Search NASA⌕ Search

SEARCH · Search NASA

Results for “site evaluation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

UAS Traffic Management Beyond Visual Line of Sight (UTM BVLOS)

NASA is working with Industry and FAA to enable beyond visual line of sight (BVLOS) unmanned aerial systems (UAS) operations wherever it is needed. Prior to NASA involvement, the UAS Traffic Management (UTM) concept and architecture did not exist. Then, a system architecture to support UTM in the nation's airspace was pioneered by NASA and adopted externally. Now, NASA will be a dedicated partner with the ongoing Key Site Operational Evaluation in Texas. NASA is needed to help define how services can be approved and applied to enable BVLOS operations in the nation's airspace.

UTM↗

Environmental Performance Report 2022: Annual Site Environmental Report per the U.S. Department of Energy Order 231.1B Chg 1

The National Renewable Energy Laboratory's (NREL's) Environmental Performance Report provides a description of the laboratory's environmental management activities in calendar year 2022, including information on environmental and sustainability performance, environmental compliance activities and status, and environmental protection programs, highlights, and successes. The purpose of this report is to ensure that the U.S. Department of Energy (DOE) and the public receive timely, accurate information about events that have positively affected or could adversely affect the health and safety of the public or workers, the environment, or the operations of DOE facilities. This report meets the DOE requirements of the Annual Site Environmental Report (ASER) and has been prepared in accordance with DOE Order 231.1B Chg 1, Environment, Safety and Health Reporting.

air quality↗

Technical Assistance for Mount Desert Island, Maine

Mount Desert Island, Maine, worked with researchers in the Energy Technology Innovation Partnership Project (ETIPP) to evaluate microgrid siting and sizing to assess how this technology could measurably improve critical service reliability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

CARETS: A prototype regional environmental information system. Volume 12: User evaluation of experimental land use maps and related products from the central Atlantic test site

The user interaction and evaluation phase of the USGS/NASA Central Atlantic Regional Ecological Test Site was designed to obtain the input of local, regional, State, and Federal agency users of land-resource information into the development, of a regional information system; to provide users with assistance and data resulting from CARETS research; and to have user. organizations evaluate to what extent the CARETS products meet their needs. The evaluation of CARETS land use and related products revealed that most user agencies interviewed, at all governmental levels, require more detailed data than that provided by the CARETS project. Few agencies found utility in the generalized ERTS Level I land--use maps. Level II data, though reported valuable by several users, was generally considered of secondary utility by most users. The products considered most useful by users at all levels were the high--altitude color-infrared photographs and the USGS orthophotoquads. Recommendations resulting from the evaluation reflect the need to establish a flexible and reliable system for providing more detailed raw and processed land-resource information as well as the need to improve the methods of making information available to users.

Land-use planning↗

An assessment of controlled source EM for monitoring subsurface CO 2 injection at the wyoming carbonSAFE geologic carbon storage site

Here we evaluate if electromagnetic (EM) geophysical methods for monitoring geologic carbon storage (GCS) efforts at the Wyoming CarbonSAFE project adjacent to the Dry Fork Station power plant near Gillette, Wyoming. This first involved acquiring both electric and magnetic fields at eleven different locations ranging in distance from immediately adjacent to 4 km from the plant. Passive EM measurements were made to provide spectral EM noise measurements generated by electricity production at the plant and to determine if useful magnetotelluric (MT) data can be successfully collected in the region. The processed data indicate that useful MT data can be collected as long as the site is located more than 2km away from the power plant as well as active roads and rail lines. Controlled source EM data were collected using three different source configurations, two of which connected to steel casings used to complete the injection wells. Comparing the EM noise measurements to the CSEM data show measurable electric and magnetic field signals at all sites. Next a series of three-dimensional (3D) numerical models were built that simulate resistivity changes caused by the proposed CO2 injection at depths ranging from 2.4 to 3.0km. These models were used to simulate various EM measurement configurations. The modeling shows that casing-source CSEM monitoring can provide sensitivity to the injected CO 2 if source electrodes are connected to the bottom of one or both of the injection wells.

58 GEOSCIENCES↗

GCS site selection in saline Miocene formations in South Louisiana

One of the key requirements of a commercial scale geologic carbon sequestration (GCS) site selection process is identifying injection sites to safely inject and retain injected CO 2 over extended time scales. This requires thorough evaluation of site-specific surface and subsurface features. A site screening and selection framework was developed and used to identify potential sites in South Louisiana, incorporating surface data including site proximity to large CO 2 stationary sources, vicinity of large population centres and state lands, land usage, legacy oil and gas wells, and local/regional geologic trends. Regionally the Miocene sediments thicken and dip towards the south, reflecting a prograding deltaic environment during the Miocene which resulted in the deposition of thick packages of fine-grained sandstones suitable for CO 2 storage. The results of three example selected sites that are spatially separated with varying subsurface and surface features are presented in this study. The multiple stacked sand zones at these sites provide ample amount of pore volume for CO 2 storage with varying degree of stratigraphic/structural traps for long terms storage containment. Here, the screening framework presented in this study and the detailed evaluation of three specific sites in South Louisiana provides a process to screen and characterize sites for GCS projects and the suitability of these Miocene sediments for commercial scale CO 2 storage projects. It is envisioned that the analysis described in this paper will be beneficial for a large number of audiences involved in GCS work and aid in the site selection process.

58 GEOSCIENCES↗

Applicability of 1D site response analysis to shallow sedimentary basins: A critical evaluation through physics-based 3D ground motion simulations

One-dimensional site response analysis (1D SRA) remains the standard practice in considering the effect of local soil deposits and predicting site-specific ground motions, although its range of applicability to realistic seismic wavefields is still in question. In this 1D approach, horizontal and vertical ground shaking are assumed to be induced by vertically propagating shear and compressional waves, respectively. A recent study based on analytical two-dimensional (2D) plane waves and simple point source earthquake simulations has shown two mechanistic limitations in this 1D modelling technique for general inclined seismic waves, that is, systematic over-prediction of the vertical motion and wave trapping in the 1D soil column. In this article, we evaluate in detail the applicability of this 1D modelling approach to realistic three-dimensional (3D) simulated seismic wavefields in shallow sedimentary basins. Linear-viscoelastic 1D SRA predictions using two types of input motions that are commonly used in practice—rock outcrop and in-column motions, are compared with the reference true site response results from 3D earthquake simulations in terms of various measures in the frequency and time domain. It is shown that the horizontal motion in the 3D seismic wavefield exhibits dominant shear wave propagation phenomenon, while the vertical motion is a combined effect of compressional and shear waves and can be over-predicted by the 1D approach when the incident seismic waves are inclined. Direct evidence of the wave refraction process that leads to the vertical motion over-prediction is provided. 1D SRA with in-column inputs can yield motions that have significantly longer duration compared to the true 3D site response solution due to trapped waves, casting in doubt the frequent need for increased soil damping in existing site studies to compensate for wave attenuation due to scattering alone. Sensitivity investigation on the increase of soil profile damping by a multiplier D mul shows D mul values compatible with those found in the literature for both horizontal and vertical motions. It is shown that the level of D mul optimized for a best match of the spectral acceleration is dependent on the characteristic of the input motion and a larger D mul is typically required for the vertical component. In contrast, 1D SRA with outcrop motions predicts motions with shorter significant duration due to its inability to capture the basin-edge generated surface waves. A suite of ground motion simulations was performed to assess the sensitivity of the observations to the basin geologic structure including the velocity gradient, rock-basin impedance contrast and basin depth. The analysis results show that the accuracy of the simplified 1D procedure is dependent on the wavefield composition of both the input motions and the true 3D site response solution. While the horizontal motions in shallow sedimentary basins can, to the first order, be reasonably captured by the simplified 1D approach, 1D SRA for the vertical component is in general not reliable and contributions from inclined shear waves should be accounted for in site-specific evaluation of the vertical design ground motion.

1D assumption↗

Evaluation of Data Catalog Software for Hanford Site Environmental Datasets

Environmental information and data underpin achievement of the U.S. Department of Energy (DOE) Office of Environmental Management (EM) mission at the Hanford Site. The Hanford Environmental Data Management (HEDM) Program is the DOE Richland Operations Office (RL) approach to develop and implement a formal program for managing environmental data and the associated records, materials, and systems at the Hanford Site. The current project, contract, organization, and contractor-specific efforts at managing environmental data sets are insufficient to provide orderly, long-term, site-wide access. A vital element to be created within the HEDM program plan is a catalog of data sources, called the Hanford Environmental Information and Data Index (HEIDI), that will enable long-term access and retrievability for the multiple independent sources of data that might otherwise be difficult to discover. This report compares leading open source and commercial data catalog platforms using criteria to assess the functionality needed to develop the HEIDI catalog of Hanford data sources that connects and exchanges data with established Hanford Local Area Network (HLAN) enterprise information technology systems. Proprietary platforms evaluated included ArcGIS Enterprise Sites, Junar, OpenDataSoft, and Socrata, and non-proprietary platforms included Energy Data eXchange (EDX), Comprehensive Knowledge Archive Network (CKAN), and DKAN (a Drupal-based open data portal based on CKAN). Capabilities supporting data discoverability, retrieval, and archival, as well as metadata standard requirements and integration into the HLAN were rated as either failing to meet requirements (F), meeting requirements (M), or exceeding requirements by delivering additional desired features (E). The lowest rating for any capability area was assigned as the overall rating for the platform. These findings enable DOE-RL and the contractors implementing the HEDM plan to focus on candidate tools likely to meet the requirements for implementing HEIDI. All of the platforms receiving an overall rating of ‘F’ were unable to be deployed on Hanford infrastructure or within dedicated cloud resources. A propriety software-as-a-service (SaaS) model of delivering a data catalog (e.g., found in software such as Junar and OpenDataSoft) favors consistency across customers at the expense of customization and configurable roles that are needed for Hanford work. Hosting data on a shared commercial platform places limits on dataset size (maximum of 240 Mb for OpenDataSoft), a significant limitation for HEIDI implementation. EDX, a government data catalog based on CKAN, received the ‘F’ rating due to an inability to incorporate authentication from HLAN into the system. Among platforms rated ‘M’ or ‘E’, only the Socrata platform had a SaaS delivery model. In contrast to other SaaS platforms, Socrata provided custom roles and gateways that allow local datasets to be incorporated into an online catalog. Socrata also complies with the Federal Risk and Authorization Management Program, a significant benefit for cloud-based management of Hanford data. The other platforms rated ‘M’ or ‘E’, ArcGIS Enterprise Sites, CKAN, and DKAN, provide fully self-hosted options, allowing for greater control and flexibility with the HEIDI catalog. These widely used tools have supportive communities of practice, extensive customization options, and demonstrated deployments that provide evidence that they can meet requirements, often deliver additional desired features, and work well with federal government systems. Completely customized alternatives built on a collection of applications were not evaluated because achieving similar performance to CKAN or DKAN requires substantial resources, especially in the absence of the active communities that have grown to support these tools. ArcGIS Enterprise Sites, Socrata, CKAN, and DKAN were evaluated as strong candidates for successful implementation with HEIDI.

54 ENVIRONMENTAL SCIENCES↗

Adaptive Site Management Strategies for the Hanford Central Plateau Groundwater

Adaptive site management (ASM) is a systematic and iterative management approach that can be used to expedite the remediation of large and/or complex sites. ASM is defined as a formal and systematic project or site management approach centered on rigorous site planning and a firm understanding of site conditions and uncertainties, using science and technology to routinely re-evaluate and prioritize site remedial actions and characterization activities. The goal of the approach is to create a framework of structured and continuous planning, implementation, and assessment processes that accommodates new information and changing site conditions to develop effective and efficient cleanup approaches that achieves the required outcome(s) while optimizing costs, cleanup timeframe, and performance. Central to ASM is an evolving conceptual site model (CSM). Over time, incremental reductions in uncertainty associated with the CSM will occur, while supporting continued progress toward site cleanup and closure through remedy optimization and evaluation. ASM has the potential to expedite cleanup for the Central Plateau area at Hanford through a planned and systematic approach for reducing uncertainty with targeted characterization activities, while continuing remediation activities that advance cleanup for key risk-driving contaminants. A core component of cleanup within the Central Plateau is the 200 West Pump-and-Treat (P&T) system. Even with an active P&T remedy, uncertainty exists with respect to plume distributions, total mass in the aquifer, and currently known continuing sources. Additional uncertainty is associated with multiple contaminant source locations in the vadose zone, which have the potential to create new groundwater plumes in the absence of any source control measures, although not all contaminant fluxes to groundwater will result in contaminant concentrations above cleanup levels. Collectively, these uncertainties need to be addressed in the CSM to support effective and efficient site progress toward cleanup goal(s). Other nontechnical factors that may warrant an ASM approach at the Hanford Central Plateau are associated with the formation of operable units (OUs) used to manage cleanup. With the exception of the 200-ZP-1 OU, the three remaining groundwater OUs only have interim action records of decision. Nine vadose zone source area OUs are also in the early stages of the remedial investigation and feasibility study process, with pending characterization and technology identification activities. A set of proposed site objectives for the Central Plateau are provided in this document as an initial consideration/example and basis for discussion for ASM implementation. These example site objectives were selected with the goal of maintaining protectiveness at the Columbia River through confinement of contaminant plumes within an administratively controlled area below existing surface waste sites and waste disposal facilities. Although site decision makers and regulators need to provide concurrence, these site objectives are used in this document to describe the elements of an ASM approach, including selection of interim objectives and a long-term adaptive management plan. Interim objectives are also defined to yield measurable incremental progress toward the overall site goals. This document identifies initial technical considerations for developing an ASM framework for the Central Plateau cleanup decisions. These considerations are intended to facilitate more specific decisions, such as objectives, near- and long-term actions, and performance metrics, to develop an overall approach that maintains protectiveness but recognizes the uncertainty, long timeframe, and technical challenges that need to be considered in selecting, implementing, and managing remediation at the Hanford Central Plateau.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Approach for Temporal Stability Evaluation of Pseudo-Invariant Calibration Sites (PICS)

Pseudo-Invariant Calibration Sites (PICS) are one of the most popular methods for in-flight vicarious radiometric calibration of Earth remote sensing satellites. The fundamental question of PICS temporal stability has not been adequately addressed. However, the main purpose of this work is to evaluate the temporal stability of a few PICS using a new approach. The analysis was performed over six PICS (Libya 1, Libya 4, Niger 1, Niger 2, Egypt 1 and Sudan 1). The concept of a “Virtual Constellation” was developed to provide greater temporal coverage and also to overcome the dependence limitation of any specific characteristic derived from one particular sensor. TOA reflectance data from four sensors consistently demonstrating “stable” calibration to within 5%—the Landsat 7 ETM+ (Enhanced Thematic Mapper Plus), Landsat 8 OLI (Operational Land Imager), Terra MODIS (Moderate Resolution Imaging Spectroradiometer) and Sentinel-2A MSI (Multispectral Instrument)–were merged into a seamless dataset. Instead of using the traditional method of trend analysis (Student’s T test), a nonparametric Seasonal Mann-Kendall test was used for determining the PICS stability. The analysis results indicate that Libya 4 and Egypt 1 do not exhibit any monotonic trend in six reflective solar bands common to all of the studied sensors, indicating temporal stability. A decreasing monotonic trend was statistically detected in all bands, except SWIR 2, for Sudan 1 and the Green and Red bands for Niger 1. An increasing trend was detected in the Blue band for Niger 2 and the NIR band for Libya 1. These results do not suggest abandoning PICS as a viable calibration source. Rather, they indicate that PICS temporal stability cannot be assumed and should be regularly monitored as part of the sensor calibration process.

Tuli, Fatima Tuz Zafrin↗

Performance Evaluation of Speech Recognition Systems as a Next-Generation Pilot-Vehicle Interface Technology

During the flight trials known as Gulfstream-V Synthetic Vision Systems Integrated Technology Evaluation (GV-SITE), a Speech Recognition System (SRS) was used by the evaluation pilots. The SRS system was intended to be an intuitive interface for display control (rather than knobs, buttons, etc.). This paper describes the performance of the current "state of the art" Speech Recognition System (SRS). The commercially available technology was evaluated as an application for possible inclusion in commercial aircraft flight decks as a crew-to-vehicle interface. Specifically, the technology is to be used as an interface from aircrew to the onboard displays, controls, and flight management tasks. A flight test of a SRS as well as a laboratory test was conducted.

Arthur, Jarvis J., III↗

Preliminary Evaluation of Removing SNF from Nuclear Power Plant Sites - Pilgrim Site Visit - 20048

The U.S. Department of Energy Office of Integrated Waste Management (DOE-IWM)a conducted an evaluation of removing spent nuclear fuel (SNF) from the Pilgrim site on November 4-8, 2019. The Pilgrim site is located on the western shore of Cape Cod Bay in the Town of Plymouth, Massachusetts, about 61 km southeast of Boston and 71 km east of Providence, Rhode Island. Participants in the site visit included the U.S. Department of Energy, Oak Ridge National Laboratory, Pacific Northwest National Laboratory, the state of Massachusetts, the Federal Railroad Administration, the U.S. Coast Guard, the U.S. Army Corps of Engineers, the Mashpee Wampanoag Tribe, the Consolidated Group of Tribes and Organizations, the Council of State Governments-Eastern Regional Conference, the Pilgrim Nuclear Decommissioning Citizens Advisory Panel, and the Massachusetts Coastal Railroad. The Pilgrim site was found to have two transportation mode options for the removal of SNF, offsite rail access and onsite barge access. Two offsite heavy haul truck to rail transload locations were evaluated, one in Middleborough, Massachusetts, about 35-47 km from the Pilgrim site, and a second location in Middleborough about 36-43 km from the Pilgrim site. A passenger railroad terminates in Plymouth, Massachusetts, about 11 km from the Pilgrim site; however, this location is not suitable for freight rail involving large SNF transportation casks. There is also an onsite barge facility located on the Pilgrim site that was used during construction and would require refurbishment to be used. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Establishing fluvial silicon regimes and their stability across the Northern Hemisphere

Abstract Fluvial silicon (Si) plays a critical role in controlling primary production, water quality, and carbon sequestration through supporting freshwater and marine diatom communities. Geological, biogeochemical, and hydrological processes, as well as climate and land use, dictate the amount of Si exported by streams. Understanding Si regimes—the seasonal patterns of Si concentrations—can help identify processes driving Si export. We analyzed Si concentrations from over 200 stream sites across the Northern Hemisphere to establish distinct Si regimes and evaluated how often sites moved among regimes over their period of record. We observed five distinct regimes across diverse stream sites, with nearly 60% of sites exhibiting multiple regime types over time. Our results indicate greater spatial and interannual variability in Si seasonality than previously recognized and highlight the need to characterize the watershed and climate variables that affect Si cycling across diverse ecosystems.

54 ENVIRONMENTAL SCIENCES↗

Model Package Report: Central Plateau Vadose Zone Models

This model package report describes concisely the modeling objectives, conceptualization, implementation, uncertainty and sensitivity, configuration control, limitations, data needs, and recommendations for improvement of the Central Plateau Vadose Zone Models. This collection of models is developed to meet the vadose zone simulation needs of the Hanford Site Composite Analysis (CA), the Hanford Site Cumulative Impact Evaluation (CIE), and are expected to find other applications in Hanford Site remedial cleanup decision-making processes. This model package report describes and documents the development of the models themselves to fulfill technical approaches defined for the CA and the CIE. This report does not document any specific calculation using these models: instead, applications of individual vadose models to perform specific calculations will be documented in environmental calculation files, including inputs and results, as appropriate. Configuration management for the Central Plateau Vadose Zone Models is managed through assignment of unique sequential numerical version numbers and archival of the models in the Environmental Modeling Management Archive.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dynamic conversion of solar generated heat to electricity

The effort undertaken during this program led to the selection of the water-superheated steam (850 psig/900 F) crescent central receiver as the preferred concept from among 11 candidate systems across the technological spectrum of the dynamic conversion of solar generated heat to electricity. The solar power plant designs were investigated in the range of plant capacities from 100 to 1000 Mw(e). The investigations considered the impacts of plant size, collector design, feed-water temperature ratio, heat rejection equipment, ground cover, and location on solar power technical and economic feasibility. For the distributed receiver systems, the optimization studies showed that plant capacities less than 100 Mw(e) may be best. Although the size of central receiver concepts was not parametrically investigated, all indications are that the optimal plant capacity for central receiver systems will be in the range from 50 to 200 Mw(e). Solar thermal power plant site selection criteria and methodology were also established and used to evaluate potentially suitable sites. The result of this effort was to identify a site south of Inyokern, California, as typically suitable for a solar thermal power plant. The criteria used in the selection process included insolation and climatological characteristics, topography, and seismic history as well as water availability.

Powell, J. C.↗