Search NASA⌕ Search

SEARCH · Search NASA

Results for “technology innovations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Assessing the evolution of research topics in a biological field using plant science as an example

Scientific advances due to conceptual or technological innovations can be revealed by examining how research topics have evolved. But such topical evolution is difficult to uncover and quantify because of the large body of literature and the need for expert knowledge in a wide range of areas in a field. Using plant biology as an example, we used machine learning and language models to classify plant science citations into topics representing interconnected, evolving subfields. The changes in prevalence of topical records over the last 50 years reflect shifts in major research trends and recent radiation of new topics, as well as turnover of model species and vastly different plant science research trajectories among countries. Our approaches readily summarize the topical diversity and evolution of a scientific field with hundreds of thousands of relevant papers, and they can be applied broadly to other fields.

60 APPLIED LIFE SCIENCES↗

Integrated Solutions for Optimized Performance (ISOP) Final Technical Report

The goal of this project was to demonstrate technical feasibility of an integrated approach for deep energy retrofits by packaging innovative technologies with smart communicating controls that represent the next generation of energy efficiency. The integrated solutions for optimized performance (ISOP) package integrates (i) advanced lighting and plug load controls; (ii) intelligent daylight harvesting through automated self-powered shades and window films; (iii) advanced HVAC controls sequences (ASHRAE Guideline (GDL) 36); and (iv) fault detection and diagnosis (FDD) and continuous commissioning (CCx) using advanced analytics. These technologies address energy use across multiple building end uses that represent more than 60% of the energy consumption in all commercial buildings. The project was structured to be implemented over three budget periods: Budget Period 1 scope included site selection, project design, site-specific customization of technology packages, procurement of technologies, initiation of installation of technologies, the development of a measurement and verification plan and collection of pre-retrofit data collection. The first year go/no-go decision was based on securing host sites representing 250,000 sq. ft. of occupied operational spaces, savings analysis, technology procurement and initiation of installation. Budget Period 2 planned to complete technology installations and initiate data collection of post-retrofit performance data. The second year go/no-go was to be the completion of technology installations and commissioning, metering and data collecting to support the requirements laid out in site specific M&V plans. Budget Period 3 planned to collect and analyze post-retrofit performance data and provide data and reporting to support energy efficiency rebate programs. After the team completed activities planned for Budget Period 1, the team reached a Go/No-Go Decision Point. At that point, TRC recommended that DOE discontinue the project without prejudice due to challenges with securing demonstration sites to meet the full 250,000 sf of occupied operational spaces and DOE concurred. In Budget Period 1, the TRC team developed criteria to recruit and evaluate potential demonstration host sites. TRC worked with Princeton University, the project demonstration partner, to identify buildings on their campus as potential candidates for the demonstration. Following the selection of demonstration sites, the TRC team customized energy technology packages according to the needs and characteristics of each site. TRC defined technology specifications, identified vendors, and conducted analysis to estimate energy and cost savings potential. The project team then developed schedules for technology procurement processes and scheduled for installation at all selected demonstration sites. The project team worked with Princeton University and DOE to develop an approach to verify energy savings achieved through measurement and verification (M&V) 2.0 methods. Princeton University initiated open bids to procure the necessary materials and installation contractors. Bid results came back higher than estimates due to a couple of factors – lack of familiarity of the bidders with the proposed technologies and lack of local trained installers to execute the installation of these new measures. Due to the higher bids, projects no longer met the internal cost-effectiveness criteria used by Princeton to proceed with procurement of the full suite of technologies as proposed in ISOP. Princeton had already procured parts of the ISOP package as part of a campus-wide initiative for FDD and lighting retrofits, but with the higher costs for other ISOP components, Princeton could no longer commit to the full ISOP package on the selected sites. Based on this, the team reached the Go/No-Go decision point, where they decided not to proceed with the project. Princeton is separately installing portions of the ISOP package where they individually meet Princeton’s payback criteria but on a different schedule than would have been needed for the DOE ISOP project. The team has learned several lessons from project progress in the first budget period. The team will utilize these lessons in future projects, as should any team which proceeds with a project around the ISOP technology. The first lesson is that more information about the proposed sites is required earlier in the process (perhaps even at the proposal stage) in order to have a successful demonstration. Technical details not evident earlier in the process (such as the TLED limitations for ALCS) can derail project execution. The second lesson is that pricing of emerging technologies is highly variable due to lack of familiarity of local installers and distributor with the proposed technologies as well as alternate bids using products they were more familiar with, but that cost more than the ones proposed by TRC. Finally, the last major lesson is that the host site’s internal project criteria is of critical importance. Based on these higher installed costs and lack of an informed installer base for the products proposed for this project, the project does not meet Princeton’s simple payback goals of five years.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Continuous Water Quality Sensing for FGD Wastewater

The coal fired plant power industry requires new solutions for on-line monitoring of flue gas desulfurization (FGD) wastewaters for regulated trace metals to reduce recurring operating and off-site laboratory analysis costs and provide a high level of confidence of compliance with state and federal discharge guidelines. The University of Alabama at Birmingham (UAB) developed an integrated water sensor package for continuous water quality monitoring of flue gas desulfurization (FGD) wastewaters for concentration measurements of Selenium (Se). UAB utilized a diverse team of University Professors/Staff Members/Student(s) (Engineering and Innovative Technology Development Group), a University Affiliated Research Institution from the local area (Southern Research), and a cost sharing Industry Partner (Metrohm). The team developed and validated a proprietary wet chemistry batch process for water sample preparation; and implemented this process as a fully automated on-line monitor prototype system. This prototype system’s performance was evaluated in both the laboratory and during in-field deployment to a coal fired power plant. In both environments it was found that the prototype system was unable to recreate the batch process’s success at preparing FGD water samples for total Se measurements with a commercial-off-the-shelf (COTS) cyclic anodic stripping voltammetry (CSV) system. Through this experience, UAB has provided insight into a number of specific areas where improvements can be made with respect to the COTS systems used in this project to yield a more complete and competitive industry solution for on-line monitoring of total Se in industrial wastewater.

01 COAL, LIGNITE, AND PEAT↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

ORBIT: Offshore Renewables Balance-of-System and Installation Tool

This report describes the Offshore Renewables Balance-of-system Installation Tool ("ORBIT"), a new model developed by the National Renewable Energy Laboratory (NREL) to evaluate the balance-of-system (BOS) costs associated with offshore wind projects. In the context of wind energy projects BOS costs encompass all expenses required to construct a project other than the capital expenditures (CapEx) of the turbines and towers, including the procurement costs for all other components (such as substructures, cables, and electrical infrastructure), offshore and land-based construction costs, port costs, site surveying fees, permitting fees, and leasing fees are all categorized as BOS costs. BOS costs significantly contribute to the levelized cost of energy (LCOE) for offshore wind, typically comprising over 50\% of the CapEx for a fixed-bottom offshore wind project and 60\% for a floating project. In addition, technology solutions and installation methods vary drastically between projects as they are impacted by factors such as vessel availability, geographic considerations and site geotechnical conditions. These effects require a model with appropriate fidelity to understand how these costs scale as turbine rating increases and the offshore wind supply chain, particularly offshore construction vessels, is expanded. For offshore wind, cost savings attributed to increased turbine rating are primarily realized through BOS procurement and project installation as fewer substructures and less cable are required. BOS costs represent both a modeling challenge, as well as an opportunity, for project developers to optimize solutions to reduce costs. It is critical to understand how these costs are affected by novel technologies, innovative installation processes, and operational constraints in order identify meaningful cost reductions for offshore wind energy.

17 WIND ENERGY↗

Empowering Energy Efficiency in Existing Big-Box Retail/Grocery Stores (Final Optimization Report)

The Center for Sustainable Energy (CSE), in partnership with the National Renewable Energy Laboratory (NREL), TRC Energy Services, P2S Engineering Inc, Walmart, and five innovative technology providers, are to demonstrate the impact of an integrated suite of pre-commercial energy efficiency (EE) technologies in a large, existing, retail building located within an inland disadvantaged community. Proposed technology packages include three categories of advanced EE solutions: heating, ventilating, air-conditioning, and refrigerating (HVAC/R); lighting; and integrated system and building level controls. The project is designed to impact Walmart’s future store specifications, which can be replicated and deployed in other buildings across California with similar end-use and system characteristics. The following lists the technologies considered for this project: DualCool (HVAC evaporative cooling); Software Motor Company (SMC) (HVAC and refrigeration fan motor); I2S: DC LED lighting; LocBit: building energy management and optimization; Saya: water monitoring.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

About the Complex Natural and Engineered Systems Pillar

Los Alamos National Laboratory is a world leader in applying multi-disciplinary science to complex systems within the Complex Natural and Engineered Systems (CNES) challenge areas. Our search for solutions requires science and technology innovation, as well as an integrated experiment, theory, and modeling and simulation approach. Our research and development spans from improving engineered systems such as nuclear weapons and the power grid, to understanding the interface of human and engineered systems from the subsurface to space, to studying how complex natural systems such as disease and climate impact humanity.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Knowledge Spillovers and Cost Reductions in Solar Soft Costs

Despite the commonly acknowledged importance of knowledge spillovers in reducing solar soft costs, we are only beginning to answer a fundamental question: who learns what (knowledge acquisition), from whom (knowledge production), and how (spillover mechanisms)? Until recently, this important topic has been largely unexplored in the case of solar soft costs. Thus, this project set out to identify how knowledge spillovers affect soft costs in the U.S. photovoltaic (PV) installation industry, specifically how important spillovers are, what types of knowledge are most likely to spillover, and how networks of actors affect spillovers. Our findings offer insights for designing solutions that address problems associated with knowledge spillovers and that leverage spillovers to reduce solar soft costs. Recognizing the ambiguity in the definition of soft costs, i.e., “non-hardware costs,” and variability in soft cost categories, we developed the Solar Soft Cost Ontology (SSCO) to systematically identify key concepts related to soft costs, network actors, learning processes, and the relationships between them. This ontology served as a foundational organizational structure for the methodology of the remaining tasks: case studies, surveys, pricing analysis, patent analysis, network analysis, and project integration across tasks. While there is substantial learning among installers that is reducing the soft costs for PV installations, most of that learning is retained by firms rather than spread across the industry. The positive relationship between experience accumulation and cost reductions is typically explained as learning by doing (LBD), but we find that LBD effects are mediated by other learning mechanisms, including learning by searching and learning by interacting. Knowledge spillovers have significant potential to reduce solar PV soft costs, but successful knowledge spillover pathways are complex and non-trivial. There are a wide variety of ways to construct an installation business, thus categories of firms that can effectively cross-learn directly are small and what knowledge is relevant to whom is challenging and costly for firms to assess. This fragmentation limits the critical mass needed for spillover related soft cost reductions. Knowledge does not flow directly between installers. Indirect knowledge transfer pathways are critical: distributors, software providers, collaboratives, and hiring. Furthermore, diverse, more integrated knowledge networks tend to promote successful learning by organizations and across the system as a whole. Accordingly, we find the need to supporting the whole ecosystem using an integrated policy and programmatic approach to support installers, distributors, complementary sector, and facilitators. Overall, a deliberate policy-mix design is needed to reduce the solar PV deployment barrier in terms of installation cost reductions, because deployment policies could potentially interact with policies that facilitate network-building and technological innovation. A combination of deployment policies, innovation-support policies, and network-facilitating policies could potentially lead to a more desired market outcome through achieving higher joint learning rates from firms’ cumulative experiences developed in a more integrated production and deployment ecosystem.

14 SOLAR ENERGY↗

New High-Energy & Safe Battery Technology with Extreme Fast Charging Capability for Automotive Applications (Final Technical Report)

Being able to refill a cars gas tank when low on fuel is incredibly convenient and is a lacking feature for battery elective vehicles. New High-Energy & Safe Battery Technology with Extreme Fast Charging Capability for Automotive Applications was a research project designed to help correct this lacking feature by developing automotive sized Li-ion battery cells and demonstrating their ability to charge in under 10-minutes. To address the technical challenges Microvast, a cell manufacturer, was joined by Argonne National Labs, battery technology innovator, and BMW, a renown OEM, worked together to define and validate materials and cells for this project. By projects end, Microvast had successfully built and demonstrated a 240 Wh/kg, 35 Ah pouch cell that was capable of over 800 10-minute charge, full discharge cycles. From the outset of the project the plan was to use large amp-hour cells (ie automotive relevant sizes) to ensure the project findings and outcomes were most relevant for electric vehicle applications. The manufacture of cells was done using test manufacturing lines at Microvast and BMW that closely resemble the procedures of a Li-ion battery cell factory.

25 ENERGY STORAGE↗

Hamilton: Flexible, Open Source $10 Wireless Sensor System for Energy Efficient Building Operation

Sensors for improving building performance are rapidly populating the market, driven in part by the drive to reduce greenhouse gas emissions resulting from energy production as well as improve the interior environment for healthy and more productive spaces. UC Berkeley has led wireless sensor development over the past 25 years (e.g., Telos mote), with the Hamilton (named after Alexander Hamilton on the US $10 bill) as the most recent. The Hamilton sensor was designed as a low-cost high-performance sensor that is modular and interoperable. The objective of the Hamilton project was to create, evaluate and establish the technological foundations for secure and easy to deploy building energy efficiency applications utilizing pervasive, low-cost wireless sensors integrated with traditional Building Management Systems (BMS), consumer-sector building components, and powerful data analytics. The project included iterative hardware design, incorporating a high-performance database (BTrDb, http://btrdb.io/), creating and iterating the development of secure data middleware (BOSSwave, WAVE/WAVEMQ), working with and pushing the development of an open-source tiny operating system RiotOS, and implementing and improving protocols such as Thread/OpenThread and TCP/IP. The hardware benefited from careful design to drive down the cost; the design included a System-on-a-Chip (SoC), chip antenna, single crystal and five passive components. Careful design of the operating system created a low-power design to enable a long life with small batteries. The hardware included several sensors: temperature, radiant temperature, relative humidity, magnetometer, accelerometer, and light, with an optional occupancy (Passive InfraRed) sensor. The project was the basis of several applications, both internal to the research team and other researchers and professionals at other institutions. Several applications used the sensor hardware as the basis for other complex devices. Other applications used the sensors to improve building performance through interoperating with the building Heating Ventilation and Air-Conditioning (HVAC) system, such as using occupancy and/or distributed temperature sensing to reduce HVAC zone energy while still providing thermal comfort and to reduce peak loads in small commercial buildings. We demonstrated cloud-based energy analytics, implemented a schedule and a Model Predictive Controller in a small commercial building to optimize HVAC energy, occupancy and electricity price. Initial integration of these technological innovations was performed through the creation of execution containers containing the WAVE agent and various driver, proxy, or building system function logic. The research added to the understanding of efficient sensor hardware, secure middleware, time-series data management (high performance database), efficient communication protocols, and interoperating with applications and building systems. The project showed the technical effectiveness and economic feasibility of creating a low-cost, modular, and easy-to-deploy sensor. Through conversations with multiple end users, the research team discovered that many customers wanted data management and services in addition to the sensors. HamiltonIOT developed packages of sensors, border router, and data services to provide a seamless “plug-and-play” sensor deployment. Some customers were willing to pay for higher quality sensors (such as light); some customers wanted a robust enclosure (waterproof).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Physics-Based Fluid System Performance Monitoring to Support Nuclear Power Plant Operations. Final CRADA report

This project targeted performance monitoring requirements for nuclear power plants with the goal of improving plant economics. We introduced a new and innovative technology to the industry that can reduce operations staffing levels by automating surveillance and can reduce maintenance staffing levels by providing early detection of degrading equipment. A beta-stage release of the PRO-AID power plant equipment fault diagnostic software ready for deployment in nuclear power plants will be delivered and demonstrated in a utility pilot project. To provide for efficient use of DOE funds the aim is to generate a minimum viable product for which we can prove the value of the product. The end state product will be serviceable for use in either a simulator environment or plant environment. The former provides a means for demonstration of the diagnostic capability for faults unlikely to be encountered in day-to-day operations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Primer on the Cost of Marine Fuels Compliant with IMO 2020 Rule

This report aims to provide information for owners and operators of U.S. ocean-going marine cargo vessels on the cost of different approaches to compliance with the IMO mandate to reduce the sulfur content of marine fuels (outside emission control areas) to no more than 0.5%. The IMO 2020 rule came into effect on January 1, 2020. The report discusses a suite of options for compliance including low-sulfur petroleum-based fuels and alternative fuels. Since fuel prices are a primary factor in determining the cost of the various alternatives, the document also includes a discussion of the main drivers of marine fuel prices. The cost analysis compares the average annual costs (capital and fuel) out to 2050 of each compliance approach under alternative scenarios regarding fuel prices, policy, and technology innovation. The cost calculations focus on representative U.S. fleet vessels for containership and tanker types. Even though the analysis focuses on average cost of approaches to comply with IMO 2020, the comparison of approaches also acknowledges other benefits or risks including fuel price risk and the contribution of the approach to achieving other potential environmental performance objectives or regulations.

02 PETROLEUM↗

Cross Section Measurements of Photonuclear Reaction Pathways Towards Promising Medical Radioisotopes

Project Objectives: The goal of this project was to generate data relevant to radioisotope production while developing innovative technologies that foster and enhance novel production of radioisotopes, and, also, while providing opportunities for cultivating and training future generations of scientists. This work has provided the foundation for methodologies for determination of photonuclear cross sections over multiple energies in a single irradiation. Simultaneously, the feasibility of electron LINAC production of several in-demand radioisotopes such as 47 Sc, 67 Cu, 77 As, and 186 Re has been demonstrated. To accomplish these objectives a collaboration was formed between two complimentary facilities, the Low Energy Accelerator Facility (LEAF) at Argonne National Laboratory and the High Intensity Gamma-ray Source (HIGS) at Triangular Universities Nuclear Laboratory (TUNL). The involvement of the research group from North Carolina Central University gave students at this Historically Black University experience in forefront nuclear-physics research relevant to addressing a high-priority interdisciplinary issue. Project Description: HIGS provides a nearly monoenergetic gamma-ray beam by intra-cavity Compton backscattering of free-electron photons from electrons circulating in a storage ring. This beam can be collimated to produce a very precise energy beam. If the beam is un-collimated a calculated and precise energy spread of the beam occurs radially. The γ-flux can be evenly distributed over the radial distribution of energy and used to perform activation experiments on concentric ring targets. Thus providing multiple energy ranges in a single irradiation. Each concentric ring target can be counted separately in order to determine activation at the given energy and successively be correlated to the activation cross section. Targets were activated to determine production feasibility using electron beams at LEAF. Potential Impact: The Nuclear Science Advisory Committee recently named production of radioisotopes with electron LINACs as one of the most compelling and largest-impact opportunities for the production of high specific activity radioisotopes. Improving the photonuclear cross sectional data base with experimentally verified results will greatly enhance a researcher’s ability to rationalize electron LINAC production routes towards desired radioisotopes. This work will provide the foundation for methodologies for determination of photonuclear cross sections over multiple energies and multiple targets in a single irradiation. The techniques developed in this project will enable future studies to continue verifying theoretically predicted photonuclear cross section with experimental results. These data will also enable adaptation of models and support more precise theoretical calculation of photonuclear cross sections. This research will involve undergraduates, graduate students, and post-docs to give them a valuable research experience leading towards the next generation of scientists in the field of medical isotopes.

07 ISOTOPE AND RADIATION SOURCES↗

Improving Cost and Safety with Cathode-Healing and Whole Battery Deactivation

Lithium-ion recycling is challenged by cost and safety related to reactivity of lithium and electrolytes. OnTo’s deactivation eliminates flammability and residual reactivity enabling a roadmap for safe, low-cost end-of-life battery services essential to the industry. Deactivation coupled with Cathode-healing provides safety and efficiency in material recycling that can be applied all along the manufacturing value chain. Dr. Sloop will present recent developments in application and scale of these innovative technologies.

25 ENERGY STORAGE↗

Deactivation and Cathode-Healing™ to support the Low-Cost US Supply Chain

Lithium-ion recycling is challenged by cost and safety related to reactivity of lithium and electrolytes. OnTo’s deactivation eliminates flammability and residual reactivity enabling a roadmap for safe, low-cost end-of-life battery services essential to the industry. Deactivation coupled with Cathode-healing provides safety and efficiency in material recycling that can be applied all along the manufacturing value chain. Dr. Sloop will present recent developments in application and scale of these innovative technologies.

25 ENERGY STORAGE↗

Multiple Stream Low-Cost Recycling Method

The global composite industry generates large quantities of waste and which mostly end as landfill due to lack of meaningful end-use applications for the multiple waste streams. In a recent report by the Electric Power Research Institute (EPRI), waste generated by the wind industry could reach 370,000 tons a year of composite wind energy blades being decommissioned and scrapped. Wind energy is just one major industry utilizing composite materials. The waste generated by industry includes End-of-Life (EoL) materials and manufacturing process scrap. GreenTex Solutions has developed a unique and innovative technology to recycle the composite waste streams in a range of forms made from production waste and EoL materials. This includes manufacturing waste materials such as dry chopped fiber tow, loose fibers, shredded fibers from reinforcement fabrics, cured/semi-cured prepregs, and it also includes fully-cured composite structure waste (such as edge trims from cured parts) from manufacturing aircraft, automobiles, wind blades, boats, and composite cylinders (tanks). Current recycling methods involve recovering the structural fiber by removing the matrix resin through methods such as pyrolysis. The resulting fibers are used in injection molding or wet laid nonwoven mats and other usable forms. The GreenTex technology bypasses these intermediate steps to create the lowest possible recycling processing costs and the lowest embodied energy/CO2 emissions. The end-product from the GreenTex technology is a finished industrial composite part/application versus intermediate fibers or fabrics. The GreenTex manufacturing process enables cross-industry reuse of recycled feedstock by taking waste from multiple industries (wind energy, aerospace, marine, etc.) and recycles the waste into a product used in other industries. The initial target market application is structural flooring for intermodal shipping containers and truck bodies. One of the team’s key partners is Wabash National which produced 29,000 truck bodies in 2019. The current flooring system is comprised of solid oak “butcher board” laminated panels. Additionally, Mediterranean Shipping Containers (MSC) transports over 1.8 million twenty-foot equivalent units per year in intermodal shipping containers. The current container floor is laminated hardwood that is harvested from the rain forests of Central and South America. The project is to develop a flooring system made from recycled composites that can be qualified for both companies (Wabash and MSC). Initial prototypes validated that the recycled composites panels are lighter and thinner with much higher mechanical strength. These results suggest a typical truck trailer would have 20% lower tare weight. The GreenTex technology is not limited to flooring and is widely applicable to other transportation elements such as walls, roof elements, cab areas and related structural components. Under this project different composite waste streams were evaluated and then combined to develop a formulation that would meet the targeted performance criteria for a flooring system. Wet compression molding was used to fabricate plaques at different tonnage using various composite waste streams. The plaques were tested for flexure and impact.

36 MATERIALS SCIENCE↗

AI@DOE Interim Executive Report

Interim executive report for DOE’s Office of Science, NNSA, and Applied Energy Offices, in collaboration with the Artificial Intelligence and Technology Office, DOE AI roundtable workshops (December 2021 through February 2022) (“AI@DOE”). These workshops were used to help identify AI research requirements and priorities for the next decade for Department of Energy in developing machine-learning-based prediction and decision-support capabilities that address and anticipate DOE mission challenges. These missions’ challenges for AI include: AI to advance scientific discovery and technological innovation AI to support high consequence decisions while managing risk AI to improve DOE’s responsiveness to national & global issues AI to assist stewardship of the environment and national critical infrastructure These will be addressed in large part through the development and application of new and powerful artificial intelligence and/or machine learning algorithms and strategies. https://web.cvent.com/event/fc3922f8-fc75-4041-a317-f13a1da44f7c/summary?locale=en-US&i=2Wx2tjbStkydRFq_N2whPw

97 MATHEMATICS AND COMPUTING↗

Windfarm Operations and Maintenance cost-Benefit Analysis Tool (WOMBAT)

This report provides technical documentation and background on the newly-developed Wind Operations and Maintenance cost-Benefit Analysis Tool (WOMBAT) software. WOMBAT is an open-source model that can be used to obtain cost estimates for operations and maintenance of land-based or offshore wind power plants. The software was designed to be flexible and modular to allow for implementation of new strategies and technological innovations for wind plant maintenance. WOMBAT uses a process-based simulation approach to model day-to-day operations, repairs, and weather conditions. High-level outputs from WOMBAT, including time-based availability and annual operating costs, are found to agree with published results from other models.

17 WIND ENERGY↗