Search NASA⌕ Search

SEARCH · Search NASA

Results for “payload processing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Space Processing Applications - Designing the initial space transportation system payloads capability

A review is presented of the broad objectives identified by the U.S. Space Processing Applications program. A description is given of the types of materials to be considered, taking into account aspects of crystal growth, questions of purification and separation, mixing, solidification, and processes in fluids. The program requirements are discussed, giving attention to time in space, energy, research and development payload equipment design efforts, design payloads, early mission automated payloads, and early mission manned payloads.

Hammel, R. L.↗

Space Shuttle planetary payload launch site operations

This paper examines the experiences of recent actual planetary payload procesing flows. The emphasis is on the processing of the Galileo spacecraft; however, the paper also addresses the Magellan and Ulysses programs to a lesser extent. An overview of the payload processing activity at the Kennedy Space Center is provided. A 'case study' narrative approach is applied to the Space Shuttle flight STS-34 Galileo processing, and some recommendations based on these operations are presented.

Schuiling, Roelof L.↗

Monodisperse Latex Reactor (MLR): A materials processing space shuttle mid-deck payload

The monodisperse latex reactor experiment has flown five times on the space shuttle, with three more flights currently planned. The objectives of this project is to manufacture, in the microgravity environment of space, large particle-size monodisperse polystyrene latexes in particle sizes larger and more uniform than can be manufactured on Earth. Historically it has been extremely difficult, if not impossible to manufacture in quantity very high quality monodisperse latexes on Earth in particle sizes much above several micrometers in diameter due to buoyancy and sedimentation problems during the polymerization reaction. However the MLR project has succeeded in manufacturing in microgravity monodisperse latex particles as large as 30 micrometers in diameter with a standard deviation of 1.4 percent. It is expected that 100 micrometer particles will have been produced by the completion of the the three remaining flights. These tiny, highly uniform latex microspheres have become the first material to be commercially marketed that was manufactured in space.

Kornfeld, D. M.↗

A monograph of the National Space Transportation System Office (NSTSO) integration activities conducted at the NASA Lyndon B. Johnson Space Center for the EASE/ACCESS payload flown on STS 61-B

The integration process of activities conducted at the NASA Lyndon B. Johnson Space Center (JSC) for the Experimental Assembly of Structures in Extravehicular activity (EASE)/Assembly Concept for Construction of Erectable Space Structures (ACCESS) payload is provided as a subset to the standard payload integration process used by the NASA Space Transportation System (STS) to fly payloads on the Space Shuttle. The EASE/ACCESS payload integration activities are chronologically reviewed beginning with the initiation of the flight manifesting and integration process. The development and documentation of the EASE/ACCESS integration requirements are also discussed along with the implementation of the mission integration activities and the engineering assessments supporting the flight integration process. In addition, the STS management support organizations, the payload safety process leading to the STS 61-B flight certification, and the overall EASE/ACCESS integration schedule are presented.

Chassay, Charles↗

The influence of the launch site operational environment on Space Shuttle scientific payloads

The effects of prelaunch assembly, testing, and integration activities on the scientific payload at the KSC are examined. The functions of the Shuttle and payload organizations of the KSC are discussed. The processing of the various types of pyaloads, and the amount of access to the payload during processing and after landing are described. The KSC facility contains: an Operations and Checkout Building, a Vertical Processing Facility, Cargo Integration and Test Equipment, an Orbiter Processing Facility, a Payload Changeout Room, payload transportation equipment, and Shuttle launch pads.

Schuiling, Roelof L.↗

Follow-the-Leader Control for the PIPS Prototype Hardware

This report describes the payload inspection and processing system (PIPS), an automated system programmed off-line for inspection of space shuttle payloads after integration and prior to launch. PIPS features a hyper-redundant 18-degree of freedom (DOF) serpentine truss manipulator capable of snake like motions to avoid obstacles. During the summer of 1995, the author worked on the same project, developing a follow-the-leader (FTL) algorithm in graphical simulation which ensures whole arm collision avoidance by forcing ensuing links to follow the same tip trajectory. The summer 1996 work was to control the prototype PIPS hardware in follow-the-leader mode. The project was successful in providing FTL control in hardware. The STS-82 payload mockup was used in the laboratory to demonstrate serpentine motions to avoid obstacles in a realistic environment.

Williams, Robert L. II↗

NASA Manufacturing and Test Requirements for Normally Closed Pyrovalves for Hazardous Flight Systems Applications

Pyrovalves (figure 1, Basic Pyrovalve Design and Features,) are typically lighter, more reliable, and in most cases less expensive than other types of valves. They also consume less electrical power. They are single-use devices that are used in propulsion systems to isolate propellants or pressurant gases. These fluids may be hazardous because of their toxicity, reactivity, temperature, or high pressure. Note that in the simplified block diagram below not all detail features are shown so that those of major interest are more prominent. The diagram is provided to point out the various features that are discussed in this Specification. Features of some NC parent metal valve designs may differ. In 2013, the NESC concluded an extensive study of the reliability and safety of NC parent metal valves used in payloads carried aboard ELVs. The assessment successfully evaluated technical data to determine the risk of NC parent metal valve leakage or inadvertent activation in ELV payloads. The study resulted in numerous recommendations to ensure personnel and hardware/facility safety during ground processing of ELV payloads. One of those recommendations was to establish a NASA specification for NC parent metal valves. This Specification is a result of that recommendation, which is documented in NESC-RP-10-00614.

McDougle, Stephen H.↗

Optical Relay for Future NASA Geosynchronous Orbiting Satellite for High Data Rate Links to NASA User Missions

NASA is exploring options for its Next Generation Relay (NGR) architecture while the current Tracking Data Relay Satellite System (TDRSS) completes its mission. The plan is to start implementation of the NGR beginning around 2025. The new system of proposed relay satellites will greatly increase the data rates between low Earth orbiting (LEO) satellite missions and the NASA TDRSS relay satellites. This increase in data rates will allow an unprecedented increase in data throughput from the LEO satellite missions back to the principal investigators (PI). This can be accomplished at Ka-band frequencies with high order modulation or at optical frequencies using Differential Phase Shift Keying (DPSK). The first satellite in the next set of relay satellites will have to be backward compatible with current technology to support ongoing and planned missions. The new set of satellites will be launched over a 10-year period with design lifetimes of at least 15 years. To meet these requirements, we analyzed various architectures and designed both the communication payloads on the relay satellite and candidate payloads on the user spacecraft by utilizing optical heads already designed. From this analysis, a demonstration optical satellite named “the Next Generation Optical Relay Pathfinder” with Ka-band capabilities was proposed to be built and launched with the purpose of evaluating an integrated high-speed optical and Ka-band communication system. Given a cost limit for the demonstration satellite, various satellite configurations were developed by varying the number of optical communication payloads. The communication payload on the relay satellite consisted of three major sub-systems: 1) Optical communication payload, 2) Ka-band communication payload, 3) Digital processing and routing of signals. The size, mass (weight), and power (SWaP) of the communication payload and other sub-systems of the satellite were obtained. The NASA Glenn Research Center COMPASS team designed the Pathfinder satellite and performed a cost analysis for its build and launch. In this paper, we first describe the needs, drivers, and the associated challenges for the Next Generation Optical Relay Pathfinder to be capable of connecting multiple LEO and GEO satellites at high data rates. Second, we detail the concept of operations (ConOps) and the system architecture, including the satellite configurations considered, their attributes and limitations, and the size of the satellite needed for each configuration. Third, we provide a summary of the Next Generation Optical Relay Pathfinder satellite design trades and its key elements. Finally, we present the path needed for implementation and operations.

Warner, Joseph H. D.↗

External Contamination Control of Attached Payloads on the International Space Station

The International Space Station (ISS) is an on-orbit platform for science utilization in low Earth orbit with multiple sites for external payloads with exposure to the natural and induced environments. Contamination is one of the induced environments that can impact performance, mission success and science utilization on the vehicle. This paper describes the external contamination control requirements and integration process for externally mounted payloads on the ISS. The external contamination control requirements are summarized and a description of the integration and verification process is detailed to guide payload developers in the certification process of attached payloads on the vehicle. A description of the required data certification deliverables covers the characterization of contamination sources. Such characterization includes identification, usage and operational data for each class of contamination source. Classes of external contamination sources covered are vacuum exposed materials, sources of leakage, vacuum venting and thrusters. ISS system level analyses are conducted by the ISS Space Environments Team to certify compliance with external contamination control requirements. This paper also addresses the ISS induced contamination environment at attached payload sites, both at the requirements level as well as measurements made on ISS.

Soares, Carlos E.↗

STS-95 CEIT in the OPF-2 and the MPPF

Live footage shows the crewmembers of STS-95, Commander Curtis L. Brown, Pilot Steven W. Lindsey, Mission Specialists Scott E. Parazynski, Stephen K. Robinson, Pedro Duque, Payload Specialists Chiaki Mukai and John H. Glenn in a training room talking. Scenes also show the crew in the simulation spacecraft. Crewmembers are seen in the Orbiter Processing Facility Bay 2 ((OPF-2) and the Multi-Payload Processing Facility (MPPF) looking over equipment during the Crew Equipment Interface Test (CEIT) for their mission. The CEIT gives astronauts an opportunity for a hands-on look at the payloads and equipment with which they will be working on orbit.

Source record↗

KSC Shuttle ground turnaround evaluation

Payload/mission development, processing flows, facilities/systems, and the various environments to which a payload is exposed during ground processing are described. These considerations are important for payload design and ground processing requirements development.

Ragusa, J. M.↗

Payload isolation and stabilization by a Suspended Experiment Mount (SEM)

Many Space Shuttle and Space Station payloads can benefit from isolation from crew or attitude control system disturbances. Preliminary studies have been performed for a Suspended Experiment Mount (SEM) system that will provide isolation from accelerations and stabilize the viewing direction of a payload. The concept consists of a flexible suspension system and payload-mounted control moment gyros. The suspension system, which is rigidly locked for ascent and descent, isolates the payload from high frequency disturbances. The control moment gyros stabilize the payload orientation. The SEM will be useful for payloads that require a lower-g environment than a manned vehicle can provide, such as materials processing, and for payloads that require stabilization of pointing direction, but not large angle slewing, such as nadir-viewing earth observation or solar viewing payloads.

Bailey, Wayne L.↗

Conducting Research on the International Space Station Using the EXPRESS Rack Facilities

EXPRESS Racks provide capability for payload access to ISS resources. The successful on-orbit operations and versatility of the EXPRESS Rack has facilitated the operations of many scientific areas, with the promise of continued payload support for years to come. EXPRESS Racks are currently deployed in the US Lab, Columbus and JEM. Process improvements and enhancements continue to improve the accommodations and make the integration and operations process more efficient. Payload Integration Managers serve as the primary interface between the ISS Program and EXPRESS Payload Developers. EXPRESS Project coordinates across multiple functional areas and organizations to ensure integrated EXPRESS Rack and subrack products and hardware are complete, accurate, on time, safe, and certified for flight. NASA is planning to expand the EXPRESS payload capacity by developing new Basic Express Racks expected to be on ISS in 2018.

Thompson, Sean W.↗

Safety issues

The purpose of the NASA safety review process is to make sure that any system hazards that can endanger the manned flight system are precluded. The systems that address manned flight in a payload safety review process are discussed. The types of basic hazards that are normally addressed on any of the payloads are: contamination, electrical shock, explosions, radiation, and temperature extremes.

Rohal, R.↗

Space Station Mission Planning System (MPS) development study. Volume 1: Executive summary

The basic objective of the Space Station (SS) Mission Planning System (MPS) Development Study was to define a baseline Space Station mission plan and the associated hardware and software requirements for the system. A detailed definition of the Spacelab (SL) payload mission planning process and SL Mission Integration Planning System (MIPS) software was derived. A baseline concept was developed for performing SS manned base payload mission planning, and it was consistent with current Space Station design/operations concepts and philosophies. The SS MPS software requirements were defined. Also, requirements for new software include candidate programs for the application of artificial intelligence techniques to capture and make more effective use of mission planning expertise. A SS MPS Software Development Plan was developed which phases efforts for the development software to implement the SS mission planning concept.

Klus, W. J.↗

Science and application payloads in the 90's

An overview is conducted of the payloads under development for NASA to support space science and the Mission to Planet Earth. The science payloads reviewed include the Controls, Astrophysics, and Structures Experiment in Space (CASES), the Advanced Solar Observatory (ASO), the Laser Atmospheric Wind Sounder (LAWS), and the Lightning Imaging Sensor. The payloads are supported by the Extended Duration Orbiter, the Space Station Freedom, and an infrastructure that includes platforms in polar and geosynchronous orbits. The LAWS payload can provide data for global wind-profile measurements, and the ASO can coordinate solar-physics observations and study solar dynamic processes. The CASES payload is designed to investigate critical control technology for stabilizing and pointing large flexible structures in space for astrophysics missions.

De Sanctis, Carmine E.↗

Spacelab operations planning

The paper reviews NASA planning in the fields of ground, launch and flight operations and experiment integration to effectively operate Spacelab. Payload mission planning is discussed taking consideration of orbital analysis and the mission of a multiuser payload which may be either single or multidiscipline. Payload analytical integration - as active process of analyses to ensure that the experiment payload is compatible to the mission objectives and profile ground and flight operations and that the resource demands upon Spacelab can be satisfied - is considered. Software integration is touched upon and the major integration levels in ground operational processing of Spacelab and its experimental payloads are examined. Flight operations, encompassing the operation of the Space Transportation System and the payload, are discussed as are the initial Spacelab missions. Charts and diagrams are presented illustrating the various planning areas.

Lee, T. J.↗

The post Challenger era Get Away Special program January 1992

The Get Away Special (GAS) program is described in terms of the changes that have taken place in both NASA and the GAS itself. Attention is given to the relationships developed between NASA and GAS customers in the context of programmatic and technical issues. The background of the GAS program is outlined with reference given to policy publications, the design of the Flight Verification Payload, and the first GAS payload launched. A review process is described that facilitates the management of the payloads through flight certification. The GAS Bridge was developed to carry up to 12 payloads simultaneously, and the recent period of GAS inactivity is explained. A price increase is introduced for future GAS payloads with negotiable access to optional services, and the ease and accessibility of the GAS programs for private experiments is emphasized.

Prouty, Clarke↗