Search NASA⌕ Search

SEARCH · Search NASA

Results for “parallel scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Leveraging Independent Management and Chief Engineer Hierarchy: Vertically and Horizontally-Derived Technical Authority Value

In the development of complex spacecraft missions, project management authority is usually extended hierarchically from NASA's highest agency levels down to the implementing institution's project team level, through both the center and the program. In parallel with management authority, NASA utilizes a complementary, but independent, hierarchy of technical authority (TA) that extends from the agency level to the project, again, through both the center and the program. The chief engineers (CEs) who serve in this technical authority capacity oversee and report on the technical status and ensure sound engineering practices, controls, and management of the projects and programs. At the lowest level, implementing institutions assign project CEs to technically engage projects, lead development teams, and ensure sound technical principles, processes, and issue resolution. At the middle level, programs and centers independently use CEs to ensure the technical success of their projects and programs. At the agency level, NASA's mission directorate CEs maintain technical cognizance over every program and project in their directorate and advise directorate management on the technical, cost, schedule, and programmatic health of each. As part of this vertically-extended CE team, a program level CE manages a continually varying balance between penetration depth and breadth across his or her assigned missions. Teamwork issues and information integration become critical for management at all levels to ensure value-added use of both the synergy available between CEs at the various agency levels, and the independence of the technical authority at each organization.

Barley, Bryan↗

Collaborative Aerospace Research and Fellowship Program at NASA Glenn Research Center

During the summer of 2004, a 10-week activity for university faculty entitled the NASA-OAI Collaborative Aerospace Research and Fellowship Program (CFP) was conducted at the NASA Glenn Research Center in collaboration with the Ohio Aerospace Institute (OAI). This is a companion program to the highly successful NASA Faculty Fellowship Program and its predecessor, the NASA-ASEE Summer Faculty Fellowship Program that operated for 38 years at Glenn. The objectives of CFP parallel those of its companion, viz., (1) to further the professional knowledge of qualified engineering and science faculty,(2) to stimulate an exchange of ideas between teaching participants and employees of NASA, (3) to enrich and refresh the research and teaching activities of participants institutions, and (4) to contribute to the research objectives of Glenn. However, CFP, unlike the NASA program, permits faculty to be in residence for more than two summers and does not limit participation to United States citizens. Selected fellows spend 10 weeks at Glenn working on research problems in collaboration with NASA colleagues and participating in related activities of the NASA-ASEE program. This year's program began officially on June 1, 2004 and continued through August 7, 2004. Several fellows had program dates that differed from the official dates because university schedules vary and because some of the summer research projects warranted a time extension beyond the 10 weeks for satisfactory completion of the work. The stipend paid to the fellows was $1200 per week and a relocation allowance of $1000 was paid to those living outside a 50-mile radius of the Center. In post-program surveys from this and previous years, the faculty cited numerous instances where participation in the program has led to new courses, new research projects, new laboratory experiments, and grants from NASA to continue the work initiated during the summer. Many of the fellows mentioned amplifying material, both in undergraduate and graduate courses, on the basis of the summer s experience at Glenn. A number of 2004 fellows indicated that proposals to NASA will grow out of their summer research projects. In addition, some journal articles and NASA publications will result from this past summer s activities. Fellows from past summers continue to send reprints of articles that resulted from work initiated at Glenn. This report is intended primarily to summarize the research activities comprising the 2004 CFP Program at Glenn. Particular research studies include: 1) Development of an Imaging-Based, Computational Fluid Dynamics Tool to Assess Fluid Mechanics in Experimental Models that Simulate Blood Vessels; 2) Analysis of Nanomaterials Produced from Precursors; and 3) LEO Propagation Analysis Tool.

Heyward, Ann O.↗

Scientific Impact of MODIS C5 Calibration Degradation and C6+ Improvements

The Collection 6 (C6) MODIS (Moderate Resolution Imaging Spectroradiometer) land and atmosphere data sets are scheduled for release in 2014. C6 contains significant revisions of the calibration approach to account for sensor aging. This analysis documents the presence of systematic temporal trends in the visible and near-infrared (500 m) bands of the Collection 5 (C5) MODIS Terra and, to lesser extent, in MODIS Aqua geophysical data sets. Sensor degradation is largest in the blue band (B3) of the MODIS sensor on Terra and decreases with wavelength. Calibration degradation causes negative global trends in multiple MODIS C5 products including the dark target algorithm's aerosol optical depth over land and Ångstrom exponent over the ocean, global liquid water and ice cloud optical thickness, as well as surface reflectance and vegetation indices, including the normalized difference vegetation index (NDVI) and enhanced vegetation index (EVI). As the C5 production will be maintained for another year in parallel with C6, one objective of this paper is to raise awareness of the calibration-related trends for the broad MODIS user community. The new C6 calibration approach removes major calibrations trends in the Level 1B (L1B) data. This paper also introduces an enhanced C6C calibration of the MODIS data set which includes an additional polarization correction (PC) to compensate for the increased polarization sensitivity of MODIS Terra since about 2007, as well as detrending and Terra- Aqua cross-calibration over quasi-stable desert calibration sites. The PC algorithm, developed by the MODIS ocean biology processing group (OBPG), removes residual scan angle, mirror side and seasonal biases from aerosol and surface reflectance (SR) records along with spectral distortions of SR. Using the multiangle implementation of atmospheric correction (MAIAC) algorithm over deserts, we have also developed a detrending and cross-calibration method which removes residual decadal trends on the order of several tenths of 1% of the top-of-atmosphere (TOA) reflectance in the visible and near-infrared MODIS bands B1-B4, and provides a good consistency between the two MODIS sensors. MAIAC analysis over the southern USA shows that the C6C approach removed an additional negative decadal trend of Terra (Delta)NDVI approx.0.01 as compared to Aqua data. This change is particularly important for analysis of vegetation dynamics and trends in the tropics, e.g., Amazon rainforest, where the morning orbit of Terra provides considerably more cloud-free observations compared to the afternoon Aqua measurements.

Terra and Aqua↗

Parallel Proximity Detection for Computer Simulation

The present invention discloses a system for performing proximity detection in computer simulations on parallel processing architectures utilizing a distribution list which includes movers and sensor coverages which check in and out of grids. Each mover maintains a list of sensors that detect the mover's motion as the mover and sensor coverages check in and out of the grids. Fuzzy grids are includes by fuzzy resolution parameters to allow movers and sensor coverages to check in and out of grids without computing exact grid crossings. The movers check in and out of grids while moving sensors periodically inform the grids of their coverage. In addition, a lookahead function is also included for providing a generalized capability without making any limiting assumptions about the particular application to which it is applied. The lookahead function is initiated so that risk-free synchronization strategies never roll back grid events. The lookahead function adds fixed delays as events are scheduled for objects on other nodes.

Steinman, Jeffrey S.↗

Parallel Proximity Detection for Computer Simulations

The present invention discloses a system for performing proximity detection in computer simulations on parallel processing architectures utilizing a distribution list which includes movers and sensor coverages which check in and out of grids. Each mover maintains a list of sensors that detect the mover's motion as the mover and sensor coverages check in and out of the grids. Fuzzy grids are included by fuzzy resolution parameters to allow movers and sensor coverages to check in and out of grids without computing exact grid crossings. The movers check in and out of grids while moving sensors periodically inform the grids of their coverage. In addition, a lookahead function is also included for providing a generalized capability without making any limiting assumptions about the particular application to which it is applied. The lookahead function is initiated so that risk-free synchronization strategies never roll back grid events. The lookahead function adds fixed delays as events are scheduled for objects on other nodes.

Steinman, Jeffrey S.↗

Launch Vehicle Design Process Description and Training Formulation

A primary NASA priority is to reduce the cost and improve the effectiveness of launching payloads into space. As a consequence, significant improvements are being sought in the effectiveness, cost, and schedule of the launch vehicle design process. In order to provide a basis for understanding and improving the current design process, a model has been developed for this complex, interactive process, as reported in the references. This model requires further expansion in some specific design functions. Also, a training course for less-experienced engineers is needed to provide understanding of the process, to provide guidance for its effective implementation, and to provide a basis for major improvements in launch vehicle design process technology. The objective of this activity is to expand the description of the design process to include all pertinent design functions, and to develop a detailed outline of a training course on the design process for launch vehicles for use in educating engineers whose experience with the process has been minimal. Building on a previously-developed partial design process description, parallel sections have been written for the Avionics Design Function, the Materials Design Function, and the Manufacturing Design Function. Upon inclusion of these results, the total process description will be released as a NASA TP. The design function sections herein include descriptions of the design function responsibilities, interfaces, interactive processes, decisions (gates), and tasks. Associated figures include design function planes, gates, and tasks, along with other pertinent graphics. Also included is an expanded discussion of how the design process is divided, or compartmentalized, into manageable parts to achieve efficient and effective design. A detailed outline for an intensive two-day course on the launch vehicle design process has been developed herein, and is available for further expansion. The course is in an interactive lecture/workshop format to engage the participants in active learning. The course addresses the breadth and depth of the process, requirements, phases, participants, multidisciplinary aspects, tasks, critical elements,as well as providing guidance from previous lessons learned. The participants are led to develop their own understanding of the current process and how it can be improved. Included are course objectives and a session-by-session outline of course content. Also included is an initial identification of visual aid requirements.

Atherton, James↗

Systems Engineering Approach to Technology Integration for NASA's 2nd Generation Reusable Launch Vehicle

The overall goal of the 2nd Generation RLV Program is to substantially reduce technical and business risks associated with developing a new class of reusable launch vehicles. NASA's specific goals are to improve the safety of a 2nd generation system by 2 orders of magnitude - equivalent to a crew risk of 1-in-10,000 missions - and decrease the cost tenfold, to approximately $1,000 per pound of payload launched. Architecture definition is being conducted in parallel with the maturating of key technologies specifically identified to improve safety and reliability, while reducing operational costs. An architecture broadly includes an Earth-to-orbit reusable launch vehicle, on-orbit transfer vehicles and upper stages, mission planning, ground and flight operations, and support infrastructure, both on the ground and in orbit. The systems engineering approach ensures that the technologies developed - such as lightweight structures, long-life rocket engines, reliable crew escape, and robust thermal protection systems - will synergistically integrate into the optimum vehicle. To best direct technology development decisions, analytical models are employed to accurately predict the benefits of each technology toward potential space transportation architectures as well as the risks associated with each technology. Rigorous systems analysis provides the foundation for assessing progress toward safety and cost goals. The systems engineering review process factors in comprehensive budget estimates, detailed project schedules, and business and performance plans, against the goals of safety, reliability, and cost, in addition to overall technical feasibility. This approach forms the basis for investment decisions in the 2nd Generation RLV Program's risk-reduction activities. Through this process, NASA will continually refine its specialized needs and identify where Defense and commercial requirements overlap those of civil missions.

Thomas, Dale↗

Systems Engineering Approach to Technology Integration for NASA's 2nd Generation Reusable Launch Vehicle

The overall goal of the 2nd Generation RLV Program is to substantially reduce technical and business risks associated with developing a new class of reusable launch vehicles. NASA's specific goals are to improve the safety of a 2nd-generation system by 2 orders of magnitude - equivalent to a crew risk of 1-in-10,000 missions - and decrease the cost tenfold, to approximately $1,000 per pound of payload launched. Architecture definition is being conducted in parallel with the maturating of key technologies specifically identified to improve safety and reliability, while reducing operational costs. An architecture broadly includes an Earth-to-orbit reusable launch vehicle, on-orbit transfer vehicles and upper stages, mission planning, ground and flight operations, and support infrastructure, both on the ground and in orbit. The systems engineering approach ensures that the technologies developed - such as lightweight structures, long-life rocket engines, reliable crew escape, and robust thermal protection systems - will synergistically integrate into the optimum vehicle. To best direct technology development decisions, analytical models are employed to accurately predict the benefits of each technology toward potential space transportation architectures as well as the risks associated with each technology. Rigorous systems analysis provides the foundation for assessing progress toward safety and cost goals. The systems engineering review process factors in comprehensive budget estimates, detailed project schedules, and business and performance plans, against the goals of safety, reliability, and cost, in addition to overall technical feasibility. This approach forms the basis for investment decisions in the 2nd Generation RLV Program's risk-reduction activities. Through this process, NASA will continually refine its specialized needs and identify where Defense and commercial requirements overlap those of civil missions.

Thomas, Dale↗

CID-720 aircraft high-environment flight instrumentation system

The high-environment flight instrumentation system was designed to acquire Langley's structural response data during the full scale transport-controlled impact demonstration test. There was only one opportunity for data acquisition. Thus, a high reliability and crashworthy design approach was implemented. The approach featured multi-level redundancy and a vigorous quality assurance testing program. Complying with an accelerated schedule, the instrumentation system was developed, tested and shipped within 18 months to Dryden Flight Research Facility. The flight instrumentation system consists of two autonomous data systems, DAS #1 and #2, and an excellent checkout subsystem. Each data system is partitioned into four pallets. The system was designed to operate on manned and unmanned flights. There are 176 data channels per data system. These channels are sequentially sampled and encoded into 1 megabit/sec pulse code modulation (PCM) data signal. To increase the probability of success, a special PCM distribution subsystem was developed. This subsystem distributes the PCM signal to two transmitters, one delay memory, and eight recorder tracks. The data on four of these trackes was digitally delayed approximately 300 msec to maximize data acquisition during impact. Therefore each data system's data is redundantly recorded onboard and on the ground. There are two time code generators. Parallel time from each is encoded into both data systems. Serial time from each is redundantly recorded on both onboard recorders. Instrumentation power is independent of aircraft power and self-contained.

Calloway, R. S.↗

Design Limit Loads and Verification Approach for the TESS Observatory

The Transiting Exoplanet Survey Satellite (TESS) is a NASA Explorer mission. The TESS Observatory is scheduled to launch on Falcon 9 in April 2018. This presentation covers the process used to define and update design limit loads for the observatory, instrument, and components throughout the life of the program. The limit loads that drove the need for a SoftRide isolation system are highlighted. The testing performed to qualify the observatory for launch loads at the instrument and observatory level is also detailed. In addition, exchanges with the launch vehicle provider in terms of loads predictions and hardware for test are discussed along with the associated issues encountered and lessons learned. The loads development and verification success on TESS was a team effort. Orbital ATK is the spacecraft provider, NASA GSFC provides project management and technical oversight, the instrument is managed by MIT Kavli Institute and the instrument cameras are built and tested by MIT Lincoln Laboratory. Since the instrument was designed in parallel with the spacecraft, the instrument design limit loads were developed in partnership with NASA and the instrument team. The three teams collaborated on a regular basis starting in the early design phase and continuing through observatory level testing.

Limit Loads↗

The SGI/Cray T3E: Experiences and Insights

The NASA Goddard Space Flight Center is home to the fifth most powerful supercomputer in the world, a 1024 processor SGI/Cray T3E-600. The original 512 processor system was placed at Goddard in March, 1997 as part of a cooperative agreement between the High Performance Computing and Communications Program's Earth and Space Sciences Project (ESS) and SGI/Cray Research. The goal of this system is to facilitate achievement of the Project milestones of 10, 50 and 100 GFLOPS sustained performance on selected Earth and space science application codes. The additional 512 processors were purchased in March, 1998 by the NASA Earth Science Enterprise for the NASA Seasonal to Interannual Prediction Project (NSIPP). These two "halves" still operate as a single system, and must satisfy the unique requirements of both aforementioned groups, as well as guest researchers from the Earth, space, microgravity, manned space flight and aeronautics communities. Few large scalable parallel systems are configured for capability computing, so models are hard to find. This unique environment has created a challenging system administration task, and has yielded some insights into the supercomputing needs of the various NASA Enterprises, as well as insights into the strengths and weaknesses of the T3E architecture and software. The T3E is a distributed memory system in which the processing elements (PE's) are connected by a low latency, high bandwidth bidirectional 3-D torus. Due to the focus on high speed communication between PE's, the T3E requires PE's to be allocated contiguously per job. Further, jobs will only execute on the user specified number of PE's and PE timesharing is possible but impractical. With a highly varied job mix in both size and runtime of jobs, the resulting scenario is PE fragmentation and an inability to achieve near 100% utilization. SGI/Cray has provided several scheduling and configuration tools to minimize the impact of fragmentation. These tools include PScheD (the political scheduler), GRM (the global resource manager) and NQE (the Network Queuing Environment). Features and impact of these tools will be discussed, as will resulting performance and utilization data. As a distributed memory system, the T3E is designed to be programmed through explicit message passing. Consequently, certain assumptions related to code design are made by the operating system (UNICOS/mk) and its scheduling tools. With the exception of HPF, which does run on the T3E, however poorly, alternative programming styles have the potential to impact the T3E in unexpected and undesirable ways. Several examples will be presented (preceeded with the disclaimer, "Don't try this at home! Violators will be prosecuted!")

Bernard, Lisa Hamet↗

Metallography of Battery Resistance Spot Welds

Li-ion cells provide an energy dense solution for systems that require rechargeable electrical power. However, these cells can undergo thermal runaway, the point at which the cell becomes thermally unstable and results in hot gas, flame, electrolyte leakage, and in some cases explosion. The heat and fire associated with this type of event is generally violent and can subsequently cause damage to the surrounding system or present a dangerous risk to the personnel nearby. The space flight environment is especially sensitive to risks particularly when it involves potential for fire within the habitable volume of the International Space Station (ISS). In larger battery packs such as Robonaut 2 (R2), numerous Li-ion cells are placed in parallel-series configurations to obtain the required stack voltage and desired run-time or to meet specific power requirements. This raises a second and less obvious concern for batteries that undergo certification for space flight use: the joining quality at the resistance spot weld of battery cells to component wires/leads and battery tabs, bus bars or other electronic components and assemblies. Resistance spot welds undergo materials evaluation, visual inspection, conductivity (resistivity) testing, destructive peel testing, and metallurgical examination in accordance with applicable NASA Process Specifications. Welded components are cross-sectioned to ensure they are free of cracks or voids open to any exterior surface. Pore and voids contained within the weld zone but not open to an exterior surface, and are not determined to have sharp notch like characteristics, shall be acceptable. Depending on requirements, some battery cells are constructed of aluminum canisters while others are constructed of steel. Process specific weld schedules must be developed and certified for each possible joining combination. The aluminum canisters' positive terminals were particularly difficult to weld due to a bi-metal strip that comes ultrasonically pre-welded by the manufacturer. This was further complicated as the maximum electrode force was limited to low-electrode force to prevent deflection of the aluminum can during welding. Other Li-ion cells are comprised of smaller diameter cylindrical steel canisters which are inherently capable of handling greater force from the electrodes. Allowing higher-electrode forces aids greatly in insuring a consistent resistance network for the weld. Overall lessons learned: developing good jigs is critical to insure the parts and electrodes are planer to one another and the location of the weld sites remains accurate and repeatable; maintaining strict control over materials is critical--materials must be of a specific hardness and chemical composition to insure that a weld schedule is repeatable; accuracy of the die used to stamp the projections is critical and worth the investment; and proper seasoning of the electrodes is critical to producing consistent welds--once the electrodes have been properly seasoned, cleaning/dressing should be avoided until it is absolutely necessary.

Martinez, J. E.↗

NASA Tech Briefs, January 2006

Topics covered include: Semiautonomous Avionics-and-Sensors System for a UAV; Biomimetic/Optical Sensors for Detecting Bacterial Species; System Would Detect Foreign-Object Damage in Turbofan Engine; Detection of Water Hazards for Autonomous Robotic Vehicles; Fuel Cells Utilizing Oxygen From Air at Low Pressures; Hybrid Ion-Detector/Data-Acquisition System for a TOF-MS; Spontaneous-Desorption Ionizer for a TOF-MS; Equipment for On-Wafer Testing From 220 to 325 GHz; Computing Isentropic Flow Properties of Air/R-134a Mixtures; Java Mission Evaluation Workstation System; Using a Quadtree Algorithm To Assess Line of Sight; Software for Automated Generation of Cartesian Meshes; Optics Program Modified for Multithreaded Parallel Computing; Programs for Testing Processor-in-Memory Computing Systems; PVM Enhancement for Beowulf Multiple-Processor Nodes; Ion-Exclusion Chromatography for Analyzing Organics in Water; Selective Plasma Deposition of Fluorocarbon Films on SAMs; Water-Based Pressure-Sensitive Paints; System Finds Horizontal Location of Center of Gravity; Predicting Tail Buffet Loads of a Fighter Airplane; Water Containment Systems for Testing High-Speed Flywheels; Vapor-Compression Heat Pumps for Operation Aboard Spacecraft; Multistage Electrophoretic Separators; Recovering Residual Xenon Propellant for an Ion Propulsion System; Automated Solvent Seaming of Large Polyimide Membranes; Manufacturing Precise, Lightweight Paraboloidal Mirrors; Analysis of Membrane Lipids of Airborne Micro-Organisms; Noninvasive Diagnosis of Coronary Artery Disease Using 12-Lead High-Frequency Electrocardiograms; Dual-Laser-Pulse Ignition; Enhanced-Contrast Viewing of White-Hot Objects in Furnaces; Electrically Tunable Terahertz Quantum-Cascade Lasers; Few-Mode Whispering-Gallery-Mode Resonators; Conflict-Aware Scheduling Algorithm; and Real-Time Diagnosis of Faults Using a Bank of Kalman Filters.

Source record↗

Feasibility study for the implementation of NASTRAN on the ILLIAC 4 parallel processor

The ILLIAC IV, a fourth generation multiprocessor using parallel processing hardware concepts, is operational at Moffett Field, California. Its capability to excel at matrix manipulation, makes the ILLIAC well suited for performing structural analyses using the finite element displacement method. The feasibility of modifying the NASTRAN (NASA structural analysis) computer program to make effective use of the ILLIAC IV was investigated. The characteristics are summarized of the ILLIAC and the ARPANET, a telecommunications network which spans the continent making the ILLIAC accessible to nearly all major industrial centers in the United States. Two distinct approaches are studied: retaining NASTRAN as it now operates on many of the host computers of the ARPANET to process the input and output while using the ILLIAC only for the major computational tasks, and installing NASTRAN to operate entirely in the ILLIAC environment. Though both alternatives offer similar and significant increases in computational speed over modern third generation processors, the full installation of NASTRAN on the ILLIAC is recommended. Specifications are presented for performing that task with manpower estimates and schedules to correspond.

Field, E. I.↗

Life Cycle Systems Engineering Approach to NASA's 2nd Generation Reusable Launch Vehicle

The overall goal of the 2nd Generation RLV Program is to substantially reduce technical and business risks associated with developing a new class of reusable launch vehicles. NASA's specific goals are to improve the safety of a 2nd- generation system by 2 orders of magnitude - equivalent to a crew risk of 1 -in- 10,000 missions - and decrease the cost tenfold, to approximately $1,000 per pound of payload launched. Architecture definition is being conducted in parallel with the maturating of key technologies specifically identified to improve safety and reliability, while reducing operational costs. An architecture broadly includes an Earth-to-orbit reusable launch vehicle, on-orbit transfer vehicles and upper stages, mission planning, ground and flight operations, and support infrastructure, both on the ground and in orbit. The systems engineering approach ensures that the technologies developed - such as lightweight structures, long-life rocket engines, reliable crew escape, and robust thermal protection systems - will synergistically integrate into the optimum vehicle. Given a candidate architecture that possesses credible physical processes and realistic technology assumptions, the next set of analyses address the system's functionality across the spread of operational scenarios characterized by the design reference missions. The safety/reliability and cost/economics associated with operating the system will also be modeled and analyzed to answer the questions "How safe is it?" and "How much will it cost to acquire and operate?" The systems engineering review process factors in comprehensive budget estimates, detailed project schedules, and business and performance plans, against the goals of safety, reliability, and cost, in addition to overall technical feasibility. This approach forms the basis for investment decisions in the 2nd Generation RLV Program's risk-reduction activities. Through this process, NASA will continually refine its specialized needs and identify where Defense and commercial requirements overlap those of civil missions.

Thomas, Dale↗

TPSAS-NF1676L-12168-DND

The Federal Aviation Administration’s Surveillance and Broadcast Services Program Office considers Interval Management (IM) to be one of the three key, near-term applications to make use of ADS-B-In, the receiving and processing of Automatic Dependent Surveillance – Broadcast data on-board an aircraft. Interval Management is used to describe a wide range of operational applications and uses of airborne spacing technology. Interval Management makes use of improved scheduling and sequencing capabilities for the air traffic controllers (ATC) and precise, relative spacing of aircraft, to improve airport throughput, increase the use of Optimized Profile Descents (OPD), and reduce tactical controller workload. The IM applications are subdivided into two categories: one where the flight crew is authorized to manage their speed to achieve the IM goal while the controller retains separation responsibility and a second where the flight crew takes responsibility for both managing speed but also for separation from the specified target aircraft. The former is referred to as Interval Management-Spacing (IM-S) and the latter as Interval Management-Delegated Separation (IM-DS). For the past 10 years NASA has been working on a specific IM application called Airborne Precision Spacing (APS). This concept has focused on increasing runway throughput while enabling OPDs. It is seen as a specific application within the IM class of applications. This talk will present the current state of the APS concept including support for dependent parallel runway operations and how NASA is working to have APS support the broader IM activities. Planned development and testing of APS, including extensions to support IM-DS and FAA-planned flight trials will be presented along with several up-coming simulations.

Bryan E Barmore↗

TPSAS-NF1676L-12329-DND

The Federal Aviation Administration’s Surveillance and Broadcast Services Program Office considers Interval Management (IM) to be one of the three key, near-term applications to make use of ADS-B-In, the receiving and processing of Automatic Dependent Surveillance – Broadcast data on-board an aircraft. Interval Management is used to describe a wide range of operational applications and uses of airborne spacing technology. Interval Management makes use of improved scheduling and sequencing capabilities for the air traffic controllers (ATC) and precise, relative spacing of aircraft, to improve airport throughput, increase the use of Optimized Profile Descents (OPD), and reduce tactical controller workload. The IM applications are subdivided into two categories: one where the flight crew is authorized to manage their speed to achieve the IM goal while the controller retains separation responsibility and a second where the flight crew takes responsibility for both managing speed but also for separation from the specified target aircraft. The former is referred to as Interval Management-Spacing (IM-S) and the latter as Interval Management-Delegated Separation (IM-DS). For the past 10 years NASA has been working on a specific IM application called Airborne Precision Spacing (APS). This concept has focused on increasing runway throughput while enabling OPDs. It is seen as a specific application within the IM class of applications. This talk will present the current state of the APS concept including support for dependent parallel runway operations and how NASA is working to have APS support the broader IM activities. Planned development and testing of APS, including extensions to support IM-DS and FAA-planned flight trials will be presented along with several up-coming simulations.

Brian T Baxley↗

A New Interferometer for Monitoring Atmospheric Phase Fluctuations

Water vapor in the Earth's troposphere introduces an extra electrical path in the propagation of radio signals through the atmosphere. The distribution of water vapor is irregular and distorts the wavefronts of incoming radio waves, limiting the angular resolution that can be achieved with ground-based telescopes. The level of fluctuations depends both on the location of the site ,and on the prevailing atmospheric conditions. The ability to measure the fluctuations is therefore important when choosing a site for a new instrument, and for scheduling observations of existing telescopes. Existing phase monitors are radio interferometers that monitor monochromatic beacon tones from geostationary communications satellites at a frequency of about 12 GHz. They have a classical heterodyne design based on two satellite receiving antennas; each has a front-end for amplifying and down-converting the incoming signals using a local oscillator that is phase-locked to a common reference frequency. In addition to multiple phase-locked loops these instruments require expensive phase-stable cabling to reduce the effects of thermal drift. The new system uses two consumer 18" digital satellite TV dishes to monitor satellite TV broadcast signals over a bandwidth of 500 MHz (12.2 to 12.7 GHz). The novel design eliminates the need for phase-locked loops and thermally stable components, and uses a pair of Gilbert Cell multipliers to perform the broadband correlation. A phase monitor has been been built and deployed at the site of the Berkeley-Illinois-Maryland Association Millimeter Array in Northern California, and has been operating successfully since June 1998, measuring the difference in electrical path length for parallel lines of sight to the satellite separated by a baseline of 100 m. With a hardware cost of approximately $4000, it is much cheaper than previous instruments, and the low power requirements and high reliability make the system suitable for site testing in remote locations.

Lay, Oliver↗