Search NASA⌕ Search

SEARCH · Search NASA

Results for “pilot system design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

CO 2 and Renewable Electricity into Chemicals: Formic Acid Production from Coal Flue Gas

Formic acid (FA) is an industrial chemical. It is used as a preservative for silage, as a digestive aid for animals, as a fluid for fracking, as a pharmaceutical intermediate and in leather tanning. The global formic acid market is valued at 777.4 million USD in 2020 and is expected to reach 851.8 million USD by the end of 2026. A new major formic acid application is the use of formic acid as a key feedstock for the bioprocessing industry. It has the potential to grow tremendously if we can lower the cost of formic acid production compared with the current fossil-fuel one. Recently, Dioxide Materials has developed a technology that can directly convert CO 2 to pure formic acid with a three-compartment CO 2 electrolyzer. However, the electrolyzer performance needs further improvement for the technology to be commercially viable. The major objective of this project is to develop the electrolyzer technology to enable formic acid as a feedstock for the bioprocessing industry to be economically manufactured from flue gas from a coal fired pilot plant. In particular, the project is to understand how to run the electrolyzer for the conversion of CO 2 into formic acid using flue gas from a coal fired power plant as a source of CO 2 . The work will include characterizing how the performance of the electrolyzer changes with low CO 2 concentration and impurities, developing new cell designs that can still operate with feedstocks with low CO 2 concentrations, testing simulated flue gas in the electrolyzer system and developing filters to remove any impurities that arise.

01 COAL, LIGNITE, AND PEAT↗

Bench-Scale Testing of a High Efficiency, Ultra-Compact Process for Pre-Combustion CO 2 Capture (Final Report)

The overarching objective of this bench-scale study is to field-validate the technical feasibility of a membrane- and adsorption-enhanced water gas shift (WGS) reaction process that employs a carbon molecular sieve (CMS) membrane reactor (MR) followed by an adsorption reactor (AR) for pre-combustion CO 2 capture while demonstrating progress towards achievement of the overall performance goals of CO 2 capture with 95% CO 2 purity at a cost of electricity (COE) of 30% less than the baseline capture approaches. The main goal of this bench-scale project is to advance the proposed MR-AR transformative CO 2 capture technology to a sufficient maturity level so that our present industrial partners (M&PT and Worley) can potentially adapt the technology for further small pilot-scale testing. The project began at TRL 4, as the system prototype had already been validated in the laboratory on simulated syngas (as part of project DE-FE0026423). The project ended at TRL 5, via scaling-up of the prototype system and testing it on actual syngas at a host site (CAER at the University of Kentucky (UKy)). The project was carried-out in two different phases: In Phase I (during BP1 of the project), the team designed, constructed, and assembled the bench-scale experimental MR-AR system, prepared the membranes, adsorbents, and catalysts, tested the bench-scale unit with simulated syngas to validate functionality, and prepared a preliminary TEA of the technology. In Phase II (during BP2 of the project), the team installed the unit at the test site at the UKy site and completed all utility connections and hookups, field-tested the novel MR-AR process in the bench-scale system using real syngas, collected and analyzed experimental data, and completed a detailed TEA of the technology. A key aim of the project was to identify and address the technical and process risks and to generate information to advance the technology to the next stage of development. All project milestones and success criteria were met. Specifically, the team: (i) designed, constructed and assembled a bench scale system that handled 1 – 5 scfm syngas and tested its functionality with simulated syngas; (ii) prepared high performance CMS membrane tubes (ID: 3.5 mm, OD: 5.7 mm, 30” long) that meet the target H 2 permeance ( > 1 m 3 /(m 2 .hr.bar) or (> 370.3 GPU)) and a target H 2 /CO selectivity >80 at the relevant temperature (up to 300oC) and pressure conditions (up to 25 bar) with a <10% decline in performance over each 250 hr. testing period (iii) procured commercial sour-shift catalyst in sufficient quantity and prepared up to 10 kg of pelletized adsorbent for use at relevant conditions (250oC 2.5wt.% and target sorbent attrition rate < 0.2; (iv) installed the bench-scale unit at the test site (UKy) and tested the MR-AR technology using real syngas for over 250 hr. for both static and flow experiments; (v) updated the TEA analysis based on bench-scale data and met CO 2 capture goals of 95% CO 2 purity at a cost of electricity 30% less than baseline capture approaches. The CMS membranes, HTC adsorbents and catalysts employed all exhibited very robust and stable performance during the long-term run (over a >250 hr live syngas run). Furthermore, the proposed MR-AR IGCC system achieved a LCOE with a N 2 sale price of $\$$ 30/ton, with N 2 compression (no N 2 compression) of 101.2 $\$$/MWh (95.3 $\$$/MWh), which represents a 29.8% (33.9%) LCOE reduction in the baseline IGCC with carbon capture of 144.2 $\$$/MWh. The proposed MR-AR IGCC delivers a CO 2 capture cost of 44.8 $\$$/tonne (39.9 $\$$/tonne) vs 98.1 $\$$/tonne of the baseline capture case and a net power production of 586 MWe (623 MWe) vs 556 MWe of the baseline capture case.

01 COAL, LIGNITE, AND PEAT↗

Subtask 2.6 – Optimization of Aerosol Mitigation Technology for Postcombustion CO 2 Capture

Growing concerns over the impact of CO 2 emissions from combustion sources on global climate change have prompted numerous research and development projects aimed at developing cost-effective technologies for CO 2 capture. One family of technologies being demonstrated at pilot and full scale globally is postcombustion CO 2 capture (PCCC) systems that employ amine-based solvents. The captured CO 2 can be compressed and permanently stored underground or used for enhanced oil recovery (EOR). The proximity of North Dakota’s lignite-fired fleet of power plants to potential CO 2 storage options creates a unique atmosphere for PCCC within the state. However, the aerosols present in lignite flue gas present a challenge for large-scale PCCC at North Dakota power plants. Aerosols can negatively impact the long-term performance of amine-based solvents for CO 2 capture. Amine-based solvents are volatile, and aerosols provide nucleation sites where amine vapors can condense. Because aerosols cannot be easily captured at the column outlet using conventional technologies, the amine-laden aerosols escape the system and lead to accelerated solvent losses. Moreover, aerosol components can chemically react with amines to form degradation products that can permanently deactivate the amine, cause fouling, and lead to hazardous emissions. Many of the elements that have been shown to catalyze solvent degradation are present in lignite coals and can exacerbate solvent replacement economics. Understanding this issue is critical to the implementation of solvent-based CO 2 capture systems as applied to lignite-fired generation systems. The Energy & Environmental Research Center (EERC) designed and carried out this project to optimize aerosol mitigation technology for PCCC at a lignite-fired power plant. To meet the goal of this project, the following objectives were identified: Determine the effectiveness of a wet electrostatic precipitator (WESP) on collection of aerosols at a low-rank coal-fired power station. Determine the impact of aerosols on the efficiency and degradation products of amine-based carbon capture systems fired with low-rank fuels. Work was conducted at Minnkota Power Cooperative’s (MPC’s) Milton R. Young (MRY) Station Unit 2 using a slipstream of flue gas from the outlet of the plant’s flue gas desulfurization (FGD) unit. To gather initial data for sizing and specifying a WESP for this system, a temporary pilot-scale WESP was rented and installed on-site. Several different conditions were tested to examine the impact of flow rate, voltage, and current on WESP performance. The WESP was effective at removing large particulate (>200 nm) but caused an increase in fine particulate (<75 nm). Fine particulate material at the inlet and outlet of the WESP was collected, analyzed, and showed that crystalline sulfates carried over from the plant’s FGD unit were being converted to fine aerosols and SO 2 was being converted to SO 3 through the WESP. Additionally, the high moisture content of the flue gas stream at this sample location also contributed to an overall increase in aerosol mass under some of the test conditions. Using the results from the rented WESP, the project team installed a smaller-scale WESP upstream of the EERC’s slipstream CO 2 capture system. Flue gas was routed through a pilot-scale FGD unit to remove SO 2 to very low levels (~1 ppm) and then through a direct contact cooler (DCC) to further cool the gas and to remove moisture. The gas exiting the DCC was then routed through the new WESP before passing to the CO 2 absorber columns. Fluor’s amine-based solvent was used to scrub CO 2 from the slipstream through a set of two absorber columns. The rich solvent was regenerated in a stripper column by heating to drive off captured CO 2 . The system operated using a catch-and-release method where the CO 2 was separated to provide data on the process, but the captured CO 2 was released back into the host site stack. Aerosols and sulfur species were measured at multiple locations throughout the pilot-scale system. The inlet FGD and DCC removed much of the particulate matter and gaseous sulfur upstream of the WESP. With this configuration, the WESP achieved >95% particulate capture. The new WESP did not show any of the increases in SO 3 or other aerosol species that had been consistently observed with the larger-scale WESP installed immediately downstream of the plant’s full-scale FGD unit. Particulate samples captured and analyzed from the WESP inlet did not show any presence of crystalline sulfate materials, indicating that the pilot-scale FGD and DCC were efficient at reducing carryover from the plant’s full-scale FGD unit. A set of parametric tests were conducted on the new WESP to assess the impacts of flow rate, voltage, number of online WESP fields, and gas-phase sulfur content on aerosol and sulfur transformations. The results showed that the WESP performed similarly well at all sets of conditions. Sulfur and particulate matter exiting the WESP were further reduced through the absorber column as the amine-based solvent captured some of the residual contaminants. Solvent analysis showed that these species were slowly concentrating in the solvent over the duration of the test. When the WESP was taken offline and the sulfur slip through the FGD allowed to rise, the sulfate content in the solvent rose sharply, showing that the extra FGD and WESP were effective at reducing sulfate and cation uptake. This would be expected to extend amine-based solvent life by slowing the formation of heat-stable salts and other degradation products. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission and MPC.

01 COAL, LIGNITE, AND PEAT↗

Distribution Grid Impact Study in Highland Park, Michigan: Understanding Rooftop Solar, Behind-the-Meter Energy Storage, Electric Vehicle Charging, and Building Electrification [Slides]

Through the Communities LEAP (Local Energy Action Program) Pilot, the National Renewable Energy Laboratory (NREL) engaged the Highland Park Stakeholder Coalition to scope four technical assistance work areas to address their energy needs and goals. This slide deck addresses the highlighted tasks under work area "B" related to policy analysis, due diligence, and case studies for removing barriers and providing best practices for local clean energy development. Highland Park community members face frequent, long-duration power interruptions due largely to the aging distribution system serving the area and the legacy design standards used in its construction. While degrading physical infrastructure such as poles, crossarms, and transformers can result in this substandard reliability, another notable characteristic of this legacy system is the lower, 4.8 kV, voltage class. This is a legacy construction standard which many utilities, DTE included, are phasing out in favor of higher, 15 or 25 kV, voltage classes instead. The existing 4.8 kV distribution system serving Highland Park may limit significant adoptions of clean-energy technologies like high percentages of building electrification or electric vehicle adoption. The following analysis seeks to quantify these limitations under a variety of clean-energy technology adoption scenarios. It compares the overall system risks of the present system to those of a hypothetical, upgraded 13.2 kV system, using NREL-developed risk metrics and offers upgrade cost considerations. The legacy 4.8 kV voltage class serving Highland park is not, as we have modeled it, a major limitation to the widespread adoption of cost-optimal rooftop solar and/or behind-the-meter energy storage. Within our modeling framework, these technologies namely impact secondary, low-voltage assets, which may be remedied without the need for a system-wide upgrade to a 13.2 kV voltage class. Our model of the current 4.8kV system indicates it is not capable of supporting community-wide electrification efforts. Widespread building electrification, and the resulting large increase in wintertime load, dramatically increases the prevalence of voltage violations and thermal overloading on the current 4.8 kV distribution system. These impacts illustrate the need for system-wide upgrades to a 13.2 kV voltage class to accommodate these technologies. Low to Moderate DER adoption does not adversely impact the grid but does improve undervoltage and asset overloading issues. However, these benefits are insufficient to defer grid upgrades. Higher DER penetration is shown to increase overvoltage and asset overloading in future electrification scenarios.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

University of Hawai‘i, Shallow Geothermal Resources: Energy Technology Innovation Partnership Project (Final Report)

Scientists at Lawrence Berkeley National Laboratory (Berkeley Lab) have teamed up with the University of Hawai‘i at Manoa (UH Manoa) through the U.S. Department of Energy’s Energy Technology Innovation Partnership Project to evaluate the technological and market feasibility of shallow geothermal heat exchanger (GHE) technology. UH requested this analysis to evaluate opportunities in building cooling, energy efficiency, and emissions reduction applications in Hawai‘i. UH has an abundance of geologic and geothermal data and is looking to the national labs’ expertise to execute this analysis. UH is also interested in investigating policy, regulatory, and business conditions advantageous for implementation of a pilot project and more broad deployment of this technology in Hawai‘i. In many locations around the world, the demands for heating and cooling are roughly balanced over the course of the year, so GHEs do not cause significant long-term changes in subsurface temperature. This is not the case in Hawai’i, where the demand for heating is very small, meaning that, over time, GHEs will add heat to the subsurface. If temperatures increase significantly, GHE systems will not work as designed. Regional groundwater flow has the potential to sweep heated water away from boreholes, thereby maintaining the functionality of the GHE system. Significant regional groundwater flow requires two things: a sufficiently large driving hydraulic head gradient (usually closely related to surface topography), and sufficient porosity and permeability to enable groundwater to flow in large enough quantities to enable near-borehole temperatures to be maintained at ambient values. Hawai‘i’s volcanic terrain offers ample surface topographic variation. The lava itself shows an extremely large range of porosity and permeability, so sites with large enough values of these properties must be selected. Numerical modeling of coupled groundwater and heat flow can be used to determine how large is large enough. Primarily, closed-loop systems have been investigated. Other options considered are open-loop systems and using cool seawater as the chilling source. Project work investigated the feasibility of GHE technology at two scales. At the island scale, GIS layers of various attributes relevant for GHE were combined to develop an overall favorability map for employing GHE in Hawai‘i. At the local scale, a hydrogeologic model for the subsurface component of a closed-loop system was developed for the Stan Sheriff Center at the UH Manoa campus. This site is considered promising because the rock below and immediately downgradient of the borefield is highly permeable, consisting of a subsurface karst system (limestone containing high-permeability open channels), which is underlain by a thick, high-permeability fractured basalt. Moreover, the site is near the base of the Ko‘olau Range, providing a large hydraulic head gradient. Thus, groundwater flow through the site is expected to be large, enabling efficient removal of heated groundwater. A full-GHE-system model of the site was also developed, with a simplified representation of the subsurface, in which groundwater flow is not considered and heat transfer is purely by conduction. Using the building cooling load data provided by UH, simulation results show that with groundwater flow present, a GHE can operate successfully for at least 10 years, but with no groundwater flow, the subsurface begins to heat up after only one year of operation, making the GHE unviable within 2-6 years. The team also developed a techno-economic model for this site to compare the cost of cooling using a GHE system with the costs of operating the current air-conditioning system. The GHE system is advantageous economically if favorable tax incentives and interest rates can be obtained.

15 GEOTHERMAL ENERGY↗

Shallow Geothermal Resources for Cooling Applications at the University of Hawai‘i

Scientists at Berkeley Lab have teamed up with The University of Hawai‘i at Manoa (UH Manoa) through the U.S. Department of Energy’s (DOE’s) Energy Transitions Initiative Partnership Project (ETIPP) to evaluate the technological and market feasibility of shallow geothermal heat exchanger (GHE) technology for building cooling, energy efficiency, and emissions reduction applications in Hawai’i. The team is assessing the data necessary to model the feasibility of deploying this technology, the actual models that will be used, and what hurdles need to be overcome to install a demonstration case. UH has an abundance of geologic and geothermal data and is looking to the national labs’ expertise to execute this analysis. UH is also interested in investigating policy, regulatory, and business conditions advantageous for implementation of a pilot project, and more broad deployment of this technology in Hawai‘i. In many locations around the world, the demands for heating and cooling are roughly balanced over the course of the year, so GHEs do not cause significant long-term changes in subsurface temperature. This is not the case in Hawai’i, where the demand for heating is very small, meaning that over time, GHEs will add heat to the subsurface. If temperatures increase significantly, GHE systems will not work as designed. Regional groundwater flow has the potential to sweep heated water away from boreholes, thereby maintaining the functionality of the GHE system. Significant regional groundwater flow requires two things: a sufficiently large driving hydraulic head gradient (usually closely related to surface topography), and sufficient porosity and permeability to enable groundwater to flow in large enough quantities to enable near-borehole temperatures to be maintained at ambient values. Hawai‘i’s volcanic terrain offers ample surface topographic variation. The lava itself shows an extremely large range of porosity and permeability, making it crucial to select sites with large enough values of these properties. Numerical modeling of coupled groundwater and heat flow can be used to determine how large is large enough. Both closed-loop and open-loop systems are being investigated. Another option being considered is using cool seawater as the source of chill. Currently work is progressing on two fronts. A hydrogeologic model for a closed-loop system is being developed for the Stan Sheriff Center at the UH Manoa campus, where a subsurface karst system immediately downgradient of the borefield may provide efficient removal of heated groundwater. The team will also develop a technoeconomic model for this site to compare the cost of cooling using a GHE system with the costs of operating the current air conditioning system. At the state scale, geographic information system (GIS) layers of various attributes relevant for GHE are being combined to develop an overall favorability map for employing GHE in Hawai‘i.

Doughty, C↗

Pilot Test Remediation of a Fractured Bedrock Aquifer at the Maywood Superfund Site, Maywood, New Jersey - 20073

The U.S. Army Corps of Engineers (USACE) and Cabrera Services are conducting a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Pilot Test treatment of a fractured bedrock aquifer at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) located in Maywood, New Jersey (NJ), USA. The Maywood Chemical Company Superfund Site in Bergen County, NJ is listed on the United States Environmental Protection Agency (USEPA) Superfund National Priorities List (NPL). The National Superfund Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) identification number is NJD980529762. The Maywood Chemical Company Superfund Site (hereafter referred to as the FMSS) consists of 92 designated properties in the communities of Maywood, Lodi and Rochelle Park, NJ. These are collectively known as FMSS 'Vicinity Properties' and include property owned by the federal government (the Maywood Interim Storage Site, or MISS); the Stepan Company (former location of the Maywood Chemical Works, or MCW); 62 residential properties; three properties owned by the state or federal government; four municipal properties; and 21 commercial properties. The Stepan Company property includes contaminated buildings and three remediated U.S. Nuclear Regulatory Commission (NRC) licensed burial pits; the MISS also includes a contaminated building. Contamination on the FMSS is being addressed under three separate actions coordinated by the lead regulator USEPA Region 2. The USACE is addressing thorium (Th) and other wastes at the site defined as 'FUSRAP waste' in the Soils and Buildings and Groundwater Records of Decision (ROD) for the FMSS. Stepan Company is addressing other chemical wastes (non-FUSRAP waste) at the FMSS. The Groundwater ROD [1] was signed into agreement by USACE Division Commander in June 2012 and USEPA Region 2 Administrator in July 2012 and presents the selected remedial actions for Operable Unit (OU) 2 groundwater at the MISS and adjacent properties. The selected remedial action is removal of non-radiologically contaminated soils on the MISS containing arsenic, lithium, and benzene with concentrations above cleanup levels, and monitored natural attenuation (MNA) of arsenic, lithium, and benzene in groundwater. In situ treatment of arsenic in the overburden aquifer using oxidation reduction (redox) alteration will also be performed if needed to meet the groundwater cleanup levels after the source soil is removed. The need for in situ treatment will be determined during the Groundwater ROD review at least three to four years after the contaminated source soil removal is completed. The third action addressing non-FUSRAP chemical wastes will be the responsibility of the Stepan Company as a primary responsible party in this action. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Importance of Convective Stage on Out-of-Cloud Convectively Induced Turbulence from High-Resolution Simulations

Turbulence (clear-air, mountain wave, convectively induced) is an aviation hazard that is a challenge to forecast due to the coarse resolution ultilized in operational weather models. Turbulence indices are commonly used to aid pilots in avoiding turbulence, but these indices have been designed and calibrated for midlatitude clear-air turbulence prediction (e.g., the Ellrod index). A significant limitation with current convectively induced turbulence (CIT) prediction is the lack of storm stage dependency. In this study, six high-resolution simulations of tropical oceanic and midlatitude continental convection are performed to characterize the turbulent environment near various convective types during the developing and mature stages. Second-order structure functions, a diagnostic commonly used to identify turbulence in turbulence prediction systems, are used to characterize the probability of turbulence for various convective types. Turbulence likelihood was found to be independent of region (i.e., tropical vs midlatitude) but dependent on convective stage. The probability of turbulence increased near developing convection for the majority of cases. Additional analysis of static stability and vertical wind shear, indicators of turbulence potential, showed that the convective environment near developing convection was more favorable for turbulence production than mature convection. Near developing convection, static stability decreased and vertical wind shear increased. Vertical wind shear near mature and developing convection was found to be weakly correlated to turbulence intensity in both the tropics and the midlatitudes. Finally, this study emphasizes the need for turbulence avoidance guidelines for the aviation community that are dependent on convective stage.

54 ENVIRONMENTAL SCIENCES↗

Evaluation of AI-enabled Digital Documented Safety Analysis

The National Reactor Innovation Center (NRIC) is leading a transformative initiative to accelerate advanced reactor deployment by fundamentally reimagining how nuclear safety basis documentation is developed, reviewed, and maintained. Traditional Documented Safety Analysis (DSA) processes for DOE-authorized facilities rely on static, document-centric workflows that consume significant time and resources, exemplified by recent major licensing efforts requiring hundreds of thousands of staff hours and millions of pages of documentation review. These conventional approaches create barriers to the rapid, cost-effective deployment of advanced reactors that America's future energy needs demand. NRIC's DOE Authorization Digital Transformation Project addresses these challenges through an innovative framework that integrates artificial intelligence (AI), digital engineering, and systems-based data management into a cohesive digital ecosystem. This white paper presents NRIC's methodology for evaluating AI-enabled document generation capabilities within this broader digital infrastructure, using the Demonstration of Microreactor Experiments (DOME) facility as a pilot case study. The evaluation will assess an AI tool's ability to generate a Preliminary Documented Safety Analysis (PDSA) through progressive integration stages—from standalone document processing to full digital thread connectivity—while maintaining rigorous verification, validation, and regulatory acceptance standards. By establishing dynamic, traceable connections between design data and safety documentation, NRIC's approach has the potential to reduce both document development time and regulatory review cycles by as much as 50%, while simultaneously improving accuracy, consistency, and traceability. This initiative represents a critical step toward establishing reusable digital infrastructure that reactor developers can leverage to accelerate their path from concept to commercial operation, directly supporting NRIC's mission to demonstrate and deploy advanced nuclear energy technologies.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Quick Talk: Resilient Communities, Maryland

Groundswell, Inc., in partnership with the Maryland Energy Administration (MEA), Ayika Solutions, the National Renewable Energy Lab (NREL), and the Baltimore Office of Sustainability, is advancing a vision for resilient, community-centered energy systems in Maryland. This effort aligns with Groundswell's commitment to a clean energy economy that equitably benefits all communities, closing gaps in representation, wages, and access to wealth generation, savings, and local jobs within a diverse energy supply chain. Project Vision and Objectives The project emphasizes "energy resilience," defined as a community’s capacity to anticipate, adapt to, and swiftly recover from power disruptions through inclusive planning and technical solutions. The approach centers on Resilience Hubs—designated community facilities equipped to support residents before, during, and after power-related disruptions. These hubs offer emergency resources, coordinate communications, and deliver essential services while reducing carbon emissions, ultimately enhancing residents' quality of life. Additionally, Resilience Hubs foster social connections, support disaster preparedness, and provide spaces for community programming and everyday use. The goals of Resilient Communities Maryland include: Developing a replicable framework for community energy resilience, applicable beyond Maryland. Defining community-led indicators of social impact and resilience. Establishing equitable decision-making processes in project design and implementation. Informing MEA of practical, community-based resilience strategies to shape future state initiatives. Approach Groundswell and its partners prioritize collaborative engagement with local stakeholders, ensuring that solutions are responsive to each community's unique needs. By integrating feedback from residents, local organizations, and government entities, the team has developed a holistic model for resilience that balances immediate benefits, such as improved emergency response, with long-term gains in social equity and environmental sustainability. Key Outcomes This initiative has produced valuable resources and insights, including: A Community Energy Resilience Framework: Designed to guide other communities in establishing energy resilience strategies tailored to their specific needs. Case Studies: Documenting best practices and lessons learned from pilot projects to serve as models for future resilience efforts. Community-Driven Impact Metrics: Highlighting the positive social impacts that resilience initiatives can bring, such as improved social connectedness and local decision-making power. Recommendations for MEA: Offering evidence-based insights to inform policies and funding opportunities that support resilient energy infrastructure in vulnerable communities. Next Steps Groundswell's final report will detail findings, including the potential for scaling resilience hubs across Maryland and other regions, with a focus on equitable access and community-driven outcomes. This project underscores the importance of aligning energy resilience with social equity, reinforcing community agency, and building systems that withstand and recover from future challenges effectively and sustainably.

14 SOLAR ENERGY↗

Ensemble Simulations on Leadership Computing Systems

Scientific productivity can be enhanced through workflow management tools, relieving large High Performance Computing (HPC) system users from the tedious tasks of scheduling and designing the complex computational execution of scientific applications. This paper presents a study on the usage of ensemble workflow tools to accelerate science using the Summit and Frontier supercomputing systems. The research aims to connect science domain simulations using Oak Ridge Leadership Computing Facility (OLCF) supercomputing platforms with ensemble workflow methods in order to accelerate HPC-enabled discovery and boost scientific impact. We present the coupling, porting and optimization of Radical-Cybertools on three applications: Chroma, NAMD and LAMMPS. The tools augment traditional HPC monolithic runs with a pilot scheduler. Lessons-learned are discussed for physics, biology and materials science applications. We discuss intrinsic limitations of coupling and porting ensemble workflow tools to applications that run on large HPC systems. The origins of technical challenges and their solutions developed during the implementation process are discussed. Data management strategies, OLCF’s policies for ensembles, and natively supported workflow tools are also summarized.

Georgiadou, Antigoni [ORNL] (ORCID:000000020977631↗

Topical Report – Findings on Subtask 2.7 – Wet ESP and Aerosol Testing at Coal Creek Station

Growing concerns over the impact of CO 2 emissions from combustion sources on global climate change have prompted numerous research and development projects aimed at developing cost-effective technologies for CO 2 capture. One family of technologies being demonstrated at pilot and full scale globally is postcombustion carbon capture (PCCC) systems that employ amine-based solvents. The captured CO 2 can be compressed and permanently stored underground or used for enhanced oil recovery. The proximity of North Dakota’s lignite-fired fleet of power plants to potential CO 2 storage options creates a unique atmosphere for PCCC within the state. However, the unique components present in lignite flue gas present a challenge for large-scale PCCC at North Dakota power plants by contributing to aerosol formation. Aerosols can negatively impact the long-term performance of amine-based solvents for CO 2 capture. Amine-based solvents are volatile, and flue gas particulate provides nucleation sites where amine vapors can condense as aerosols. Because aerosols cannot be easily captured at the column outlet using conventional technologies, the amine-laden aerosols escape the system and lead to accelerated solvent losses. Moreover, particulate components can chemically react with amines to form degradation products that can permanently deactivate the amine, cause fouling, and lead to hazardous emissions. Many of the elements that have been shown to catalyze solvent degradation are present in lignite coals and can exacerbate solvent replacement economics. Understanding this issue is critical to the implementation of solvent-based CO 2 capture systems as applied to lignite-fired generation systems. The Energy & Environmental Research Center (EERC) designed and carried out this project to fully characterize aerosol behavior with various control technologies installed to better optimize aerosol mitigation technology for CO 2 capture. To meet the goal of this project, the following objectives were identified: Determine the effectiveness of a wet electrostatic precipitator (WESP) on mitigating formation of problematic aerosols at Great River Energy’s Coal Creek Station, upstream of the PCCC system. Determine the effectiveness of the Mitsubishi Heavy Industries (MHI) proprietary amine emission reduction unit (AERU) as a postcapture solvent recovery system for reducing aerosol emissions and extending solvent life downstream of the PCCC system. Determine the impact of aerosols on the efficiency and degradation products of both commercial and advanced solvents within the PCCC system. Work was conducted at Coal Creek Station Unit 1 using a slipstream of flue gas from the outlet of the plant’s flue gas desulfurization (FGD) unit. Flue gas was routed through a pilot-scale FGD unit to remove SO 2 to very low levels (~1 ppm) and then through a direct contact cooler (DCC) to further cool the gas and to remove moisture. The gas exiting the DCC was then optionally routed through a WESP before passing to the CO 2 absorber columns. The MHI solvent was used to scrub CO 2 from the slipstream through a set of two absorber columns. The rich solvent was regenerated in a stripper column by heating to drive off captured CO 2 . Flue gas exiting the absorber column was routed to MHI’s proprietary AERU to recover entrained solvent. The system operated using a catch-and-release method where the CO 2 was separated to provide data on the process, but the captured CO 2 was released back into the host site stack. Particulate was measured, collected, and analyzed from multiple locations throughout the pilot-scale system. Unlike the performance observed in prior work, the inlet FGD and DCC did not remove significant particulate matter from the flue gas. This appears to be due to a difference in the nature of the particulate. The DCC seemed to increase particulate size and count, most likely owing to water condensing onto the surfaces of fly ash particles. When the WESP was operated, it achieved >95% particulate capture. Very little particulate matter or indications of solvent were detected at the AERU outlet. When operating with advanced KS 21 solvent, the particulate material at the AERU outlet was even further decreased. Solvent analysis showed that some species derived from flue gas and ash were slowly concentrating in the solvent over the duration of the test. The levels observed were reported to be within expected ranges and were not of concern to MHI. A high-level techno-economic assessment of installing CO 2 capture at Coal Creek Station suggested that, when using a standard monoethanolamine (MEA)-based solution with simple heat integration, the energy penalty to net generation would be 34%. The bulk of this was due to steam losses for regenerating solvent, followed by parasitic electrical demand for CO 2 compression and then by increased parasitic load for pushing flue gas through the absorber column. These demands could be decreased with a more advanced solvent that exhibits lower heat of regeneration and lower pressure drop than does a simple MEA solution. Further energy could be saved with more thorough heat integration to recover useful energy from the steam used for solvent regeneration. Installing a WESP was predicted to increase the cost of electricity by nearly $5/MWh. This would become cost-effective if solvent losses were roughly 10 times the baseline estimate when not using a WESP but could be returned to baseline by installing the WESP. Piping CO 2 for storage in more favorable geology could help with carbon capture and storage economics. Although storing off-site would necessitate construction of a CO 2 transport pipeline, the cost of this pipeline might be more than offset by reducing the number of wells required, the depths of the wells required, and the electrical demand for the CO 2 compressor. Additional factors that favor off-site storage costs include smaller expected CO 2 plume sizes, which translates to less monitoring and fewer landowner agreements. More detailed assessment of the specific geology in the region under and around Coal Creek Station would be needed to accurately assess the costs and benefits of different storage site options. This subtask was cofunded through the Energy & Environmental Research Center–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission.

Strege, Joshua↗

Fusion Materials Research at Oak Ridge National Laboratory in Fiscal Year 2023

The materials science challenge of providing a suite of suitable materials to satisfy the technology to achieve fusion energy is addressed in this ORNL program. The inability of currently available materials and components to withstand the harsh fusion nuclear environment requires development of new materials, and an understanding of their response to the fusion environment. The overarching goal of the ORNL Fusion Materials program is to provide the applied materials science support and materials understanding to underpin the ongoing DOE Office of Science—Fusion Energy Sciences program, in parallel with developing the materials for fusion power systems. In this effort the program continues to be integrated both with the larger U.S. and international fusion materials communities and with the U.S. and international fusion design and technology communities. The excitement of this program comes from the priorities given to this subject in the two recent fusion reviews, by the FESAC and NAS committees. An important element of those recommendations is the support for pivoting the national R&D emphasis to the Fusion Materials and Technologies (FM&T), the long-advocated Fusion Prototypic Neutron Source, and for the Fusion Pilot Plant study that will help focus program direction and efforts. Furthermore, the surge of venture capital investment into the private fusion industry start-ups over the last few years is anticipated to help accelerate all aspects of the fusion energy development. This twelfth annual report of the ORNL (Oak Ridge National Laboratory) Fusion Reactor Materials Program summarizes the accomplishments in Fiscal Year 2023 (FY2023). The year was the first to return to full post-COVID-restriction operations, with students and international assignees no longer impacted by COVID restrictions, as in FY20-21-22. Following the pattern of planning used in this program, work for the year FY2023 focused on having the data and productivity to support a strong presence at the International Conference on Fusion Reactor Materials (ICFRM) 21, organized by Spain and occurred in October 2023. Twenty-nine ORNL-led abstracts were submitted, with all accepted. Four were invited presentations, nine contributed oral, fourteen posters, and two withdrawn due to unforeseen circumstances. Additionally, nine external abstracts with ORNL contributing authors were presented. These will be reported in the FY24 report next year.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Insights from PPL's DERMS Implementation

PPL Electric Utilities’ Keystone Solar Future Project (KSFP) is part of the U.S. Department of Energy’s Office of Energy Efficiency and Renewables, Energy Enabling Extreme Real-time Grid Integration of Solar Energy (ENERGISE) grant. The three-year project, beginning in October, 2017, funded an innovative pilot program to develop and evaluate a technology platform and framework for managing high levels of distributed energy resources (DER), and improving future DER interconnection. The KSFP aimed to bridge gaps between existing and future technology, including Distributed Energy Resource Management Systems (DERMS), by monitoring, managing, and optimizing a system with high penetration of solar and other DER. Specifically, the project worked to make Demand Management Systems (DMS) applications, devices, and real-time communications technology DER-aware to allow for advanced applications for utility operations. Here, by installing and implementing a DERMS, project designers transformed how DERs interact with PPL’s distribution system, offering learnings and results worth sharing industry-wide.

Leader, Jared↗

SolarAPP+ Performance Review (2022 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have those specifications automatically reviewed for code compliance, and receive instant approval for code-compliant systems. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to authorities having jurisdiction (AHJs) at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through conventional AHJ permitting processes. As of the end of 2022, the National Renewable Energy Laboratory (NREL) had contacted over 1,500 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 607 AHJs had at least expressed interest in the platform. 16 AHJs had begun piloting the platform and 15 of these had publicly launched the platform by the end of 2022. In 2022, 206 installers submitted 11,092 permits through the SolarAPP+ platform, including 708 permits for solar+storage systems. SolarAPP+ permits accounted for around 37% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 8 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved between 3,500 and 13,900 hours of AHJ staff time in 2022. Finally, we find evidence that SolarAPP+ may improve inspection outcomes, with SolarAPP+ projects failing inspections about 28% less frequently than traditional projects.

14 SOLAR ENERGY↗

White Paper on Lithium-Ion Battery Safety for use in Safety Planning at the Waste Isolation Pilot Plant

The Waste Isolation Pilot Plant (WIPP) is an underground facility designed to safely dispose of radioactive waste. The WIPP uses many heavy vehicles to transport materials and equipment underground. Most of these vehicles are powered by traditional internal combustion engines (ICE) with diesel fuel. Recently, electric vehicles (EVs) powered with batteries have been used at the WIPP. EVs have very low operational and maintenance costs, not considering battery replacements, and they have zero emissions during operation. This absence of emissions makes them ideal for underground facilities with limited ventilation. Even if a facility has robust ventilation normally, ventilation systems can break down leading to restrictions in ICE powered operations. Figure 1 shows a rendering of the WIPP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SolarAPP+ Performance Review (2023 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to AHJs at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2023, the National Renewable Energy Laboratory (NREL) had contacted over 1,700 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 793 AHJs had expressed interest in the platform as of the end of 2023. 161 AHJs had begun piloting the platform and 97 of these had publicly launched the platform by the end of 2023. In 2023, 668 installers submitted 18,906 permits through the SolarAPP+ platform, including 4,834 permits submitted as part of a solar plus storage program. SolarAPP+ permits accounted for around 43% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 14.5 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 7,200 hours of AHJ staff time in 2023. Finally, we estimate that SolarAPP+ eliminated over 150,000 business days in permitting-related delays in 2023.

14 SOLAR ENERGY↗

Evaluating the Effectiveness of a Detection and Deterrent System in Reducing Golden Eagle Fatalities at Operational Wind Facilities

The Renewable Energy Wildlife Institute (REWI) was appointed as the prime awardee of DOE award number DE-EE0007883 to lead a team of scientists, wind developers, and technology manufacturers toward the overarching goal of evaluating the effectiveness of the current DTBird system in minimizing the risk of golden eagles (Aquila chrysaetos) and other large soaring raptors from approaching the rotor-swept zone (RSZ) of operating wind turbines. As part of this goal, the team set out to 1) quantify the expected reduction in collision risk for golden eagles from operation of the detection and deterrence modules in a manner that supports the approach used by the U.S. Fish and Wildlife Service (USFWS) to assess and credit facility operators for their efforts to minimize predicted collision fatalities and 2) provide information to help improve the technology to maximize its effectiveness. DTBird is an automated detection and audio deterrent system created by the Spanish company Liquen, designed to discourage birds from entering the RSZ of spinning wind turbines. The system uses cameras to automatically detect airborne targets of interest, records each such event in an online database, and triggers a warning signal (loud sound) if the tracked object has moved close to the turbine. If the object moves even closer to the RSZ, a more aggressive dissuasion signal is broadcast. To meet our objectives, the team conducted a two-year experiment at the Goodnoe Hills wind facility in Washington state, in which 14 turbines were outfitted with DTBird units. Daily, each DTBird-equipped turbine was randomly assigned to a control or treatment group. Treatment turbines operated with DTBird running as intended—broadcasting warning or deterrent signals when DTBird detected a target within range. On control turbines, no sound signals were broadcast if a moving target triggered the DTBird system. The team also flew unmanned aerial vehicles (UAVs) designed to coarsely mimic the general size, weight, and coloration of golden eagles in programmed flight transects across DTBird detection ranges to quantify DTBird’s ability to detect intended targets and to evaluate factors that influence the probability of detection and DTBird’s response distances. Additionally, the team evaluated the behavioral responses of in situ eagles exposed to spinning turbines alone (visual and sound influences) versus spinning turbines plus broadcasted DTBird audio deterrents, to estimate the effectiveness of deterrence by the DTBird system. The data and results from these investigations were combined with those from a pilot study conducted at the Manzana Wind Power Project in California to better evaluate DTBird’s effectiveness across different landscapes.

17 WIND ENERGY↗