Search NASA⌕ Search

SEARCH · Search NASA

Results for “pilot development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Spider silk MASP1 and MASP2 proteins as carbon fiber precursors

The objective of this project is to develop an unconventional non-petroleum based carbon fiber precursor which has the potential to be produced in high yield and quantities. Methods will be developed to produce pilot-scale quantities of fibers from spider silk proteins with mechanical properties at least 75% that of the natural dragline silk fibers in tensile strength and elongations of less than 5%. The precursor fibers will be converted to carbon fibers, with a goal of >250Ksi strength and 1-2% elongation. Cost analysis will be performed and the process optimized. Task 1: Subtask 1. Protein production: We exceeded the go/ no go milestone of 1.0g/L of one of the spider silk protein (MSp2) purified last FY and have now increased from 5L to 500L fermentations. We have made a series of changes to the purification protocol from the initial report last FY. These led to a reduction in the time needed for the purification and reduced the purification costs by nearly 90%. Subtask 2. Fiber spinning: The major focus has been to produce more material to send 24 fiber thread to ONRL. We are still developing the methodology to successfully spin 24 fiber yarns. This involves both the spinning dope solutions as well as the methods to keep the fibers from fusing during the post spin stretch. The second area of focus has been to standardize the spin dopes for making the fibers. We now know that the conductivity (indicative of salt remaining with the protein after purification) is an important factor in successful spinning as is the pH. We now know that we need to be below 600 uS conductivity and that the most effective pH is protein dependent. Subtask 3. Silkworm silk: We have found the transgenic silkworms made using gene replacement at the fibroin light chain instead of heavy chain as we did previously have a higher tensile strength. See figures below showing the curve for the top end of the cocoon fibers. This tensile strength is the same as the average for spider dragline silk. Task 2. Carbonization: The major accomplishment in the latter part of the work is that the ONRL group has successfully heated the spider silk protein fibers all the way up to 1700°C and produced a very competitive carbon fiber based on mechanical properties. Several important factors were discovered during these initial trials: 1) the ramp speed for increasing the temperature is critical; 2) maintaining tension on the fiber during the heating process because as it is heated it tends to expand; and 3) narrow temperature window in which stretching the fiber during heating leads to much better final materials. Task 3. Techno-Economic Methods: The techno-economic analysis was expanded to determine the relative cost of production with the bacterial production system compared to the transgenic alfalfa and goat production systems. The comparisons show two important things. For all systems the key factor in the final price is the amount of spider silk protein produced for whatever measure of volume or weight is used. Second alfalfa can be the cheapest but is subject to the possible regulatory control unless the US develops a more comprehensive approach to GMOs. The silkworm analysis was not completed due to a variety of confounding factors. The primary one was that if the production were shifted overseas then the cost would likely be nearly equivalent to current silk prices of $5-15/kg. However if concerns about the location of production is important then it would need to be done in the US and initial costs would be much higher but if the later scenario is utilized then the cost would be lowered but it was not possible to calculate exact costs.

36 MATERIALS SCIENCE↗

An Open-Source Framework for the Computational Analysis and Design of Autothermal Chemical Processes

The main project object was to develop software tools for simulating non-equilibrium autothermal processes, improving the prospects for identifying and designing such systems. The project demonstrates the use of these tools to simulate autothermal pyrolysis, a process recently developed at the pilot-plant scale at Iowa State University. In such process, instead of externally heating a reactor to pro-vide the enthalpy of pyrolysis, sufficient oxygen in the form of air is introduced into the reactor to support partial oxidation of reactants and products with the exothermic energy released supporting endothermic pyrolysis reactions. A fluidized bed is used to assure good mixing of biomass and oxidant and provide an isothermal reaction environment. The amount of oxygen required depends upon the kind of biomass being pyrolyzed and parasitic heat losses from the reactor. For example, for woody biomass pyrolyzed under conditions that simulate adiabatic operation, equivalence ratios can be as low as 0.06, compared to 0.20 or higher for autothermal gasifiers. By removing the heat transfer bottleneck of conventional pyrolysis, operation in autothermal mode allowed a significant increase in reactor throughput process, approaching five times the throughput of the conventionally operated pyrolyzer. Different simulation strategies were considered and developed: a zero-dimensional chemistry model was used to verify the applicability of kinetic schemes to predict biomass fast pyrolysis in autothermal conditions. Conventional chemical reactor models such as the plug flow reactor and the partially stirred reactor were used to investigate the role of mixing in the fluidized bed pyrolyzer and to establish the impact of mixing time on the gas-phase reactions. A comprehensive multiphase computational fluid dynamics (mCFD) framework, including polydisperse granular phase modeling and detailed chemical kinetics was formulated and used to model the experimental setup for autothermal biomass fast pyrolysis at ISU. Multiphase CFD was also used to investigate the role of biomass feed positioning on the mixing of biomass in the pyrolizer. Finally, a reduced order model (ROM), suitable to be implemented in process simulators was obtained. Both the mCFD and the ROM were validated against experiments.

09 BIOMASS FUELS↗

Synthesis Report on the Implementation of Building Energy Codes in China

China is the new leader in the global construction market, with $1,000 billion invested into new construction projects in 2010. With its already significant building stock, high construction rate of new buildings, and strong governmental commitment to improving building energy efficiency, China is positioned to have great influence on global building energy use in the years to come. Building energy efficiency was first addressed in the mid 1980s, after China developed its new political doctrine of “Socialism with Chinese Characteristics” in the late 1970s and launched its unprecedented economic reform. Since then, the development of building energy efficiency policy has gone through into five stages: (1) early research and preparation, (2) pilots and demonstrations, (3) institution development and goal setting, (4) goal implementation, and (5) development and implementation of an array of policies and projects promoting building energy efficiency (Chapter 2). Building energy standards and codes are one important policy instrument targeted by Chinese government. Over three decades of governmental efforts, China has successfully established a comprehensive system of building energy standards and codes. The system covers the life cycle process of a building project, from design, construction and acceptance, inspection, evaluation, modification, products and selection of building materials to building operation. This project, the DOS project, is focused on the implementation of four building energy codes: three of which are design standards (two for residential buildings and one for public/commercial) and one is a code of construction and acceptance (Chapter 3). The current implementation status of building energy codes in China is a tale of two extremes: while there is no implementation in rural areas, the implementation in urban areas is very encouraging. The compliance rates of building energy codes in both the design and construction stages in the inspected large- and mid-size cities were a stunning 98% and 90%, respectively, in 2009. The impressive compliance rates come from establishing an implementation system that consists of a complete loop of the monitoring and inspection subsystem: building design companies, building inspection companies, construction companies, construction inspection companies, testing companies and labs (all of them are third parties), and semi-governmental quality supervision stations to oversee the implementation process (Sections 4.1 and 4.2). Besides the unique, active engagement of third parties, China’s implementation practices are also equipped with strict penalties for violations (Section 4.3), annual inspection for building energy efficiency (Section 4.4), and comprehensive national title exams for key stakeholders (Section 4.5.1). So, what are the challenges faced by key stakeholders when they implement building energy codes? Through stakeholder meetings, focus group meetings, training seminars, onsite construction visits, and personal communications, the project team concluded that training and information dissemination is the ignored, under-invested, and weak component in China’s current implementation practices (Section 6.1).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Radiography Facility - Building 239 Independent Validation Review

The purpose of this task was to perform an Independent Validation Review to evaluate the successful implementation and effectiveness of Safety Basis controls, including new and revised controls, to support the implementation of a new DSA/TSR for B239. This task addresses Milestone 2 of FY10 PEP 7.6.6. As the first IVR ever conducted on a LLNL nuclear facility, it was designated a pilot project. The review follows the outline developed for Milestone 1 of the PEP, which is based on the DOE Draft Guide for Performance of Independent Verification Review of Safety Basis Controls. A formal Safety Basis procedure will be developed later, based on the lessons learned with this pilot project. Note, this review is termed a ''Validation'' in order to be consistent with the PEP definition and address issues historically raised about verification mechanisms at LLNL. Validation is intended to confirm that implementing mechanisms realistically establish the ability of TSR LCO, administrative control or safety management program to accomplish its intended safety function and that the controls are being implemented. This effort should not, however, be confused with a compliance assessment against all relevant DOE requirements and national standards. Nor is it used as a vehicle to question the derivation of controls already approved by LSO unless a given TSR statement simply cannot be implemented as stated.

99 GENERAL AND MISCELLANEOUS↗

Advanced gasifier and water gas shift technologies for low cost coal conversion to high hydrogen syngas

The Gas Technology Institute (GTI) and team members RTI International (RTI), Coanda Research and Development, and Nexant, are developing and maturing a portfolio of technologies to meet the United States Department of Energy (DOE) goals for lowering the cost of producing high hydrogen syngas from coal for use in carbon capture power and coal-to-liquids/chemicals. This project matured an advanced pilot-scale gasifier, with scalable and commercially traceable components, to readiness for use in a first-of-a-kind commercially-relevant demonstration plant on the scale of 500-1,000 tons per day (TPD). This was accomplished through cold flow simulation of the gasifier quench zone transition region at Coanda and through an extensive hotfire gasifier test program on highly reactive coal and high ash/high ash fusion temperature coals at GTI. RTI matured an advanced water gas shift process and catalyst to readiness for testing at pilot plant scale through catalyst development and testing, and development of a preliminary design basis for a pilot scale reactor demonstrating the catalyst. A techno-economic analysis was performed by Nexant to assess the potential benefits of the gasifier and catalyst technologies in the context of power production and methanol production. This analysis showed an 18%reduction in cost of power and a 19%reduction in cost of methanol relative to DOE reference baseline cases.

01 COAL, LIGNITE, AND PEAT↗

Textile Resource Conservation Final Report CRADA No. TC-0699-93

This project was undertaken to develop and demonstrate on a pilot scale the use of electro-osmotic transport to increase the efficiency of textiles wet processing operations. In particular, we sought to develop a means of rinsing textiles to remove material entrapped between the individual fibers that constitute a yarn. Material trapped within the yarn is slow to exchange with rinse water flowing primarily in the open weave are abetween the yarns. The application of an external field (strength, 5-50 kV /m) requires only a few volts for most fabric thicknesses. This field is sufficient to promote a rapid exchange of material to enhance rinsing and reduce the water required for rinsing from about 20 kg/kg-fabric to 3-6 kg/kg-fabric. We successfully developed technical and economic models of application of the process to the rinsing of many materials of industrial importance, including dyes, tints, chemicals, detergents and dye electrolytes. We demonstrated the process on a pilot plant scale using a translator designed in cooperation with Milliken and Company (Spartanburg, SC).

42 ENGINEERING↗

Drilling and abandonment preparation of CO₂ storage wells – Experience from the Ketzin pilot site

At Ketzin, located west of Berlin, the GFZ German Centre for Geosciences is operating Europe's largest CO₂ research storage site. This pilot site has been developed since 2004 and is comprised of one combined injection/observation well and four monitoring wells. From June 2008 to August 2013, a total of 67 kilotons of CO₂ were safely injected into the sandstone units of the Upper Triassic Stuttgart Formation in a depth between 630 to 650 m. The paper discusses the well designs and lessons learned in drilling engineering and operations. The abandonment phase started in Ketzin with the first plug cementation of the observation well Ktzi 202 shortly after shut-in of CO₂ injection. The experience with the first CO₂ well killing operation will be reviewed.

54 ENVIRONMENTAL SCIENCES↗

Automated work package: capabilities of the future - 275

As part of the ongoing efforts at the U.S. Department of Energy's Light Water Reactor Sustainability Program, Idaho National Laboratory (INL) is conducting several pilot projects in collaboration with the nuclear industry to improve the reliability, safety, and economics of the nuclear power industry, especially as the nuclear power plants extend their operating licenses to 80 years. One of these pilot projects is the automated work package (AWP) pilot project. An AWP is an electronic intelligent and interactive work package. It uses plant condition, resources status, and user progress to adaptively drive the work process in a manner that increases efficiency while reducing human error. To achieve this mission, the AWP acquires information from various systems of a nuclear power plant and incorporates several advanced instrumentation and control technologies along with modern human factors techniques. With the current rapid technological advancement, it is possible to envision several available or soon-to-be-available capabilities that can play a significant role in improving the work package process. In this pilot project, the researchers develop an AWP prototype of an expanding set of capabilities and evaluates them in an industrial environment. While some of the proposed capabilities are based on using technological advances in other applications, others are conceptual; thus, they require significant research and development to be applicable in an AWP. The scope of this paper is to introduce a set of envisioned capabilities, their need for the industry, and the industry difficulties they resolve. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Connected Vehicles and Powertrain Optimization

This article discusses the basic concept of connected and automated vehicles (CAV) technology. The common methods to improve fuel economy are also introduced. The effects of connectivity on vehicle/powertrain control and optimization are also elaborated. The Michigan Tech NEXTCAR project is also presented to provide a more detailed view of predictive vehicle/powertrain control enabled by CAV technologies. The U.S. Department of transportation (DOT) and other federal/state funding agencies have supported research and pilot deployment efforts to develop crosscutting CV technologies and evaluate the effectiveness of CV technologies in real-world transportation systems. The concurrent development of connected and automated vehicle technologies is anticipated to provide synergistic benefits to improve traffic safety, mobility, and energy efficiency. Here, it is observed that increased CAV technologies are being deployed in real-world transportation systems.

33 ADVANCED PROPULSION SYSTEMS↗

Real-time individualized training vectors for experiential learning.

Military training utilizing serious games or virtual worlds potentially generate data that can be mined to better understand how trainees learn in experiential exercises. Few data mining approaches for deployed military training games exist. Opportunities exist to collect and analyze these data, as well as to construct a full-history learner model. Outcomes discussed in the present document include results from a quasi-experimental research study on military game-based experiential learning, the deployment of an online game for training evidence collection, and results from a proof-of-concept pilot study on the development of individualized training vectors. This Lab Directed Research & Development (LDRD) project leveraged products within projects, such as Titan (Network Grand Challenge), Real-Time Feedback and Evaluation System, (America's Army Adaptive Thinking and Leadership, DARWARS Ambush! NK), and Dynamic Bayesian Networks to investigate whether machine learning capabilities could perform real-time, in-game similarity vectors of learner performance, toward adaptation of content delivery, and quantitative measurement of experiential learning.

99 GENERAL AND MISCELLANEOUS↗

Demonstration of a Piston Plug feed System for Feeding Coal/Biomass Mixtures across a Pressure Gradient for Application to a Commercial CBTL System

Producing liquid transportation fuels and power via coal and biomass to liquids (CBTL) and integrated gasification combined cycle (IGCC) processes can significantly improve the nation's energy security. The Energy Independence and Security Act of 2007 mandates increasing renewable fuels nearly 10-fold to >2.3 million barrels per day by 2022. Coal is abundantly available and coal to liquids (CTL) plants can be deployed today, but they will not become sustainable without large scale CO 2 capture and storage. Co-processing of coal and biomass in CBTL processes in a 60 to 40 ratio is an attractive option that has the potential to produce 4 million barrels of transportation fuels per day by 2020 at the same level of CO 2 emission as petroleum. In this work, Southern Research Institute (Southern) has made an attempt to address one of the major barriers to the development of large scale CBTL processes - cost effective/reliable dry-feeding of coal-biomass mixtures into a high pressure vessel representative of commercial entrained-flow gasifiers. Present method for dry coal feeding involves the use of pressurized lock-hopper arrangements that are not only very expensive with large space requirements but also have not been proven for reliably feeding coal-biomass mixtures without the potential problems of segregation and bridging. The project involved the development of a pilot-scale 250 lb/h high pressure dry coal-biomass mixture feeder provided by TKEnergi and proven for feeding biomass at a scale up to 6 ton/day. The aim of this project is to demonstrate cost effective feeding of coal-biomass mixtures (50:50 to 70:30) made from a variety of coals (bituminous, lignite) and biomass (wood, corn stover, switch grass). The feeder uses a hydraulic piston-based approach to produce a series of plugs of the mixture that act as a seal against high back-pressure of the gasification vessel in to which the mixture is being fed. The plugs are then fed one by one via a plug breaker into the high pressure gasification vessel. A number of runs involving the feeding of coal and biomass mixtures containing 50 to 70 weight % coal into a high pressure gasification vessel simulator have shown that plugs of sufficient density can be formed to provide a seal against pressures up to 450 psig if homogeneity of the mixture can be maintained. However, the in-homogeneity of coal-biomass mixtures can occur during the mixing process because of density, particle size and moisture differences. Also, the much lower compressibility of coal as opposed to biomass can contribute to non-uniform plug formation which can result in weak plugs. Based on present information, the piston plug feeder offered marginal economic advantages over lock-hoppers. The results suggest a modification to the piston feeder that can potentially seal against pressure without the need for forming plugs. This modified design could result in lower power requirements and potentially better economics.

01 COAL, LIGNITE, AND PEAT↗

Process/Equipment Co-Simulation on Syngas Chemical Looping Process

The chemical looping strategy for fossil energy applications promises to achieve an efficient energy conversion system for electricity, liquid fuels, hydrogen and/or chemicals generation, while economically separate CO 2 by looping reaction design in the process. Chemical looping particle performance, looping reactor engineering, and process design and applications are the key drivers to the success of chemical looping process development. In order to better understand and further scale up the chemical looping process, issues such as cost, time, measurement, safety, and other uncertainties need to be examined. To address these uncertainties, advanced reaction/reactor modeling and process simulation are highly desired and the modeling efforts can accelerate the chemical looping technology development, reduce the pilot-scale facility design time and operating campaigns, as well as reduce the cost and technical risks. The purpose of this work is thus to conduct multiscale modeling and simulations on the key aspects of chemical looping technology, including particle reaction kinetics, reactor design and operation, and process synthesis and optimization.

42 ENGINEERING↗

Integrated pre-feasibility study for CO 2 geological storage in the Cascadia Basin, offshore Washington State, British Columbia

The Cascadia CarbonSAFE project conducted a pre-feasibility study to evaluate technical and nontechnical aspects of storing 50 million metric tons (MMT) of carbon dioxide in a safe, ocean basalt reservoir offshore Washington State and British Columbia. Sub-seafloor basalts are very common on Earth and enable geological mineralization as a long-term storage mechanism, permanently sequestering the carbon in solid rock form. This project evaluated the offshore storage complex, developed potential industrial source/transport scenarios, built an inventory of existing geophysical/geological data and environmental monitoring capabilities, conducted laboratory studies and reservoir modeling to determine storage capacity, and analyzed economic factors, regulatory requirements, and project management risks. Our team included researchers at Columbia University in New York, Pacific Northwest National Laboratory (PNNL) in Washington, University of Victoria in British Columbia, University of California at Santa Cruz, and GHG Underground in Maine, as well as collaborators at University of Iceland in Reykjavik and University of Washington in Saint Louis. In the study region, large emitters (>100,000 MT/year) generate a total of approximately 40 MMT annually from stationary sources, such as power plants, refineries, ammonia production, and mineral processing plants. Five potential industry source/transport scenarios were identified (three in U.SA S. and two in Canada) to potentially provide 50 MMT of carbon dioxide to the offshore reservoir. One scenario included net carbon-negative sources that would reduce atmospheric levels. The inventory of existing data illustrated that basalt properties in the region are potentially beneficial for long-term storage. Permeability is on the order of 0.1 to 1 Darcies within the uppermost 600 m of ocean crust and density-derived porosity reaches 10–20% in thin layers that provide act as flow channels and provide access to porous and permeable basalt. Fine-grained sediments overlying basalt provide a low-permeability barrier separating the storage reservoir from the overlying ocean. Subsurface monitoring of the storage complex benefits from a unique opportunity close proximity of to the nearby NEPTUNE cabled seafloor observatory, which actively transmits data to shore and could be used to monitor reservoir properties. Injection pressure changes, reservoir chemistry, seismicity, well head corrosion, and potential leakage monitoring would be feasible in real time. Using existing data and published models, the STOMP-CO 2 modeling code developed at PNNL was used to simulate carbon dioxide injection, storage, and mineralization in the reservoir. Preliminary simulations indicate that a 50 MMT carbon dioxide plume injected over a 20-year period remains well within the reservoir area, both laterally and vertically, for at least a 50-year period of post-injection monitoring. Laboratory studies on core samples from Cascadia measured dissolution rates in CO 2 –basalt–seawater mixtures and indicated large variability in rates with the potential for complete mineralization. Compared to published data, the dissolution rate measured in these samples is faster, decreasing the time until full conversion to carbonate minerals would occur. Adding geochemical reactivity in the STOMP-CO 2 model indicates that carbon dioxide would be fully converted to carbonate minerals in 135 years or less after injection ceases. The project assessed the viability and costs for the five scenarios using either dedicated offshore pipelines or shipping vessels. Carbon dioxide capture costs were not considered. Shipping incurred lower upfront CAPEX costs, and because most viable sources were located near the shore and waterways, shipping is preferred; no dedicated carbon dioxide pipelines exist in the region. The project also considered potential risks from mixed-use impacts on surrounding lands and ocean areas, such as active use by commercial and recreational fisherman, and other community considerations in planning for public engagement in the future. Other project risks were identified, including project management, permitting and compliance, and financing, as well as technical issues such as long-term instrumentation, plume migration, and model development. Geological concerns like reservoir permeability, seal, and induced seismicity held relatively low risk. The regulatory framework for offshore storage in the U.S. and Canada may be covered by general legal/regulatory programs, but is not yet fully defined. Existing programs appear to restrict the transportation of carbon dioxide across national boundaries (e.g., Canada to U.S.) and its sub-seabed disposal in some circumstances. Our assessment suggests that developing specific and separate pilot projects will help to advance the technical feasibility and regulatory requirements in each country, and lessons learned from such activities may be transferable elsewhere around the globe.

42 ENGINEERING↗

Large Area Projection Sintering Technology Development (CRADA Final Report)

This CRADA was formed through support of the Innovation Crossroads program, which has been an invaluable experience for Ascend Manufacturing and our additive manufacturing technology. Without Innovation Crossroads, the research, capital and operational requirements to develop our company would have been too high and Ascend Manufacturing simply would not exist. Our patented and federally funded technology would have gone to waste. Through this CRADA, Ascend has been able to collaborate with the worlds experts in additive manufacturing to assist in developing our state of the art technology. This project assisted in developing a fully scalable 3D printing process, developed an industrial and pilot system design, assisted in the fabrication of a pilot system, allowing us to print components with materials impossible by any other 3D printing process. This work has allowed us to achieve significant follow-on funding to fully commercialize this highly capable manufacturing technology.

36 MATERIALS SCIENCE↗

Plan for Scaling Up Hydrogen Production with Nuclear Power Plants

The United States (U.S.) Department of Energy’s (DOE’s) Light Water Reactor Sustainability (LWRS) Program Flexible Plant Operations and Generation (FPOG) Pathway is developing options to help U.S. nuclear power plants (NPPs) better integrate with intermittent wind and solar capacity and the recent surge of natural gas power generation. Research is focusing on improving NPP flexibility through hybrid production of electricity and other products, such as hydrogen (H 2 ) and energy storage for the purpose of shifting power production to a later time. In the case of H 2 production, the clean electrical and thermal power from an NPP can be used to split water using electrolysis. This report outlines the opportunity for NPPs to participate in a first-of-akind (FOAK) commercial nuclear H 2 project intended to bring industry partners together to create regional clean H 2 hubs. The Bipartisan Infrastructure Law (BIL) will fund at least one hub up to $1.25 billion as federal cost share totally no less than 50% to execute a nuclear H 2 project. The report discusses the set of activities that are now underway or that are planned for completion by the FPOG Pathway to reduce the economic, technical, regulatory, and safety risks of these projects. DOE cross-program activities are being coordinated to ensure success in the timeframe allowed by the BIL. Figure ES-1 shows the approximate schedule of coordinated research and development (R&D) and pilot demonstration projects leading up to the first commercial nuclear H 2 production project. Execution of this plan requires DOE and industry collaboration. DOE research accomplishments are being provided to the electric utilities or industries looking to participate in the H 2 hub proposal and project execution process.

08 HYDROGEN↗

Particle Separator for Improved Flameless Pressurized Oxy-Combustion

The team of Southwest Research Institute® (SwRI®), ITEA, Electric Power Research Institute, Inc. (EPRI), and General Electric Global Research (GE) is advancing Flameless Pressurized Oxy-combustion (FPO), a novel coal technology. This effort seeks to develop a particle separator for the hot-gas stream leaving the FPO loop. In order to maximize the energy extracted from the cycle, the hot gas is put through a turbo-expander before flue-gas treatment. The particle separator designed under this project sought to operate at high temperature and with low-pressure drop, protecting the turbo-expander from erosion damage. The team engaged potential vendors for the test, developed plans for the pilot test loop modification, and refined requirements for the commercial turbo-expander.

01 COAL, LIGNITE, AND PEAT↗