Search NASA⌕ Search

SEARCH · Search NASA

Results for “site selection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Carbon storage cost modeling for the offshore Gulf of Mexico

Groundbreaking for geologic carbon storage (GCS) projects in the offshore Gulf of Mexico is imminent, and there is great interest in utilizing this region for GCS projects. Offshore saline reservoirs provide a significant and accessible resource for GCS. However, conducting GCS in the offshore environment will pose distinct challenges pertaining to site selection, operations, infrastructure use, and monitoring compared to operating onshore that ultimately affect technoeconomic assessment of offshore GCS projects. Carbon storage and transport costs are critical to project developers looking to deploy carbon storage in the offshore environment. We present CO2_S_COM_Offshore, a model developed by the National Energy Technology Laboratory (NETL) as a screening-level offshore saline GCS cost modeling tool. Based on NETL’s widely used CO2_S_COM cost model for onshore saline CS, CO2_S_COM_Offshore enables technoeconomic analysis of GCS in offshore areas. This model comprehensively incorporates multiple facets of offshore GCS projects, from regional evaluation and site selection to permitting, transport, operations, monitoring, site closure, and decommissioning. In general, the model can explore the cost implications for potential offshore GCS project(s) by enabling the user to change several project operational and financial attribute configurations. Key inputs include offshore storage formation options, CO2 injection rate and duration, infrastructure types, monitoring intensity, project financing, and post-injection site care duration. Supporting cost algorithms within CO2_S_COM_Offshore were compiled utilizing S&P Global’ s QUE$TORTM cost estimation software alongside a variety of open-source scientific literature. In addition to reviewing key model components, we discuss several sensitivity analyses, input variabilities, and results on analysis of break-even CO2 price required by a project based on different regulation/policy and operational scenarios for the offshore Gulf of Mexico. These results indicate the value of modeling offshore GCS specifically, and the potential of offshore GCS within a decarbonization value chain. Presented at the 41st USAEE/IAEE North American Conference, 3-6 November 2024, Baton Rouge, LA, United States.

Mark-Moser, Mackenzie K.↗

Impact of aquifer properties on the extent and timeline of CO 2 trapping

Abstract Geologic CO 2 sequestration in porous saline aquifers is a promising approach to reducing atmospheric concentrations of CO 2 . Reactive transport simulations provide the opportunity to analyze which factors influence geochemical reactivity in the reservoir, understand those most important for promoting CO 2 trapping, and assess individual sites. Field‐scale aquifer characterization is time and resource intensive such that here, reactive transport simulations are leveraged to enhance understanding of selected aquifer properties including porosity, permeability, depth of storage, and carbonate mineralogy on the overall CO 2 trapping potential to better select sites promoting geochemical reactivity for CO 2 trapping. There are different mechanisms for sequestrating CO 2 . Once injected, CO 2 will dissolve into the brine to create an acidic environment, resulting in the dissolution of pre‐injection formation minerals. Released ions can reprecipitate as secondary minerals. The dissolved CO 2 and mineralized CO 2 are considered as a more secure form of CO 2 trapping in this study compared to the free supercritical CO 2 . Here, a framework leveraging a controlled set of field scale simulations is developed to facilitate rapid, optimized site selection. Simulations vary aquifer properties to understand the impact of each unique property on CO 2 trapping, tracking, and comparing the amount of supercritical, aqueous, and mineralized CO 2 . The rate at which the CO 2 injected into the aquifer is converted to aqueous or mineralized CO 2 is newly defined here as the sequestration efficiency and used to compare simulation results. The reservoir depth and fraction of carbonate minerals in the formation are shown to be more important factors than reservoir porosity and permeability in affecting CO 2 trapping. However, the impact of aquifer properties on the evolution of injected CO 2 depends on the stage of the sequestration project. © 2023 Society of Chemical Industry and John Wiley & Sons, Ltd.

Energy & Fuels↗

Past Approaches for Spent Nuclear Fuel, Transuranic, and High-Level Waste Disposal in the United States—Part 2: Siting Process, Staged Development, and Public Preferences

This report presents pertinent aspects of the ~50-year United States experience in siting a mined geologic disposal repository for spent nuclear fuel (SNF), transuranic (TRU) waste, and high-level radioactive waste (HLW) as related to site selection and the staged process for site investigations as specified in the Nuclear Waste Policy Act of 1982 and generic and site-specific regulations of the US Department of Energy (DOE), US Environmental Protection Agency (EPA), and US Nuclear Regulatory Commission (NRC). The roles of the Environmental Impact Statement and guidance in international consensus standards by the International Atomic Energy Agency are also mentioned. The focus is on siting and developing the Waste Isolation Pilot Plant, an operating repository for TRU waste from atomic energy defense activities, and the proposed Yucca Mountain repository for commercial SNF and HLW. In the social dimension, the role of institutional stakeholders is described. Past national surveys related to waste management options for storage and disposal provide insight on public preferences of other stakeholders. The descriptions are intended to help other countries more fully understand the stages adopted for siting and developing repositories in the United States.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Exobiological exploration of Mars

Of all the other planets in the solar system, Mars remains the most promising for further elucidating concepts about chemical evolution and the origin of life. Strategies were developed to pursue three exobiological objectives for Mars exploration: determining the abundance and distribution of the biogenic elements and organic compounds, detecting evidence of an ancient biota on Mars, and determining whether indigenous organisms exist anywhere on the planet. The three strategies are quite similar and, in fact, share the same sequence of phases. In the first phase, each requires global reconnaissance and remote sensing by orbiters to select sites of interest for detailed in situ analyses. In the second phase, lander missions are conducted to characterize the chemical and physical properties of the selected sites. The third phase involves conducting 'critical' experiments at sites whose properties make them particularly attractive for exobiology. These critical experiments would include, for example, identification of organics, detection of fossils, and detection of extant life. The fourth phase is the detailed analysis of samples returned from these sites in Earth-based laboratories to confirm and extend previous discoveries. Finally, in the fifth phase, human exploration is needed to establish the geological settings for the earlier findings or to discover and explore sites that are not accessible to robotic spacecraft.

Klein, H. P.↗

Exobiological Exploration of Mars

Of all the other planets in the solar system, Mars remains the most promising for studying concepts about chemical evolution and the origin of life. Strategies were developed to pursue three exobiological objectives for Mars: determine abundance and distribution of biogenic elements and organic compounds, detect evidence of an ancient biota, and determine if organisms exist anywhere on the planet. The three strategies share the same sequence of phases. In the first phase, each requires global reconnaissance and remote sensing by orbiters to select sites of interest for detailed in situ analyses. In the second phase, lander missions are conducted to characterize the chemical and physical properties of the selected sites. The third phase involves conducting "critical" experiments at sites whose properties make them particularly attractive for exobiology. These critical experiments would include, for example, identification of organics, detection of fossils, and detection of extant life. The fourth phase is the detailed analysis of samples returned from these sites in Earth-based laboratories to confirm and extend previous discoveries. Finally, in the fifth phase, human exploration is needed to establish the geological context or to discover and explore sites that are not accessible to robotic spacecraft.

DeVincenzi, Donald L.↗

Balancing Water Sustainability and Productivity Objectives in Microalgae Cultivation: Siting Open Ponds by Considering Seasonal Water-Stress Impact Using AWARE-US

Microalgae have great potential as an energy crop. Scaling-up algal biofuel production in the United States (US) should be done with careful attention to water stress. This study evaluates the regional and seasonal water-stress impact of potential algae-pond deployments in the US. Three site-selection strategies focusing on biomass yield, water-use efficiency (WUE), and water-stress impact, respectively, are applied and compared to meet a US algae biomass production target of 30 million metric tons/yr ash-free dry weight, which converts to 20.8 billion L renewable diesel, via hydrothermal liquefaction. Ranking algae ponds based on biomass yield leads to freshwater consumption of 2.66 km3/yr, resulting in the highest water-stress impact (39.1 US equivalent km3). Under the WUE scenario, water consumption is reduced by 81%, but biomass yield is reduced by 12%. In contrast, adding a water-stress constraint to the biomass-yield ranking reduces water consumption by 50% and water-stress impact by 97%, with a small yield reduction (1.7%). Results show that pond location has a significant effect on water stress and that water stress is not proportional to water consumption or yield. Furthermore, capturing seasonal water patterns is critical for planning because sites in water-abundant regions can have short-term but significant water-stress impacts.

algae, Biofuel, water scarcity footprint, hydrothe↗

Application of ERTS-1 imagery in the fields of geology, agriculture, forestry, and hydrology to selected test sites in Iran

The preliminary study of the ERTS-1 imagery coverage of Iran, commenced on October 26, 1972. All of the images were carefully examined, and a photomosaic covering approximately ninety-five per cent of the country was prepared. A number of images of selected areas were studied in detail. In the field of geology, a number of large scale faults were identified, which do not figure on geological maps. Furthermore, a preliminary study was carried out on the recent sediments, their possible sources, and origin. A limited number of geological work maps were prepared as well. In the fields of agriculture and forestry, studies based on color composite prints of certain areas were undertaken, with a purpose of identifying potential arable areas. Investigations in the field of water resources resulted in the discovery of a number of small lakes, and streams. Furthermore, fluctuations of the water level in some lakes were observed.

Ebtehadj, K.↗

A Bis(imidazole)-based cysteine labeling tool for metalloprotein assembly

Precise metal-protein coordination by design remains a considerable challenge. Polydentate, high-metal-affinity protein modifications, both chemical and recombinant, can enable metal localization. However, these constructs are often bulky, conformationally and stereochemically ill-defined, or coordinately saturated. Here, we expand the biomolecular metal-coordination toolbox with the irreversible attachment to cysteine of bis(1-methylimidazol-2-yl)ethene (“BMIE”), which generates a compact imidazole-based metal-coordinating ligand. Conjugate additions of small-molecule thiols (thiocresol and N-Boc-Cys) with BMIE confirm general thiol reactivity. The BMIE adducts are shown to complex the divalent metal ions Cu ++ and Zn ++ in bidentate (N 2 ) and tridentate (N 2 S*) coordination geometries. Cysteine-targeted BMIE modification (>90% yield at pH 8.0) of a model protein, the S203C variant of carboxypeptidase G2 (CPG2), measured with ESI-MS, confirms its utility as a site-selective bioconjugation method. ICP-MS analysis confirms mono-metallation of the BMIE-modified CPG2 protein with Zn ++ , Cu ++ , and Co ++ . EPR characterization of the BMIE-modified CPG2 protein reveals the structural details of the site selective 1:1 BMIE-Cu ++ coordination and symmetric tetragonal geometry under physiological conditions and in the presence of various competing and exchangeable ligands (H 2 O/HO – , tris, and phenanthroline). An X-ray protein crystal structure of BMIE-modified CPG2-S203C demonstrates that the BMIE modification is minimally disruptive to the overall protein structure, including the carboxypeptidase active sites, although Zn ++ metalation could not be conclusively discerned at the resolution obtained. The carboxypeptidase catalytic activity of BMIE-modified CPG2-S203C was also assayed and found to be minimally affected. Finally, these features, combined with ease of attachment, define the new BMIE-based ligation as a versatile metalloprotein design tool, and enable future catalytic and structural applications.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

NASA's Solar System Treks: Online Portals for Planetary Mapping and Modeling

NASA's Solar System Treks are a suite of web-based of lunar and planetary mapping and modeling portals providing interactive visualization and analysis tools enabling mission planners, planetary scientists, students, and the general public to access mapped lunar data products from past and current missions for the Moon, Mars, Vesta, and more. New portals for additional planetary bodies are being planned. This presentation will recap significant enhancements to these toolsets during the past year and look ahead to future features and releases. Moon Trek is a new portal replacing its predecessor, the Lunar Mapping and Modeling Portal (LMMP), that significantly upgrades and builds upon the capabilities of LMMP. It features greatly improved navigation, 3D visualization, fly-overs, performance, and reliability. Additional data products and tools continue to be added. These include both generalized products as well as polar data products specifically targeting potential sites for NASA's Resource Prospector mission as well as for missions being planned by NASA's international partners. The latest release of Mars Trek includes new tools and data products requested by NASA's Planetary Science Division to support site selection and analysis for Mars Human Landing Exploration Zone Sites. Also being given very high priority by NASA Headquarters is Mars Trek's use as a means to directly involve the public in upcoming missions, letting them explore the areas the agency is focusing upon, understand what makes these sites so fascinating, follow the selection process, and get caught up in the excitement of exploring Mars. Phobos Trek, the latest effort in the Solar System Treks suite, is being developed in coordination with the International Phobos/Deimos Landing Site Working Group, with landing site selection and analysis for JAXA's MMX (Martian Moons eXploration) mission as a primary driver.

Day, Brian↗

Pinpoint landing concepts for the Mars Rover Sample Return mission

From knowledge of hazards gained following Viking, several approaches are being pursued for making the Mars Rover Sample Return (MRSR) landing safer. With the pinpoint landing capability approach, a single landing site would be certified in advance of initiating the descent orbit, using pictures transmitted to earth from the orbiter. Onboard instruments would guide the lander to follow mapped terrain to the selected site. If navigation proves insufficiently accurate, a small number of scattered sites would be certified, and the lander would select the most accessible one in real time. Some early-site certification and navigation concepts are discussed. Some of the key problems to overcome include how to recognize hazards too small to be transmitted to earth, how to represent terrain features in the flight computer, how to overcome errors in inertial measurements during landing of over 12-hour duration, how to find the selected site in real time, and how to navigate to the selected site once it is found.

Klumpp, Allan R.↗

Standalone Hazard Evaluation and Refinement From Instrument Findings (S.H.E.R.I.F.)

The Standalone Hazard Evaluation From Instrument Findings or SHERIF is a set of novel algorithms and associated framework designed to support the generation of Digital Elevation Maps (DEMs) from multiple LiDAR scans and perform Hazard Detection (HD) and Safe Site Selection with minimal input from other onboard systems. SHERIF can employ several techniques to perform Point Cloud registration(PCR) on disparate LiDAR scans of a planetary surface to generate a DEM which evolves over the course of a trajectory, with a flow designed to enable robustness. The framework also supports a variety of Hazard Detection and Safe Site Selection algorithms which can be run on the evolving DEM being produced. SHERIF features a robust and modular construction, allowing the user a high degree of flexibility in selecting and implementing whichever PCR and HD/SSL algorithms they may prefer, while maintaining the data products and sensor independence of the core SHERIF framework. SHERIF was recently tested in a hardware in the loop simulation at NASA JSC.

Entry Descent and Landing Guidance Navigation Cont↗

Applications of ERTS-1 imagery to terrestrial and marine environmental analyses in Alaska

ERTS-1 imagery provides a means of distinguishing and monitoring estuarine surface water circulation patterns and changes in the relative sediment load of discharging rivers on a regional basis. It also will aid local fishing industries by augmenting currently available hydrologic and navigation charts. The interpretation of geologic and vegetation features resulted in preparation of improved surficial geology, vegetation and permafrost terrain maps at a scale of 1:1 million utilizing ERTS-1 band 7 imagery. This information will be further utilized in a route and site selection study for the Nome to Kobuk Road in central Alaska. Large river icings along the proposed Alaska pipeline route have been monitored. Sea ice deformation and drift northeast of Point Barrow, Alaska has been measured and shorefast ice accumulation and ablation along the west coast of Alaska is being mapped for the spring and early summer seasons. These data will be used for route and site selection, regional environmental analysis, identification and inventory of natural resources, land use planning, and in land use regulation and management.

Anderson, D. M.↗

Detecting multi‐scale riverine topographic variability and its influence on Chinook salmon habitat selection

Abstract Quantifying geomorphic conditions that impact riverine ecosystems is critical in river management due to degraded riverine habitat, changing flow and thermal conditions, and increasing anthropogenic pressure. Geomorphic complexity at different scales directly impacts habitat heterogeneity and affects aquatic biodiversity resilience. Here we showed that the combination of continuous spatial survey at high resolution, topobathymetric light detection and ranging (LiDAR), and continuous wavelet analysis can help identify and characterize that complexity. We used a continuous wavelet analysis on 1‐m resolution topobathymetry in three rivers in the Salmon River Basin, Idaho (USA), to identify different scales of topographic variability and the potential effects of this variability on salmonid redd site selection. On each river, wavelet scales characterized the topographic variability by portraying repeating patterns in the longitudinal profile. We found three major representative spatial wavelet scales of topographic variability in each river: a small wavelet scale associated with local morphology such as pools and riffles, a mid‐wavelet scale that identified larger channel unit features, and a large wavelet scale related to valley‐scale controls. The small wavelet scale was used to identify pools and riffles along the entire lengths of each river as well as areas with differing riffle‐pool development. Areas along the rivers with high local topographic variability (high wavelet power) at all wavelet scales contained the largest features (i.e., deepest or longest pools) in the systems. By comparing the wavelet power for each wavelet scale to Chinook salmon redd locations, we found that higher small‐scale wavelet power, which is related to pool‐riffle topography, is important for redd site selection. The continuous wavelet methodology objectively identified scales of topographic variability present in these rivers, performed efficient channel‐unit identification, and provided geomorphic assessment without laborious field surveys.

Duffin, Jenna↗

Characterization Approaches to Place Invariant Sites on SI-Traceable Scales

The effort to understand the Earth's climate system requires a complete integration of remote sensing imager data across time and multiple countries. Such an integration necessarily requires ensuring inter-consistency between multiple sensors to create the data sets needed to understand the climate system. Past efforts at inter-consistency have forced agreement between two sensors using sources that are viewed by both sensors at nearly the same time, and thus tend to be near polar regions over snow and ice. The current work describes a method that would provide an absolute radiometric calibration of a sensor rather than an inter-consistency of a sensor relative to another. The approach also relies on defensible error budgets that eventually provides a cross comparison of sensors without systematic errors. The basis of the technique is a model-based, SI-traceable prediction of at-sensor radiance over selected sites. The predicted radiance would be valid for arbitrary view and illumination angles and for any date of interest that is dominated by clear-sky conditions. The effort effectively works to characterize the sites as sources with known top-of-atmosphere radiance allowing accurate intercomparison of sensor data that without the need for coincident views. Data from the Advanced Spaceborne Thermal Emission and Reflection and Radiometer (ASTER), Enhanced Thematic Mapper Plus (ETM+), and Moderate Resolution Imaging Spectroradiometer (MODIS) are used to demonstrate the difficulties of cross calibration as applied to current sensors. Special attention is given to the differences caused in the cross-comparison of sensors in radiance space as opposed to reflectance space. The radiance comparisons lead to significant differences created by the specific solar model used for each sensor. The paper also proposes methods to mitigate the largest error sources in future systems. The results from these historical intercomparisons provide the basis for a set of recommendations to ensure future SI-traceable cross calibration using future missions such as CLARREO and TRUTHS. The paper describes a proposed approach that relies on model-based, SI-traceable predictions of at-sensor radiance over selected sites. The predicted radiance would be valid for arbitrary view and illumination angles and for any date of interest that is dominated by clear-sky conditions. The basis of the method is highly accurate measurements of at-sensor radiance of sufficient quality to understand the spectral and BRDF characteristics of the site and sufficient historical data to develop an understanding of temporal effects from changing surface and atmospheric conditions.

Thome, Kurtis↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗