DOE OSTI2026
This objective of this project was to develop a retrofittable combustor module for the GE Vernova Operations LLC (GE Vernova, GEV) frame 7F gas turbine (GT) that would allow operation on blends of hydrogen in Natural Gas (NG) between 0% and 100%. The new system was to be part of a package that retained current cycle performance while limiting the increase in NOx emissions to the equivalent of 25ppm (parts per million by volume dry at 15% O2, ppmvd15) with consideration for the impact of hydrogen fuel on the O2 correction. The expectation was that with the addition of Axial Fuel Staging (AFS), turndown within emission compliance would be extended to below 20% GT load. The original project plan included three budget periods (BPs): BP1 spanning October 1, 2022 through August 31, 2024; BP2 spanning September 1, 2024 through December 31, 2025; and BP3 spanning January 1, 2026 through September 30, 2026. The project was terminated early by the DOE on October 10, 2025 about three months prior to the end of BP2. BP3 activities were therefore cancelled. The program was on track to meet all objectives prior to the DOE termination. This Final Report covers work completed during BP1 and BP2 prior to the program termination.