Search NASA⌕ Search

SEARCH · Search NASA

Results for “software metrics”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Changes in Exercise Data Management

The suite of exercise hardware aboard the International Space Station (ISS) generates an immense amount of data. The data collected from the treadmill, cycle ergometer, and resistance strength training hardware are basic exercise parameters (time, heart rate, speed, load, etc.). The raw data are post processed in the laboratory and more detailed parameters are calculated from each exercise data file. Updates have recently been made to how this valuable data are stored, adding an additional level of data security, increasing data accessibility, and resulting in overall increased efficiency of medical report delivery. Questions regarding exercise performance or how exercise may influence other variables of crew health frequently arise within the crew health care community. Inquiries over the health of the exercise hardware often need quick analysis and response to ensure the exercise system is operable on a continuous basis. Consolidating all of the exercise system data in a single repository enables a quick response to both the medical and engineering communities. A SQL server database is currently in use, and provides a secure location for all of the exercise data starting at ISS Expedition 1 - current day. The database has been structured to update derived metrics automatically, making analysis and reporting available within minutes of dropping the inflight data it into the database. Commercial tools were evaluated to help aggregate and visualize data from the SQL database. The Tableau software provides manageable interface, which has improved the laboratory's output time of crew reports by 67%. Expansion of the SQL database to be inclusive of additional medical requirement metrics, addition of 'app-like' tools for mobile visualization, and collaborative use (e.g. operational support teams, research groups, and International Partners) of the data system is currently being explored.

Buxton, R. E.↗

Changes in Exercise Data Management

The suite of exercise hardware aboard the International Space Station (ISS) generates an immense amount of data. The data collected, treadmill, cycle ergometer, and resistance strength training hardware, are basic exercise parameters (time, heart rate, speed, load, etc.). The raw data are processed in the laboratory and more detailed parameters are calculated from each exercise data file. Updates recently have been made to how these valuable data are stored, adding an additional level of security, increasing accessibility, and resulting in overall increased efficiency of medical report delivery. Questions regarding exercise performance or how exercise may influence other variables of crew health frequently arise within the crew health care community. Inquiries regarding the health of the exercise hardware often need quick analysis and response to ensure the exercise system is operable on a continuous basis. Consolidating all of the exercise system data in a single repository enables a quick response to both the medical and engineering communities. A SQL server database is currently in use, and provides a secure location for all of the exercise data starting at ISS Expedition 1 to current date. The database has been structured to update derived metrics automatically, making analysis and reporting available within minutes of dropping the in-flight data into the database. Commercial tools were evaluated to help aggregate and visualize data from the SQL database. The Tableau software provides manageable interface, which has improved the laboratory’s output time of crew reports by 67%. Expansion of the SQL database, to be inclusive of additional medical requirement metrics, addition of ‘app-like’ tools for mobile visualization, and collaborative use (e.g., operational support teams, research groups, and International Partners) of the data system, is currently being explored.

Buxton, R. E.↗

Monitoring cognitive function and need with the automated neuropsychological assessment metrics in Decompression Sickness (DCS) research

Hypobaric decompression sickness (DCS) research presents the medical monitor with the difficult task of assessing the onset and progression of DCS largely on the basis of subjective symptoms. Even with the introduction of precordial Doppler ultrasound techniques for the detection of venous gas emboli (VGE), correct prediction of DCS can be made only about 65 percent of the time according to data from the Armstrong Laboratory's (AL's) hypobaric DCS database. An AL research protocol concerned with exercise and its effects on denitrogenation efficiency includes implementation of a performance assessment test battery to evaluate cognitive functioning during a 4-h simulated 30,000 ft (9144 m) exposure. Information gained from such a test battery may assist the medical monitor in identifying early signs of DCS and subtle neurologic dysfunction related to cases of asymptomatic, but advanced, DCS. This presentation concerns the selection and integration of a test battery and the timely graphic display of subject test results for the principal investigator and medical monitor. A subset of the Automated Neuropsychological Assessment Metrics (ANAM) developed through the Office of Military Performance Assessment Technology (OMPAT) was selected. The ANAM software provides a library of simple tests designed for precise measurement of processing efficiency in a variety of cognitive domains. For our application and time constraints, two tests requiring high levels of cognitive processing and memory were chosen along with one test requiring fine psychomotor performance. Accuracy, speed, and processing throughout variables as well as RMS error were collected. An automated mood survey provided 'state' information on six scales including anger, happiness, fear, depression, activity, and fatigue. An integrated and interactive LOTUS 1-2-3 macro was developed to import and display past and present task performance and mood-change information.

Nesthus, Thomas E.↗

DSN Array Simulator

The DSN Array Simulator (wherein 'DSN' signifies NASA's Deep Space Network) is an updated version of software previously denoted the DSN Receive Array Technology Assessment Simulation. This software (see figure) is used for computational modeling of a proposed DSN facility comprising user-defined arrays of antennas and transmitting and receiving equipment for microwave communication with spacecraft on interplanetary missions. The simulation includes variations in spacecraft tracked and communication demand changes for up to several decades of future operation. Such modeling is performed to estimate facility performance, evaluate requirements that govern facility design, and evaluate proposed improvements in hardware and/or software. The updated version of this software affords enhanced capability for characterizing facility performance against user-defined mission sets. The software includes a Monte Carlo simulation component that enables rapid generation of key mission-set metrics (e.g., numbers of links, data rates, and date volumes), and statistical distributions thereof as functions of time. The updated version also offers expanded capability for mixed-asset network modeling--for example, for running scenarios that involve user-definable mixtures of antennas having different diameters (in contradistinction to a fixed number of antennas having the same fixed diameter). The improved version also affords greater simulation fidelity, sufficient for validation by comparison with actual DSN operations and analytically predictable performance metrics.

Tikidjian, Raffi↗

Image Navigation and Registration Performance Assessment Evaluation Tools for GOES-R ABI and GLM

The GOES-R Flight Project has developed an Image Navigation and Registration (INR) Performance Assessment Tool Set (IPATS) for measuring Advanced Baseline Imager (ABI) and Geostationary Lightning Mapper (GLM) INR performance metrics in the post-launch period for performance evaluation and long term monitoring. IPATS utilizes a modular algorithmic design to allow user selection of data processing sequences optimized for generation of each INR metric. This novel modular approach minimizes duplication of common processing elements, thereby maximizing code efficiency and speed. Fast processing is essential given the large number of sub-image registrations required to generate INR metrics for the many images produced over a 24 hour evaluation period. This paper describes the software design and implementation of IPATS and provides preliminary test results.

Image registration↗

Image Navigation and Registration Performance Assessment Evaluation Tools for GOES-R ABI and GLM

The GOES-R Flight Project has developed an Image Navigation and Registration (INR) Performance Assessment Tool Set (IPATS) for measuring Advanced Baseline Imager (ABI) and Geostationary Lightning Mapper (GLM) INR performance metrics in the post-launch period for performance evaluation and long term monitoring. IPATS utilizes a modular algorithmic design to allow user selection of data processing sequences optimized for generation of each INR metric. This novel modular approach minimizes duplication of common processing elements, thereby maximizing code efficiency and speed. Fast processing is essential given the large number of sub-image registrations required to generate INR metrics for the many images produced over a 24 hour evaluation period. This paper describes the software design and implementation of IPATS and provides preliminary test results.

image registration↗

JUSTIFI: Software for Improving Performance Objectives via Energy Efficiency

With growing energy supply concerns and rising costs, energy efficiency is a critical component of industrial energy resilience and competitiveness by directly reducing energy operating costs. Energy efficiency projects in manufacturing also yield valuable benefits to other key metrics, such as improved quality, reduced maintenance costs, improved safety, decreased pollution, and enhanced productivity. However, it is difficult to receive approval for energy efficiency projects, so implementation rates are low, even when meeting capital project payback period criteria. The inclusion and quantification of non-energy benefits (NEBs) in the decision-making process for energy efficiency projects can improve the overall financial payback period while demonstrating a positive impact on the firm's key performance metrics and business strategy. Despite their significant financial and strategic value, NEBs are rarely factored into decision-making due to lack of tools to effectively identify and quantify them. Therefore, a comprehensive and integrative approach is needed for the rapidly evolving energy landscape. To address these challenges, through funding from U.S. Department of Energy, our new assessment methodology integrates common continuous improvement six sigma concepts, such as the DMAIC process, and a protocol of guiding questions, into energy efficiency assessments to identify NEBs. We have also developed open-source software, JUSTIFI, to guide users through this process, data collection, and quantification. It is designed to be used concurrently with DOE energy system analysis software suite, MEASUR. Our methodology and tools inform energy assessors, firm engineering, decision makers, and workforce seeking to increase energy resilience and to maximize benefits aligned with performance metrics.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Metrics and Benchmarks for Visualization

What is a "good" visualization? How can the quality of a visualization be measured? How can one tell whether one visualization is "better" than another? I claim that the true quality of a visualization can only be measured in the context of a particular purpose. The same image generated from the same data may be excellent for one purpose and abysmal for another. A good measure of visualization quality will correspond to the performance of users in accomplishing the intended purpose, so the "gold standard" is user testing. As a user of visualization software (or at least a consultant to such users) I don't expect visualization software to have been tested in this way for every possible use. In fact, scientific visualization (as distinct from more "production oriented" uses of visualization) will continually encounter new data, new questions and new purposes; user testing can never keep up. User need software they can trust, and advice on appropriate visualizations of particular purposes. Considering the following four processes, and their impact on visualization trustworthiness, reveals important work needed to create worthwhile metrics and benchmarks for visualization. These four processes are (1) complete system testing (user-in-loop), (2) software testing, (3) software design and (4) information dissemination. Additional information is contained in the original extended abstract.

Uselton, Samuel P.↗

A Large-Scale Analysis to Optimize the Control and V2V Communication Protocols for CDA Agreement-Seeking Cooperation

Cooperative driving automation (CDA) Class C, agreement-seeking cooperation, is an innovative and practical solution that can promote cooperation among general passenger vehicles on the road. However, more comprehensive studies are needed before establishing the standard protocols of agreement-seeking cooperation, such as communication frequency and the duration of cooperation. Here, this article presents an initiative study on the impacts of communication capabilities on agreement-seeking cooperation. Through a large-scale analysis by regulating vehicle-to-vehicle (V2V) communication metrics, this work suggests desirable system parameters that can maximize the benefits of cooperation and ensure reliable operability while avoiding exhaustive communication loads. As the first step, an example agreement-seeking cooperation system is created for a car-following scenario, including decision-making and control algorithms for autonomous vehicles. Then, software-in-the-loop tests explore the performance of the developed system as it encounters various communication risks, such as latency and message packet drops. The system performance metrics are evaluated from various angles, including the time consumed for the agreement-seeking process, cooperation ratio, and the ratio of faulty cooperation. Energy saving from the cooperation is assessed by using simulation software that can run multiple high-fidelity vehicle models simultaneously. Based on the analyses, this article suggests the V2V communication requirements for the reliable operation of CDA agreement-seeking, which can be referred to when developing the standard protocols of agreement-seeking cooperation.

42 ENGINEERING↗

Learning from examples - Generation and evaluation of decision trees for software resource analysis

A general solution method for the automatic generation of decision (or classification) trees is investigated. The approach is to provide insights through in-depth empirical characterization and evaluation of decision trees for software resource data analysis. The trees identify classes of objects (software modules) that had high development effort. Sixteen software systems ranging from 3,000 to 112,000 source lines were selected for analysis from a NASA production environment. The collection and analysis of 74 attributes (or metrics), for over 4,700 objects, captured information about the development effort, faults, changes, design style, and implementation style. A total of 9,600 decision trees were automatically generated and evaluated. The trees correctly identified 79.3 percent of the software modules that had high development effort or faults, and the trees generated from the best parameter combinations correctly identified 88.4 percent of the modules on the average.

Selby, Richard W.↗

Software and System Health Management with R2U2

R2U2 (Realizable, Responsive, Unobtrusive Unit) is a hardware-supported tool and framework for the real-time system and software health management of cyber-physical systems. R2U2 continuously monitors properties about safety, performance, and security of the vehicle and can perform diagnostic reasoning. Efficient observers for past-time and future-time Metric Temporal Logic, reasoners for Bayesian Networks, and model-based prognostics algorithms are major components of R2U2. Their combination makes it possible to design powerful models for system runtime monitoring, diagnostics, software health management, prognostics, and security monitoring. The R2U2 monitoring engine is designed for minimal runtime overhead and is available as Simulink block or as a software component for integration into the flight software stack, and enables R2U2 to monitor complex cyber-physical systems without any instrumentation of the flight software. In this presentation, we give an overview of R2U2 architecture and reasoning algorithms, present its features, and give a life demo of the tool.

Schumann, Johann↗

Hybrid-BPR (Bayesian Personalized Ranking with Feature Embeddings and Explicit Negative Sampling) [SWR-26-039]

Hybrid-BPR is a Python library for Bayesian Personalized Ranking (BPR) with two key capabilities that go beyond standard BPR implementations: 1. User and item feature embeddings - incorporate content-based signals (genres, tags, metadata) alongside collaborative filtering. 2. Implicit negative interactions - use observed non-interactions (e.g. viewed-but-not-clicked) as negative training signal instead of random sampling from the full item space. The software is built for recommender systems research with MLflow experiment tracking, parallel hyperparameter sweeps, and standard ranking metrics.

Sandhu, Rimple [National Laboratory of the Rockies↗

Equations for Scoring Rules When Data Are Missing

A document presents equations for scoring rules in a diagnostic and/or prognostic artificial-intelligence software system of the rule-based inference-engine type. The equations define a set of metrics that characterize the evaluation of a rule when data required for the antecedence clause(s) of the rule are missing. The metrics include a primary measure denoted the rule completeness metric (RCM) plus a number of subsidiary measures that contribute to the RCM. The RCM is derived from an analysis of a rule with respect to its truth and a measure of the completeness of its input data. The derivation is such that the truth value of an antecedent is independent of the measure of its completeness. The RCM can be used to compare the degree of completeness of two or more rules with respect to a given set of data. Hence, the RCM can be used as a guide to choosing among rules during the rule-selection phase of operation of the artificial-intelligence system..

James, Mark↗

Runtime Monitoring with R2U2 for Aircraft Systems with Neural Networks

R2U2 (Realizable, Responsive, Unobtrusive Unit) is a hardware-supported tool and framework for real-time system monitoring and software health management of cyber-physical systems. During system operation, R2U2 continuously monitors properties about safety, performance, and security of the vehicle and its vital components and can perform diagnostic reasoning. Efficient observers for past-time and future-time Metric Temporal Logic, fast reasoners for Bayesian Networks, and model-based prognostics algorithms are key components of R2U2 and designed for minimal computational footprint. R2U2 has been implemented in software supporting ROS, NASA's cFS/cFE, and Simulink and as an FPGA configuration. The synergistic combination of monitors and observers in R2U2 makes it possible to design powerful models for system runtime monitoring, diagnostics, software health management, prognostics, and security monitoring. In this presentation, I will give a detailed overview of the R2U2 architecture and its features and will discuss the application of R2U2 for safety-monitoring of a neural-network based autonomous centerline tracking system (ACT) for autonomous aircraft.

Runtime Monitoring↗

Mbin v1.0

The Mbin software, is a software toolkit that implements the IMG metagenome binning pipeline. The software allows the user to process input metagenome contigs, and produces metagenome assembled genomes (metagenome bins) and valuation metrics per bin including completion and contamination estimates, quality assignment, predicted lineage and eukaryotic potential. It is currently packed as a portable docker container and provides the advantage of running the process of binning and analysis of the bins generated, using a suite of tools run sequentially with controls in place to capture errors and optional arguments to run a modified version depending on individual needs and capabilities.

Varghese, Neha↗

Analyzing the test process using structural coverage

A large, commercially developed FORTRAN program was modified to produce structural coverage metrics. The modified program was executed on a set of functionally generated acceptance tests and a large sample of operational usage cases. The resulting structural coverage metrics are combined with fault and error data to evaluate structural coverage. It was shown that in the software environment the functionally generated tests seem to be a good approximation of operational use. The relative proportions of the exercised statement subclasses change as the structural coverage of the program increases. A method was also proposed for evaluating if two sets of input data exercise a program in a similar manner. Evidence was provided that implies that in this environment, faults revealed in a procedure are independent of the number of times the procedure is executed and that it may be reasonable to use procedure coverage in software models that use statement coverage. Finally, the evidence suggests that it may be possible to use structural coverage to aid in the management of the acceptance test processed.

Ramsey, James↗