Search NASA⌕ Search

SEARCH · Search NASA

Results for “planning scheduling architecture”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

NASA's Space Launch System: An Enabling Capability for Discovery

The National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is making progress toward delivering a new capability for human spaceflight and scientific missions beyond Earth orbit. Developed with the goals of safety, affordability, and sustainability in mind, the SLS rocket will launch the Orion Multi-Purpose Crew Vehicle (MPCV), equipment, supplies, and major science missions for exploration and discovery. Making its first uncrewed test flight in 2017 and its first crewed flight in 2021, the SLS will evolve into the most powerful launch vehicle ever flown, capable of supporting human missions into deep space and to Mars. This paper will summarize the planned capabilities of the vehicle, the progress the SLS Program has made in the years since the Agency formally announced its architecture in September 2011, and the path the program is following to reach the launch pad in 2017 and then to evolve the 70 metric ton (t) initial lift capability to 130 t lift capability. The paper will outline the milestones the program has already reached, from developmental milestones such as the manufacture of the first flight hardware and recordbreaking engine testing, to life-cycle milestones such as the vehicle's Preliminary Design Review in the summer of 2013. The paper will also discuss the remaining challenges in both delivering the 70 t vehicle and in evolving its capabilities to the 130 t vehicle, and how the program plans to accomplish these goals. In addition, this paper will demonstrate how the Space Launch System is being designed to enable or enhance not only human exploration missions, but robotic scientific missions as well. Because of its unique launch capabilities, SLS will support simplifying spacecraft complexity, provide improved mass margins and radiation mitigation, and reduce mission durations. These capabilities offer attractive advantages for ambitious science missions by reducing infrastructure requirements, cost, and schedule. A traditional baseline approach for a mission to investigate the Jovian system would require a complicated trajectory with several gravity-assist planetary fly-bys to achieve the necessary outbound velocity. The SLS rocket, offering significantly higher C3 energies, can more quickly and effectively take the mission directly to its destination, providing scientific results sooner and at lower operational cost. The SLS rocket will launch payloads of unprecedented mass and volume, such as "monolithic" telescopes and in-space infrastructure, and will revolutionize science mission planning and design for years to come. As this paper will explain, SLS is making measurable progress toward becoming a global infrastructure asset for robotic and human scouts of all nations by harnessing business and technological innovations to deliver sustainable solutions for space exploration.

Creech, Stephen D.↗

NASA Tech Briefs, May 2010

Topics covered include: Instrument for Analysis of Greenland's Glacier Mills Cryogenic Moisture Apparatus; A Transportable Gravity Gradiometer Based on Atom Interferometry; Three Methods of Detection of Hydrazines; Crossed, Small-Deflection Energy Analyzer for Wind/Temperature Spectrometer; Wavefront Correction for Large, Flexible Antenna Reflector; Novel Micro Strip-to-Waveguide Feed Employing a Double-Y Junction; Thin-Film Ferro Electric-Coupled Microstripline Phase Shifters With Reduced Device Hysteresis; Two-Stage, 90-GHz, Low-Noise Amplifier; A 311-GHz Fundamental Oscillator Using InP HBT Technology; FPGA Coprocessor Design for an Onboard Multi-Angle Spectro-Polarimetric Imager; Serrating Nozzle Surfaces for Complete Transfer of Droplets; Turbomolecular Pumps for Holding Gases in Open Containers; Triaxial Swirl Injector Element for Liquid-Fueled Engines; Integrated Budget Office Toolbox; PLOT3D Export Tool for Tecplot; Math Description Engine Software Development Kit; Astronaut Office Scheduling System Software; ISS Solar Array Management; Probabilistic Structural Analysis Program; SPOT Program; Integrated Hybrid System Architecture for Risk Analysis; System for Packaging Planetary Samples for Return to Earth; Offset Compound Gear Drive; Low-Dead-Volume Inlet for Vacuum Chamber; Simple Check Valves for Microfluidic Devices; A Capillary-Based Static Phase Separator for Highly Variable Wetting Conditions; Gimballing Spacecraft Thruster; Finned Carbon-Carbon Heat Pipe with Potassium Working Fluid; Lightweight Heat Pipes Made from Magnesium; Ceramic Rail-Race Ball Bearings; Improved OTEC System for a Submarine Robot; Reflector Surface Error Compensation in Dual-Reflector Antennas; Enriched Storable Oxidizers for Rocket Engines; Planar Submillimeter-Wave Mixer Technology with Integrated Antenna; Widely Tunable Mode-Hop-Free External-Cavity Quantum Cascade Laser; Non-Geiger-Mode Single-Photon Avalanche Detector with Low Excess Noise; Using Whispering-Gallery-Mode Resonators for Refractometry; RF Device for Acquiring Images of the Human Body; Reactive Collision Avoidance Algorithm; Fast Solution in Sparse LDA for Binary Classification; Modeling Common-Sense Decisions in Artificial Intelligence; Graph-Based Path-Planning for Titan Balloons; Nanolaminate Membranes as Cylindrical Telescope Reflectors; Air-Sea Spray Airborne Radar Profiler Characterizes Energy Fluxes in Hurricanes; Large Telescope Segmented Primary Mirror Alignment; and Simplified Night Sky Display System.

Source record↗

Risk Characterization Research for Artemis II: Human Factors and Behavioral Performance

BACKGROUND Artemis II will be the first time NASA astronauts go beyond low-Earth orbit (LEO) since the Apollo era, and the first astronauts heading into space in the Orion vehicle. As such, it provides a critical opportunity to refine our understanding of the likelihood and consequences associated with the Behavioral Medicine (BMed), Team, Human System Integration Architecture (HSIA), and Sleep Risks, and prepare for future Moon and Mars missions. However, Artemis II research efforts are uniquely shaped by in-mission data collection constraints. There is currently no in-mission crew time available to complete measures. In-mission data will need to be collected unobtrusively from available data streams (e.g., audiovisual, existing records such as schedules, and actigraphy). Accordingly, the overarching goal of our research is to utilize Artemis II data to further define the likelihood and consequences of these risks, and to create an unobtrusive research infrastructure that can be expanded to include future Artemis missions. This goal spans four aims across three research phases: (1) identify and operationally define key performances metrics and constructs across the four aforementioned risks, (2) develop an unobtrusive methodology and coding scheme for in-mission data collection, (3) characterize performance decrements due to Bmed, Team, HSIA, and Sleep Risks, and (4) develop a data infrastructure for future Artemis missions. The following details results of Phase I efforts in which we address Aims 1 and 2 to develop an unobtrusive measurement plan and coding scheme to capture key constructs, contributing factors, and performance decrements across each risk area. METHOD As part of Phase I, we conducted an interdisciplinary literature review and consulted with SMEs to identify unobtrusive methodologies that leverage text, audio, and/or video data as well as conceptualize key performance metrics, contributing factors, and BMed, Team, HSIA, and Sleep risk constructs related to performance decrements. The Phase I effort resulted in a finalized pre- and post-mission protocol for Artemis II, along with a measurement and coding scheme for in-mission Artemis II data. Phase II will involve data collection from the upcoming Artemis II mission. Phase III will include data processing, coding, depiction, analysis, and report writing of the Artemis II data. RESULTS & DISCUSSION To date, we have completed Phase I efforts. Specifically, we identified BMed, Team, HSIA, and Sleep risk constructs related to performance metrics, summarized how these constructs can be measured using audiovisual data collected during the mission, and worked with NASA’s HFBP Element to finalize a data collection protocol that leverages audiovisual input from the Orion spacecraft system. Our protocol includes novel unobtrusive methodologies that adhere to in-mission data streams and subsequent constraints (e.g., limited storage space on GoPro cameras, ambient noise impeding audio files) to best capture in-mission phenomena across each risk area. We will present our results from Phase I efforts, namely best practices for unobtrusive measurement as identified through literature reviews and SME consultation as well as codebook excerpts for use in Artemis II. We will include a description of planned work as we prepare for Phase II and Phase III of this research plan and the Artemis II mission itself. SUMMARY We describe progress on our Human Factors and Behavioral Performance Research for Artemis II study.

behavioral health↗

High Altitude Long Endurance Remotely Operated Aircraft - National Airspace System Integration - Simulation IPT: Detailed Airspace Operations Simulation Plan. Version 1.0

The primary goal of Access 5 is to allow safe, reliable and routine operations of High Altitude-Long Endurance Remotely Operated Aircraft (HALE ROAs) within the National Airspace System (NAS). Step 1 of Access 5 addresses the policies, procedures, technologies and implementation issues of introducing such operations into the NAS above pressure altitude 40,000 ft (Flight Level 400 or FL400). Routine HALE ROA activity within the NAS represents a potentially significant change to the tasks and concerns of NAS users, service providers and other stakeholders. Due to the complexity of the NAS, and the importance of maintaining current high levels of safety in the NAS, any significant changes must be thoroughly evaluated prior to implementation. The Access 5 community has been tasked with performing this detailed evaluation of routine HALE-ROA activities in the NAS, and providing to key NAS stakeholders a set of recommended policies and procedures to achieve this goal. Extensive simulation, in concert with a directed flight demonstration program are intended to provide the required supporting evidence that these recommendations are based on sound methods and offer a clear roadmap to achieving safe, reliable and routine HALE ROA operations in the NAS. Through coordination with NAS service providers and policy makers, and with significant input from HALE-ROA manufacturers, operators and pilots, this document presents the detailed simulation plan for Step 1 of Access 5. A brief background of the Access 5 project will be presented with focus on Steps 1 and 2, concerning HALE-ROA operations above FL400 and FL180 respectively. An overview of project management structure follows with particular emphasis on the role of the Simulation IPT and its relationships to other project entities. This discussion will include a description of work packages assigned to the Simulation IPT, and present the specific goals to be achieved for each simulation work package, along with the associated deliverables necessary to achieve these goals and the needs of other Access 5 IPTs. The simulation environment chosen for this task is then outlined. This section includes a description of the system architecture, a list of the necessary assumptions made by the Simulation IPT, and the roles, responsibilities and interactions of simulation participants. The method of simulation conduct is presented in the next section with particular emphasis on scenario development and applicability to evaluation of Step 1 HALE-ROA operations. Following, data collection and analysis methods are discussed for air traffic specialists and air vehicle control station operators. Lastly, a schedule of Step 1 simulation activities is presented for reference.

Source record↗

System-of-Systems Tools for the Analysis of Technological Choices in Space Propulsion

Difficulties in space mission architecture design arise from many factors. Performance, cost, and risk constraints become less obvious due to complex interactions between the systems involved in the mission; decisions regarding long-term goals can heavily impact technological choices for short-term parts of the mission, while conversely decisions in the near future will impact the whole flexibility of long-term plans. Furthermore, the space community is broadening its borders, and space agencies from different countries are collaborating with industry and commercial partners towards large-scale endeavors. This paradigm shift is prompting the development of non-traditional approaches to the design of space missions. This paper reports the results of the first year of a continuing collaboration of the authors to develop and demonstrate System-of-System engineering methodologies for the deep analysis of dependencies and synthesis of robust architectures in exploration mission contexts. We present the procedure that we followed to develop and apply our methodology, obstacles found, steps taken to improve the methods based on the needs of experts and decision makers, required data for the analysis, and results produced by our holistic analysis. In particular, we focus on the analysis of technological choices for space propulsion for a generic cislunar mission, including both complex interactions between subsystems in different type of propulsion and availability of different providers. We identify critical systems and sets of systems based on cascading effects of performance degradation, assessment of the robustness of different designs in the operational domain, and simultaneous analysis of schedule dependencies between the constituent systems.

Guariniello, Cesare↗

Flight and Direct to Earth/Space Relay Communication System Architecture for GSFC CubeSat Missions

The CubeSat platform is finding increasing use in space science applications due to its low cost and comparative ease of launch. It is becoming a key scientific discovery tool in low Earth orbit (LEO) and beyond, including geosynchronous equatorial orbit (GEO), the Lagrange Points, Lunar missions, and more. The increasing complexity of these missions and their scientific goals must be supported by equal advancements in communications technology. Higher data rates and greater reliability are required every year. However, the reduced Size, Weight, and Power (SWaP) constraints of CubeSat platforms introduce unique challenges in the area of satellite communications. There is currently a lack of communication equipment tailored specifically to the CubeSat platform. This lack of standardized, tested equipment extends development time and reduces mission confidence. Furthermore, missions utilizing the CubeSat platform are often subject to more difficult design constraints. Antenna placement, size, and pointing are often subordinate to the requirements of the payload instruments and mission goals. Traditional link margin estimation techniques are insufficient in these cases, as they emphasize worst case scenarios. In reality the actual link parameters may vary widely even during a single pass. This presents new challenges in predicting communications performance and scheduling ground station contacts, but also new opportunities for improving efficiency. This paper presents the integration, testing, and validation process for a new software defined radio (SDR) designed for the CubeSat platform in conjunction with Vulcan Wireless, Inc. The SDR is planned for use on 5 upcoming CubeSat missions at NASAs Goddard Space Flight Center (GSFC) including a Geosynchronous Transfer Orbit (GTO) mission and it may also serve as a standard and well-tested option for future missions by enabling a standardized, rapid and low cost CubeSat communication system network integration process. Detailed simulations have been developed to estimate the communication performance of these missions, taking the unique antenna placements and attitude behavior of each satellite into account. These simulations allow a much more accurate analysis of the expected link margin, which varies considerably during each pass for the NASA Space Relay (SR) and Direct to Earth (DTE) network. The modelling procedures are outlined, and the results are used to predict communications performance of the missions.

Space Networks↗

Performance Considerations for the SIMPL Single Photon, Polarimetric, Two-Color Laser Altimeter as Applied to Measurements of Forest Canopy Structure and Composition

The Slope Imaging Multi-polarization Photon-counting Lidar (SIMPL) is a multi-beam, micropulse airborne laser altimeter that acquires active and passive polarimetric optical remote sensing measurements at visible and near-infrared wavelengths. SIMPL was developed to demonstrate advanced measurement approaches of potential benefit for improved, more efficient spaceflight laser altimeter missions. SIMPL data have been acquired for wide diversity of forest types in the summers of 2010 and 2011 in order to assess the potential of its novel capabilities for characterization of vegetation structure and composition. On each of its four beams SIMPL provides highly-resolved measurements of forest canopy structure by detecting single-photons with 15 cm ranging precision using a narrow-beam system operating at a laser repetition rate of 11 kHz. Associated with that ranging data SIMPL provides eight amplitude parameters per beam unlike the single amplitude provided by typical laser altimeters. Those eight parameters are received energy that is parallel and perpendicular to that of the plane-polarized transmit pulse at 532 nm (green) and 1064 nm (near IR), for both the active laser backscatter retro-reflectance and the passive solar bi-directional reflectance. This poster presentation will cover the instrument architecture and highlight the performance of the SIMPL instrument with examples taken from measurements for several sites with distinct canopy structures and compositions. Specific performance areas such as probability of detection, after pulsing, and dead time, will be highlighted and addressed, along with examples of their impact on the measurements and how they limit the ability to accurately model and recover the canopy properties. To assess the sensitivity of SIMPL's measurements to canopy properties an instrument model has been implemented in the FLIGHT radiative transfer code, based on Monte Carlo simulation of photon transport. SIMPL data collected in 2010 over the Smithsonian Environmental Research Center, MD are currently being modelled and compared to other remote sensing and in situ data sets. Results on the adaptation of FLIGHT to model micropulse, single'photon ranging measurements are presented elsewhere at this conference. NASA's ICESat-2 spaceflight mission, scheduled for launch in 2016, will utilize a multi-beam, micropulse, single-photon ranging measurement approach (although non-polarimetric and only at 532 nm). Insights gained from the analysis and modelling of SIMPL data will help guide preparations for that mission, including development of calibration/validation plans and algorithms for the estimation of forest biophysical parameters.

Dabney, Philip W.↗

Implementation of a Relay Coordination System for the Mars Network

Mars network relay operations involve the coordination of lander and orbiter teams through long-term and short-term planning, tactical changes and post-pass analysis. Much of this coordination is managed through email traffic and point-to-point file data exchanges. It is often difficult to construct a complete and accurate picture of the relay situation at any given moment, as there is no centralized store of correlated relay data. The Mars Relay Operations Service (MaROS) is being implemented to address the problem of relay coordination for current and next-generation relay missions. The service is provided for the purpose of coordinating communications sessions between landed spacecraft assets and orbiting spacecraft assets at Mars. The service centralizes a set of functions previously distributed across multiple spacecraft operations teams, and as such greatly improves visibility into the end-to-end strategic coordination process. Most of the process revolves around the scheduling of communications sessions between the spacecraft during periods of time when a landed asset on Mars is geometrically visible by an orbiting spacecraft. These "relay" sessions are used to transfer data both to and from the landed asset via the orbiting asset on behalf of Earth-based spacecraft operators. This paper will discuss the relay coordination problem space, overview the architecture and design selected to meet system requirements, and describe the first phase of system implementation

Allard, Daniel A.↗

Transportation Network Topologies

A discomforting reality has materialized on the transportation scene: our existing air and ground infrastructures will not scale to meet our nation's 21st century demands and expectations for mobility, commerce, safety, and security. The consequence of inaction is diminished quality of life and economic opportunity in the 21st century. Clearly, new thinking is required for transportation that can scale to meet to the realities of a networked, knowledge-based economy in which the value of time is a new coin of the realm. This paper proposes a framework, or topology, for thinking about the problem of scalability of the system of networks that comprise the aviation system. This framework highlights the role of integrated communication-navigation-surveillance systems in enabling scalability of future air transportation networks. Scalability, in this vein, is a goal of the recently formed Joint Planning and Development Office for the Next Generation Air Transportation System. New foundations for 21PstP thinking about air transportation are underpinned by several technological developments in the traditional aircraft disciplines as well as in communication, navigation, surveillance and information systems. Complexity science and modern network theory give rise to one of the technological developments of importance. Scale-free (i.e., scalable) networks represent a promising concept space for modeling airspace system architectures, and for assessing network performance in terms of scalability, efficiency, robustness, resilience, and other metrics. The paper offers an air transportation system topology as framework for transportation system innovation. Successful outcomes of innovation in air transportation could lay the foundations for new paradigms for aircraft and their operating capabilities, air transportation system architectures, and airspace architectures and procedural concepts. The topology proposed considers air transportation as a system of networks, within which strategies for scalability of the topology may be enabled by technologies and policies. In particular, the effects of scalable ICNS concepts are evaluated within this proposed topology. Alternative business models are appearing on the scene as the old centralized hub-and-spoke model reaches the limits of its scalability. These models include growth of point-to-point scheduled air transportation service (e.g., the RJ phenomenon and the 'Southwest Effect'). Another is a new business model for on-demand, widely distributed, air mobility in jet taxi services. The new businesses forming around this vision are targeting personal air mobility to virtually any of the thousands of origins and destinations throughout suburban, rural, and remote communities and regions. Such advancement in air mobility has many implications for requirements for airports, airspace, and consumers. These new paradigms could support scalable alternatives for the expansion of future air mobility to more consumers in more places.

Holmes, Bruce J.↗

Transportation Network Topologies

A discomforting reality has materialized on the transportation scene: our existing air and ground infrastructures will not scale to meet our nation's 21st century demands and expectations for mobility, commerce, safety, and security. The consequence of inaction is diminished quality of life and economic opportunity in the 21st century. Clearly, new thinking is required for transportation that can scale to meet to the realities of a networked, knowledge-based economy in which the value of time is a new coin of the realm. This paper proposes a framework, or topology, for thinking about the problem of scalability of the system of networks that comprise the aviation system. This framework highlights the role of integrated communication-navigation-surveillance systems in enabling scalability of future air transportation networks. Scalability, in this vein, is a goal of the recently formed Joint Planning and Development Office for the Next Generation Air Transportation System. New foundations for 21st thinking about air transportation are underpinned by several technological developments in the traditional aircraft disciplines as well as in communication, navigation, surveillance and information systems. Complexity science and modern network theory give rise to one of the technological developments of importance. Scale-free (i.e., scalable) networks represent a promising concept space for modeling airspace system architectures, and for assessing network performance in terms of scalability, efficiency, robustness, resilience, and other metrics. The paper offers an air transportation system topology as framework for transportation system innovation. Successful outcomes of innovation in air transportation could lay the foundations for new paradigms for aircraft and their operating capabilities, air transportation system architectures, and airspace architectures and procedural concepts. The topology proposed considers air transportation as a system of networks, within which strategies for scalability of the topology may be enabled by technologies and policies. In particular, the effects of scalable ICNS concepts are evaluated within this proposed topology. Alternative business models are appearing on the scene as the old centralized hub-and-spoke model reaches the limits of its scalability. These models include growth of point-to-point scheduled air transportation service (e.g., the RJ phenomenon and the Southwest Effect). Another is a new business model for on-demand, widely distributed, air mobility in jet taxi services. The new businesses forming around this vision are targeting personal air mobility to virtually any of the thousands of origins and destinations throughout suburban, rural, and remote communities and regions. Such advancement in air mobility has many implications for requirements for airports, airspace, and consumers. These new paradigms could support scalable alternatives for the expansion of future air mobility to more consumers in more places.

Holmes, Bruce J.↗

Game Changing: NASA's Space Launch System and Science Mission Design

NASA s Marshall Space Flight Center (MSFC) is directing efforts to build the Space Launch System (SLS), a heavy-lift rocket that will carry the Orion Multi-Purpose Crew Vehicle (MPCV) and other important payloads far beyond Earth orbit (BEO). Its evolvable architecture will allow NASA to begin with Moon fly-bys and then go on to transport humans or robots to distant places such as asteroids and Mars. Designed to simplify spacecraft complexity, the SLS rocket will provide improved mass margins and radiation mitigation, and reduced mission durations. These capabilities offer attractive advantages for ambitious missions such as a Mars sample return, by reducing infrastructure requirements, cost, and schedule. For example, if an evolved expendable launch vehicle (EELV) were used for a proposed mission to investigate the Saturn system, a complicated trajectory would be required - with several gravity-assist planetary fly-bys - to achieve the necessary outbound velocity. The SLS rocket, using significantly higher C3 energies, can more quickly and effectively take the mission directly to its destination, reducing trip time and cost. As this paper will report, the SLS rocket will launch payloads of unprecedented mass and volume, such as "monolithic" telescopes and in-space infrastructure. Thanks to its ability to co-manifest large payloads, it also can accomplish complex missions in fewer launches. Future analyses will include reviews of alternate mission concepts and detailed evaluations of SLS figures of merit, helping the new rocket revolutionize science mission planning and design for years to come.

Creech, Stephen D.↗

Using NASA's Space Launch System to Enable Game Changing Science Mission Designs

NASA's Marshall Space Flight Center is directing efforts to build the Space Launch System (SLS), a heavy-lift rocket that will help restore U.S. leadership in space by carrying the Orion Multi-Purpose Crew Vehicle and other important payloads far beyond Earth orbit. Its evolvable architecture will allow NASA to begin with Moon fly-bys and then go on to transport humans or robots to distant places such as asteroids, Mars, and the outer solar system. Designed to simplify spacecraft complexity, the SLS rocket will provide improved mass margins and radiation mitigation, and reduced mission durations. These capabilities offer attractive advantages for ambitious missions such as a Mars sample return, by reducing infrastructure requirements, cost, and schedule. For example, if an evolved expendable launch vehicle (EELV) were used for a proposed mission to investigate the Saturn system, a complicated trajectory would be required with several gravity-assist planetary fly-bys to achieve the necessary outbound velocity. The SLS rocket, using significantly higher C3 energies, can more quickly and effectively take the mission directly to its destination, reducing trip times and cost. As this paper will report, the SLS rocket will launch payloads of unprecedented mass and volume, such as monolithic telescopes and in-space infrastructure. Thanks to its ability to co-manifest large payloads, it also can accomplish complex missions in fewer launches. Future analyses will include reviews of alternate mission concepts and detailed evaluations of SLS figures of merit, helping the new rocket revolutionize science mission planning and design for years to come.

Creech, Stephen D.↗

A Mathematical Analysis of an Example Delay Tolerant Network using the Theory of Sheaves

NASA’s High-Data Rate Architecture (HiDRA) project is working towards a general yet practical toolkit and knowledge base to help usher in the era of new technologies for space systems communications, such as optical links. The High-Rate Delay Tolerant Networking (HDTN) implementation falls under the umbrellas of both the toolkit and the knowledge base, as its advancements illuminate more general areas of Delay Tolerant Networking (DTN) that need growth. The goal of this paper is to explore the usage of particular mathematical machineries, namely temporal flow networks and sheaves, to identify fundamental, underlying structures in DTN for space systems. Satellites, space assets, ground stations, etc. give rise to a disconnected network, and it is the goal of DTN to glue disparate links together into a cohesive system, that is, a network. Depending on a given link, the latencies might be beyond that which the Transmission Control Protocol (TCP) can handle, and contact times might have one-way light times in excess of minute (sometimes significantly longer). Some links might be periodic (say, due to orbital mechanics) or they might not be. This diversity has made it difficult to probe the underlying structure. An immediate consequence is that DTNs in practice today are controlled by globally distributed contact plans (schedules), which are the input to the contact graph routing (CGR) algorithm. While this is effective for smaller networks, it will be very difficult to scale for future networks. Deeper and more rigorous theory is needed to bring DTN to the next evolutionary step. To this end, this paper introduces and suggests a mathematical framework for DTN, and applies it to a space network that is simulated using an orbital analysis toolkit. The tag-line for the structure known as sheaves is that they are the mathematically precise way of gluing local data together into unique, global data. If we consider routing, we see that networking is a “sheafy” science. We then discuss a simplified sheaf model, known as the cellular sheaf. The sheaf-theoretic analysis is presented and discussed, as it is hoped that this and related papers will help form the primordial ooze of DTN theory. Finally there is a section of future work suggesting follow-on research.

Delay Tolerant Networking↗

Towards a Decision Support System for Space Flight Operations

The Mission Operations Directorate (MOD) at the Johnson Space Center (JSC) has put in place a Model Based Systems Engineering (MBSE) technological framework for the development and execution of the Flight Production Process (FPP). This framework has provided much added value and return on investment to date. This paper describes a vision for a model based Decision Support System (DSS) for the development and execution of the FPP and its design and development process. The envisioned system extends the existing MBSE methodology and technological framework which is currently in use. The MBSE technological framework currently in place enables the systematic collection and integration of data required for building an FPP model for a diverse set of missions. This framework includes the technology, people and processes required for rapid development of architectural artifacts. It is used to build a feasible FPP model for the first flight of spacecraft and for recurrent flights throughout the life of the program. This model greatly enhances our ability to effectively engage with a new customer. It provides a preliminary work breakdown structure, data flow information and a master schedule based on its existing knowledge base. These artifacts are then refined and iterated upon with the customer for the development of a robust end-to-end, high-level integrated master schedule and its associated dependencies. The vision is to enhance this framework to enable its application for uncertainty management, decision support and optimization of the design and execution of the FPP by the program. Furthermore, this enhanced framework will enable the agile response and redesign of the FPP based on observed system behavior. The discrepancy of the anticipated system behavior and the observed behavior may be due to the processing of tasks internally, or due to external factors such as changes in program requirements or conditions associated with other organizations that are outside of MOD. The paper provides a roadmap for the three increments of this vision. These increments include (1) hardware and software system components and interfaces with the NASA ground system, (2) uncertainty management and (3) re-planning and automated execution. Each of these increments provide value independently; but some may also enable building of a subsequent increment.

Meshkat, Leila↗

Towards a decision support system for space flight operations

The Mission Operations Directorate (MOD) at the Johnson Space Center (JSC) has put in place a Model Based Systems Engineering (MBSE) technological framework for the development and execution of the Flight Production Process (FPP). This framework has provided much added value and return on investment to date. This paper describes a vision for a model based Decision Support System (DSS) for the development and execution of the FPP and its design and development process. The envisioned system extends the existing MBSE methodology and technological framework which is currently in use. The MBSE technological framework currently in place enables the systematic collection and integration of data required for building an FPP model for a diverse set of missions. This framework includes the technology, people and processes required for rapid development of architectural artifacts. It is used to build a feasible FPP model for the first flight of spacecraft and for recurrent flights throughout the life of the program. This model greatly enhances our ability to effectively engage with a new customer. It provides a preliminary work breakdown structure, data flow information and a master schedule based on its existing knowledge base. These artifacts are then refined and iterated upon with the customer for the development of a robust end-to-end, high-level integrated master schedule and its associated dependencies. The vision is to enhance this framework to enable its application for uncertainty management, decision support and optimization of the design and execution of the FPP by the program. Furthermore, this enhanced framework will enable the agile response and redesign of the FPP based on observed system behavior. The differences between the anticipated system behavior and the observed behavior may be due to the processing of tasks internally, or due to external factors such as changes in program requirements or conditions associated with other organizations that are outside of MOD. The paper provides a roadmap for the four increments of this vision. These increments include (1) the existing capabilities (2) hardware and software system components and interfaces with the NASA ground system, (3) uncertainty management and (4) re-planning and automated execution. Each of these increments provides value independently; but some may also enable building of a subsequent increment.

Ruszkowski, James↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗

Considerations for the Next Revision of STRS

Development of NASAs Software Defined Radio architecture, the Space Telecommunication Radio System (STRS), was initiated in 2004 with a goal of reducing the cost, risk and schedule when implementing Software Defined Radios (SDR) for NASA space missions. Since STRS was first flown in 2012 on three Software Defined Radios on the Space Communication and Navigation (SCaN) Testbed, only minor changes have been made to the architecture. Multiple entities have since implemented the architecture and have provided significant feedback for consideration for the next revision of the standard. The focus for the first set of updates to the architecture is items that enhance application portability. Items that require modifications to existing applications before migrating to the updated architecture will only be considered if there is compelling reasons to make the change. The significant suggestions that were further evaluated for consideration include expanding and clarifying the timing Application Programming Interfaces (APIs), improving handle name and identification (ID) definitions and use, and multiple items related to implementation of STRS Devices. In addition to ideas suggested while implementing STRS, SDR technology has evolved significantly and this impact to the architecture needs to be considered. These include incorporating cognitive concepts - learning from past decisions and making new decisions that the radio can act upon. SDRs are also being developed that do not contain a General Purpose Module which is currently required for the platform to be STRS compliant. The purpose of this paper is to discuss the comments received, provide a summary of the evaluation considerations, and examine planned dispositions

waveforms↗