Search NASA⌕ Search

SEARCH · Search NASA

Results for “parachute”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Video Analysis for Surveillance of Spacecraft Parachute Systems

The Commercial Crew Program (CCP) has established a surveillance methodology to ensure the reliability of spacecraft parachute systems. The implemented methodology relies on an interconnected framework consisting of imagery analysis, hardware inspections, and vehicle data analysis. Imagery analysis serves as a foundation for these core activities which provide a robust approach to the surveillance of spacecraft parachute systems. As the surveillance framework has been developed, the role of imagery has become more prominent, and therefore imagery requirements have changed. To complete photogrammetric analysis, careful consideration must be made to the role of imagery, required data, imagery requirements, the analysis process, and mission planning. The role of imagery will drive the required data, which will in turn drive imagery requirements. Imagery requirements are likely to drive mission planning through consideration to camera selection and placement. If onboard imagery is required, the camera and data system must be implemented prior to launch. If external imagery is required, the photography package must be implemented such that it can be positioned for a return and free of potential debris fields. For these reasons, an integrated approach must be used to build an imagery package around the required analysis with careful coordination with mission planners.

parachutes↗

Video Analysis for Surveillance of Spacecraft Parachute Systems

The Commercial Crew Program (CCP) has established a surveillance methodology to ensure the reliability of spacecraft parachute systems. The implemented methodology relies on an interconnected framework consisting of imagery analysis, hardware inspections, and vehicle data analysis. Imagery analysis serves as a foundation for these core activities which provide a robust approach to the surveillance of spacecraft parachute systems. As the surveillance framework has been developed, the role of imagery has become more prominent, and therefore imagery requirements have changed. To complete photogrammetric analysis, careful consideration must be made to the role of imagery, required data, imagery requirements, the analysis process, and mission planning. The role of imagery will drive the required data, which will in turn drive imagery requirements. Imagery requirements are likely to drive mission planning through consideration to camera selection and placement. If onboard imagery is required, the camera and data system must be implemented prior to launch. If external imagery is required, the photography package must be implemented such that it can be positioned for a return and free of potential debris fields. For these reasons, an integrated approach must be used to build an imagery package around the required analysis with careful coordination with mission planners.

parachutes↗

Jettisoning system for a parachute's canister

Three-point automatically released suspension and jettisoning system operates independently of lander's power system and releases parachute on touchdown. The system is based on a ball-lock device operated by the shock of the parachute's opening and by the subsequent decay in the load on the main cord.

Lonborg, J. O.↗

Textile mechanical elements in aerospace vehicle parachute systems

Materials, design considerations, and design details for textile mechanical elements used in aerospace vehicle parachute systems are briefly reviewed. Friction burns are noted as a major cause of parachute system failures. The friction burn hazard can be minimized by designing for predeployment and deployment sequence control with textile mechanical restraints. Two basic restraint designs (restraint loops and line ties) are discussed and various applications of the designs shown.

Lindgren, M. J.↗

Summary of design considerations for airplane spin-recovery parachute systems

A compilation of design considerations applicable to spin-recovery parachute systems for military airplanes has been made so that the information will be readily available to persons responsible for the design of such systems. This information was obtained from a study of available documents and from discussions with persons in both government and industry experienced in parachute technology, full-scale and model spin testing, and related systems.

Burk, S. M., Jr.↗

Drag characteristics of a disk-gap-band parachute with a nominal diameter of 1.65 meters at Mach numbers from 2.0 to 3.0

Supersonic wind-tunnel tests were conducted with disk-gap-band parachute models having a nominal diameter of 1.65 meters and geometric porosities of 10.0, 12.5, and 15.0 percent. Canopy inflation characteristics, angles of attack, and drag performance are presented for deployment behind forebody base extensions which were free to oscillate in pitch and yaw. The effect of increasing suspension-line length on canopy motions and drag performance is included, and the drag performance of a model with 12.5 percent geometric porosity is compared with results from flight tests of a parachute with a nominal diameter of 12.19 meters.

Mayhue, R. J.↗

Numerical solution of equations governing longitudinal suspension line wave motion during the parachute unfurling process

Equations are presented which govern the dynamics of the lines-first parachute unfurling process, including wave motion in the parachute suspension lines. Techniques are developed for obtaining numerical solutions to the governing equations. Histories of tension at test data, and generally good agreement is observed. Errors in computed results are attributed to several areas of uncertainty, the most significant being a poorly defined boundary condition on the wave motion at the vehicle-suspension line boundary.

Poole, L. R.↗

Postflight simulation of parachute deployment dynamics of Viking qualification flight tests

Simulation calculations of the Viking qualification flight tests are conducted by use of analytical models of the parachute deployment dynamics process. Results from the study indicate that good simulations of event times and trajectory are obtained. If the full-scale parachute drag coefficient is used, a good simulation of first opening load is obtained and the overall nature of the load history is calculated. For longitudinal motions, the two-degree-of-freedom models give good agreement with a six-degree-of-freedom model. It is believed that the analytical models used are tools which will aid in the analysis of future flight systems.

Whitlock, C. H.↗

Effect of suspension-line viscous damping on parachute opening load amplification.

A digital computer program was used to investigate the effects of suspension-line viscous damping on the opening loads of a high-altitude parachute system having a specified configuration. It was found (1) that the nonlinear elastic characteristics of the suspension system produce an amplification of the opening load when the viscous damping is negligible, (2) that the load amplification is markedly reduced when the suspension-line viscous damping coefficient is increased, and (3) that the suspension-line viscous damping is an important parameter of opening load amplification for high-velocity parachute inflations.

Poole, L. R.↗

The Viking parachute qualification test technique.

The parachute system for NASA's Viking '75 Mars lander was flight qualified in four high-altitude flight tests at the White Sands Missile range (WSMR). A balloon system lifted a full-scale simulated Viking spacecraft to an altitude where a varying number of rocket motors were used to propel the high drag, lifting test vehicle to test conditions which would simulate the range of entry conditions expected at Mars. A ground-commanded cold gas pointing system located on the balloon system provided powered vehicle azimuth control to insure that the flight trajectory remained within the WSMR boundaries. A unique ground-based computer-radar system was employed to monitor inflight performance of the powered vehicle and insure that command ignition of the parachute mortar occurred at the required test conditions of Mach number and dynamic pressure. Performance data were obtained from cameras, telemetry, and radar.

Raper, J. L.↗

Parachute gore shape and flow visualization during transient and steady-state conditions.

Single parachute gore segments were tested in an experimental wind tunnel having a unique 'V' splitter plate test section with a glass panel on the near side and a grid of orifices for smoke injection on the back panel. The parachute gore shape and flow patterns were viewed in cross section during the inflation process and also during changing flow conditions as would occur with rapid reduction of payload weight. Observations of flow during inflation revealed a transient internal counterflow and the formation and degeneration of several trailing vortices. Gore shapes observed compared well with those of free flight.

Dereng, V. G.↗

Lightweight, variable solidity knitted parachute fabric

A parachute fabric for aerodynamic decelerator applications is described. The fabric will permit deployment of the decelerator at high altitudes and low density conditions. The fabric consists of lightweight, highly open, circular knitted parachute fabric with ribbon-like yarns to assist in air deflection.

Matthews, F. R., Jr.↗

Flight tests of Viking parachute system in three Mach number regimes. 1: Vehicle description, test operations, and performance

Flight qualifications for parachutes were tested on full-scale simulated Viking spacecraft at entry conditions for the Viking 1975 mission to Mars. The vehicle was carried to an altitude of 36.6 km for the supersonic and transonic tests by a 980.000 cu m balloon. The vehicles were released and propelled to test conditions with rocket engines. A 117,940 cu m balloon carried the test vehicle to an altitude of 27.5 km and the conditions for the subsonic tests were achieved in free fall. Aeroshell separation occurred on all test vehicles from 8 to 14 seconds after parachute deployment. This report describes: (1) the test vehicle; (2) methods used to insure that the test conditions were achieved; and (3) the balloon system design and operations. The report also presents the performance data from onboard and ground based instruments and the results from a statistical trajectory program which gives a continuous history of test-vehicle motions.

Lundstrom, R. R.↗

Scale drogue parachute model

Drogue parachute models, pilot parachute models, and their deployment bags were fabricated incorporating recommended design changes. These changes are described in detail.

Source record↗

Flight qualification of mortar-actuated parachute deployment systems

A brief discussion outlines background of mortar use in parachute deployment systems. A description of the system operation is presented. Effects of the environment on performance are discussed as well as the instrumentation needed to assess this performance. Power unit qualification and lot qualification for shear pins and cartridges is delineated. Functional mortar system tests are described. Finally, bridle deployment and parachute deployment are discussed.

Pleasants, J. E.↗

Spin-tunnel investigation of the spinning characteristics of typical single-engine general aviation airplane designs. 2: Low-wing model A; tail parachute diameter and canopy distance for emergency spin recovery

A spin tunnel study is reported on a scale model of a research airplane typical of low-wing, single-engine, light general aviation airplanes to determine the tail parachute diameter and canopy distance (riser length plus suspension-line length) required for energency spin recovery. Nine tail configurations were tested, resulting in a wide range of developed spin conditions, including steep spins and flat spins. The results indicate that the full-scale parachute diameter required for satisfactory recovery from the most critical conditions investigated is about 3.2 m and that the canopy distance, which was found to be critical for flat spins, should be between 4.6 and 6.1 m.

Burk, S. M., Jr.↗

Development of the ARIES parachute system

The design and testing of a two-stage parachute system to recover a space telescope weighing up to 2000 pounds is described. The system consists of a 15-ft dia ribbon parachute reefed to 50% for 10 seconds and a 73-ft dia paraform or cross second stage reefed to 10% for 10 seconds. The results of eight drop tests and one operational rocket launched flight and recovery are presented. A successful operational recovery of a 1600-lb NASA space telescope was conducted. The payload was launched by a second stage Minuteman rocket to an altitude of about 300 miles above sea level.

Pepper, W. B.↗