Search NASA⌕ Search

SEARCH · Search NASA

Results for “program management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

STS-114: Post Launch MMT Briefing

Bill Parsons, Space Shuttle Program Manager, and Wayne Hill, Deputy Manager of the Space Shuttle Program, and Chair of the Mission Management Team talks about the flight day 2 of the Discovery. Bill noted that flight operations are extremely going on well. He also explained an unexpected debris event on a power ramp little ways down where LH2 ramp begins. Before flight and based from technical data, slight modifications were done on the power ramp to ensure safety of return to flight. Bill also noted that STS-114 is a test flight; all data collected and brought back by the crew will be analyzed to ensure that all information needed is sufficient to work on faults and defects and to make appropriate repairs. Wayne discussed on flight safety. He emphasized the need to thoroughly inspect the thermal protection system of the Orbiter to ensure safe entry. Inspection of still photographs from the ISS and the boom sensor system scan are the primary means to understand engineering data in terms of the immediate flight safety. He also reported accomplishments for the day such as survey of the Orbiter boom system, all the wing leading edge, RCC panels and the nose cap, to make sure these are in good shape and working well, and re-emphasized that these are primary methods to clear the thermal protection system of the Orbiter to prove that it is safe to come home on this flight.

Source record↗

A systems engineering management approach to resource management applications

The author presents a program management response to the following question: How can the traditional practice of systems engineering management, including requirements specification, be adapted, enhanced, or modified to build future planning and scheduling systems for effective operations? The systems engineering management process, as traditionally practiced, is examined. Extensible resource management systems are discussed. It is concluded that extensible systems are a partial solution to problems presented by requirements that are incomplete, partially immeasurable, and often dynamic. There are positive indications that resource management systems have been characterized and modeled sufficiently to allow their implementation as extensible systems.

Hornstein, Rhoda Shaller↗

Aggregate Risk Tool for Human Space Flight

This project utilized Data fusion capabilities developed from the 2020-2022 Information Fusion (IFDA) IRAD to enhance functionality of a Human Spaceflight (HSF) Aggregate Risk Product developed by the JSC Flight Safety Office. The tool compiles and presents risk data from multiple Program and Commercial Provider vehicles to provide a holistic assessment of residual risk to Program Managers and Technical Authorities prior to HSF Launches. The aggregation or coupling of risks from multiple sources (Examples: PRA, variances, anomaly data bases, Program Risk Management data bases, technical review board minutes, Hazard Analysis, etc.) when analyzed, identify potential areas of elevated risk in components, systems or mission phases that would otherwise be undetected by nonintegrated program risk management tools and possesses.

Patrick Huckaby↗

Strategic Options for International Participation in Space Exploration: Lessons from U.S.-Japan Defense Cooperation

The President's Commission on Implementation of United States Space Exploration Policy suggests that after NASA establishes the Space Exploration vision architecture, it should pursue international partnerships. Two possible approaches were suggested: multiple independently operated missions and an integrated mission with carefully selected international components. The U.S.-Japan defense sectors have learned key lessons from experience with both of these approaches. U.S.-Japan defense cooperation has evolved over forty years from simple military assistance programs to more complex joint development efforts. With the evolution of the political-military alliance and the complexity of defense programs, these cooperative efforts have engaged increasingly industrial resources and capabilities as well as more sophisticated forms of planning, technology transfers and program management. Some periods of this evolution have been marked by significant frictions. The U.S.Japan FS-X program, for example, provides a poor example for management of international cooperation. In November 1988, the United States and Japan signed a Memorandum of Understanding (MOU) to co-develop an aircraft, named FS-X and later renamed F -2, as a replacement to the aging Japan support fighter F-l. The program was marked by numerous political disputes. After over a decade of joint development and testing, F -2 production deliveries finally began in 1999. The production run was curtailed due to much higher than anticipated costs and less than desired aircraft performance. One universally agreed "lesson" from the FSX/F-2 case was that it did not represent the ideal approach to bilateral cooperation. More recent cooperative programs have involved targeted joint research and development, including component development for ballistic missile defense systems. These programs could lay the basis for more ambitious cooperative efforts. This study examines both less-than-stellar international cooperation efforts as well as more successful initiatives to identify lessons from military programs that can help NASA encourage global investment in its Space Exploration Vision. The paper establishes a basis for examining related policy and industrial concerns such as effective utilization of dual-use technologies and trans-Pacific program management of large, complex cooperative programs.

Hudiburg, John J.↗

The NASA Software Management and Assurance Program

A committee of experienced managers representing each major NASA organization guides a major development effort which seeks to ensure the acquisition of economical and reliable software for more complex future programs. The primary, near-term development objectives of the NASA Software Management and Assurance Program are: (1) to provide the best management and technical guidance available; (2) to facilitate the use of proven tools, techniques, and information; and (3) to maintain a pool of highly qualified software personnel. The software development tasks addressed involve such problems as satellite end-to-end architecture and advanced aircraft guidance and control systems.

Hall, D. L.↗

Evaluation of human engineering design standard (MSFC-STD-267A) in the design of manned space vehicles

The major conclusion of the detailed examination of the human factors engineering design standard is that it is unsuitable for future spacecraft design. The standard, published in 1966, was not intended to be a zero or reduced gravity standard and was directed primarily toward ground support equipment and technology. Futhermore, ambiguities, conflicts, and unenforceable requirements contribute to the difficulty. The role of man in future space missions and its impact on human engineering standards are also discussed, and it is concluded that greater standardization is vital to the success of future missions. A survey of NASA/MSFC contractors was made, and it was found that MSFC-STD-267A is largely ignored and the most significant problems are inaccessibility and nonspecificity of the data. The resistance of contract management and designer and of program managers is a primary reason for poor human engineering design. Specific recommendations for improvement of format and organization, including an interim solution, are given.

Rogers, J. G.↗

The personal computer and GP-B management

The Gravity Probe-B (GP-B) experiment is one of the most sophisticated and challenging developments to be undertaken by NASA. Its objective is to measure the relativistic drift of gyroscopes in orbit about the earth. In this paper, the experiment is described, and the strategy of phased procurements for accomplishing the engineering development of the hardware is discussed. The microcomputer is a very convenient and powerful tool in the management of GP-B. It is used in creating and monitoring such project data as schedules, budgets, hardware procurements and technical and interface requirements. Commercially available software in word processing, database management, communications, spreadsheet, graphics and program management are used. Examples are described of the efficacy of the application of the computer by the management team.

Neighbors, A. K.↗

NASA commercial programs

Highlights of NASA-sponsored and assisted commercial space activities of 1989 are presented. Industrial R and D in space, centers for the commercial development of space, and new cooperative agreements are addressed in the U.S. private sector in space section. In the building U.S. competitiveness through technology section, the following topics are presented: (1) technology utilization as a national priority; (2) an exploration of benefits; and (3) honoring Apollo-Era spinoffs. International and domestic R and D trends, and the space sector are discussed in the section on selected economic indicators. Other subjects included in this report are: (1) small business innovation; (2) budget highlights and trends; (3) commercial programs management; and (4) the commercial programs advisory committee.

Source record↗

The natural space environment: Effects on spacecraft

The effects of the natural space environments on spacecraft design, development, and operation are the topic of a series of NASA Reference Publications currently being developed by the Electromagnetics and Environments Branch, Systems Analysis and Integration Laboratory, Marshall Space Flight Center. This primer provides an overview of the natural space environments and their effect on spacecraft design, development, and operations, and also highlights some of the new developments in science and technology for each space environment. It is hoped that a better understanding of the space environment and its effect on spacecraft will enable program management to more effectively minimize program risks and costs, optimize design quality, and successfully achieve mission objectives.

James, Bonnie F.↗

STS-101: Atlantis Orbiter Upgrade Briefing

Live footage shows panelists, Manager of the Space Shuttle Program Development, Elric McHenry, and the Associate Program Manager for Space Shuttle Upgrades, Andy Allen, giving an overview of the new upgrades on the STS-101 Orbiter. McHenry and Allen speaks about the changes and modernization of Atlantis. The panelists' mentions all the new capabilities of the new glass cockpit. They emphasize the redesign of the engine, specifically, the ability to shut down automatically. They also discuss future implementation of a smart cockpit.

Source record↗

Space Science Research and Technology at NASA's Marshall Space Flight Center

This presentation will summarize the various projects and programs managed in the Space Science Programs and Projects Office at NASA's Marshall Space Flight Center in Huntsville, Alabama. Projects in the portfolio include NASA's Chandra X-Ray telescope, Hinode solar physics satellite, various advanced space propulsion technologies, including solar sails and tethers, as well as NASA's Discovery and New Frontiers Programs.

Johnson, Charles L.↗

Implementing Earned Value Management in the CxP EVA Systems Project Office

Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

Sorge, Les L.↗

Keeping the dream alive: Managing the Space Station Program, 1982 to 1986

The management is described and analyzed of the formative years of the NASA Space Station Program (1982 to 1986), beginning with the successful initiative for program approval by Administrator James M. Beggs through to the decision to bring program management to Reston, Virginia. Emphasis is on internal management issues related to the implementation of the various phases of the program. Themes examined are the problem of bringing programmatic and institutional interests together and focusing them to forward the program; centralized versus decentralized control of the program; how the history of NASA and of the individual installations affected the decisions made; and the pressure from those outside NASA. The four sections are: (1) the decision to build the space station, (2) the design of the management experiment, (3) the experiment comes to life, and (4) the decision reversal.

Lewin, Thomas J.↗

Saturn Manufacturing Review

Review of processes developed, program management, and reporting techniques related to manufacturing of various stages of Saturn boosters - conference

MANUFACTURING↗