Search NASA⌕ Search

SEARCH · Search NASA

Results for “parachute deployment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Technology Development for Deployable Aerodynamic Decelerators at Mars

Parachutes used for Mars landing missions are only certified for deployment at Mars behind blunt bodies flying at low angles of attack, Mach numbers up to 2.2, and dynamic pressures of up to 800 Pa. NASA is currently studying entry vehicle concepts for future robotic missions to Mars that would require parachutes to be deployed at higher Mach numbers and dynamic pressures. This paper demonstrates the need for expanding the parachute deployment envelope, and describes a three-phase technology development activity that has been initiated to address the need. The end result of the technology development program will be a aerodynamic decelerator system that can be deployed at Mach numbers of up to 3.1 and dynamic pressures of up to 1400 Pa.

Masciarelli, James P.↗

Parachute Decelerator System Performance During the Low Density Supersonic Decelerator Program's First Supersonic Flight Dynamics Test

During the first Supersonic Flight Dynamics Test (SFDT-1) for NASA's Low Density Supersonic Decelerator (LDSD) Program, the Parachute Decelerator System (PDS) was successfully tested. The main parachute in the PDS was a 30.5-meter supersonic Disksail parachute. The term Disksail is derived from the canopy's constructional geometry, as it combined the aspects of a ringsail and a flat circular round (disk) canopy. The crown area of the canopy contained the disk feature, as a large flat circular disk that extended from the canopy's vent down to the upper gap. From this upper gap to the skirt-band the canopy was constructed with characteristics of sails seen in a ringsail. There was a second lower gap present in this sail region. The canopy maintained a nearly 10x forebody diameter trailing distance with 1.7 Do suspension line lengths. During the test, the parachute was deployed at the targeted Mach and dynamic pressure. Although the supersonic Disksail parachute experienced an anomaly during the inflation process, the system was tested successfully in the environment it was designed to operate within. The nature of the failure seen originated in the disk portion of the canopy. High-speed and high-resolution imagery of the anomaly was captured and has been used to aid in the forensics of the failure cause. In addition to the imagery, an inertial measurement unit (IMU) recorded test vehicle dynamics and loadcells captured the bridle termination forces. In reviewing the imagery and load data a number of hypothesizes have been generated in an attempt to explain the cause of the anomaly.

Gallon, John C.↗

Rigging Test Bed Development for Validation of Multi-Stage Decelerator Extractions

The Low Density Supersonic Decelerator project is developing new decelerator systems for Mars entry which would include testing with a Supersonic Flight Dynamics Test Vehicle. One of the decelerator systems being developed is a large supersonic ringsail parachute. Due to the configuration of the vehicle it is not possible to deploy the parachute with a mortar which would be the preferred method for a spacecraft in a supersonic flow. Alternatively, a multi-stage extraction process using a ballute as a pilot is being developed for the test vehicle. The Rigging Test Bed is a test venue being constructed to perform verification and validation of this extraction process. The test bed consists of a long pneumatic piston device capable of providing a constant force simulating the ballute drag force during the extraction events. The extraction tests will take place both inside a high-bay for frequent tests of individual extraction stages and outdoors using a mobile hydraulic crane for complete deployment tests from initial pack pull out to canopy extraction. These tests will measure line tensions and use photogrammetry to track motion of the elements involved. The resulting data will be used to verify packing and rigging as well, as validate models and identify potential failure modes in order to finalize the design of the extraction system.

Low Density Supersonic Decelerator (LDSD)↗

Solid Rocket Booster Large Main and Drogue Parachute Reliability Analysis

The parachutes on the Space Transportation System (STS) Solid Rocket Booster (SRB) are the means for decelerating the SRB and allowing it to impact the water at a nominal vertical velocity of 75 feet per second. Each SRB has one pilot, one drogue, and three main parachutes. About four minutes after SRB separation, the SRB nose cap is jettisoned, deploying the pilot parachute. The pilot chute then deploys the drogue parachute. The drogue chute provides initial deceleration and proper SRB orientation prior to frustum separation. At frustum separation, the drogue pulls the frustum from the SRB and allows the main parachutes that are mounted in the frustum to unpack and inflate. These chutes are retrieved, inspected, cleaned, repaired as needed, and returned to the flight inventory and reused. Over the course of the Shuttle Program, several improvements have been introduced to the SRB main parachutes. A major change was the replacement of the small (115 ft. diameter) main parachutes with the larger (136 ft. diameter) main parachutes. Other modifications were made to the main parachutes, main parachute support structure, and SRB frustum to eliminate failure mechanisms, improve damage tolerance, and improve deployment and inflation characteristics. This reliability analysis is limited to the examination of the SRB Large Main Parachute (LMP) and drogue parachute failure history to assess the reliability of these chutes. From the inventory analysis, 68 Large Main Parachutes were used in 651 deployments, and 7 chute failures occurred in the 651 deployments. Logistic regression was used to analyze the LMP failure history, and it showed that reliability growth has occurred over the period of use resulting in a current chute reliability of R = .9983. This result was then used to determine the reliability of the 3 LMPs on the SRB, when all must function. There are 29 drogue parachutes that were used in 244 deployments, and no in-flight failures have occurred. Since there are no observed drogue chute failures, Jeffreys Prior was used to calculate a reliability of R =.998. Based on these results, it is concluded that the LMP and drogue parachutes on the Shuttle SRB are suited to their mission and changes made over their life have improved the reliability of the parachute.

Clifford, Courtenay B.↗

Modeling and Flight Performance of Supersonic Disk-Gap-Band Parachutes in Slender Body Wakes

NASA's ASPIRE (Advanced Supersonic Parachute Inflation Research and Experiments) project is investigating the supersonic deployment and inflation of full-scale parachutes. To achieve Mars-relevant conditions, the parachutes are deployed at high altitudes over Earth on a sounding rocket platform. During the flight test, Disk-Gap-Band parachutes of 21.5 meter diameter are deployed behind a slender payload 1/6th the diameter of the blunt Mars2020 capsule. Due to the differences in leading body geometry between the test flight and a parachute deployment at Mars, high fidelity numerical simulations of slender and blunt bodywakes, and of rigid parachutes behind them, were used to understand differences and similarities in the flow and the effect on parachute drag. The slender body wake is thinner, closes earlier, and presents a smaller wake deficit. Thus, a parachute deployed in the wake of a slender body is more likely to see a higher dynamic pressure than a parachute deployed behind a blunt body. In the presence of a parachute, the interaction of the unsteady wake with the parachute bow shock is stronger behind the blunt body. Simulations yield highly unsteady forces on the parachute, which was modeled as a rigid body. The mean parachute force behind a slender body is between 3 and 12 percent higher than behind a blunt body, depending on the angle of the parachute with the flow. As the angle of incidence increases, more of the parachute moves out of the leading body wakes, decreasing the sensitivity to leading body shape. To compare the flow past parachutes in Earth's and Mars' atmospheres, simulations were also performed in CO2. At the Mach number considered (1.75), the shock standoff distance ahead of the parachute, post-shock jump conditions, and the resulting parachute forces were found to be very similar in both air and CO2, indicating that a high altitude test is a good proxy for a Mars descent. The results of these numerical simulations and available data on past flight and wind tunnel tests of supersonic Disk-Gap-Band parachutes behind slender bodies were used to generate a parachute drag model for ASPIRE, which in turn was used to help design the flight test. The first flight test occurred in October 2017. The parachute was successfully deployed at Mach 1.77 and an altitude of 42 kilometers. Test instrumentation provided the atmospheric conditions, test vehicle trajectory, and the loads on the parachute along with detailed high-resolution imagery of the inflation process. Reconstruction of the flight test indicated that the measured forces on the parachute were within the model's bounds, although the model over-predicted the parachute force during the first few seconds. The parachute forces during the long subsonic period were well-predicted by the ASPIRE drag model.

Muppidi, Suman↗

ASPIRE Aerodynamic Models and Flight Performance

The Advanced Supersonic Parachute Inflation Research Experiments (ASPIRE) project was launched in 2016 to develop a capability for testing supersonic parachutes at Mars-relevant conditions. Three parachute tests successfully tested two candidate parachute designs and qualified a parachute for NASA’s Mars 2020 mission (that successfully delivered Perseverance rover to the surface of Mars in Feb 2021). To achieve Mars-relevant densities, these parachutes were deployed at targeted conditions at high altitudes over Earth, launched via sounding rockets. ASPIRE Flight Tests provided valuable data on parachute inflation, forces, and aerodynamic behavior. Design of the flight tests depended on flight mechanics simulations which in turn required aerodynamic models for the payload, and the parachute. Computational Fluid Dynamics (CFD) was used to generate these models pre-flight and they are compared against the flight data after the tests. This talk will go over some aspects of the test design, development of pre-flight models, and comparison with flight test data.

Flight Test↗

A parachute system for upper atmospheric studies

The Goddard Space Flight Center's Sounding Rocket Division successfully flight tested a high altitude, low velocity, 63.5 foot cross parachute system. The system was developed to provide a platform for atmospheric studies at altitudes higher than those attainable with balloons. This paper represents the approach taken to determine the necessary conditions for a successful apogee deployment of the parachute. The test flight deployed the parachute system at an apogee altitude of 61 kilometers. Post-flight results of rocket and parachute performance are compared to the preflight analyses.

Maksimovic, V. M.↗

Progress Report on Mars Pathfinder Project Approach

Mars Pathfinder, launching on December 2, 1996 and landing on Mars on July 4, 1997, will demonstrate a low-cost delivery system to the surface of Mars. Historically, spacecraft that orbit or land on a distant body carry massive amounts of fuel for braking at the planet. Pathfinder requires fuel only to navigate to Mars; the spacecraft aerobrakes into the Mars atmosphere directly from Earth-Mars transfer trajectory, deploys a parachute at 10 km above the surface and, within 100 m of the surface, fires solid rockets for final braking prior to deployment of airbags that cushion touchdown. After landing, petals open to upright the lander, followed by deployment of a small rover and several science instruments.

Mars↗

Advanced Supersonic Parachute Inflation Research Experiment-2 (ASPIRE2) Parachute Modeling and Flight Mechanics Performance

The Advanced Supersonic Parachute Inflation Research Experiment-2 (ASPIRE2) program is designed to test and qualify the supersonic parachute for the Mars entry, descent, and landing stage of the Mars Sample Return campaign. The ASPIRE2 test was planned for early 2026 and would have involved testing the parachute at deployments of Mach 2.1 and higher load conditions than previous Mars missions. The ASPIRE2 simulation builds upon a previous test framework from the ASPIRE tests in 2017-2018 used to qualify the Mars 2020 parachute, but due to new requirements, the modeling and simulation for ASPIRE2 has needed development and characterization of different sensitivities. This paper looks at the mission design as of mid-2024 and presents the trade space for qualifying the parachute in a dynamic environment.

Evan Roelke↗

Advanced Supersonic Parachute Inflation Research Experiment-2 (ASPIRE2) Parachute Modeling and Flight Mechanics Performance

The Advanced Supersonic Parachute Inflation Research Experiment-2 (ASPIRE2) program is designed to test and qualify the supersonic parachute for the Mars entry, descent, and landing stage of the Mars Sample Return campaign. The ASPIRE2 test was planned for early 2026 and would have involved testing the parachute at deployments of Mach 2.1 and higher load conditions than previous Mars missions. The ASPIRE2 simulation builds upon a previous test framework from the ASPIRE tests in 2017-2018 used to qualify the Mars 2020 parachute, but due to new requirements, the modeling and simulation for ASPIRE2 has needed development and characterization of different sensitivities. This paper looks at the mission design as of mid-2024 and presents the trade space for qualifying the parachute in a dynamic environment.

Evan Roelke↗

Max Launch Abort System (MLAS) Landing Parachute Demonstrator (LPD) Drop Test

The Landing Parachute Demonstrator (LPD) was conceived as a low-cost, rapidly-developed means of providing soft landing for the Max Launch Abort System (MLAS) crew module (CM). Its experimental main parachute cluster deployment technique and off-the-shelf hardware necessitated a full-scale drop test prior to the MLAS mission in order to reduce overall mission risk. This test was successfully conducted at Wallops Flight Facility on March 6, 2009, with all vehicle and parachute systems functioning as planned. The results of the drop test successfully qualified the LPD system for the MLAS flight test. This document captures the design, concept of operations and results of the drop test.

Shreves, Christopher M.↗

Cluster Development Test 2: An Assessment of a Failed Test

On 31 July 2008 the National Aeronautics and Space Administration Crew Exploration Vehicle Parachute Assembly System team conducted the final planned cluster test of the first generation parachute recovery system design. The two primary test objectives were to demonstrate the operation of the complete parachute system deployed from a full scale capsule simulator and to demonstrate the test technique of separating the capsule simulator from the Low Velocity Air Drop pallet used to extract the test article from a United States Air Force C-17 aircraft. The capsule simulator was the Parachute Test Vehicle with an accurate heat shield outer mold line and forward bay compartment of the Crew Exploration Vehicle Command Module. The Parachute Test Vehicle separated cleanly from the pallet following extraction, but failed to reach test conditions resulting in the failure of the test and the loss of the test assets. No personnel were injured. This paper will discuss the design of the test and the findings of the team that investigated the test, including a discussion of what were determined to be the root causes of the failure.

Machin, Ricardo A.↗

Rocket-Powered Parachutes Rescue Entire Planes

Small Business Innovation Research (SBIR) contracts with Langley Research Center helped BRS Aerospace, of Saint Paul, Minnesota, to develop technology that has saved 246 lives to date. The company s whole aircraft parachute systems deploy in less than 1 second thanks to solid rocket motors and are capable of arresting the descent of a small aircraft, lowering it safely to the ground. BRS has sold more than 30,000 systems worldwide, and the technology is now standard equipment on many of the world s top-selling aircraft. Parachutes for larger airplanes are in the works.

Source record↗

Opening Loads Analyses for Various Disk-Gap-Band Parachutes

Detailed opening loads data is presented for 18 tests of Disk-Gap-Band (DGB) parachutes of varying geometry with nominal diameters ranging from 43.2 to 50.1 ft. All of the test parachutes were deployed from a mortar. Six of these tests were conducted via drop testing with drop test vehicles weighing approximately 3,000 or 8,000 lb. Twelve tests were conducted in the National Full-Scale Aerodynamics Complex 80- by 120-foot wind tunnel at the NASA Ames Research Center. The purpose of these tests was to structurally qualify the parachute for the Mars Exploration Rover mission. A key requirement of all tests was that peak parachute load had to be reached at full inflation to more closely simulate the load profile encountered during operation at Mars. Peak loads measured during the tests were in the range from 12,889 to 30,027 lb. Of the two test methods, the wind tunnel tests yielded more accurate and repeatable data. Application of an apparent mass model to the opening loads data yielded insights into the nature of these loads. Although the apparent mass model could reconstruct specific tests with reasonable accuracy, the use of this model for predictive analyses was not accurate enough to set test conditions for either the drop or wind tunnel tests. A simpler empirical model was found to be suitable for predicting opening loads for the wind tunnel tests to a satisfactory level of accuracy. However, this simple empirical model is not applicable to the drop tests.

Cruz, J. R.↗

Study of radioisotope safety devices for electric propulsion system, Volume 1: Summary report

A new reference design was prepared for the 5 kW(e) thermionic power supply. The safety equipment in this design is a passive containment system which does not rely on the operation of any mechanisms such as a launch escape rocket or deployment of parachutes. It includes: (1) a blast shield to protect against the explosion of the launch vehicle; (2) a combination of refractory thermal insulation and heat storage material to protect against a sustained launch pad fire; (3) a reentry body with a spherical nose and a large conical flare at the aft end to stabilize the reentry attitude and lower the terminal velocity in air; (4) composite graphite thermal protection to sustain the reentry heat pulse; (5) crushable honeycomb behind the nose to limit the deceleration of the radioisotope source due to impact on land at terminal velocity; (6) a double-walled secondary containment vessel surrounding the isotopic capsules; (7) neutron shielding to reduce external dose rates; (8) an auxiliary cooling system employing redundant heat pipes to remove the radioactive decay heat from the heat source and reject it to the surroundings or to a forced convection loop.

Bradshaw, G. B.↗

Advances in modeling aerodynamic decelerator dynamics.

The Viking entry vehicle uses a lines-first type of deployment in which the parachute, packed in a deployment bag, gets ejected rearward from the vehicle by a mortar. As the bag moves rearward, first the lines are unfurled and then the canopy. An analysis of the unfurling process is conducted, giving attention to longitudinal and rotational dynamics. It is shown that analytical modeling of aerodynamic systems provides significant information for a better understanding of the physics of the deployment process.

Whitlock, C. H.↗