Search NASA⌕ Search

SEARCH · Search NASA

Results for “risk modeling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Risk-Assessment Computer Program

RISK D/C is prototype computer program assisting in attempts to do program risk modeling for Space Exploration Initiative (SEI) architectures proposed in Synthesis Group Report. Risk assessment performed with respect to risk events, probabilities, and severities of potential results. Enables ranking, with respect to effectiveness, of risk-mitigation strategies proposed for exploration program architecture. Allows for fact that risk assessment in early phases of planning subjective. Although specific to SEI in present form, also used as software framework for development of risk-assessment programs for other specific uses. Developed for Macintosh(TM) series computer. Requires HyperCard(TM) 2.0 or later, as well as 2 Mb of random-access memory and System 6.0.8 or later.

Dias, William C.↗

Advances in Entry Modeling for Impact Risk Assessment

A summary of recent advancements in the detailed modeling of asteroid atmospheric entry processes made through NASA’s Asteroid Threat Assessment Project (ATAP) is presented. Understanding, and accurately modeling these processes and their associated uncertainties is critical to predicting all downstream impact effects, such as blast wave and thermal damage footprints. Furthermore, there is (perhaps thankfully) a dearth of empirical data for large impactors of the kind that would pose a threat to human populations, on which to anchor and/or validate models used in risk assessments. Therefore, we must rely heavily on detailed theoretical and numerical modeling to develop robust assessments for decision makers. To that end, ATAP has made some significant progress in advancing the capabilities in this area. Two areas in particular are highlighted in the present work: meteoroid ablation mechanisms, and bolide luminosity.

ATAP↗

Technical Evaluation of the NASA Model for Cancer Risk to Astronauts Due to Space Radiation

At the request of NASA, the National Research Council's (NRC's) Committee for Evaluation of Space Radiation Cancer Risk Model1 reviewed a number of changes that NASA proposes to make to its model for estimating the risk of radiation-induced cancer in astronauts. The NASA model in current use was last updated in 2005, and the proposed model would incorporate recent research directed at improving the quantification and understanding of the health risks posed by the space radiation environment. NASA's proposed model is defined by the 2011 NASA report Space Radiation Cancer Risk Projections and Uncertainties--2010 . The committee's evaluation is based primarily on this source, which is referred to hereafter as the 2011 NASA report, with mention of specific sections or tables. The overall process for estimating cancer risks due to low linear energy transfer (LET) radiation exposure has been fully described in reports by a number of organizations. The approaches described in the reports from all of these expert groups are quite similar. NASA's proposed space radiation cancer risk assessment model calculates, as its main output, age- and gender-specific risk of exposure-induced death (REID) for use in the estimation of mission and astronaut-specific cancer risk. The model also calculates the associated uncertainties in REID. The general approach for estimating risk and uncertainty in the proposed model is broadly similar to that used for the current (2005) NASA model and is based on recommendations by the National Council on Radiation Protection and Measurements. However, NASA's proposed model has significant changes with respect to the following: the integration of new findings and methods into its components by taking into account newer epidemiological data and analyses, new radiobiological data indicating that quality factors differ for leukemia and solid cancers, an improved method for specifying quality factors in terms of radiation track structure concepts as opposed to the previous approach based on linear energy transfer, the development of a new solar particle event (SPE) model, and the updates to galactic cosmic ray (GCR) and shielding transport models. The newer epidemiological information includes updates to the cancer incidence rates from the life span study (LSS) of the Japanese atomic bomb survivors, transferred to the U.S. population and converted to cancer mortality rates from U.S. population statistics. In addition, the proposed model provides an alternative analysis applicable to lifetime never-smokers (NSs). Details of the uncertainty analysis in the model have also been updated and revised. NASA's proposed model and associated uncertainties are complex in their formulation and as such require a very clear and precise set of descriptions. The committee found the 2011 NASA report challenging to review largely because of the lack of clarity in the model descriptions and derivation of the various parameters used. The committee requested some clarifications from NASA throughout its review and was able to resolve many, but not all, of the ambiguities in the written description.

Source record↗

Architecture for Integrated Medical Model Dynamic Probabilistic Risk Assessment

Probabilistic Risk Assessment (PRA) is a modeling tool used to predict potential outcomes of a complex system based on a statistical understanding of many initiating events. Utilizing a Monte Carlo method, thousands of instances of the model are considered and outcomes are collected. PRA is considered static, utilizing probabilities alone to calculate outcomes. Dynamic Probabilistic Risk Assessment (dPRA) is an advanced concept where modeling predicts the outcomes of a complex system based not only on the probabilities of many initiating events, but also on a progression of dependencies brought about by progressing down a time line. Events are placed in a single time line, adding each event to a queue, as managed by a planner. Progression down the time line is guided by rules, as managed by a scheduler. The recently developed Integrated Medical Model (IMM) summarizes astronaut health as governed by the probabilities of medical events and mitigation strategies. Managing the software architecture process provides a systematic means of creating, documenting, and communicating a software design early in the development process. The software architecture process begins with establishing requirements and the design is then derived from the requirements.

Probability Theory↗

Aviation security screening optimizer for risk and throughput (ASSORT)

The increasing number of air travelers each year presents a challenge as many airports are near their capacity in terms of resources and space for passenger screening. Fortunately, advancements in technologies like next-generation millimeter wave scanning offer solutions to ease this strain. The focus remains on managing risk while enhancing the passenger experience for the traveling public. The risk model presented in this paper known as the Aviation Security Screening Optimizer for Risk and Throughput (ASSORT) is designed to assess risk-based approaches for passenger screening and checkpoint operations. Additionally, ASSORT is exploring various traveler categories — general, trusted, and trusted-plus — along with different checkpoint screening Concept of Operations tailored to each traveler type. For instance, travelers with a higher trust level may experience fewer screening technologies, resulting in quicker processing times at the checkpoint. The output of ASSORT provides a risk score for predefined threat scenarios, as well as the overall risk to the checkpoint, aircraft, and airport by traveler type. In conclusion, benefits of using this tool include assessing the trade-offs between the overall risk associated with checkpoints and the throughput rate of passengers screened. We show for example the impact that different passenger volumes at the checkpoint can have on risk.

99 GENERAL AND MISCELLANEOUS↗

Evaluating the mineral commodity supply risk of the U.S. manufacturing sector

Trade tensions, resource nationalism, and various other factors are increasing concerns regarding the supply reliability of nonfuel mineral commodities. This is especially the case for commodities required for new and emerging technologies ranging from electric vehicles to wind turbines. In this analysis, we use a conventional risk-modeling framework to develop and apply a new methodology for assessing the supply risk to the U.S. manufacturing sector. Specifically, supply risk is defined as the confluence of three factors: the likelihood of a foreign supply disruption, the dependency of U.S. manufacturers on foreign supplies, and the ability of U.S. manufacturers to withstand a supply disruption. The methodology is applied to 52 commodities for the decade spanning 2007–2016. The results indicate that a subset of 23 commodities, including cobalt, niobium, rare earth elements, and tungsten, pose the greatest supply risk. This supply risk is dynamic, shifting with changes in global market conditions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

PRA in Design: Increasing Confidence in Pre-Operational Assessments of Risks (Results of a Joint NASA/NRC Workshop)

In late 2009, the National Aeronautics and Space Administration (NASA) and the U.S. Nuclear Regulatory Commission (NRC) jointly organized a workshop to discuss technical issues associated with application of risk assessments to early phases of system design. The workshop, which was coordinated by the Idaho National Laboratory, involved invited presentations from a number of PRA experts in the aerospace and nuclear fields and subsequent discussion to address the following questions: (a) What technical issues limit decision-makers' confidence in PRA results, especially at a pre-operational phase of the system life cycle? (b) What is being done to address these issues'? (c) What more can be done ? The workshop resulted in participant observations and suggestions on several technical issues, including the pursuit of non-traditional approaches to risk assessment and the verification and validation of risk models. The workshop participants also identified several important non-technical issues, including risk communication with decision makers, and the integration of PRA into the overall design process.

Youngblood, Robert↗

An Approach to Dynamic Human Reliability Analysis Using the EMRALD Dynamic Risk Assessment Tool

There is a need for research into dynamic human reliability analysis (HRA) (i.e., simulation- or computation-based HRA), as many researchers have emphasized the importance of applying dynamic approaches to probabilistic safety assessments (PSAs). This study proposes the Procedure-based Investigation Method of EMRALD Risk Assessment – Human Reliability Analysis (PRIMERA-HRA), a dynamic HRA approach based on the Event Modeling Risk Assessment Using Linked Diagram (EMRALD) software developed by Idaho National Laboratory (INL). This study suggests how this software can be used to model human actions and evaluate error probabilities. The applicability of this approach is also be investigated in light of an extended loss of AC power (ELAP) scenario. This paper then discusses the major insights derived by comparing this dynamic HRA approach against the static one.

99 GENERAL AND MISCELLANEOUS↗

Light Water Reactor Sustainability Program: Upgrade of EMRALD to a Modern JavaScript-based Framework

Event Modeling Risk Assessment using Linked Diagrams (EMRALD) is a software tool developed at Idaho National Laboratory for researching the capabilities of dynamic probabilistic risk assessment. It provides a simple interface to represent complex interactions often seen when developing dynamic models. EMRALD can also interface with other applications by modifying inputs, running, and using their results within EMRALD for dynamic and integrated assessment. This report goes over the work performed as part of the Risk-Informed Systems Analysis Pathway under the Light Water Reactor Sustainability program to upgrade the EMRALD software.

97 MATHEMATICS AND COMPUTING↗

Verification of RESRAD-BUILD Code Version 4

This report documents the verification of the RESRAD-BUILD code, Version 4.0, which was released on December 22, 2022. Two earlier reports verifying Versions 3.0 and 3.1, respectively, were published in 2001 (Kamboj, et al. 2001) and 2003 (Tetra Tech NUS 2003). Version 4.0 of the RESRAD-BUILD code has many new features and modeling enhancements over the earlier versions, including the previously released Version 3.5. Chapter 2 of this report focuses on verifying the external dose and risk modeling for point, line, area, and volume sources, as well as for floor deposition. Besides verification, the external radiation doses calculated by RESRAD-BUILD were also benchmarked with those calculated by the MCNP code (Briemeister 1993). Section J.3 of the RESRAD-BUILD User’s Manual Vol. 1 (Yu et al. 2022) documents the results of that benchmarking effort. Chapter 3 of this report focuses on verifying the ventilation modeling, from checking the remaining source inventory, releases of radionuclides to the air, air concentrations and deposited floor concentrations over time, to the radiation dose and risk associated with inhalation, ingestion, and air submersion, with and without vacuuming. The verification efforts involve designing spreadsheets to perform calculations the same as or like those performed by the RESRAD-BUILD code and then comparing the spreadsheet results with those produced by the code. When the results agree or the differences are within acceptable range, the accuracy of model implementation in the code is verified. In addition to model implementation, the implementation of key functions and features that facilitate the modeling or the use of the code were also verified during the release testing of the code. Appendix A presents the test cases developed for these verification testing, and Appendix B presents the testing results that verify proper implementation of key functions and features.

54 ENVIRONMENTAL SCIENCES↗

An Approach to Dynamic Human Reliability Analysis using EMRALD Dynamic Risk Assessment Tool

Research for dynamic human reliability analysis (HRA) (a.k.a., simulation-based or computation-based HRA) has been required, as many researchers have emphasized the importance of dynamic approaches to probabilistic safety assessment (PSA). This study proposes the PRocedure-based Investigation Method of EMRALD Risk Assessment – Human Reliability Analysis (PRIMERA-HRA) method, which is an approach to dynamic HRA using the Event Modeling Risk Assessment using Linked Diagram (EMRALD) software developed by Idaho National Laboratory (INL). In this study, how to model human actions using the software and evaluate the error probabilities is suggested. The applicability of this approach will be also investigated through an extended loss of AC power (ELAP) scenario. Then, major insights from this dynamic HRA approach against the static one will be discussed in the paper.

99 GENERAL AND MISCELLANEOUS↗

The Use of Pro/Engineer CAD Software and Fishbowl Tool Kit in Ray-tracing Analysis

This document is designed as a manual for a user who wants to operate the Pro/ENGINEER (ProE) Wildfire 3.0 with the NASA Space Radiation Program's (SRP) custom-designed Toolkit, called 'Fishbowl', for the ray tracing of complex spacecraft geometries given by a ProE CAD model. The analysis of spacecraft geometry through ray tracing is a vital part in the calculation of health risks from space radiation. Space radiation poses severe risks of cancer, degenerative diseases and acute radiation sickness during long-term exploration missions, and shielding optimization is an important component in the application of radiation risk models. Ray tracing is a technique in which 3-dimensional (3D) vehicle geometry can be represented as the input for the space radiation transport code and subsequent risk calculations. In ray tracing a certain number of rays (on the order of 1000) are used to calculate the equivalent thickness, say of aluminum, of the spacecraft geometry seen at a point of interest called the dose point. The rays originate at the dose point and terminate at a homogenously distributed set of points lying on a sphere that circumscribes the spacecraft and that has its center at the dose point. The distance a ray traverses in each material is converted to aluminum or other user-selected equivalent thickness. Then all equivalent thicknesses are summed up for each ray. Since each ray points to a direction, the aluminum equivalent of each ray represents the shielding that the geometry provides to the dose point from that particular direction. This manual will first list for the user the contact information for help in installing ProE and Fishbowl in addition to notes on the platform support and system requirements information. Second, the document will show the user how to use the software to ray trace a Pro/E-designed 3-D assembly and will serve later as a reference for troubleshooting. The user is assumed to have previous knowledge of ProE and CAD modeling.

Nounu, Hatem N.↗

EMRALD Technology Advancements for Commercial Grade Dedication Readiness

Event Modeling Risk Assessment using Linked Diagrams (EMRALD) is a software tool developed at Idaho National Laboratory for researching the capabilities of dynamic probabilistic risk assessment. It provides a simple interface to represent complex interactions often seen when developing dynamic models. EMRALD can also interface with other applications by modifying inputs as well as running and using their results within EMRALD for dynamic and integrated assessment. To enable wider industry use cases, collaborative work between Idaho National Laboratory and FPoliSolutions was performed through the technology commercialization fund TCF-20-21448. This report covers the additional features and capabilities developed under this work.

97 MATHEMATICS AND COMPUTING↗

Probabilistic risk assessment of the Space Shuttle. Phase 3: A study of the potential of losing the vehicle during nominal operation, volume 1

This document is the Executive Summary of a technical report on a probabilistic risk assessment (PRA) of the Space Shuttle vehicle performed under the sponsorship of the Office of Space Flight of the US National Aeronautics and Space Administration. It briefly summarizes the methodology and results of the Shuttle PRA. The primary objective of this project was to support management and engineering decision-making with respect to the Shuttle program by producing (1) a quantitative probabilistic risk model of the Space Shuttle during flight, (2) a quantitative assessment of in-flight safety risk, (3) an identification and prioritization of the design and operations that principally contribute to in-flight safety risk, and (4) a mechanism for risk-based evaluation proposed modifications to the Shuttle System. Secondary objectives were to provide a vehicle for introducing and transferring PRA technology to the NASA community, and to demonstrate the value of PRA by applying it beneficially to a real program of great international importance.

Fragola, Joseph R.↗

Constellation Program Life-cycle Cost Analysis Model (LCAM)

The Constellation Program (CxP) is NASA's effort to replace the Space Shuttle, return humans to the moon, and prepare for a human mission to Mars. The major elements of the Constellation Lunar sortie design reference mission architecture are shown. Unlike the Apollo Program of the 1960's, affordability is a major concern of United States policy makers and NASA management. To measure Constellation affordability, a total ownership cost life-cycle parametric cost estimating capability is required. This capability is being developed by the Constellation Systems Engineering and Integration (SE&I) Directorate, and is called the Lifecycle Cost Analysis Model (LCAM). The requirements for LCAM are based on the need to have a parametric estimating capability in order to do top-level program analysis, evaluate design alternatives, and explore options for future systems. By estimating the total cost of ownership within the context of the planned Constellation budget, LCAM can provide Program and NASA management with the cost data necessary to identify the most affordable alternatives. LCAM is also a key component of the Integrated Program Model (IPM), an SE&I developed capability that combines parametric sizing tools with cost, schedule, and risk models to perform program analysis. LCAM is used in the generation of cost estimates for system level trades and analyses. It draws upon the legacy of previous architecture level cost models, such as the Exploration Systems Mission Directorate (ESMD) Architecture Cost Model (ARCOM) developed for Simulation Based Acquisition (SBA), and ATLAS. LCAM is used to support requirements and design trade studies by calculating changes in cost relative to a baseline option cost. Estimated costs are generally low fidelity to accommodate available input data and available cost estimating relationships (CERs). LCAM is capable of interfacing with the Integrated Program Model to provide the cost estimating capability for that suite of tools.

Prince, Andy↗

Plant-specific Model and Data Analysis using Dynamic Security Modeling and Simulation

The requirements for U.S. nuclear power plants to maintain a large on-site physical security force contribute to their high operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability (LWRS) program’s physical security pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. The conservatisms built into current security postures may be analyzed and minimized in order to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within LWRS program’s physical security pathway has successfully developed a dynamic force-on-force modeling framework using various computer simulation tools and integrating them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This document provides an update on the progress in applying a dynamic computational framework that links results from a commercially available force-on-force simulation tool, a commercially available thermal-hydraulic tool, and EMRALD to an operating commercial nuclear power plant. This report is only a summary of the progress and does not contain specific modeling results as those contain sensitive security information. This process of including plant procedures and multiple analysis results is being called Modeling and Analysis for Safety Security using Dynamic EMRALD Framework or MASS-DEF. Previous reports described how a user could integrate their plant-specific force-on-force models with the dynamic simulation tool EMRALD, model operator actions, integrate with probabilistic risk assessment tools, such as CAFTA (Computer Aided Fault Tree Analysis System) or SAPHIRE (Systems Analysis Programs for Hands-on Integrated Reliability Evaluations), and with thermal-hydraulic tools, such as RELAP-5. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report documents the results of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. This report does not contain any plant's sensitive information and/or Safeguards Information. The purpose of this study was to verify that results achieved using generic models are similar to actual plant results and to refine our guidance on the use of the framework. This assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Closure to “Coincidence Risk Analysis of Floods Using Multivariate Copulas: Case Study of Jinsha River and Min River, China” by Yang Peng, Yulong Shi, Hongxiang Yan, Kai Chen, and Jipeng Zhang

We would like to thank the discusser for his comments on the coincidence flood risk modeling in Jinsha River and Min River, China. The discusser’s comment brings focus to the discussion of extreme-value selection methodology and historical flood information. In flood risk analysis, we acknowledge that there is always an alternative modeling approach that could be used to generate desired prediction results. In this comment, the discusser made two valuable points regarding the original paper, and the following two paragraphs provide our responses.

42 ENGINEERING↗

Evaluation of Physical Security Risk for Potential Implementation of FLEX using Dynamic Simulation Methods

The requirements for United States nuclear power plants to maintain a large onsite physical security force contribute to their large operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability Program Physical Security Pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. This pathway will analyze and minimize the conservatisms built into current security postures in order to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within this pathway has successfully developed a dynamic force-on-force (FOF) modeling framework using various computer simulation tools and integrated them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This document provides an overview of lessons learned in applying a dynamic computational framework that links results from a commercially available FOF simulation tool, a commercially available thermal-hydraulic tool, and EMRALD to an operating commercial nuclear power plant. This process of including plant procedures and multiple analysis results is being called Modeling and Analysis for Safety Security using Dynamic EMRALD Framework. Previous reports described how a user could integrate their plant-specific FOF models with the dynamic simulation tool EMRALD, model operator actions, integrate with probabilistic risk assessment tools, such as Computer Aided Fault Tree Analysis System or Systems Analysis Programs for Hands-on Integrated Reliability Evaluations, and with thermal-hydraulic tools, such as RELAP-5. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report documents the results of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. The purpose of this study was to verify that results achieved using generic models are similar to actual plant results and to refine our guidance of the use of the framework. Such an assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants. NOTE: The work performed in this report is based on a generic EMRALD model with actual plant data used for the analysis. However, only the generic model and general results of the analysis are in the report. No plant’s sensitive information is discussed in this report. The discussion shows examples of insights that can be obtained from the MASS-DEF methodology.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗