Search NASA⌕ Search

SEARCH · Search NASA

Results for “scheduler development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Scheduling For Urban Air Mobility Using Safe Learning

This work considers the scheduling problem for Urban Air Mobility (UAM) vehicles travelling between origin-destination pairs with both hard and soft trip deadlines. Each route is described by a discrete probability distribution over trip completion times (or delay) and over interarrival times of requests (or demand) for the route along with a fixed hard or soft deadline. Soft deadlines carry a cost that is incurred when the deadline is missed. An online, safe scheduler is developed that ensures that hard deadlines are never missed and that average cost of missing soft deadlines is minimized. The system is modelled as a Markov Decision Process (MDP) and safe model based learning is used to find the probabilistic distributions over route delays and demand. Monte Carlo Tree Search (MCTS) Earliest Deadline First (EDF) is used to safely explore the learned models in an online fashion and develop a near-optimal non-preemptive scheduling policy. These results are compared with Value Iteration (VI) and MCTS (Random) scheduling solutions.

Urban Air Mobility↗

Scheduling for Urban Air Mobility using Safe Learning

This work considers the scheduling problem for Urban Air Mobility (UAM) vehicles travelling between origin-destination pairs with both hard and soft trip deadlines. Each route is described by a discrete probability distribution over trip completion times (or delay) and over interarrival times of requests (or demand) for the route along with a fixed hard or soft deadline. Soft deadlines carry a cost that is incurred when the deadline is missed. An online, safe scheduler is developed that ensures that hard deadlines are never missed and that average cost of missing soft deadlines is minimized. The system is modelled as a Markov Decision Process (MDP) and safe model based learning is used to find the probabilistic distributions over route delays and demand. Monte Carlo Tree Search (MCTS) Earliest Deadline First (EDF) is used to safely explore the learned models in an online fashion and develop a near-optimal non-preemptive scheduling policy. These results are compared with Value Iteration (VI) and MCTS (Random) scheduling solutions.

Urban Air Mobility↗

Development of a Pioneer Venus expert scheduling system

An Expert System has been developed to perform a substantial part of the science planning for NASA's Pioneer Venus spacecraft. The program performs functions that have been traditionally performed by operations personnel ('orbit builders'), and attempts to directly duplicate their methods and techniques. Output from the program is formatted to correspond to the previously hand-generated worksheets, in order to ease program validation as well as operator acceptance. Pioneer Venus mission operations are described in detail followed by a description of the expert system implementation.

Rosenthal, Donald A.↗

What is the Role of Usability and Trust in Autonomy?

Usability encompasses learnability, efficiency, memorability, effectiveness, and satisfaction. NASA’s standards for usability acceptance criteria focus on interfaces that help operators achieve their tasks efficiently, effectively, and with satisfaction. However, discussions on usability, especially regarding future highly automated and autonomous systems, rarely include trust. As NASA plans for long-duration exploration missions, it envisions astronauts operating more independently from Mission Control on Earth. This independence will drive the development of these highly automated and autonomous systems that astronauts will use daily. To prepare for this future, our team has developed a scheduling and execution software tool that facilitates self-scheduling, allowing astronauts to independently manage their own schedule without Mission Control’s involvement. Over many years, we have developed, matured, and evaluated our software tool in extreme environments, prioritizing user-centered design and high usability. These evaluations have included multiple campaigns in NASA analogs, including NEEMO, BASALT, and HERA, as well as technology demonstrations onboard the International Space Station. Our recent research on software interfaces for future astronaut autonomy revealed a strong correlation between usability and trust measures. In a controlled lab experiment, we asked novice users to perform a complex scheduling task, during which the software immediately validated the schedule’s constraints and checked for violations. We collected usability (User Experience Questionnaire, UEQ) and trust (Trust in Automated Systems scale, TAS) measures; significant, strong, and moderate correlations emerged between several of the UEQ metrics and TAS. These results support the argument for investing in usability early to enable and sustain trust in highly automated and autonomous systems.

usability↗

OMP-26 - An interactive scheduling tool for the 26 meter subnetwork

Operations Mission Planner for the 26 Meter (26M) Antenna Subnetwork (OMP-26) is an interactive scheduling tool developed by the Jet Propulsion Laboratory (JPL) to assist in allocating the Deep Space Network (DSN) 26M antennas to support Earth-orbiting Spacecraft (SC). Prior to integrating OMP-26 into the 26M scheduling arena, the text-based, labor-intensive task lacked the sufficient means to support the 1992 mission support increase. Therefore, JPL developed the OMP-26 interactive scheduling tool to automate the time consuming tasks of the existing, manual scheduling process. OMP-26 has addressed the scheduling dilemma by assisting schedulers to identify and resolve conflicts more quickly through its graphical display features and constraint-checking editing capability. Although OMP-26 has reduced the scheduler's existing workload by easing the identification and resolution of conflicts, it will not meet the needs of another mission support increase to occur by 1995. Therefore, future plans for OMP-26 involve transitioning from a solely interactive scheduling tool to one that is highly automated and more powerful.

Rosas, Jody L.↗

Spike: AI scheduling for Hubble Space Telescope after 18 months of orbital operations

This paper is a progress report on the Spike scheduling system, developed by the Space Telescope Science Institute for long-term scheduling of Hubble Space Telescope (HST) observations. Spike is an activity-based scheduler which exploits artificial intelligence (AI) techniques for constraint representation and for scheduling search. The system has been in operational use since shortly after HST launch in April 1990. Spike was adopted for several other satellite scheduling problems; of particular interest was the demonstration that the Spike framework is sufficiently flexible to handle both long-term and short-term scheduling, on timescales of years down to minutes or less. We describe the recent progress made in scheduling search techniques, the lessons learned from early HST operations, and the application of Spike to other problem domains. We also describe plans for the future evolution of the system.

Johnston, Mark D.↗

An extended abstract: A heuristic repair method for constraint-satisfaction and scheduling problems

The work described in this paper was inspired by a surprisingly effective neural network developed for scheduling astronomical observations on the Hubble Space Telescope. Our heuristic constraint satisfaction problem (CSP) method was distilled from an analysis of the network. In the process of carrying out the analysis, we discovered that the effectiveness of the network has little to do with its connectionist implementation. Furthermore, the ideas employed in the network can be implemented very efficiently within a symbolic CSP framework. The symbolic implementation is extremely simple. It also has the advantage that several different search strategies can be employed, although we have found that hill-climbing methods are particularly well-suited for the applications that we have investigated. We begin the paper with a brief review of the neural network. Following this, we describe our symbolic method for heuristic repair.

Minton, Steven↗

Sao Paulo Lightning Mapping Array (SP-LMA): Deployment and Plans

An 8-10 station Lightning Mapping Array (LMA) network is being deployed in the vicinity of Sao Paulo to create the SP-LMA for total lightning measurements in association with the international CHUVA [Cloud processes of tHe main precipitation systems in Brazil: A contribUtion to cloud resolVing modeling and to the GPM (GlobAl Precipitation Measurement)] field campaign. Besides supporting CHUVA science/mission objectives and the Sao Luz Paraitinga intensive operation period (IOP) in December 2011-January 2012, the SP-LMA will support the generation of unique proxy data for the Geostationary Lightning Mapper (GLM) and Advanced Baseline Imager (ABI), both sensors on the NOAA Geostationary Operational Environmental Satellite-R (GOES-R), presently under development and scheduled for a 2015 launch. The proxy data will be used to develop and validate operational algorithms so that they will be ready for use on "day1" following the launch of GOES-R. A preliminary survey of potential sites in the vicinity of Sao Paulo was conducted in December 2009 and January 2010, followed up by a detailed survey in July 2010, with initial network deployment scheduled for October 2010. However, due to a delay in the Sa Luz Paraitinga IOP, the SP-LMA will now be installed in July 2011 and operated for one year. Spacing between stations is on the order of 15-30 km, with the network "diameter" being on the order of 30-40 km, which provides good 3-D lightning mapping 150 km from the network center. Optionally, 1-3 additional stations may be deployed in the vicinity of Sa Jos dos Campos.

Bailey, J. C.↗

Sao Paulo Lightning Mapping Array (SP-LMA): Deployment, Operation and Initial Data Analysis

An 8-10 station Lightning Mapping Array (LMA) network is being deployed in the vicinity of Sao Paulo to create the SP-LMA for total lightning measurements in association with the international CHUVA [Cloud processes of the main precipitation systems in Brazil: A contribution to cloud resolving modeling and to the GPM (Global Precipitation Measurement)] field campaign. Besides supporting CHUVA science/mission objectives and the Sao Luiz do Paraitinga intensive operation period (IOP) in November-December 2011, the SP-LMA will support the generation of unique proxy data for the Geostationary Lightning Mapper (GLM) and Advanced Baseline Imager (ABI), both sensors on the NOAA Geostationary Operational Environmental Satellite-R (GOES-R), presently under development and scheduled for a 2015 launch. The proxy data will be used to develop and validate operational algorithms so that they will be ready for use on "day1" following the launch of GOES-R. A preliminary survey of potential sites in the vicinity of Sao Paulo was conducted in December 2009 and January 2010, followed up by a detailed survey in July 2010, with initial network deployment scheduled for October 2010. However, due to a delay in the Sao Luiz do Paraitinga IOP, the SP-LMA will now be installed in July 2011 and operated for one year. Spacing between stations is on the order of 15-30 km, with the network "diameter" being on the order of 30-40 km, which provides good 3-D lightning mapping 150 km from the network center. Optionally, 1-3 additional stations may be deployed in the vicinity of Sao Jos dos Campos.

Blakeslee, R.↗

Planning for "What If" Scenarios

Interval Logic Corporation is a graduate of the Ames Technology Commercialization Center (Ames Research Center's business incubator). The founders are the developers of the Spike Scheduling system, the most successful scheduling technology ever developed for NASA. This software was used to double the operational efficiency of the Hubble Space Telescope. Today the software is called Leverage and used to optimize all levels of semiconductor manufacturing.

Source record↗

A Method for Forecasting the Commercial Air Traffic Schedule in the Future

This report presents an integrated set of models that forecasts air carriers' future operations when delays due to limited terminal-area capacity are considered. This report models the industry as a whole, avoiding unnecessary details of competition among the carriers. To develop the schedule outputs, we first present a model to forecast the unconstrained flight schedules in the future, based on the assumption of rational behavior of the carriers. Then we develop a method to modify the unconstrained schedules, accounting for effects of congestion due to limited NAS capacities. Our underlying assumption is that carriers will modify their operations to keep mean delays within certain limits. We estimate values for those limits from changes in planned block times reflected in the OAG. Our method for modifying schedules takes many means of reducing the delays into considerations, albeit some of them indirectly. The direct actions include depeaking, operating in off-hours, and reducing hub airports'operations. Indirect actions include using secondary airports, using larger aircraft, and selecting new hub airports, which, we assume, have already been modeled in the FAA's TAF. Users of our suite of models can substitute an alternative forecast for the TAF.

Long, Dou↗

Integration of CELSS Simulation with Long-Term Crop Scheduling

This project presents guidelines for the integration of the Intelligent Crop Scheduler (ICS) developed by Leon (1995) with a version of the Biological Life Support System (BLSS) simulation based on the work by Volk and Rummel (1987). These guidelines will also aid in defining the appropriate model detail of simulation-based schedulers. ICS determines what, when and how much to plant of different crops. These decisions are made such that the critical reservoir levels are maintained close to their nominal or desired settings during the duration of the mission. Initial feasibility of the approach has been demonstrated using simplified implementations of the scheduling approach and CELSS 'world' model developed by the investigator at JSC in the Summer of 1995. The BLSS model incorporates more detail. The increased fidelity is in terms of added mass-regeneration formalism (biochemical stoichiometry), more plants, and more accurate modeling of the mechanical system. This report describes the main features of the Crop scheduler and CELSS simulator, discusses integration issues, and provides with detailed guidelines for the integration of these two applications.

Leon, V. Jorge↗

Automatic planning concept - An analysis of optimum scheduling

Study considers resource costs, mission constraints, and experiment results as linear functions, insofar as possible, in an effort to develop optimum scheduling by the use of linear programming. It involves a mathematical approach in which a number of constraints are considered operative.

Rebelein, P. R.↗

Exploring Self-Scheduling Strategies and Heuristics in Novice Schedulers

Missions beyond low Earth orbit will require crews to act with greater autonomy. Increasing communication delays will require crews to take on tasks currently supported by Mission Control, including the involved process of scheduling and rescheduling their own complex spaceflight timelines to fit a variety of restrictions and constraints. Astronauts, unlike Mission Control, are not expert planners, however, and determining simple strategies and heuristics that enable them to schedule successfully can increase the range of problems they can solve successfully. In two human-in-the-loop scheduling experiments, we analyzed 1) common strategies among novice schedules, and 2) the development of self-scheduling heuristics. We find that, even when participants are instructed to follow a given strategy, they rapidly develop their own self-scheduling heuristics as they learn to successfully complete the scheduling task. Participants conducting naturally learn to schedule activities with the most constraints first, while participants vary in heuristics in the rescheduling task.

self-scheduling↗

Exploring Self-Scheduling Strategies and Heuristics in Novice Schedulers

Missions beyond low Earth orbit will require crews to act with greater autonomy. Increasing communication delays will require crews to take on tasks currently supported by Mission Control, including the involved process of scheduling and rescheduling their own complex spaceflight timelines to fit a variety of restrictions and constraints. Unlike Mission Control, astronauts are not expert planners, and determining strategies and heuristics that enable crews to schedule successfully may increase the range of problems they can solve. In two human-in-the-loop scheduling experiments, we analyzed 1) common strategies among novice schedulers and 2) the development of self-scheduling heuristics. We find that, even when participants are instructed to follow a given strategy, they rapidly develop their own self-scheduling heuristics as they learn to successfully complete the scheduling task. While scheduling, participants naturally learn to arrange activities with the most constraints first, whereas while rescheduling, they display greater variability in their heuristics.

self-scheduling↗

The MFIVE Space Station Crew Activity Scheduler and Stowage Logistics Clerk

An interactive computer scheduling tool, the MFIVE Space Station Crew Activity Scheduler and Stowage Logistics Clerk, is described. The MFIVE employs the intelligent perturbation method, which was developed to schedule complex time and resource constrained problems. This algorithm was used to minimize the completion time of sample scheduling problems and solutions were derived which averaged within 7 percent of optimum where standard solution techniques gave solutions 23 percent longer than optimum.

Kurtzman, Clifford R.↗

A hybrid job-shop scheduling system

The intention of the scheduling system developed at the Fraunhofer-Institute for Material Flow and Logistics is the support of a scheduler working in a job-shop. Due to the existing requirements for a job-shop scheduling system the usage of flexible knowledge representation and processing techniques is necessary. Within this system the attempt was made to combine the advantages of symbolic AI-techniques with those of neural networks.

Hellingrath, Bernd↗