Search NASA⌕ Search

SEARCH · Search NASA

Results for “orbital operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Issues associated with establishing control zones for international space operations

Cooperative missions in Earth orbit can be facilitated by developing a strategy to regulate the manner in which vehicles interact in orbit. One means of implementing such a strategy is to utilize a control zones technique that assigns different types of orbital operations to specific regions of space surrounding a vehicle. Considered here are issues associated with developing a control zones technique to regulate the interactions of spacecraft in proximity to a manned vehicle. Technical and planning issues, flight hardware and software issues, mission management parameter, and other constraints are discussed. Also covered are manned and unmanned vehicle operations, and manual versus automated flight control. A review of the strategies utilized by the Apollo Soyuz Test Project and the Space Station Freedom Program is also presented.

Nader, Blair A.↗

Issues in developing control zones for international space operations

Cooperative missions in earth orbit can be facilitated by developing a strategy to regulate the manner in which vehicles interact in orbit. One means of implementing such a strategy is to utilize a control zones technique that assigns different types of orbital operations to specific regions of space surrounding a vehicle. Considered here are issues associated with developing a control zones technique to regulate the interactions of spacecraft in proximity to a manned vehicle. Technical and planning issues, flight hardware and software issues, mission management parameter, and other constraints are discussed. Also covered are manned and unmanned vehicle operations, and manual versus automated flight control. A review of the strategies utilized by the Apollo Soyuz Test Project and the Space Station Freedom Program is also presented.

Nader, Blair A.↗

Small orbital transfer vehicle for shuttle operations

Small orbital transfer vehicles to place payloads in orbits with altitudes above those of the standard Shuttle operation are studied. Low energy earth orbits below those of the planned spinning solid upper stages are addressed. Tandem and clustered solids are considered along with controlled solids, monopropellant and bipropellant liquids, and staged solid/liquid combinations. The performance, airborne support equipment, and program costs for the selected candidate concepts are presented. The results show that the most economical way to deliver the low energy payloads is with a modular liquid bipropellant stage system for the large majority of the payloads. The remainder of the payloads would use the Shuttle with integral OMS and Scout from WTR for a few specialized payloads until the Shuttle is operational at WTR.

Sibila, A. I.↗

The Space Shuttle - Key considerations

Typical Space Shuttle flight operations, including launch/insertion, on-orbit operations, de-orbit, and ground turnaround, are summarized. The orbiter, main engine, and solid rocket boosters will be reusable. The Shuttle will be able to abort ascent and return the orbiter plus payload to the launch site if necessary. Mission capabilities include a 7-30 day duration, crew of 4-7 (with 1-4 payload specialists), and 14,500-29,500 kg payloads. Payload accommodations, including cabin, crew provisions, pointing and position stability, thermal constraints, electric power, communications, payload deployment and retrieval, contamination control, and kits for extended missions, are considered. The Thermal Protection System, utilizing pyrolized carbon and silica tiles, is described. The Space Shuttle Main Engine design and performance are considered and compared to those of the J-2 engine used on Saturn/Apollo missions.

Malkin, M. S.↗

Final Summary of On-Orbit ADR Operation on Hitomis Soft X-Ray Spectrometer Instrument

The Soft X-ray Spectrometer (SXS) on the Astro-H observatory contains a 6x6 array of x-ray microcalorimeters that are cooled to 50 mK by an adiabatic demagnetization refrigerator (ADR). The ADR consists of three stages in order to provide stable detector cooling using either a 1.2 K superfluid helium bath or a 4.5 K Joule-Thomson (JT) cryocooler as its heat sink. Astro-H was renamed Hitomi after it was successfully launched in February 2016. The SXS carried approximately 36 liters of helium into orbit, and by day 5 the helium had cooled sufficiently (1.4 K) to allow operation of the ADR. This paper summarizes the ADRs performance during the 38 days that the satellite was operational.

space astronomy↗

An Overview of MODIS Calibration and Characterization

The MODerate Resolution Imaging Spectroradiometer (MODIS) is one of the key instruments for the NASA s Earth Observing System (EOS). It is currently operating on both EOS Terra and Aqua satellites. The MODIS is a major advance over its heritage sensors in terms of its spectral, spatial, and temporal resolutions with frequent global observations and a broad range of science applications. There are 20 reflective solar bands (RSB) with center wavelengths ranging from 0.41 to 2.l microns and 16 thermal emissive bands (TEB) from 3.7 to 14.4 microns. The absolute radiometric accuracy requirements (lsigma) at the typical spectral radiance levels are plus or minus 2% for the RSB reflectance factors and plus or minus 5% for the RSB radiance products. With few exceptions, the TEB requirements are plus or minus 1%. To verify that the instruments met their specified design requirements both Terra and Aqua MODIS underwent extensive pre-launch calibration and characterization at various levels, including system-level thermal vacuum testing. On-orbit calibration and characterization are performed by the on-board calibrators: a solar diffuser (SD) and a solar diffuser stability monitor (SDSM), a V-groove flat panel blackbody (BB), and a spectro-radiometric calibration assembly (SRCA). In this paper, we present an overview of MODIS calibration and characterization activities, methodologies, and lessons learned from pre-launch testing and on-orbit operations. Key issues to be discussed include our on-orbit efforts of monitoring detectors noise characterization, tracking solar diffuser and optics degradation, and updating sensor s response versus scan-angle. The MODIS experience has provided invaluable lessons that are being used in designing and testing the Visible Infrared Imaging Radiometer Suite (VIIRS), a direct follow-on to the MODIS that will be flown on the National Polar-Orbit Operational Environmental Satellite System (NPOESS) missions.

Xiong, X.↗

Fault diagnosis in orbital refueling operations

Usually, operation manuals are provided for helping astronauts during space operations. These manuals include normal and malfunction procedures. Transferring operation manual knowledge into a computerized form is not a trivial task. This knowledge is generally written by designers or operation engineers and is often quite different from the user logic. The latter is usually a compiled version of the former. Experiments are in progress to assess the user logic. HORSES (Human - Orbital Refueling System - Expert System) is an attempt to include both of these logics in the same tool. It is designed to assist astronauts during monitoring and diagnosis tasks. Basically, HORSES includes a situation recognition level coupled to an analytical diagnoser, and a meta-level working on both of the previous levels. HORSES is a good tool for modeling task models and is also more broadly useful for knowledge design. The presentation is represented by abstract and overhead visuals only.

Boy, Guy A.↗

Follow That Satellite: EO-1 Maneuvers into Closed Formation With Landsat-7

As the Landsat-7 spacecraft continued NASA's historic program of earth imaging, begun over three decades ago, NASA launched the Earth Observing-1 (EO-1) spacecraft carrying examples of the next generation of Landsat-7 instruments. The validation method for these instruments was to have EO-1 fly in a close formation behind Landsat-7 on the same World Reference System path. From that formation hundreds of near coincident images would be taken by each spacecraft and compared to evaluate improvements in the EO-1 instruments. This paper will address the mission analysis required to launch and maneuver EO-1 into the formation with Landsat-7 where instrument validation was to occur plus a summary of completing the formation acquisition. EO-1 is required to operate one minute +/- 6 seconds behind Landsat-7 during the period of co-fly imaging with a cross track separation of within + 3 kilometers. This separation time can also be stated as a one minute +/- 6 seconds time difference in the Mean Local Time (MLT) at the descending nodes. Achieving the required MLT is heavily dependent on the time of launch. The EO-1 launch window, which had to accommodate the dual payloads of EO-1 and SAC-C, was very limited ranging from 0 to 22 seconds over the 16 day Landsat-7 WRS repeat cycle during which EO-1 was launched. Each EO-1 launch opportunity that occurred on a different day of a Landsat-7 16 day repeat cycle required a separate and distinct maneuver profile. These profiles varied significantly in duration and amount of onboard propellant required to achieve them. EO-1 launched on a day judged to have "medium" resource requirements for achieving the formation with Landsat-7. To phase EO-1 one minute behind Landsat-7 in the along track direction, a series of altitude adjusts separated by specific drift intervals were executed. Additional maneuvers slightly changed the EO-1 inclination to maintain the MLT requirements. Orbit maneuvers were planned and executed within errors of less than 1.5 percent and propellant usage was near nominal consuming 3.4 kilograms out of a launch and early orbit budget of 11 kilograms. The pre-launch 3 -sigma propellant budget allowed for 1+ years of EO-1 mission life. The success of the EO-1 launch and early orbit operations provided sufficient propellant for nearly 4 years of on orbit operations. Special action taken during the EO-1 maneuver period involved some maneuver re-planning to reduce concerns about a potential close approach between EO-1 and Landsat-7. The result of this re-planning was a safer close approach and improvement in future formation acquisition planning.

DeFazio, Robert↗

Operations considerations in Space Station Freedom assembly

The importance of planning the on-orbit operations inherent in the Space Station Freedom assembly sequence is discussed. Any solution to the assembly puzzle requires the simultaneous satisfaction of many diverse constraints, including: on-orbit assembly operations, NSTS (National Space Transportation System) payload bay constraints, NSTS performance capabilities, and provision of the requisite functionality for each on-orbit configuration. Because operations are in the critical path SSFP (Space Station Freedom Program) has chosen to carefully assess assembly operations as each launch manifest is developed and evaluated.

Doering, Stephen C.↗

On-Orbit Performance & Operation of the Attitude & Pointing Control Subsystems on ASTERIA

The Arcsecond Space Telescope Enabling Research in Astrophysics (ASTERIA) is a 6U CubeSat that was deployed from the International Space Station on 20 November 2017. The underlying goal of the mission is to image and perform photometry on bright, nearby stars and possibly detect transiting exoplanets orbiting these stars. As a technology demonstration with an eye to enable this science, the payload must be pointed with a stability of 5 arcseconds RMS over 20-minute observations and a repeatability of 1 arcsecond RMS across multiple observations. A two-stage control system was employed to achieve these pointing requirements: reaction wheels control the attitude of the spacecraft bus while a piezo stage translates the focal plane array to control the pointing of the payload. This paper will present on-orbit results that demonstrate a pointing stability of 0.5 arcsecond RMS over 20 minutes and a pointing repeatability of 1 milliarcsecond RMS from observation to observation, the best pointing of a CubeSat to date. In addition, this paper will discuss the pointing achieved by the attitude control subsystem alone, pointing issues due to temporarily bright pixels, hot pixels, and reaction wheel speed reversals or zero crossings, the deployment and Sun acquisition phase, momentum management issues arising from a large residual dipole, and some of the anomalies encountered with the attitude control subsystem.

Pong, Christopher M.↗

Missed Thrust Requirements for Psyche Mission

The Psyche Mission, part of NASA’s Discovery Mission Program, will explore the metal asteroid (16) Psyche which orbits the sun at ~3 AU. The spacecraft uses solar electric propulsion (SEP) as its primary propulsion system during the ~3.5 year trajectory to (16) Psyche and 21 month orbital operations period around the asteroid. As the first NASA mission to use Hall thrusters for deep space exploration, unique challenges have been identified and resolved in how we plan to accommodate unplanned coast (missed thrust time) during the trajectory and orbital operations and still meet the mission objectives. This paper describes the projects missed thrust requirements in detail, along with the accompanying rationale and analysis plan for the Psyche mission.

Snyder, John Steven↗

Theoretical treatment of the spin-orbit coupling in the rare gas oxides NeO, ArO, KrO, and XeO

Off-diagonal spin-orbit matrix elements are calculated as a function of internuclear distance for the rare gas oxides NeO, ArO, KrO, and XeO using the full microscopic spin-orbit Hamiltonian, including all one- and two-electron integrals, and POL-CI wave functions comparable to those of Dunning and Hay (1977). A good agreement was found when comparing these results in detail with the calculations of Cohen, Wadt and Hay (1979) that utilize an effective one-electron one-center spin-orbit operator. For the rare gas oxide molecules, it is suggested that the numerical results are a more sensitive test of the wave functions (particularly to the extent of charge transfer) than the exact evaluation of all terms in the full spin-orbit operator.

Langhoff, S. R.↗

OAST Space Theme Workshop. Volume 3: Working Group Summary. 5: Propulsion (P-1). A. Summary Statement. B. Technology Needs (Form 1). C. Priority Assessments (Form 2)

All themes require some form of advanced propulsion capabilities to achieve their stated objectives. Requirements cover a broad spectrum ranging from a new generation of heavy lift launch vehicles to low thrust, long lift system for on-orbit operations. The commonality extant between propulsive technologies was established and group technologies were grouped into vehicle classes by functional capability. The five classes of launch vehicles identified by the space transportation theme were augmented with a sixth class, encompassing planetary and on-orbit operations. Propulsion technologies in each class were then ranked, and assigned priority numbers. Prioritized technologies were matched to theme requirements.

Source record↗

Study for analysis of benefit versus cost of low thrust propulsion system

The benefits and costs associated with placing large space systems (LSS) in operational orbits were investigated, and a flexible computer model for analyzing these benefits and costs was developed. A mission model for LSS was identified that included both NASA/Commercial and DOD missions. This model included a total of 68 STS launches for the NASA/Commercial missions and 202 launches for the DOD missions. The mission catalog was of sufficient depth to define the structure type, mass and acceleration limits of each LSS. Conceptual primary propulsion stages (PPS) designs for orbital transfer were developed for three low thrust LO2/LH2 engines baselined for the study. The performance characteristics for each of these PPS was compared to the LSS mission catalog to create a mission capture. The costs involved in placing the LSS in their operational orbits were identified. The two primary costs were that of the PPS and of the STS launch. The cost of the LSS was not included as it is not a function of the PPS performance. The basic relationships and algorithms that could be used to describe the costs were established. The benefit criteria for the mission model were also defined. These included mission capture, reliability, technical risk, development time, and growth potential. Rating guidelines were established for each parameter. For flexibility, each parameter is assigned a weighting factor.

Hamlyn, K. M.↗

Space station buildup simulation

Simulations of selected earth orbital operations involving the shuttle orbiter and various modular space station components are examined. Data on the physical characteristics of these items, such as size, shape, and configuration, as well as the current operational concepts were obtained from NASA, MSC and from drawings and sketches. From these data numerical models were developed for the space shuttle orbiter and components of a six-man initial station including a core module, power module with solar arrays, representative station modules, and various sensors and antenna. Also included are maintenance inspection and failure reports, discussions with operating and service personnel, and a detailed examination of the equipment. No incipient long term reliability problems were found.

Source record↗

Polar Spin Axis Anomaly

The Global Geospace Science (GGS) Polar Plasma Laboratory (POLAR) spacecraft was launched on February 24, 1996, by a Delta 2. The spacecraft, a major axis spinner, appeared to function nominally throughout the early mission phase, which included several deployments, and orbit and attitude maneuvers. Of particular interest is the fact that the spacecraft was launched with a deliberate dynamic imbalance. During a segment of early orbit operations, a pair of Lanyard Deployed Booms (LDB) were extended. These booms were not identical; the intent was that the spacecraft would be nearly dynamically balanced after they were deployed. The spacecraft contained two dynamic balance mechanisms intended to fine tune the balance on orbit. However, subsequent images taken by the science instruments on the Despun Platform during the dynamic balancing segment indicated an offset of the principal spin axis from the geometric axis. This offset produced a sinusoidal blurring of the science images sufficiently large to degrade science data below mission requirement specifications. In the end, the imbalance encountered in flight was significantly outside the correction capability of the balances. The purpose of this paper is to examine the flight data during the various deployment and maneuver stages of the early orbit operations coupled with analytical simulations to discuss some of the potential causes of the resultant imbalance.

Crouse, Patrick L.↗

Space shuttle engineering and operations support. Orbiter to spacelab electrical power interface. Avionics system engineering

The results are presented of an investigation of the factors which affect the determination of Spacelab (S/L) minimum interface main dc voltage and available power from the orbiter. The dedicated fuel cell mode of powering the S/L is examined along with the minimum S/L interface voltage and available power using the predicted fuel cell power plant performance curves. The values obtained are slightly lower than current estimates and represent a more marginal operating condition than previously estimated.

Emmons, T. E.↗

Earth-to-orbit launch system alternatives

A robust earth-to-orbit (ETO) transportation system, designed to facilitate the continuing human exploration of space, is discussed. The concept stresses larger lift capability and minimized on-orbit operations, of which the assembly and refueling operations are given priority. The modularity of the system is based on the required compatibility with the Space Shuttle vehicle, and it offers resiliency and reduced development costs. The support of lunar and Mars missions is interrelated with the mission logistics, the design of a transfer vehicle, the extent of reusability, and the required on-orbit operations. The transfer systems, the magnitude and frequency of propellant deliveries, and some human transportation requirements are considered with respect to vehicle concepts and flight rate strategies.

Teixeira, Charles↗