Search NASA⌕ Search

SEARCH · Search NASA

Results for “reasoning about programs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Adoption of High Performance Computational (HPC) Modeling Software for Widespread Use in the Manufacture of Welded Structures

This report summarizes the final product developed for the US DOE Small Business Innovation Research (SBIR) Phase II grant made to Engineering Mechanics Corporation of Columbus (Emc 2 ) between April 16, 2014 and August 31, 2016 titled ‘Adoption of High Performance Computational (HPC) Modeling Software for Widespread Use in the Manufacture of Welded Structures’. Many US companies have moved fabrication and production facilities off shore because of cheaper labor costs. A key aspect in bringing these jobs back to the US is the use of technology to render US-made fabrications more cost-efficient overall with higher quality. One significant advantage that has emerged in the US over the last two decades is the use of virtual design for fabrication of small and large structures in weld fabrication industries. Industries that use virtual design and analysis tools have reduced material part size, developed environmentally-friendly fabrication processes, improved product quality and performance, and reduced manufacturing costs. Indeed, Caterpillar Inc. (CAT), one of the partners in this effort, continues to have a large fabrication presence in the US because of the use of weld fabrication modeling to optimize fabrications by controlling weld residual stresses and distortions and improving fatigue, corrosion, and fracture performance. This report describes Emc 2 ’s DOE SBIR Phase II final results to extend an existing, state-of-the-art software code, Virtual Fabrication Technology (VFT®), currently used to design and model large welded structures prior to fabrication - to a broader range of products with widespread applications for small and medium-sized enterprises (SMEs). VFT® helps control distortion, can minimize and/or control residual stresses, control welding microstructure, and pre-determine welding parameters such as weld-sequencing, pre-bending, thermal-tensioning, etc. VFT® uses material properties, consumable properties, etc. as inputs. Through VFT®, manufacturing companies can avoid costly design changes after fabrication. This leads to the concept of joint design/fabrication where these important disciplines are intimately linked to minimize fabrication costs. Finally service performance (such as fatigue, corrosion, and fracture/damage) can be improved using this product. Emc 2 ’s DOE SBIR Phase II effort successfully adapted VFT® to perform efficiently in an HPC environment independent of commercial software on a platform to permit easy and cost effective access to the code. This provides the key for SMEs to access this sophisticated and proven methodology that is quick, accurate, cost effective and available “on-demand” to address weld-simulation and fabrication problems prior to manufacture. In addition, other organizations, such as Government agencies and large companies, may have a need for spot use of such a tool. The open source code, WARP3D, a high performance finite element code used in fracture and damage assessment of structures, was significantly modified so computational weld problems can be solved efficiently on multiple processors and threads with VFT®. The thermal solver for VFT®, based on a series of closed form solution approximations, was extensively enhanced for solution on multiple processors greatly increasing overall speed. In addition, the graphical user interface (GUI) was re-written to permit SMEs access to an HPC environment at the Ohio Super Computer Center (OSC) to integrate these solutions with WARP3D. The GUI is used to define all weld pass descriptions, number of passes, material properties, consumable properties, weld speed, etc. for the structure to be modeled. The GUI was enhanced to make it more user-friendly so that non-experts can perform weld modeling. Finally, an extensive outreach program to market this capability to fabrication companies was performed. This access will permit SMEs to perform weld modeling to improve their competitiveness at a reasonable cost.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ADAPTIVE OPTICS IMAGING OF QUASI-STELLAR OBJECTS WITH DOUBLE-PEAKED NARROW LINES: ARE THEY DUAL ACTIVE GALACTIC NUCLEI?

Active galaxies hosting two accreting and merging supermassive black holes (SMBHs)-dual active galactic nuclei (AGNs)-are predicted by many current and popular models of black-hole-galaxy co-evolution. We present here the results of a program that has identified a set of probable dual AGN candidates based on near-infrared laser guide star adaptive optics imaging with the Keck II telescope. These candidates are selected from a complete sample of radio-quiet quasi-stellar objects (QSOs) drawn from the Sloan Digital Sky Survey (SDSS), which show double-peaked narrow AGN emission lines. Of the 12 AGNs imaged, we find 6 with double galaxy structure, of which four are in galaxy mergers. We measure the ionization of the two velocity components in the narrow AGN lines to test the hypothesis that both velocity components come from an active nucleus. The combination of a well-defined parent sample and high-quality imaging allows us to place constraints on the fraction of SDSS QSOs that host dual accreting black holes separated on kiloparsec scales: {approx}0.3%-0.65%. We derive from this fraction the time spent in a QSO phase during a typical merger and find a value that is much lower than estimates that arise from QSO space densities and galaxy merger statistics. We discuss possible reasons for this difference. Finally, we compare the SMBH mass distributions of single and dual AGNs and find little difference between the two within the limited statistics of our program, hinting that most SMBH growth happens in the later stages of a merger process.

79 ASTRONOMY AND ASTROPHYSICS↗

Polyene phosphatidylcholine overcomes oxaliplatin resistance in human gastric cancer BGC823 cells

Highlights: • Polyene phosphatidylcholine conquers oxaliplatin resistance in gastric cancer cells. • Polyene phosphatidylcholine counteracts stemness programs in resistant cells. • ABCF2 is a new candidate to confer resistance to oxaliplatin. Intrinsic or acquired resistance to oxaliplatin (L-OHP) is a major reason of treatment failure in gastric cancer and limits therapeutic success. Here we generated an oxaliplatin resistant gastric cancer cell line, BGC823/L-OHP, to investigate the effect of a hepatoprotective compound, polyene phosphatidylcholine (PPC), on conquest of oxaliplatin resistance. BGC823/L-OHP cells showed less sensitive to L-OHP directed growth inhibition than the parental BGC823 cells. PPC treatment significantly increased anti-proliferative activity of L-OHP on resistant cells and promoted L-OHP triggered apoptosis, indicating that drug resistance was overcome. Mechanistically, L-OHP incubation stimulated upregulation of an ABC family protein, ABCF2, and the expression was inhibited by PPC. Moreover, expression levels of the stemness factor Nanog and its regulator TLR4 were notably enhanced in BGC823/L-OHP cells and reduced by PPC treatment. To conclude, PPC can overcome oxaliplatin resistance in gastric cancer cells via promoting apoptosis, inhibiting ABCF2, as well via reducing cancer stem cell-like features. The combination therapeutic strategy could serve to increase oxaliplatin effectiveness in the clinic.

60 APPLIED LIFE SCIENCES↗

CO2-Binding Organic Liquids Gas Capture with Polarity-Swing-Assisted Regeneration Full Technology Feasibility Study B1 - Solvent-based Systems

PNNL, Fluor Corporation and Queens University (Kingston, ON) successfully completed a three year comprehensive study of the CO2BOL water-lean solvent platform with Polarity Swing Assisted Regeneration (PSAR). This study encompassed solvent synthesis, characterization, environmental toxicology, physical, thermodynamic and kinetic property measurements, Aspen Plus™ modeling and bench-scale testing of a candidate CO2BOL solvent molecule. Key Program Findings The key program findings are summarized as follows: • PSAR favorably reduced stripper duties and reboiler temperatures with little/no impact to absorption column • >90% CO2 capture was achievable at reasonable liquid-gas ratios in the absorber • High rich solvent viscosities (up to 600 cP) were successfully demonstrated in the bench-scale system. However, the projected impacts of high viscosity to capital cost and operational limits compromised the other levelized cost of electricity benefits. • Low thermal conductivity of organics significantly increased the required cross exchanger surface area, and potentially other heat exchange surfaces. • CO2BOL had low evaporative losses during bench-scale testing • There was no evidence of foaming during bench scale testing • Current CO2BOL formulation costs project to be $35/kg • Ecotoxicity (Water Daphnia) was comparable between CO2BOL and MEA (169.47 versus 103.63 mg/L) • Full dehydration of the flue gas was determined to not be economically feasible. However, modest refrigeration (13 MW for the 550 MW reference system) was determined to be potentially economically feasible, and still produce a water-lean condition for the CO2BOLs (5 wt% steady-state water loading). • CO2BOLs testing with 5 wt% water loading did not compromise anhydrous performance behavior, and showed actual enhancement of CO2 capture performance. • Mass transfer of CO2BOLs was not greatly impeded by viscosity • Facile separation of antisolvent from lean CO2BOL was demonstrated on the bench cart • No measurable solvent degradation was observed over 4 months of testing – even with 5 wt% water present

Heldebrant, David J↗

Status of Wrought FeCrAl-UO 2 Capsules Irradiated in the Advanced Test Reactor

Candidate cladding materials for accident tolerant fuel applications require extensive testing and validation prior to commercial deployment within the nuclear power industry. One class of cladding materials, FeCrAl alloys, is currently undergoing such effort. Within these activities is a series of irradiation programs within the Advanced Test Reactor. These programs are developed to aid in commercial maturation and understand the fundamental mechanisms controlling the cladding performance during normal operation of a typical light water reactor. Three different irradiation programs are on-going; one designed as a simple proof-of-principle concept, the other to evaluate the susceptibility of FeCrAl to fuel-cladding chemical interaction, and the last to fully simulate the conditions of a pressurized water reactor experimentally. To date, nondestructive post-irradiation examination has been completed on the rodlet deemed FCA-L3 from the simple proof-of-concept irradiation program. Initial results show possible breach of the rodlet under irradiation but further studies are needed to conclusively determine whether breach has occurred and the underlying reasons for such a possible failure. Further work includes characterizing additional rodlets following irradiation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Intelligent Monitoring Systems and Advanced Well Integrity and Mitigation

Long-term seismic monitoring of carbon capture and storage projects is needed to verify that the injected gas is safely stored in the subsurface until permanence can be assured. Conventional surface seismic monitoring techniques are usually expensive, require highly invasive surface operations, and need significant time investments on the part of personnel for both the field effort and processing the acquired data. For these reasons, permanent reservoir monitoring technologies are preferred, as they can offer a cost-effective solution for long-term monitoring. As part of the monitoring program of the Archer Daniels Midland’s large-scale injection of CO 2 in Decatur, Illinois, USA, a continuous seismic monitoring array was installed using a combination of surface orbital vibrator (SOV) sources and fiber-optic cables for distributed acoustic sensing (DAS) acquisition with the objective to build a continuous monitoring array. The aim of the presented project was to build a monitoring array and platform that integrates real-time seismic data with conventional data streams and provides continuous data analysis using dynamic computational models to deliver a comprehensive real-time assessment of subsurface conditions. It is in this context that the Intelligent Monitoring Systems and Advanced Well Integrity and Mitigation project was proposed with the objective to develop an integrated architecture that utilizes a permanent seismic monitoring network, combines the real-time geophysical and process data with reservoir flow and geomechanical models to create a comprehensive monitoring, visualization, and control system that delivers critical information for process surveillance and optimization.

54 ENVIRONMENTAL SCIENCES↗

Alternative Method for Performing As-Built, As-Irradiated Neutronics Analyses

Neutronics analyses have been used to assist in the design, development, and qualification of miniature fuel (MiniFuel) experiments irradiated in the High Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory (ORNL) since their conception almost a decade ago. In recent years, upon completion of a MiniFuel target’s irradiation, neutronics analyses that reflect the as-built, as-irradiated conditions of an experiment have also been performed to validate postirradiation examination (PIE) efforts. Several radiation transport and depletion/activation software wrapper programs have been developed to increase the fidelity of these calculations; at ORNL, a program called HFIRCON is the primary software method employed. However, the utilization of these wrapper programs comes at a cost. To produce accurate results, the radiation transport portion of these analyses requires significant time and resources to execute. Therefore, this report discusses an alternative methodology for calculating some of the desired output for PIE validation—specifically, the output used in evaluating the experiment’s fuel burnup—without complete reliance on ORNL’s wrapper program. The alternative method is not a new software but rather a procedure for utilizing the depletion/activation software, SCALE, in conjunction with limited input data and reasonable assumptions to bypass most of the radiation transport calculations and thereby reduce the time required for the completion of a standard analysis.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Systematically tracking the hourly progression of large wildfires using GOES satellite observations

Abstract. In the western United States, prolonged drought, a warming climate, and historical fuel buildup have contributed to larger and more intense wildfires as well as to longer fire seasons. As these costly wildfires become more common, new tools and methods are essential for improving our understanding of the evolution of fires and how extreme weather conditions, including heat waves, windstorms, droughts, and varying levels of active-fire suppression, influence fire spread. Here, we develop the Geostationary Operational Environmental Satellites (GOES)-Observed Fire Event Representation (GOFER) algorithm to derive the hourly fire progression of large wildfires and create a product of hourly fire perimeters, active-fire lines, and fire spread rates. Using GOES-East and GOES-West geostationary satellite detections of active fires, we test the GOFER algorithm on 28 large wildfires in California from 2019 to 2021. The GOFER algorithm includes parameter optimizations for defining the burned-to-unburned boundary and correcting for the parallax effect from elevated terrain. We evaluate GOFER perimeters using 12 h data from the Visible Infrared Imaging Radiometer Suite (VIIRS)-derived Fire Event Data Suite (FEDS) and final fire perimeters from the California's Fire and Resource Assessment Program (FRAP). Although the GOES imagery used to derive GOFER has a coarser resolution (2 km at the Equator), the final fire perimeters from GOFER correspond reasonably well to those obtained from FRAP, with a mean Intersection-over-Union (IoU) of 0.77, in comparison to 0.83 between FEDS and FRAP; the IoU indicates the area of overlap over the area of the union relative to the reference perimeters, in which 0 is no agreement and 1 is perfect agreement. GOFER fills a key temporal gap present in other fire tracking products that rely on low-Earth-orbit imagery, where perimeters are available at intervals of 12 h or longer or at ad hoc intervals from aircraft overflights. This is particularly relevant when a fire spreads rapidly, such as at maximum hourly spread rates of over 5 km h−1. Our GOFER algorithm for deriving the hourly fire progression using GOES can be applied to large wildfires across North and South America and reveals considerable variability in the rates of fire spread on diurnal timescales. The resulting GOFER product has a broad set of potential applications, including the development of predictive models for fire spread and the improvement of atmospheric transport models for surface smoke estimates. The resulting GOFER product has a broad set of potential applications, including the development of predictive models for fire spread and the improvement of atmospheric transport models for surface smoke estimates (https://doi.org/10.5281/zenodo.8327264, Liu et al., 2023).

Geology↗

International Internships in Nuclear Safeguards and Security: Challenges and Successes

All students in the Russian safeguards and security degree programs at the National Research Nuclear University MEPhI and Tomsk Polytechnic University, sponsored by the Material Protection, Control and Accounting (MPC&A) Education Project, take part in a domestic internship at a Russian enterprise or facility. In addition, a select few students are placed in an international internship. These internships provide students with a better view of how MPC&A and nonproliferation in general are addressed outside of Russia. The possibility of an international internship is a significant incentive for students to enroll in the safeguards and security degree programs. The U.S. members of the MPC&A Education Project team interview students who have been nominated by their professors. These students must have initiative and reasonable English skills. The project team and professors then select students to be tentatively placed in various international internships during the summer or fall of their final year of study. Final arrangements are then made with the host organizations. This paper describes the benefits of the joint United States/Russia cooperation for next-generation workforce development, some of the international internships that have been carried out, the benefits of these international internships, and lessons learned in implementing them.

education↗

Hydropower Operations in the Colorado River Basin: Institutional Analysis of Opportunities and Constraints

The Colorado River Basin is facing an unprecedented drought. In ongoing drought management efforts, limited attention has been paid to hydropower generation. While some studies do exist on hydropower, they are quantitative in nature and focus on calculating the reduction in megawatts generated at dams in the Basin with declining water availability. These studies simplify the complex process of hydropower generation; water availability is but one factor that impacts hydropower generation. At a more fundamental level, formal institutional arrangements, that is, laws, policies, and rules create the framework within which dams are operated and hydropower is generated. This paper conducts a comparative institutional analysis of water, environment, and energy laws and policies and changes therein to understand the constraints and opportunities faced by hydropower generation in the Colorado River Basin. To tease out the nuances in how institutional arrangements affect dam operations and hydropower generation, the comparative analysis focuses on the two largest and strategically important dams in the Basin: Hoover and Glen Canyon. This paper uses Elinor Ostrom’s Institutional Analysis and Development Framework to analyze laws and policies at three levels: constitutional-choice, collective-choice, and operational levels. Constitutional-choice level laws and policies apply to the entire Basin, whereas collective-choice level and operational level laws and policies are dam specific. Hoover and Glen Canyon Dams face similar biophysical challenges by the virtue of their location in the same river basin. Yet, despite the similarity in the biophysical setting, the analysis in this study finds that the differences in the applicability of constitutional-choice level laws along with the differences in dam specific collective-choice and operational level institutional arrangements produce a distinct set of constraints for hydropower generation at Hoover and Glen Canyon Dams. Even without a drought, water and environmental laws at both the constitutionalchoice and collective-choice levels as well as power contracts constrain hydropower generation and limit the flexibility with which Glen Canyon Dam can be operated. Water and environmental laws also impose specific water release requirements that, at times, require off-peak power generation at Glen Canyon Dam. On the other hand, even with a drought, Hoover Dam faces limited hydropower generation constraints and can operate flexibly. This is because constitutional-choice level laws and dam-specific collective-choice and operational level laws pose limited constraints for flexible daily operations at Hoover. The result is that Hoover Dam can generate hydropower at the same level as it did three decades ago and operate flexibly to provide ancillary services and peaking generation. While water and environmental laws and policies pose constraints for hydropower generation, the analysis in this study further finds that specific historic provisions within energyrelated institutional arrangements and recent changes within power contracts have maintained and even enhanced the value of hydropower to power customers. Historic institutional provisions ensure that hydropower is sold ‘at cost’ making this resource economically competitive with wholesale electricity market rates. Recent power contract modifications have resulted in the amendment of an older resale prohibition clause to expand the flexibility available to power customers in using their capacity and/or energy allocation in RTOs, ISOs, and bulk power markets. This amendment has opened up an opportunity for customers, especially Hoover power customers, to use flexible generation and ancillary services in a market environment. In addition, the extension of power contract duration to the legally maximum term has enhanced the reliability and stability of this resource for customers. In the Colorado River Basin, despite the enduring economic responsibility of power customers—where laws require customers to pay for a large portion of construction and O&M costs whether or not they actually receive hydropower— the persistent threat of a drought-induced water shortage, and constraints imposed by water and environmental laws and policies, power customers continue to invest in this resource as energy-related institutional arrangements and power contract provisions protect the reasons why they value hydropower. Lastly, the analysis in this study finds that the consequences of changes in hydropower generation for energy users, irrigators, and environmental programs in the Basin depend on how specific institutional arrangements tie electricity revenues to irrigation aid and environmental programs, and how the power contracts themselves are set up. Collective-choice level institutional arrangements create a higher level of financial dependency of irrigation aid and environmental programs on electricity revenues in the Upper Basin—the legal subdivision of Colorado River where Glen Canyon Dam is located—compared to the Lower Basin—the legal subdivision of Colorado River where Hoover Dam is located. Therefore, changes in hydropower generation or the way its revenue is collected and used will have far reacting detrimental consequences for the Upper Basin. Likewise, differences in the nature of power contracts for Glen Canyon and Hoover Dams also creates differences in the financial impact incurred by energy users when there is a reduction in hydropower generation. While this study identifies the types of impacts on resource users as a result of specific institutional arrangements, the calculation of extent of impact warrants further attention. Hydropower in the United States is in a unique position today. The strategic importance of this resource for the nation’s electricity sector is rapidly growing even as its contribution to overall electricity generation remains fairly small. This strategic importance, however, is built hydropower’s ability to operate flexibly in order to support the integration of intermittent renewable generating sources and the expansion of electricity markets. As this study shows, such flexibility may not be available at certain plants not due to the lack of water availability but because of institutional constraints. Institutional arrangements may also require dam operators to first consider high priority water uses (such as irrigation or environmental needs), which in turn may limit the ability to generate hydropower when it is most valuable or useful. Engineering and quantitative models, such as production cost models, recognize policy constraints for hydropower operations but often inadequately capture or assume away such constraints in the models. A failure to account for policy constraints in these models runs the risk of inaccurate representation of the operational flexibility and capacity available at specific hydropower plants, which can result in over/underestimation of hydropower’s ability to support the integration of variable renewable resources and address grid reliability concerns. Against this background, this paper and the analysis herein serves as an example of how we can systematically identify institutional constraints (and opportunities) that influence the flexibility in not only generating electricity at specific dams but also using this hydropower once it is generated.

13 HYDRO ENERGY↗

Model based multivariable controller for large scale compression stations. Design and experimental validation on the LHC 18KW cryorefrigerator

In this paper, a multivariable model-based non-linear controller for Warm Compression Stations (WCS) is proposed. The strategy is to replace all the PID loops controlling the WCS with an optimally designed model-based multivariable loop. This new strategy leads to high stability and fast disturbance rejection such as those induced by a turbine or a compressor stop, a key-aspect in the case of large scale cryogenic refrigeration. The proposed control scheme can be used to have precise control of every pressure in normal operation or to stabilize and control the cryoplant under high variation of thermal loads (such as a pulsed heat load expected to take place in future fusion reactors such as those expected in the cryogenic cooling systems of the International Thermonuclear Experimental Reactor ITER or the Japan Torus-60 Super Advanced fusion experiment JT-60SA). The paper details how to set the WCS model up to synthesize the Linear Quadratic Optimal feedback gain and how to use it. After preliminary tuning at CEA-Grenoble on the 400W@1.8K helium test facility, the controller has been implemented on a Schneider PLC and fully tested first on the CERN's real-time simulator. Then, it was experimentally validated on a real CERN cryoplant. The efficiency of the solution is experimentally assessed using a reasonable operating scenario of start and stop of compressors and cryogenic turbines. This work is partially supported through the European Fusion Development Agreement (EFDA) Goal Oriented Training Program, task agreement WP10-GOT-GIRO.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Waste management strategy for cost effective and environmentally friendly NPP decommissioning

Decommissioning of nuclear power plants generates large volumes of radioactive or potentially radioactive waste. The proper management of the dismantling waste plays an important role for the time needed for the dismantling phase and thus is critical to the decommissioning cost. An efficient and thorough process for inventorying, characterization and categorization of the waste provides a sound basis for the planning process. As part of comprehensive decommissioning studies for Nordic NPPs, Westinghouse has developed the decommissioning inventories that have been used for estimations of the duration of specific work packages and the corresponding costs. As part of creating the design basis for a national repository for decommissioning waste, the total production of different categories of waste packages has also been predicted. Studsvik has developed a risk based concept for categorization and handling of the generated waste using six different categories with a span from extremely small risk for radiological contamination to high level waste. The two companies have recently joined their skills in the area of decommissioning on selected market in a consortium named ndcon to further strengthen the proposed process. Depending on the risk for radiological contamination or the radiological properties and other properties of importance for waste management, treatment routes are proposed with well-defined and proven methods for on-site or off-site treatment, activity determination and conditioning. The system is based on a graded approach philosophy aiming for high confidence and sustainability, aiming for re-use and recycling where found applicable. The objective is to establish a process where all dismantled material has a pre-determined treatment route. These routes should through measurements, categorization, treatment, conditioning, intermediate storage and final disposal be designed to provide a steady, un-disturbed flow of material to avoid interruptions. Bottle-necks in the process causes increased space requirements and will have negative impact on the project schedule, which increases not only the cost but also the dose exposure to personnel. For these reasons it is critical to create a process that transfers material into conditioned waste ready for disposal as quickly as possible. To a certain extent the decommissioning program should be led by the waste management process. With the objective to reduce time for handling of dismantled material at site and to efficiently and environmental-friendly use waste management methods (clearance for re-use followed by clearance for recycling), the costs for the plant decommissioning could be reduced as well as time needed for performing the decommissioning project. Also, risks for delays would be reduced with a well-defined handling scheme which limits surprises. Delays are a major cost driver for decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experimental design applications for modeling and assessing carbon dioxide sequestration in saline aquifers

This project was a computer modeling effort to couple reservoir simulation and ED/RSM using Sensitivity Analysis, Uncertainty Analysis, and Optimization Methods, to assess geologic, geochemical, geomechanical, and rock-fluid effects and factors on CO 2 injectivity, capacity, and plume migration. The project objective was to develop proxy models to simplify the highly complex coupled geochemical and geomechanical models in the utilization and storage of CO 2 in the subsurface. The goals were to investigate and prove the feasibility of the ED/RSM processes and engineering development, and bridge the gaps regarding the uncertainty and unknowns of the many geochemical and geomechanical interacting parameters in the development and operation of anthropogenic CO 2 sequestration and storage sites. The bottleneck in this workflow is the high computational effort of reactive transport simulation models and large number of input variables to optimize with ED/RSM techniques. The project was not to develop the reactive transport, geomechanical, or ED/RSM software, but was to use what was commercially and/or publically available as a proof of concept to generate proxy or surrogate models. A detailed geologic and petrographic mineral assemblage and geologic structure of the doubly plunging anticline was defined using the USDOE RMOTC formations of interest data (e.g., Lower Sundance, Crow Mountain, Alcova Limestone, and Red Peak). The assemblage of 23 minerals was primarily developed from literature data and petrophysical (well log) analysis. The assemblage and structure was input into a commercial reactive transport simulator to predict the effects of CO 2 injection and complex reactions with the reservoir rock. Significant impediments were encountered during the execution phase of the project. The only known commercial reactive transport simulator was incapable of simulating complex geochemistry modeled in this project. Significant effort and project funding was expended to determine the limitations of both the commercial simulator and the Lawrence Berkeley National Laboratory (LBNL) R&D simulator, TOUGHREACT available to the project. A simplified layer cake model approximating the volume of the RMOTC targeted reservoirs was defined with 1-3 minerals eventually modeled with limited success. Modeling reactive transport in porous media requires significant computational power. In this project, up to 24 processors were used to model a limited mineral set of 1-3 minerals. In addition, geomechanical aspects of injecting CO 2 into closed, semi-open, and open systems in various well completion methods was simulated. Enhanced Oil Recovery (EOR) as a storage method was not modeled. A robust and stable simulation dataset or base case was developed and used to create a master dataset with embedded instructions for input to the ED/RSM software. Little success was achieved toward the objective of the project using the commercial simulator or the LBNL simulator versions available during the time of this project. Several hundred realizations were run with the commercial simulator and ED/RSM software, most having convergence problems and terminating prematurely. A proxy model for full field CO 2 injection sequestration utilization and storage was not capable of being developed with software available for this project. Though the chemistry is reasonably known and understood, based on the amount of effort and huge computational time required, predicting CO 2 sequestration storage capacity in geologic formations to within the program goals of ±30% proved unsuccessful.

54 ENVIRONMENTAL SCIENCES↗

A Better Handoff for Code Officials

The U.S. Department of Energy's Building Energy Codes Program has partnered with ICC to release the new Building Energy Codes Resource Guide: Code Officials Edition. We created this binder of practical materials for a simple reason: code officials are busy learning and enforcing several codes at once for the diverse buildings across their jurisdictions. This doesn’t leave much time to search www.energycodes.gov, www.iccsafe.org, or the range of other helpful web-based resources for the latest energy codes tools, support, and information. So, we decided to bring the most relevant materials to code officials in a way that works best with their daily routine, and point to where they can find even more. Like a coach’s game plan, the Resource Guide is an "energy playbook" for code officials.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Waste Management Strategy for Dismantling Waste to Reduce Costs for Power Plant Decommissioning - 13543

Decommissioning of nuclear power plants generates large volumes of radioactive or potentially radioactive waste. The proper management of the dismantling waste plays an important role for the time needed for the dismantling phase and thus is critical to the decommissioning cost. An efficient and thorough process for inventorying, characterization and categorization of the waste provides a sound basis for the planning process. As part of comprehensive decommissioning studies for Nordic NPPs, Westinghouse has developed the decommissioning inventories that have been used for estimations of the duration of specific work packages and the corresponding costs. As part of creating the design basis for a national repository for decommissioning waste, the total production of different categories of waste packages has also been predicted. Studsvik has developed a risk based concept for categorization and handling of the generated waste using six different categories with a span from extremely small risk for radiological contamination to high level waste. The two companies have recently joined their skills in the area of decommissioning on selected market in a consortium named 'ndcon' to further strengthen the proposed process. Depending on the risk for radiological contamination or the radiological properties and other properties of importance for waste management, treatment routes are proposed with well-defined and proven methods for on-site or off-site treatment, activity determination and conditioning. The system is based on a graded approach philosophy aiming for high confidence and sustainability, aiming for re-use and recycling where found applicable. The objective is to establish a process where all dismantled material has a pre-determined treatment route. These routes should through measurements, categorization, treatment, conditioning, intermediate storage and final disposal be designed to provide a steady, un-disturbed flow of material to avoid interruptions. Bottle-necks in the process causes increased space requirements and will have negative impact on the project schedule, which increases not only the cost but also the dose exposure to personnel. For these reasons it is critical to create a process that transfers material into conditioned waste ready for disposal as quickly as possible. To a certain extent the decommissioning program should be led by the waste management process. With the objective to reduce time for handling of dismantled material at site and to efficiently and environmental-friendly use waste management methods (clearance for re-use followed by clearance for recycling), the costs for the plant decommissioning could be reduced as well as time needed for performing the decommissioning project. Also, risks for delays would be reduced with a well-defined handling scheme which limits surprises. Delays are a major cost driver for decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Ceramic Membrane System for Hydrogen Production

Phase I was a technoeconomic feasibility study that defined the process scheme for the integrated ceramic membrane system for hydrogen production and determined the plan for Phase II. The hydrogen production system is comprised of an oxygen transport membrane (OTM) and a hydrogen transport membrane (HTM). Two process options were evaluated: 1) Integrated OTM-HTM reactor – in this configuration, the HTM was a ceramic proton conductor operating at temperatures up to 900°C, and 2) Sequential OTM and HTM reactors – in this configuration, the HTM was assumed to be a Pd alloy operating at less than 600°C. The analysis suggested that there are no technical issues related to either system that cannot be managed. The process with the sequential reactors was found to be more efficient, less expensive, and more likely to be commercialized in a shorter time than the single reactor. Therefore, Phase II focused on the sequential reactor system, specifically, the second stage, or the HTM portion. Work on the OTM portion was conducted in a separate program. Phase IIA began in February 2003. Candidate substrate materials and alloys were identified and porous ceramic tubes were produced and coated with Pd. Much effort was made to develop porous substrates with reasonable pore sizes suitable for Pd alloy coating. The second generation of tubes showed some improvement in pore size control, but this was not enough to get a viable membrane. Further improvements were made to the porous ceramic tube manufacturing process. When a support tube was successfully coated, the membrane was tested to determine the hydrogen flux. The results from all these tests were used to update the technoeconomic analysis from Phase I to confirm that the sequential membrane reactor system can potentially be a low-cost hydrogen supply option when using an existing membrane on a larger scale. Phase IIB began in October 2004 and focused on demonstrating an integrated HTM/water gas shift (WGS) reactor to increase CO conversion and produce more hydrogen than a standard water gas shift reactor would. Substantial improvements in substrate and membrane performance were achieved in another DOE project (DE-FC26-07NT43054). These improved membranes were used for testing in a water gas shift environment in this program. The amount of net H2 generated (defined as the difference of hydrogen produced and fed) was greater than would be produced at equilibrium using conventional water gas shift reactors up to 75 psig because of the shift in equilibrium caused by continuous hydrogen removal. However, methanation happened at higher pressures, 100 and 125 psig, and resulted in less net H2 generated than would be expected by equilibrium conversion alone. An effort to avoid methanation by testing in more oxidizing conditions (by increasing CO2/CO ratio in a feed gas) was successful and net H2 generated was higher (40-60%) than a conventional reactor at equilibrium at all pressures tested (up to 125 psig). A model was developed to predict reactor performance in both cases with and without methanation. The required membrane area depends on conditions, but the required membrane area is about 10 ft2 to produce about 2000 scfh of hydrogen. The maximum amount of hydrogen that can be produced in a membrane reactor decreased significantly due to methanation from about 2600 scfh to about 2400 scfh. Therefore, it is critical to eliminate methanation to fully benefit from the use of a membrane in the reaction. Other modeling work showed that operating a membrane reactor at higher temperature provides an opportunity to make the reactor smaller and potentially provides a significant capital cost savings compared to a shift reactor/PSA combination.

08 HYDROGEN↗

A Multi-Objective, Hub-and-Spoke Supply Chain Design Model For Densified Biomass

In this paper we propose a model to design the supply chain for densified biomass. Rail is typically used for long-haul, high-volume shipment of densified biomass. This is the reason why a hub-and-spoke network structure is used to model this supply chain. The model is formulated as a multi-objective, mixed-integer programing problem under economic, environmental, and social criteria. The goal is to identify the feasibility of meeting the Renewable Fuel Standard (RFS) by using biomass for production of cellulosic ethanol. The focus in not just on the costs associated with meeting these standards, but also exploring the social and environmental benefits that biomass production and processing offers by creating new jobs and reducing greenhouse gas (GHG) emissions. We develop an augmented ?-constraint method to find the exact Pareto solution to this optimization problem. We develop a case study using data from the Mid-West. The model identifies the number, capacity and location of biorefineries needed to make use of the biomass available in the region. The model estimates the delivery cost of cellulosic ethanol under different scenario, the number new jobs created and the GHG emission reductions in the supply chain.

09 BIOMASS FUELS↗