At least 235 records · Page 13

Minimum-Time and Vibration Avoidance Attitude Maneuver for Spacecraft with Torque and Momentum Limit Constraints in Redundant Reaction Wheel Configuration

This viewgraph presentation presents an algorithm for trajectory control of a spacecraft that minimizes the time to perform slews, including settling, by avoiding reaction wheel torque and momentum limits that would excite flexible structural modes. This algorithm was validated by simulation during the design of the NGST 'Yardstick' (precursor to JWST). Performance verification of a reduced form for single-axis slews was carried out using the MIT Origins Testbed. It is currently baselined for use by TPF-Coronagraph.

Ha, Kong Q.↗

Main Power Distribution Unit for the Jupiter Icy Moons Orbiter (JIMO)

Around the year 2011, the Jupiter Icy Moons Orbiter (JIMO) will be launched and on its way to orbit three of Jupiter s planet-sized moons. The mission goals for the JIMO project revolve heavily around gathering scientific data concerning ingredients we, as humans, consider essential: water, energy and necessary chemical elements. The JIM0 is an ambitious mission which will implore propulsion from an ION thruster powered by a nuclear fission reactor. Glenn Research Center is responsible for the development of the dynamic power conversion, power management and distribution, heat rejection and ION thrusters. The first test phase for the JIM0 program concerns the High Power AC Power Management and Distribution (PMAD) Test Bed. The goal of this testing is to support electrical performance verification of the power systems. The test bed will incorporate a 2kW Brayton Rotating Unit (BRU) to simulate the nuclear reactor as well as two ION thrusters. The first module of the PMAD Test Bed to be designed is the Main Power Distribution Unit (MPDU) which relays the power input to the various propulsion systems and scientific instruments. The MPDU involves circuitry design as well as mechanical design to determine the placement of the components. The MPDU consists of fourteen relays of four different variations used to convert the input power into the appropriate power output. The three phase system uses 400 Vo1ts(sub L-L) rms at 1000 Hertz. The power is relayed through the circuit and distributed to the scientific instruments, the ION thrusters and other controlled systems. The mechanical design requires the components to be positioned for easy electrical wiring as well as allowing adequate room for the main buss bars, individual circuit boards connected to each component and power supplies. To accomplish creating a suitable design, AutoCAD was used as a drafting tool. By showing a visual layout of the components, it is easy to see where there is extra room or where the components may interfere with one another. By working with the electrical engineer who is designing the circuit, the specific design requirements for the MPDU were determined and used as guidelines. Space is limited due to the size of the mounting plate therefore each component must be strategically placed. Since the MPDU is being designed to fit into a simulated model of the spacecraft systems on the JIMO, components must be positioned where they are easily accessible to be wired to the other onboard systems. Mechanical and electrical requirements provided equally important limits which are combined to produce the best possible design of the MPDU.

Papa, Melissa R.↗

Jupiter Icy Moons Orbiter (JIMO) Electrical Systems Testbed

The Jupiter Icy Moons Orbiter (JIMO) mission will send a spacecraft to explore three of Jupiter s moons (Callisto, Ganymede, and Europa), all of which show evidence of containing vast subterranean oceans beneath their icy surfaces. The evidence of these oceans was discovered by Galileo, and the moons are believed to have the three essential ingredients for life: water, energy, and the necessary chemical elements. Galileo has shown that melted water on Europa has been in contact with the surface of the moon in geologically recent times, and may still lie relatively close to the surface. This project will also introduce a revolutionary new form of electric propulsion powered by a nuclear fission reactor. This electric propulsion is called ion propulsion. It was used on a previous mission called Deep Space 1, proving that ion propulsion works for interplanetary travel. Since JIMO will be traveling farther from the sun, solar power will be difficult to supply the electric energy demanded by the mission. Therefore a nuclear reactor and a thermo-electric converter system will be necessary. Besides making the trip to three of Jupiter's moons - one after the other - a realistic possibility, this new form of power and propulsion opens up the rest of the outer solar system for future exploration. JIMO will fulfill its goals by exploring Europa first, with subsequent trips to the moons Callisto and Ganymede in order to provide comparisons key to understanding the evolution of all three. In order to ensure the stability and proper preparation of the electrical system on JIMO, the High Power AC Power Management and Distribution (PMAD) Test Bed is being developed. The testing on.this AC PMAD will consist of electrical performance verification of candidate power system components. Examples of these components are: high power AC switchgear, high power ACDC converters, AC power distribution units, DC power distribution units, etc. Throughout the course of the summer the over-current control circuit for the five different size relays will be constructed and tested. This circuit will sense the current input to the spacecraft loads and automatically switch off power if the current is too high. Once the circuit is verified to function properly and all necessary modifications have been made, a circuit schematic and board layout will have to be drawn using OrCAD, and the circuits will have to be built.

Trapp, Scott J.↗

Assessment of Stirling Technology Has Provided Critical Data Leading Toward Flight Readiness of the Stirling Converter

The NASA Glenn Research Center is supporting the development of a Stirling converter with the Department of Energy (DOE, Germantown, Maryland) for an advanced Stirling Radioisotope Power System (SRPS) to provide spacecraft onboard electric power for NASA space science missions. A key technology assessment completed by Glenn and DOE has led to the SRPS being identified as a high-efficiency power source for such deep space missions as the Europa Orbiter and the Solar Probe. In addition, the Stirling system is now being considered for unmanned Mars rovers, especially where mission profiles may exclude the use of photovoltaic power systems, such as exploration at high Martian latitudes or for missions of long duration. The SRPS efficiency of over 20 percent will reduce the required amount of radioisotope by more than a factor of 3 in comparison to current radioisotope thermoelectric generators. This significantly reduces radioisotope cost, radiological inventory, and system cost, and it provides efficient use of scarce radioisotope resources. In support of this technology assessment, Glenn conducted a series of independent evaluations and tests to determine the technology readiness of a 55-We Stirling converter developed by Stirling Technology Company (Kennewick, Washington) and DOE. Key areas evaluated by Glenn included: 1) Radiation tolerance of materials; 2) Random vibration testing of the Stirling converter in Glenn's Structural Dynamics Lab to simulate operation in the launch environment; 3) Electromagnetic interference and compatibility (EMI/EMC) of the converter operating in Glenn's EMI lab; Independent failure modes, effects, and criticality analysis, and life and reliability 4. Independent failure modes, effects, and criticality analysis, and life and reliability assessment; and 5) SRPS cost estimate. The data from these evaluations were presented to NASA Headquarters and the Jet Propulsion Laboratory mission office by a joint industry/Government team consisting of DOE, Glenn, and Lockheed Martin Astronautics. This team concluded that there are no technical reasons that would rule out using the Stirling converter for deep space missions. As a direct result of the successful testing at Glenn, the DOE/Stirling Technology Company 55-We Stirling converter has been baselined for the SRPS. Glenn is now continuing an in-house project to assist in developing the Stirling converter for readiness for space qualification and mission implementation. As part of this effort, the Stirling converter will be further characterized under launch environment random vibration testing, methods to reduce converter EMI will be developed, and an independent performance verification will be completed. Converter life assessment and permanent magnet aging characterization tasks are also underway. Substitute organic materials for the linear alternator and piston bearing coatings for use in a high-radiation environment have been identified and have now been incorporated in Stirling converters built by Stirling Technology Company for Glenn. Electromagnetic and thermal finite element analyses for the alternator are also being conducted.

Thieme, Lanny G.↗

Real-time Models at the Community Coordinated Modeling Center and their Capabilities

Real-time models at the Community Coordinated Modeling Center and their capabilities The Community Coordinated Modeling Center serves both scientific research and space weather operations communities through access to and evaluation of modern space environment models. Critical to both objectives is an unbiased assessment of model capabilities, which includes scientific validity, performance verification, and model robustness. While all of these assessments are relevant to operational customers, the latter plays a particularly important role. For this reason, as well as for testing model validity, CCMC established a set of fully automated real-time execution systems, which are based on models provided by the research community. This presentation will provide a summary of these activities, and a report on experiences and model validity. Finally, this presentation will invite feedback from CCMC customers regarding future directions of real time modeling at CCMC.

Hesse, Michael↗

Seal Analysis for the Ares-I Upper Stage Fuel Tank Manhole Covers

Naflex seals have long history of use in launch vehicle components, including Saturn stages and Space Shuttle External Tank. Ares-I Upper Stage tank pressures are higher than ET pressures, requiring performance verification of heritage seal design in new manhole cover configurations. Heritage external tank analyses are reviewed for potential application to Upper Stage.

Phillips, Dawn R.↗

Ignition-and-Growth Modeling of NASA Standard Detonator and a Linear Shaped Charge

The main objective of this study is to quantitatively investigate the ignition and shock sensitivity of NASA Standard Detonator (NSD) and the shock wave propagation of a linear shaped charge (LSC) after being shocked by NSD flyer plate. This combined explosive train was modeled as a coupled Arbitrary Lagrangian-Eulerian (ALE) model with LS-DYNA hydro code. An ignition-and-growth (I&G) reactive model based on unreacted and reacted Jones-Wilkins-Lee (JWL) equations of state was used to simulate the shock initiation. Various NSD-to-LSC stand-off distances were analyzed to calculate the shock initiation (or failure to initiate) and detonation wave propagation along the shaped charge. Simulation results were verified by experimental data which included VISAR tests for NSD flyer plate velocity measurement and an aluminum target severance test for LSC performance verification. Parameters used for the analysis were obtained from various published data or by using CHEETAH thermo-chemical code.

Oguz, Sirri↗

Comparison of VIIRS Prelaunch RVS Among Independent Studies

The Visible Infrared Imaging Radiometer Suite (VIIRS) is a key sensor carried on the NPOESS (National Polar-orbiting Operational Environmental Satellite System), upgraded and developed recently from heritage instruments including AVHRR, OLS, MODIS, and SeaWiFS. It has on-board calibration components including a solar diffuser (SD) and a solar diffuser stability monitor (SDSM) for the reflective solar bands (RSB), a V-groove blackbody for the thermal emissive bands (TEB), and a space view (SV) port for background subtraction. These on-board calibrators are located at fixed scan angles. The VIIRS response versus scan angle (RVS) was characterized prelaunch in lab ambient conditions and will be used on-orbit to characterize the response for the all scan angles relative to the calibrator scan angle (SD for RSB and blackbody for TEB). Since the RVS is vitally important to the quality of calibrated radiance products, several independent studies were performed and their results were compared and validated. This document provides RVS results from three groups: the NPP Instrument Calibration Support Team (NICST), Raytheon, and the Aerospace Corporation. A comparison of the RVS results obtained using a 2nd order polynomial fit to measurement data is conducted for each band, detector, and half angle mirror (HAM) side. The associated RVS fitting residuals are examined and compared with the relative differences in RVS found between independent studies. Results show that the agreement is within 0.1% and comparable with fitting residuals for all bands except for RSB band M9, where a difference of 0.2% results from the application of the atmospheric water vapor correction for laboratory conditions during the test by Raytheon. NICST has slightly larger RSB RVS uncertainties but still well within the 0.3% total uncertainty allowed for the RVS characterization defined in the Performance Verification Plan.

Wu, Aisheng↗

From Paper to Production to Test: An Update on NASA's J-2X Engine for Exploration

The NASA/industry team responsible for developing the J-2X upper stage engine for the Space Launch System (SLS) Program has made significant progress toward moving beyond the design phase and into production, assembly, and test of development hardware. The J-2X engine exemplifies the SLS Program goal of using proven technology and experience from more than 50 years of United States spaceflight experience combined with modern manufacturing processes and approaches. It will power the second stage of the fully evolved SLS Program launch vehicle that will enable a return to human exploration of space beyond low earth orbit. Pratt & Whitney Rocketdyne (PWR) is under contract to develop and produce the engine, leveraging its flight-proven LH2/LOX, gas generator cycle J-2 and RS-68 engine capabilities, recent experience with the X-33 aerospike XRS-2200 engine, and development knowledge of the J-2S tap-off cycle engine. The J- 2X employs a gas generator operating cycle designed to produce 294,000 pounds of vacuum thrust in primary operating mode with its full nozzle extension. With a truncated nozzle extension suitable to support engine clustering on the stage, the nominal vacuum thrust level in primary mode is 285,000 pounds. It also has a secondary mode, during which it operates at 80 percent thrust by altering its mixture ratio. The J-2X development philosophy is based on proven hardware, an aggressive development schedule, and early risk reduction. NASA Marshall Space Flight Center (MSFC) and PWR began development of the J-2X in June 2006. The government/industry team of more than 600 people within NASA and PWR successfully completed the Critical Design Review (CDR) in November 2008, following extensive risk mitigation testing. Assembly of the first development engine was completed in May 2011 and the first engine test was conducted at the NASA Stennis Space Center (SSC), test stand A2, on 14 July 2011. Testing of the first development engine will continue through the autumn of 2011, be paused for test stand modifications to the passive diffuser, and then restart in the spring of 2012. This testing will be followed by specialized powerpack testing intended to examine the design and operating margins of the engine turbomachinery. The development plan beyond this point leads through more system-level, engine testing of several samples, analytical model validation activities, functional and performance verification, and then ultimate certification to support human spaceflight. This paper will discuss the J-2X development background, provide top-level information on design and development planning, and will explore some of the development challenges and mitigation activities pursued to date.

Kynard, Michael↗

Control System Modeling for the Thirty Meter Telescope Primary Mirror

The Thirty Meter Telescope primary mirror is composed of 492 segments that are controlled to high precision in the presence of wind and vibration disturbances, despite the interaction with structural dynamics. The higher bandwidth and larger number of segments compared with the Keck telescopes requires greater attention to modeling to ensure success. We focus here on the development and validation of a suite of quasi-static and dynamic modeling tools required to support the design process, including robustness verification, performance estimation, and requirements flowdown. Models are used to predict the dynamic response due to wind and vibration disturbances, estimate achievable bandwidth in the presence of control-structure-interaction (CSI) and uncertainty in the interaction matrix, and simulate and analyze control algorithms and strategies, e.g. for control of focus-mode, and sensor calibration. Representative results illustrate TMT performance scaling with parameters, but the emphasis is on the modeling framework itself.

uncetainty↗

Rigging Test Bed Development for Validation of Multi-Stage Decelerator Extractions

The Low Density Supersonic Decelerator project is developing new decelerator systems for Mars entry which would include testing with a Supersonic Flight Dynamics Test Vehicle. One of the decelerator systems being developed is a large supersonic ringsail parachute. Due to the configuration of the vehicle it is not possible to deploy the parachute with a mortar which would be the preferred method for a spacecraft in a supersonic flow. Alternatively, a multi-stage extraction process using a ballute as a pilot is being developed for the test vehicle. The Rigging Test Bed is a test venue being constructed to perform verification and validation of this extraction process. The test bed consists of a long pneumatic piston device capable of providing a constant force simulating the ballute drag force during the extraction events. The extraction tests will take place both inside a high-bay for frequent tests of individual extraction stages and outdoors using a mobile hydraulic crane for complete deployment tests from initial pack pull out to canopy extraction. These tests will measure line tensions and use photogrammetry to track motion of the elements involved. The resulting data will be used to verify packing and rigging as well, as validate models and identify potential failure modes in order to finalize the design of the extraction system.

Low Density Supersonic Decelerator (LDSD)↗

Delivery of Colloid Micro-Newton Thrusters for the Space Technology 7 Mission

Two flight-qualified clusters of four Colloid Micro-Newton Thruster (CMNT) systems have been delivered to the Jet Propulsion Laboratory (JPL). The clusters will provide precise spacecraft control for the drag-free technology demonstration mission, Space Technology 7 (ST7). The ST7 mission is sponsored by the NASA New Millennium Program and will demonstrate precision formation flying technologies for future missions such as the Laser Interferometer Space Antenna (LISA) mission. The ST7 disturbance reduction system (DRS) will be on the ESA LISA Pathfinder spacecraft using the European gravitational reference sensor (GRS) as part of the ESA LISA Technology Package (LTP). Developed by Busek Co. Inc., with support from JPL in design and testing, the CMNT has been developed over the last six years into a flight-ready and flight-qualified microthruster system, the first of its kind. Recent flight-unit qualification tests have included vibration and thermal vacuum environmental testing, as well as performance verification and acceptance tests. All tests have been completed successfully prior to delivery to JPL. Delivery of the first flight unit occurred in February of 2008 with the second unit following in May of 2008. Since arrival at JPL, the units have successfully passed through mass distribution, magnetic, and EMI/EMC measurements and tests as part of the integration and test (I&T) activities including the integrated avionics unit (IAU). Flight software sequences have been tested and validated with the full flight DRS instrument successfully to the extent possible in ground testing, including full functional and 72 hour autonomous operations tests. Delivery of the cluster assemblies along with the IAU to ESA for integration into the LISA Pathfinder spacecraft is planned for the summer of 2008 with a planned launch and flight demonstration in late 2010.

Precision Formation Flying↗

Implementing Reliability Centered Maintenance (RCM) with State of the Art PT&I Technologies

Building on the work that was started two decades ago, Jacobs Space Operations Group has utilized state of the art PTI technologies to assess the current condition of the assets they manage under the Test and Operations Support Contract (TOSC). Specifically, the Asset Management department leveraged the benefits of ultrasound technology to quantify a motor issue in the Liquid Oxygen Storage Area, and troubleshoot the sources prior to loading the tank to perform Verification and Validation (VV) activities. This technology was efficient, easy to implement, and provided system engineers with data on a possible source of the problem. In situations where legacy motors are exhibiting unexpected noises, it may seem easier to remove and refurbish the motor and replace the bearings because that solution resolves most of the common causes of the noise. However, that solution would have involved additional spending and may not have solved issues stemming from the foundation, if those existed. By utilizing the ultrasound equipment provided by UE Systems, the sound profiles allowed Jacobs TOSC team to determine that the issue resembled a faulty bearing. After replacing the bearing, the unexpected noise ceased.

Reliability Centered Maintenance↗

Dynamic Radioisotope Power Systems Development Status and Path to Flight

Dynamic power conversion offers the potential to produce Radioisotope Power Systems (RPS) that generate higher power outputs and utilize the Pu-238 radioisotope more efficiently. Additionally, dynamic power conversion offers the potential of producing generators with minimal degradation resulting in more power at the end of the mission, when the power is needed. Dynamic power conversion technologies being developed for space applications include the Stirling and Brayton thermodynamic cycle machines. Machines can be built based on these cycles while eliminating wear mechanisms of the moving components, enabling long design life necessary for space missions. The Dynamic Radioisotope Power Systems (DRPS) project at NASA Glenn Research Center (Glenn Research Center) is pursuing the realization of this type of power source on a flight mission. The project currently has three convertor development contracts that will deliver prototype hardware in 2020. This hardware will undergo a gamut of experimental performance verification efforts at NASA GRC. In parallel, the project has also initiated generator design efforts based on these underlying convertor options, and is also on track to build an in-house version of a generator for laboratory system-level testing. The project is also funding control electronics technology, which are necessary to convert alternating current from the dynamic devices to direct current for use by a spacecraft. A lunar mission is being targeted as the first use of this new technology, as DRPS enables a wide range of high-return scientific missions on the moon, while the mission being short in duration (2 years rather than 10 years for an outer planets mission).

Salvatore M Oriti↗

Dynamic Radioisotope Power Systems Status and Path to Flight

Dynamic power conversion offers the potential to produce Radioisotope Power Systems (RPS) that generate higher power outputs and utilize the Pu-238 radioisotope more efficiently. Additionally, dynamic power conversion offers the potential of producing generators with minimal degradation resulting in more power at the end of the mission, when the power is needed. Dynamic power conversion technologies being developed for space applications include the Stirling and Brayton thermodynamic cycle machines. Machines can be built based on these cycles while eliminating wear mechanisms of the moving components, enabling long design life necessary for space missions. The Dynamic Radioisotope Power Systems (DRPS) project at NASA Glenn Research Center (Glenn Research Center) is pursuing the realization of this type of power source on a flight mission. The project currently has three convertor development contracts that will deliver prototype hardware in 2020. This hardware will undergo a gamut of experimental performance verification efforts at NASA GRC. In parallel, the project has also initiated generator design efforts based on these underlying convertor options, and is also on track to build an in-house version of a generator for laboratory system-level testing. The project is also funding control electronics technology, which are necessary to convert alternating current from the dynamic devices to direct current for use by a spacecraft. A lunar mission is being targeted as the first use of this new technology, as DRPS enables a wide range of high-return scientific missions on the moon, while the mission being short in duration (2 years rather than 10 years for an outer planets mission).

Salvatore Oriti↗

Tradeoffs When Considering Deep Reinforcement Learning for Contingency Management in Advanced Air Mobility

Air transportation is undergoing a rapid evolution globally with the introduction of Advanced Air Mobility (AAM) and with it comes novel challenges and opportunities for transforming aviation. As AAM operations introduce increasing heterogeneity in vehicle capabilities and density, increased levels of automation are likely necessary to achieve operational safety and efficiency goals. This paper focuses on one example where increased automation has been suggested. Autonomous operations will need contingency management systems that can monitor evolving risk across a span of interrelated (or interdependent) hazards and, if necessary, execute appropriate control interventions via supervised or automated decision making. Accommodating this complex environment may require automated functions (autonomy) that apply artificial intelligence (AI) techniques that can adapt and respond to a quickly changing environment. This paper explores the use of Deep Reinforcement Learning (DRL) which has shown promising performance in complex and high-dimensional environments where the objective can be constructed as a sequential decision-making problem. An extension of a prior formulation of the contingency management problem as a Markov Decision Process (MDP) is presented and uses a DRL framework to train agents that mitigate hazards present in the simulation environment. A comparison of these learning-based agents and classical techniques is presented in terms of their performance, verification difficulties, and development process.

machine learningautonomous systems; flight simulat↗