IV and V Issues in Achieving High Reliability and Safety in Critical Control System Software

Risk analysis and integrated verification and validation are two important elements in a plan for ensuring the safety of critical software systems. We describe an approach we are currently developing for integrating risk analysis, and metrics analysis, and propose a fault predictor that would integrate the results of these activities. Practical difficulties associated with our approach are also discussed, as are limitations of the proposed predictor. We conclude with a discussion of what as been learned to date, and with suggestions for future work.

validation software reliability software risk asse↗

Pre-flight risk assessment in Emergency Medical Service (EMS) helicopters

The Emergency Medical Service (EMS) industry has been the subject of several television and newspaper articles (Harvey and Jensen, 1987) which emphasized the negative aspects, (e.g., fatalities and high accident rates), rather than the life saving services performed. Until recently, the accident rate of the EMS industry has been five times as high as that of other civil helicopters. This high accident rate has been coupled with the dramatic rise in the number of programs. The industry has built from a single service at its inception in 1972, to over 180 in 1987 (Spray, 1987), to the point that 93 percent of the contiguous U.S. is now covered by some type of EMS service. These factors prompted the National Transportation Safety Board (NTSB) to study the accidents that occurred between May 11, 1978 and December 3, 1986 (NTSB, 1988). The NTSB report concluded that 'Sound pilot judgment is central to safe flight operations.' They further stated that '... factors unique to EMS helicopter operations--such as the influence of the mission itself, program competition, and EMS program management perspectives--can drastically influence pilot judgment during the EMS mission.' One of the most difficult decisions that a pilot must make is whether to accept or decline a mission. A pre-flight risk assessment system (SAFE) was developed at NASA-Ames Research Center for civil EMS operations to aid pilots in making this decision objectively. The ability of the SAFE system to predict mission risk profiles was tested at an EMS facility. The results of this field study demonstrated that the usefulness of SAFE was highly dependent on the type of mission flown. SAFE is now being modified so that it can 'learn' with each mission flown. For example, after flying a mission to a particular site, an EMS pilot would input information about this mission into the system, such as new buildings, wires, or approach procedures. Then, the next time a pilot flew a similar mission or one to the same area, this additional information would be taken into account in computing a risk assessment.

Shively, R. J.↗

An Overview of PRA with Applications to Aerospace Systems

Probabilistic Risk Assessment (PRA) is a systematic process for evaluating the probabilities and consequences of undesirable events that can occur in a process or system along with providing a measure of the uncertainty associated with these probability estimates. In the past it was looked at with suspicion by many at NASA, perhaps because of bad experiences with unsuccessful quantitative methods during the Apollo era, but since the Challenger accident NASA has mandated that it be used, and it has been very successful. With NASA's new "faster, better, cheaper" philosophy, it is vital that a tool be in place that can help to achieve these goals in the reliability area. This paper describes the history of PRA, gives examples of its aerospace applications to date, and gives suggestions for how it can be used in the future, both for space shuttle upgrades and for totally new technologies such as the Second Generation Reusable Launch Vehicle.

Sharon E. Navard↗

The Application of Integrated Knowledge-based Systems for the Biomedical Risk Assessment Intelligent Network (BRAIN)

One of NASA's goals for long duration space flight is to maintain acceptable levels of crew health, safety, and performance. One way of meeting this goal is through the Biomedical Risk Assessment Intelligent Network (BRAIN), an integrated network of both human and computer elements. The BRAIN will function as an advisor to flight surgeons by assessing the risk of in-flight biomedical problems and recommending appropriate countermeasures. This paper describes the joint effort among various NASA elements to develop BRAIN and an Infectious Disease Risk Assessment (IDRA) prototype. The implementation of this effort addresses the technological aspects of the following: (1) knowledge acquisition; (2) integration of IDRA components; (3) use of expert systems to automate the biomedical prediction process; (4) development of a user-friendly interface; and (5) integration of the IDRA prototype and Exercise Countermeasures Intelligent System (ExerCISys). Because the C Language, CLIPS (the C Language Integrated Production System), and the X-Window System were portable and easily integrated, they were chosen as the tools for the initial IDRA prototype. The feasibility was tested by developing an IDRA prototype that predicts the individual risk of influenza. The application of knowledge-based systems to risk assessment is of great market value to the medical technology industry.

Loftin, Karin C.↗

Harnessing the Risk-Related Data Supply Chain: An Information Architecture Approach to Enriching Human System Research and Operations Knowledge

An Information Architecture facilitates the understanding and, hence, harnessing of the human system risk-related data supply chain which enhances the ability to securely collect, integrate, and share data assets that improve human system research and operations. By mapping the risk-related data flow from raw data to useable information and knowledge (think of it as a data supply chain), the Human Research Program (HRP) and Space Life Science Directorate (SLSD) are building an information architecture plan to leverage their existing, and often shared, IT infrastructure.

Buquo, Lynn E.↗

Research in Modeling and Simulation for Airspace Systems Innovation

This viewgraph presentation provides an overview of some of the applied research and simulation methodologies at the NASA Langley Research Center that support aerospace systems innovation. Risk assessment methodologies, complex systems design and analysis methodologies, and aer ospace operations simulations are described. Potential areas for future research and collaboration using interactive and distributed simula tions are also proposed.

Ballin, Mark G.↗

Functional Risk Modeling for Lunar Surface Systems

We introduce an approach to risk modeling that we call functional modeling , which we have developed to estimate the capabilities of a lunar base. The functional model tracks the availability of functions provided by systems, in addition to the operational state of those systems constituent strings. By tracking functions, we are able to identify cases where identical functions are provided by elements (rovers, habitats, etc.) that are connected together on the lunar surface. We credit functional diversity in those cases, and in doing so compute more realistic estimates of operational mode availabilities. The functional modeling approach yields more realistic estimates of the availability of the various operational modes provided to astronauts by the ensemble of surface elements included in a lunar base architecture. By tracking functional availability the effects of diverse backup, which often exists when two or more independent elements are connected together, is properly accounted for.

Thomson, Fraser↗

Program Promotion Can Distort Space Systems Engineering and Deny Risk

NASA's spectacular success in the Apollo moon landings was achieved against the odds by an obsessive dedication to reducing the great risk. But risk analysis predicted so many astronaut fatalities that it was thought to be unreasonably pessimistic and potentially damaging to the Apollo program. Risk analysis was discontinued, risk was neglected in space shuttle engineering, and so the space shuttle design was unnecessarily dangerous. Since the Apollo era it has been understood that long human space missions would recycle oxygen and water to avoid the very high launch cost of directly supplying them. The development of recycling systems was justified by the need to increase material closure and reduce launch mass. When it was recognized that increasing closure leads to rapidly diminishing returns, the program goal was changed to reducing launch mass and reliability, cost, and risk were considered irrelevant. Systems engineering and especially the discouraging problems of risk and cost have been deliberately ignored because they detract from program promotion, with unfortunate results. Current human launch system design does account for risk and the result strongly resembles Apollo. Current life support design continues to assume recycling, even though the recent great reduction in launch cost now allows direct supply of oxygen and water with significantly better quality, reliability, cost, and risk.

Advocacy↗

Cost reduction by integration of the assurance technologies.

It is shown how the cost of applying assurance disciplines to the development of complex systems can be reduced by integrating the mechanics of system engineering and system management into a 'Development Risk Control System'. The essential features of the integration process are examined. A 'Development Risk Management Model' is described, and the use of the model to integrate and thereby reduce the cost of other assurance disciplines is discussed and illustrated.

Ball, L. W.↗

Safety analysis for complex systems

Operational risk assessment considers hardware, environment, and human factors. Technique starts with division of postulated mission into segments which are further subdivided into separate operational steps. Consequences of steps, nonoccurrence, premature operation, out-of-sequence operation, and inadvertent execution are examined at subevent, event, and phase levels. Hazards are identified and treated individually. Analysis is well suited to application in energy and transportation fields.

Onesty, J. P.↗

Intelligent systems/software engineering methodology - A process to manage cost and risk

A systems development methodology is discussed that has been successfully applied to the construction of a number of intelligent systems. This methodology is a refinement of both evolutionary and spiral development methodologies. It is appropriate for development of intelligent systems. The application of advanced engineering methodology to the development of software products and intelligent systems is an important step toward supporting the transition of AI technology into aerospace applications. A description of the methodology and the process model from which it derives is given. Associated documents and tools are described which are used to manage the development process and record and report the emerging design.

Friedlander, Carl↗

Product Engineering Class in the Software Safety Risk Taxonomy for Building Safety-Critical Systems

When software safety requirements are imposed on legacy safety-critical systems, retrospective safety cases need to be formulated as part of recertifying the systems for further use and risks must be documented and managed to give confidence for reusing the systems. The SEJ Software Development Risk Taxonomy [4] focuses on general software development issues. It does not, however, cover all the safety risks. The Software Safety Risk Taxonomy [8] was developed which provides a construct for eliciting and categorizing software safety risks in a straightforward manner. In this paper, we present extended work on the taxonomy for safety that incorporates the additional issues inherent in the development and maintenance of safety-critical systems with software. An instrument called a Software Safety Risk Taxonomy Based Questionnaire (TBQ) is generated containing questions addressing each safety attribute in the Software Safety Risk Taxonomy. Software safety risks are surfaced using the new TBQ and then analyzed. In this paper we give the definitions for the specialized Product Engineering Class within the Software Safety Risk Taxonomy. At the end of the paper, we present the tool known as the 'Legacy Systems Risk Database Tool' that is used to collect and analyze the data required to show traceability to a particular safety standard

Hill, Janice↗

Technology Development Risk Assessment for Space Transportation Systems

A new approach for assessing development risk associated with technology development projects is presented. The method represents technology evolution in terms of sector-specific discrete development stages. A Monte Carlo simulation is used to generate development probability distributions based on statistical models of the discrete transitions. Development risk is derived from the resulting probability distributions and specific program requirements. Two sample cases are discussed to illustrate the approach, a single rocket engine development and a three-technology space transportation portfolio.

Mathias, Donovan L.↗

Interface Consistency: Phase I Results & Phase II Status

Future exploration missions will rely on designing and developing vehicles and complex systems from within NASA and through multiple external commercial partners to meet mission goals. Despite existing consistency-related agency requirements, NASA’s approach to commercial spaceflight development encourages providers’ flexibility and innovation. This strategy is resulting in significant design diversity across Artemis vehicles. Design best practices and guidelines champion interface consistency to promote mental model development and knowledge transfer. However, research investigating the benefits of consistency is mixed, and little is known about its role in complex systems. Determining the level of risk that system diversity presents is difficult, as there is no established method for quantifying the degree of consistency within and across interfaces, nor is there information about the differential impacts of different types of inconsistency. Phase I of this project (Characterization and Measurement) served as a starting point to better understand the construct of consistency, its application, and the range of studies and methods for measuring it. The project team created a taxonomy of consistency to apply to interfaces as a framework to guide the development of tools to assess intersystem consistency. Checklist and cognitive walkthrough methods were developed for use by human factors (HF) and human-computer interaction (HCI) experts. The Intersystem Consistency Scale (ICS) was developed for interface evaluations with crew. A pilot study evaluated the methods’ ability to distinguish differences between Artemis-like prototype pairs exhibiting either high or low design consistency. In addition, click errors and time on task were collected within the ICS (crew-like) group. Results from our exploratory analysis and lessons learned from the pilot study will be discussed. The project team will also present the status of Phase II (Risk Assessment, Standards and Guidelines). This includes incorporating feedback to redesign the assessment tools, and inputs from displays and training Subject Matter Experts to update tasks and prototype designs. The team will present the risk assessment study design to identify the types and levels of inconsistency that pose the greatest risk to performance. Plans to apply these results toward agency standards and guideline recommendations will also be discussed.

Human-Computer Interaction↗

The economic viability of pursuing a space power system concept

The development of a space power system requires no fundamental technological breakthroughs. There are, however, uncertainties regarding the degree to which necessary developments can be achieved or exceeded. An analysis is conducted concerning the implementation of a 5000 MW space-based solar power system based on photovoltaic conversion of solar energy to electrical energy. The solar array is about 13 km long and 5 km wide. Placed in geosynchronous orbit, it provides power to the earth for 30 years. Attention is given to the economic feasibility of a space power system, a risk analysis for space power systems, and the use of the presented methodology for comparing alternative technology development programs.

Hazelrigg, G. A., Jr.↗

Conceptual Design of the Adaptive Optics System for the Laser Communication Relay Demonstration Ground Station at Table Mountain

The Laser Communication Relay Demonstration will feature a geostationary satellite communicating via optical links to multiple ground stations. The first ground station (GS-1) is the 1m OCTL telescope at Table Mountain in California. The optical link will utilize pulse position modulation (PPM) and differential phase shift keying (DPSK) protocols. The DPSK link necessitates that adaptive optics (AO) be used to relay the incoming beam into the single mode fiber that is the input of the modem. The GS-1 AO system will have two MEMS Deformable mirrors to achieve the needed actuator density and stroke limit. The AO system will sense the aberrations with a Shack-Hartmann wavefront sensor using the light from the communication link's 1.55 microns laser to close the loop. The system will operate day and night. The system's software will be based on heritage software from the Palm 3000 AO system, reducing risk and cost. The AO system is being designed to work at r(sub 0) greater than 3.3 cm (measured at 500 nm and zenith) and at elevations greater than 20deg above the horizon. In our worst case operating conditions we expect to achieve Strehl ratios of over 70% (at 1.55 microns), which should couple 57% of the light into the single mode DPSK fiber. This paper describes the conceptual design of the AO system, predicted performance and discusses some of the trades that were conducted during the design process.

optical communications↗

Flow-Field Measurements in a Wing-Fuselage Junction Using an Embedded Particle Image Velocimetry System

A novel, embedded, 2D Particle Image Velocimetry system has been developed and implemented to obtain off-body velocity measurements in the junction of an 8% wing-body configuration in the NASA Langley Research Center 14- by 22-Foot Subsonic Tunnel. Although the initial purpose for implementing the system during this test was to evaluate system performance and identify potential risks, the system worked remarkably well and a considerable amount of data were obtained in the wing-fuselage junction near the trailing edge at a Reynolds Number of 2.4 Million and angle of attack of 5 degrees. In addition to providing notable efficiencies with regard to image acquisition and test operations, the PIV system proved to be quite capable of capturing unique details of the flow separation to complement the extensive suite of measurement techniques applied during the test. Instantaneous PIV vector fields reveal that the flow separation is not stationary but rather highly dynamic. Mean flow statistics calculated from the PIV measurements highlight where reverse flow and Reynolds stresses are concentrated in the separated region and agree well with results from the embedded Laser Doppler Velocimeter system and Computational Fluid Dynamics. The comparisons and additional insight gained during this effort will help guide system improvements for follow-on tests.

Jenkins, Luther N.↗