 (Hydrogen Resistant -1) as a solution using AM techniques. NASA HR-1 is a high-strength Fe-Ni superalloy designed to resist high pressure, hydrogen environment embrittlement, oxidation, and corrosion. NASA HR-1 meets materials requirements for liquid rocket engine components, including good hydrogen resistance, high conductivity, good low cycle fatigue performance, and high elongation and strength for components in high heat flux environments. Material properties and process characterization have been completed on the high density thin-wall material in addition to advancements of the supply chain. NASA has also completed fabrication of several subscale and full-scale channel wall nozzles in LP-DED NASA HR-1 and completed hot-fire testing. This includes refinement of the process to produce thin-walls and various channel geometries to meet the requirements for channel wall nozzle applications. This paper will provide an overview of the LP-DED process development, material characterization and properties, component manufacturing, and hot-fire testing. Hot-fire testing was completed for a lander-class 7K-lbf thrust chamber using Liquid Oxygen (LOX)/Methane. The design overview and results from hot-fire testing will be presented in addition to hardware development for future testing on 2K-lbf and 35k-lbf thrust chambers and large-scale manufacturing technology demonstrators.

DED↗

Process Development and Hot-fire Testing of Additively Manufactured NASA HR-1 for Liquid Rocket Engine Applications

Additive manufacturing (AM) has provided new design and manufacturing opportunities to reduce cost and schedules, consolidate parts, and optimize performance. One technique being evaluated is Laser Powder Directed Energy Deposition (LP-DED), which provides a significant increase in scale compared to Laser Powder Bed Fusion (L-PBF). NASA along with industry partners have been developing the LP-DED process to demonstrate internal channel geometry and development components for use in liquid rocket engine channel cooled nozzles. Optimized materials in the extreme high pressure and hydrogen environment for liquid rocket engines remains a key challenge. NASA has advanced an enabling material called NASA HR-1 (Hydrogen Resistant -1) as a solution using AM techniques. NASA HR-1 is a high-strength Fe-Ni superalloy designed to resist high pressure, hydrogen environment embrittlement, oxidation, and corrosion. NASA HR-1 meets materials requirements for liquid rocket engine components, including good hydrogen resistance, high conductivity, good low cycle fatigue performance, and high elongation and strength for components in high heat flux environments. Material properties and process characterization have been completed on the high density thin-wall material in addition to advancements of the supply chain. NASA has also completed fabrication of several subscale and full-scale channel wall nozzles in LP-DED NASA HR-1 and completed hot-fire testing. This includes refinement of the process to produce thin-walls and various channel geometries to meet the requirements for channel wall nozzle applications. This paper will provide an overview of the LP-DED process development, material characterization and properties, component manufacturing, and hot-fire testing. Hot-fire testing was completed for a lander-class 7K-lbf thrust chamber using Liquid Oxygen (LOX)/Methane. The design overview and results from hot-fire testing will be presented in addition to hardware development for future testing on 2K-lbf and 35k-lbf thrust chambers and large-scale manufacturing technology demonstrators.

Additive Manufacturing↗

Estimation of Timing Performance with Pulsed Laser Links for Small Satellite PNT

Satellite constellations are growing in size and in utility for applications as diverse as providing reliable, low-latency internet service to rural areas orEarth science missions.This expansion of satellite constellations brings attention to the need for responsive and reliable satellite communication.Current research in the PrecisionSpace Systems Laboratory at the University of Florida focuses on using pulsed laser communications as the method of relaying time signals instead of the radio frequency (RF)signals.The upcoming CLICK (CubeSat Laser Infrared CrosslinK) missions (Massachusetts Institute of Technology, University of Florida, NASA Ames Research Center) will demonstrate a spacecraft-to-spacecraft laser communication link and time-transfer.For pre-flight technology assessment of missions such as CLICK, a simulation of a spacecraft constellation in Earth orbit has been created to estimate clock synchronization and precision orbit determination based on measured instrumentation performance.We have developed a novel MATLAB-based numerical simulator to model spacecraft-to-spacecraft laser time-transfer and estimate the offset between the spacecraft clocks over time.This simulation includes timing errors associated with laser pulse generation and detection, as well as non-Gaussian clock drift models.The two on-board clocks modeled are a cesium-based Chip-Scale Atomic Clock (CSAC) and a rubidium-based Miniature Atomic Clock (MAC), both produced by Microchip.An example case of two spacecraft in a circular, low-Earth orbit receiving GPS position, GPS timing, and laser pulse time-of-flight measurements is simulated.The positions and velocities of the two spacecraft at a reference epoch and the constant clock model coefficients are estimated.Polynomial models of different orders were used as clock models. The effect of clock model order on the root-mean-square (RMS) of the clock error is apparent in the case using GPS and lasing measurements, showing that the clock model improves with increasing clock model order. Results compare the estimated clock model of a mission operation that only uses GPS measurements and a mission operation that uses both GPS and laser pulse time-of-flight measurements between spacecraft referenced to their on-board CSACs or on-board MACs. Including lasing measurements reduces the RMS clock model error by approximately 80% of the RMS of the cases with only GPS measurements.This simulation tool can be used to optimize the lasing operations schedule based on mission timing performance objectives. During this presentation, I will discuss the details of the simulation and clock model estimation, as well as discuss the results.I will compare the results of incorporating lasing timing measurements to using only GPS measurements and the outcomes of using different orders of polynomials.

Timing Performance↗

Development of Laser Powder Bed Fusion NASA HR-2 for Hydrogen Sensitive Liquid Rocket Engine Applications

The National Aeronautics and Space Administration (NASA) has been involved in the development and maturation of metal additive manufacturing (AM) for space applications since the late 2000’s. AM has provided new design and manufacturing opportunities to reduce cost and schedule, consolidate parts, and optimize performance. Laser Powder Bed Fusion (L-PBF) is one of the most commonly used AM processes to fabricate components that have complex shape and need fine feature resolution. Due to exposure to high pressure gaseous hydrogen, mechanical property degradation caused by hydrogen environment embrittlement (HEE) is a critical concern for many materials in liquid hydrogen propulsion systems. NASA has identified the need to develop and advance new materials in unique engine applications using liquid hydrogen as a propellant. One such material being developed at NASA Marshall Space Flight Center is L-PBF NASA HR-2 (Hydrogen Resistant-2), a high-strength Fe-Ni-based superalloy resistant to HEE. The chemistry of NASA HR-2 was formulated to meet requirements for key liquid rocket engine (LRE) components that operate in high-pressure hydrogen environments. Initial development and material characterization found NASA HR-2 has excellent L-PBF printability and its microstructure evolves well after heat treatment. This new alloy has undergone fundamental metallurgical evaluations, heat treatment studies, detailed microstructure characterization, and mechanical testing across a range of temperatures. Tensile testing was performed in pressurized gaseous hydrogen (GH2) environment to assess its resistance to HEE. L-PBF NASA HR-2 has an average yield stress of 95 ksi, ultimate tensile stress of 165 ksi, and very high fracture elongation at 34 - 36% when tested in a 5 ksi high pressure hydrogen environment. The tensile property data confirms hydrogen has little influence on its ductility, strength, and fracture behavior. L-PBF NASA HR-2 is a promising option for many hydrogen sensitive LRE components that require exceptional resistance to HEE. The development of L-PBF NASA HR-2 is funded under the grants provided by Jacobs TIPI program and the Liquid Engine Office at NASA Marshall Space Flight Center. This paper will provide an overview of the L-PBF process development, material characterization, mechanical and thermophysical properties, and LRE hardware development for NASA HR-2.

NASA HR-2↗

Development of Laser Powder Bed Fusion NASA HR-2 for Hydrogen Sensitive Liquid Rocket Engine Applications

The National Aeronautics and Space Administration (NASA) has been involved in the development and maturation of metal additive manufacturing (AM) for space applications since the late 2000’s. AM has provided new design and manufacturing opportunities to reduce cost and schedule, consolidate parts, and optimize performance. Laser Powder Bed Fusion (L-PBF) is one of the most commonly used AM processes to fabricate components that have complex shape and need fine feature resolution. Due to exposure to high pressure gaseous hydrogen, mechanical property degradation caused by hydrogen environment embrittlement (HEE) is a critical concern for many materials in liquid hydrogen propulsion systems. NASA has identified the need to develop and advance new materials in unique engine applications using liquid hydrogen as a propellant. One such material being developed at NASA Marshall Space Flight Center is L-PBF NASA HR-2 (Hydrogen Resistant-2), a high-strength Fe-Ni-based superalloy resistant to HEE. The chemistry of NASA HR-2 was formulated to meet requirements for key liquid rocket engine (LRE) components that operate in high-pressure hydrogen environments. Initial development and material characterization found NASA HR-2 has excellent L-PBF printability and its microstructure evolves well after heat treatment. This new alloy has undergone fundamental metallurgical evaluations, heat treatment studies, detailed microstructure characterization, and mechanical testing across a range of temperatures. Tensile testing was performed in pressurized gaseous hydrogen (GH2) environment to assess its resistance to HEE. L-PBF NASA HR-2 has an average yield stress of 95 ksi, ultimate tensile stress of 165 ksi, and very high fracture elongation at 34 - 36% when tested in a 5 ksi high pressure hydrogen environment. The tensile property data confirms hydrogen has little influence on its ductility, strength, and fracture behavior. L-PBF NASA HR-2 is a promising option for many hydrogen sensitive LRE components that require exceptional resistance to HEE. The development of L-PBF NASA HR-2 is funded under the grants provided by Jacobs TIPI program and the Liquid Engine Office at NASA Marshall Space Flight Center. This paper will provide an overview of the L-PBF process development, material characterization, mechanical and thermophysical properties, and LRE hardware development for NASA HR-2.

NASA HR-2↗

Development of Laser Powder Bed Fusion NASA HR-2 for Hydrogen Sensitive Liquid Rocket Engine Applications

The National Aeronautics and Space Administration (NASA) has been involved in the development and maturation of metal additive manufacturing (AM) for space applications since the late 2000s. AM has provided new design and manufacturing opportunities to reduce cost and schedule, consolidate parts, and optimize performance. Laser Powder Bed Fusion (L-PBF) is one of the most commonly used AM processes to fabricate components of complex shape requiring fine feature resolution. Due to exposure to high-pressure gaseous hydrogen, mechanical property degradation caused by hydrogen environment embrittlement (HEE) is a critical concern for many materials in liquid hydrogen propulsion systems. NASA has identified the need to develop and advance new materials in unique engine applications using liquid hydrogen as a propellant. One such material being developed at NASA Marshall Space Flight Center is L-PBF NASA HR-2 (Hydrogen Resistant-2), a high-strength Fe-Ni-based superalloy resistant to HEE. The chemistry of NASA HR-2 was formulated to meet requirements for key liquid rocket engine (LRE) components that operate in high-pressure hydrogen environments. Initial development and material characterization found that NASA HR-2 has excellent L-PBF printability, and its microstructure evolves well after heat treatment. This new alloy has undergone fundamental metallurgical evaluations, heat treatment studies, detailed microstructure characterization, and mechanical testing across a range of temperatures. Tensile testing was performed in a pressurized gaseous hydrogen (GH2) environment to assess its resistance to HEE. L-PBF NASA HR-2 has an average yield stress of 95 ksi, an ultimate tensile stress of 165 ksi, and a very high fracture elongation of 34 - 36% when tested in a high-pressure (5 ksi) hydrogen environment. The tensile property data confirms hydrogen has little influence on HR-2’s ductility, strength, and fracture behavior. L-PBF NASA HR-2 is a promising option for many hydrogen-sensitive LRE components that require exceptional resistance to HEE. This paper will provide an overview of the L-PBF process development, material characterization, mechanical and thermophysical properties, and LRE hardware development for NASA HR-2.

Po S Chen↗

Planning and Scheduling for Fleets of Earth Observing Satellites

We address the problem of scheduling observations for a collection of earth observing satellites. This scheduling task is a difficult optimization problem, potentially involving many satellites, hundreds of requests, constraints on when and how to service each request, and resources such as instruments, recording devices, transmitters, and ground stations. High-fidelity models are required to ensure the validity of schedules; at the same time, the size and complexity of the problem makes it unlikely that systematic optimization search methods will be able to solve them in a reasonable time. This paper presents a constraint-based approach to solving the Earth Observing Satellites (EOS) scheduling problem, and proposes a stochastic heuristic search method for solving it.

Frank, Jeremy↗

Transient Optimization of an Electrified Gas Turbine Engine Using Machine Learning

Gas turbine engines are designed with sufficient margin to prevent stall under normal operating conditions throughout their life. This compromise ensures that during rapid accelerations, compressor operation remains stable, but at the cost of efficiency and thrust responsiveness. The design margin encompasses multiple sources of uncertainty and systematic deviances from the operating line, the largest of which is the transient allowance. This set-aside accounts for the temporary incoordination of the engine spools during an acceleration while still enabling it to meet the certification requirement to accelerate from low to high power within a specified time, and without experiencing overtemperature, surge, stall, or other detrimental factors. Electrification of the powertrain provides the opportunity to address this reserve and truly optimize the design. The addition of electric machines inherent in hybrid propulsion concepts offers a means to interact with the engine shafts such that the necessary margin can be reduced, which can positively impact the engine design. By adjusting the amount of power extracted from or injected to the engine spools by the electric machines during transient operation, excursions from the operating line can be minimized. Past work using a dynamic engine model has shown that optimization of the fuel flow schedule during acceleration can reduce the required margin while still meeting the time requirement, and results are further improved when combined with power injection and extraction. The current work uses machine learning through a genetic algorithm to address the problem holistically by concurrently optimizing the electric machine power command and fuel flow acceleration schedule using an updated, higher fidelity version of the original engine model.

Stall Margin↗

Transient Optimization of an Electrified Gas Turbine Engine Using Machine Learning

Gas turbine engines are designed with sufficient margin to prevent stall under normal operating conditions throughout their life. This compromise ensures that during rapid accelerations, compressor operation remains stable, but at the cost of efficiency and thrust responsiveness. The design margin encompasses multiple sources of uncertainty and systematic deviances from the operating line, the largest of which is the transient allowance. This set-aside accounts for the temporary incoordination of the engine spools during an acceleration while still enabling it to meet the certification requirement to accelerate from low to high power within a specified time, and without experiencing overtemperature, surge, stall, or other detrimental factors. Electrification of the powertrain provides the opportunity to address this reserve and truly optimize the design. The addition of electric machines inherent in hybrid propulsion concepts offers a means to interact with the engine shafts such that the necessary margin can be reduced, which can positively impact the engine design. By adjusting the amount of power extracted from or injected to the engine spools by the electric machines during transient operation, excursions from the operating line can be minimized. Past work using a dynamic engine model has shown that optimization of the fuel flow schedule during acceleration can reduce the required margin while still meeting the time requirement, and results are further improved when combined with power injection and extraction. The current work uses machine learning through a genetic algorithm to address the problem holistically by concurrently optimizing the electric machine power command and fuel flow acceleration schedule using an updated, higher fidelity version of the original engine model.

Stall Margin↗

Transient Optimization of an Electrified Gas Turbine Engine Using Machine Learning

Gas turbine engines are designed with sufficient margin to prevent stall under normal operating conditions throughout their life. This compromise ensures that during rapid accelerations, compressor operation remains stable, but at the cost of efficiency and thrust responsiveness. The design margin encompasses multiple sources of uncertainty and systematic deviances from the operating line, the largest of which is the transient allowance. This set-aside accounts for the temporary incoordination of the engine spools during an acceleration while still enabling it to meet the certification requirement to accelerate from low to high power within a specified time, and without experiencing overtemperature, surge, stall, or other detrimental factors. Electrification of the powertrain provides the opportunity to address this reserve and truly optimize the design. The addition of electric machines inherent in hybrid propulsion concepts offers a means to interact with the engine shafts such that the necessary margin can be reduced, which can positively impact the engine design. By adjusting the amount of power extracted from or injected to the engine spools by the electric machines during transient operation, excursions from the operating line can be minimized. Past work using a dynamic engine model has shown that optimization of the fuel flow schedule during acceleration can reduce the required margin while still meeting the time requirement, and results are further improved when combined with power injection and extraction. The current work uses machine learning through a genetic algorithm to address the problem holistically by concurrently optimizing the electric machine power command and fuel flow acceleration schedule using an updated, higher fidelity version of the original engine model.

Stall Margin↗

The EUVE proposal database and scheduling system

The proposal database and scheduling system for the Extreme Ultraviolet Explorer will be described. The proposal database has been implemented to take input for approved observations selected by the EUVE Peer Review Panel and output target information suitable for the scheduling system to digest. The scheduling system is a hybrid of the SPIKE program and EUVE software which checks spacecraft constraints, produces a proposed schedule and selects spacecraft orientations with optimal configurations for acquiring star trackers, etc. This system has been used to schedule the In Orbit Calibration activities that took place this summer, following the EUVE launch in early June 1992. The implemented strategy has implications for the selection of approved targets, which have impacted the Peer Review process. In addition, it will be discussed how the proposal database, founded on Sybase, controls the processing of EUVE Guest Observer data.

Christian, C.↗

The requirement for designing analyzable space deployable structures

The applied technology satellite parabolic reflector subsystem is one of the first systems designed for space environment with limited terrestrial environmental ability. As a result, the complete performance of the system could not be demonstrated in a terrestrial environment without unacceptable design compromises. This problem was circumvented by developing a test philosophy which relied heavily on analysis to qualify and accept the flight hardware. The test program was successfully concluded and an optimized, low cost structure resulted. It is felt that this test and analysis philosophy can be applied to future space systems, resulting in substantial cost and schedule savings and a mission optimized system.

Woods, A. A., Jr.↗

An expert system for shuttle and satellite radar tracker scheduling

This expert system automates and optimizes radar tracker selection for shuttle missions. The expert system is written in the FORTRAN and C languages on an HP9000. It is portable to any UNIX machine having both ANSI-77 FORTRAN and C language compilers. It is a rule based expert system that selects tracking stations from the S-band and C-band radar stations and the TDRSS east and TDRSS west satellites under a variety of conditions. The expert system was prototyped on the Symbolics in the Automated Reasoning Tool (ART) and ZetaLisp. After the prototype demonstrated an acceptable automation of the process of selecting tracking stations to support the orbit determination requirements of Shuttle missions, the basic ART rules of the prototype were ported to the HP9000 computer using the CLIPS language. CLIPS is a forward-chaining rule-based expert system language written in C. Prior to the development of this expert system the selection process was a tedious manual process and expensive in terms of human resources. Manual tracking station selection required from 1 to 2 man weeks per mission; whereas the expert system can complete the selection process in about 2 hours.

Mitchell, Paul↗

Optimizing Integrated Arrival, Departure and Surface Operations Under Uncertainty

In airports and surrounding terminal airspaces, the integration of arrival, departure and surface scheduling and routing have the potential to improve the operations efficiency. Recent research had developed mixed-integer-linear programming algorithm-based scheduler for integrated arrival and departure operations in the presence of uncertainty. This paper extends to the surface previous research performed by the authors to integrate taxiway and runway operations. The developed algorithm is capable of computing optimal aircraft schedules and routings that reflects the integration of air and ground operations. A preliminary study case is conducted for a set of thirteen aircraft evolving in a model of the Los Angeles International airport and surrounding terminal areas. Using historical data, a representative traffic scenario is constructed and probabilistic distributions of pushback delay and arrival gate delay are obtained. To assess the benefits of optimization, a First- Come-First-Serve algorithm approach comparison is realized. Evaluation results demonstrate that the optimization can help identifying runway sequencing and schedule that reduce gate waiting time without increasing average taxi times.

Bosson, Christabelle↗

The Dynamic Planner: The Sequencer, Scheduler, and Runway Allocator for Air Traffic Control Automation

The Dynamic Planner (DP) has been designed, implemented, and integrated into the Center-TRACON Automation System (CTAS) to assist Traffic Management Coordinators (TMCs), in real time, with the task of planning and scheduling arrival traffic approximately 35 to 200 nautical miles from the destination airport. The TMC may input to the DP a series of current and future scheduling constraints that reflect the operation and environmental conditions of the airspace. Under these constraints, the DP uses flight plans, track updates, and Estimated Time of Arrival (ETA) predictions to calculate optimal runway assignments and arrival schedules that help ensure an orderly, efficient, and conflict-free flow of traffic into the terminal area. These runway assignments and schedules can be shown directly to controllers or they can be used by other CTAS tools to generate advisories to the controllers. Additionally, the TMC and controllers may override the decisions made by the DP for tactical considerations. The DP will adapt to computations to accommodate these manual inputs.

Wong, Gregory L.↗

Power, data latency, and radio frequnecy interference issues in Mars Realy Network scheduling

At different time periods in the future, missions to Mars will overlap. Previous studies indicate that during such periods, existing deep space communication infrastructure cannot handle all Mars communication needs. A plausible solution is to take into account the end-to-end communication performances of network along with operational constraints, and optimize the resource usage by scheduling communication at highest possible data throughputs. As a result, shorter communication time is required and more missions can be accommodated. This principle is demonstrated in this paper for a Mars relay communication network; a network consisting of multiple surface units and orbiters on Mars and the Deep Space Stations.

power latency RFI Mars Relay Network scheduling↗

Predicting scheduling success

This paper provides an analytical formulation to predict scheduling success for a class of problems frequently referred to as activity scheduling. Space Network communications scheduling is an example of activity scheduling. The principal assumption is that the activity start times are randomly distributed over the available time in the time line. The formulation makes it possible to estimate how much of the demand can be scheduled as a function of the demand, number of resources, activity duration, and activity flexibility. The paper includes computed results for a variety of resource and demand conditions. The results demonstrate that even with highly flexible activities, it is difficult to schedule demand greater than 60 percent of resources without the use of optimization and conflict resolution capabilities in the scheduling system.

Messing, Fredric↗