Search NASA⌕ Search

SEARCH · Search NASA

Results for “utility meter”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Medical Imaging Equipment Energy Efficiency

The energy use of medical imaging equipment (MIE) in healthcare facilities is estimated to be about 5% of total site energy use. MIE energy use is only expected to increase as technology advances and more patients seek services from MIE, enabling more facilities to install additional MIE. Healthcare organizations need reliable information regarding comprehensive energy use or lifetime energy costs with which to make energy-efficient MIE procurement decisions, and there are currently no MIE energy or efficiency standards in the United States (U.S.). This fact sheet provides background on MIE energy consumption, key terms, and guidance on why and how to meter MIE, helping stakeholders make informed decisions to enhance their facility's performance.

ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION↗

Preparing Distribution Utilities for the Future - Unlocking Demand-Side Management Potential: A Novel Analytical Framework

The balance of supply and demand in the power systems has traditionally been served solely through generation and network capacity planning and operations. However, with increased requirements for flexibility due to the uptake in variable renewable generation sources such as wind and solar there is a need to increased demand-side flexibility. In addition, there are increased communications and flexibility capabilities emerging on the demand-side from the adoption of advanced metering infrastructures and smart meter deployment and intelligent loads such as smart thermostats and schedulable white goods (e.g. dishwashers and washing machines). Unlocking demand-side flexibility can bring system benefits from peak load reduction bringing about generation capacity and network upgrade deferral, to reducing demand and more efficient utilization of generation and network capacity. Unlocking demand-side flexibility is an evolving process for utilities and solutions must be tailored to each specific customer group. Demand-side management (DSM) is a broad set of tools that can include demand response (both dispatchable and non-dispatchable), energy efficiency and distributed energy resources and demand-side technologies. The National Renewable Energy Laboratory (NREL), in collaboration with BSES Rajdhani Power Ltd. (BRPL) and Deloitte, examined the potential of DSM in BRPL’s service territory, developing detailed information on customer classes and willingness to participate in DSM. The study developed modeling frameworks for load analysis and the analysis tools to assess the potential of time-of-use tariffs in motivating customers to reduce their peak period energy consumption. The study shows that BRPL customers, specifically their domestic customers, are willing to participate in DSM programs and that time-of-use pricing can help BRPL reduce their peak demand and help unlock demand-side flexibility.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Experimental characterization and potential energy savings of insulated cladding for U.S. residential buildings

This study evaluates a novel insulated cladding composed of foamed cement and vinyl siding that is designed as a retrofit product to enhance thermal performance in U.S. residential buildings. Experimental measurements showed that foamed cement exhibits a thermal conductivity of 0.0334–0.0365 W/m-K (R-value of 4.0–4.3 °F⋅ft 2 ⋅h/BTU), which is significantly higher than that of conventional fiber cement boards. Although mechanical testing confirmed the material’s brittleness and low strength, it also indicated its suitability for nonstructural insulation applications. Water vapor permeability testing demonstrated effective moisture resistance with the polymer coating. To evaluate the insulated cladding’s energy performance, we used the U.S. Department of Energy’s prototype single-family building model and simulated across 50 locations spanning 16 International Energy Conservation Code climate zones. The R-7 (R-value of 7 °F⋅ft 2 ⋅h/BTU per inch) retrofit cladding resulted in heating energy savings up to 275 therms (Fairbanks, AK) and cooling energy savings up to 1,547 kWh (Phoenix, AZ). The energy cost savings varied by region, but the highest annual cost savings ($\$$434/year) were observed in Santa Maria, CA, and the highest annual cost savings percentage (37 %) were noted in Monterey, CA. On a national scale, the insulated retrofit provided an average annual energy cost reduction of 16 %, highlighting the cladding system’s broad applicability and financial viability.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Basin and Range Investigation for Developing Geothermal Energy: Exploration Data

This data package includes exploration material from the Basin & Range Investigation for Developing Geothermal Energy [in Hidden Systems] project (BRIDGE), which is part of a broader initiative to advance the exploration of hidden geothermal resources in the Basin & Range Province of the western U.S. Data modalities include a helicopter-borne time-domain electromagnetic survey, magnetotellurics, 2-meter temperature measurements, ground-based gravity and legacy aeromagnetic surveys, geochemistry, geologic mapping, LiDAR analysis, 3D models, associated geospatial data, and a bibliography of existing data and references utilized in prospect characterization and conceptual modeling. Key files are in CSV, Geosoft, and Geotools formats. Please refer to READMEs for dataset-specific information. Where applicable, acquisition data and inversion models for a particular prospect or area of interest are organized separately. This BRIDGE data package is the product of a collaboration led by Sandia National Laboratories with partners from Geologica Geothermal Group, Inc., the U.S. Navy Geothermal Program Office, and consultants Steven Sewell (Australis Geoscience Ltd) and William Cumming (Cumming Geoscience). The project's areas of interest (AOIs) are based off priority areas of interest in the southwestern portion of the Nevada Play Fairway map, distribution across tectonic provinces, accessibility, and the project team's extensive experience in the region. AOIs cover about a dozen basins that include unexplored prospects, partially explored prospects, and some developed analogue resources that provide validation cases. Many unexplored and partially explored prospects are on U.S. Department of Defense (DoD) land, though adjacent lands are included as well.

15 GEOTHERMAL ENERGY↗

Updating PV and Battery Bill Savings Calculations for Net Billing: New Best Practices for Input Data and Uncertainty

Jurisdictions are increasingly adopting compensation structures for distributed PV and PV-battery systems that price exported energy lower than energy consumed onsite (net billing rates). Standard methods for calculating the bill savings from PV and PV-battery systems were developed for net metering structures, and applying these same methods to net billing structures (such as using Typical Meteorological Year weather with actual year load) introduces bias errors that underestimate PV-battery system bill savings by between 1.5\% and 9\%, depending on the utility rate. We assess the magnitude of these errors and compare them to other sources of uncertainty when estimating the bill savings from PV and PV-battery systems under more complex utility rates.

14 SOLAR ENERGY↗

Infusible thermoplastic resin based sandwich structures for wind blade applications and the influence of scrim on facesheet to core interface debonding

Infusible thermoplastic Elium® family of resins from Arkema have garnered much attention in recent years as a possible replacement for thermoset resins in laminate and sandwich composite manufacturing for wind blade applications due to its ease of recyclability and the ability to utilize existing manufacturing processes without imposing complicated variations. However, physical and mechanical properties of the proposed Elium® based thermoplastic composites must be comparable to existing epoxy (thermoset) based composites using manufacturing processes relevant for large wind turbine blades. A 13-meter-long demonstration blade was manufactured for that purpose and sandwich samples were obtained from that project for a detailed study. This paper details three-point flexural properties of unidirectional E-glass fiber reinforced acrylic and epoxy based sandwich panels with identical balsa wood core materials. In addition, to evaluate the relative merit considering debond failure mode, the interfacial critical strain energy release rate, predominantly in mode-1, was compared via single cantilever beam testing. In sandwich composites constructed with balsa wood core material, resin uptake by the balsa core is traditionally impeded via the insertion of a scrim material at the facesheet to core interface. Results revealed that inclusion of scrim mesh layer at the facesheet to core interface reduced flexural properties and strain energy release rates in panels infused with acrylic resin but did not significantly reduce these properties in epoxy infused facesheets.

Engineering↗

Real-World Distribution System Modeling Framework for Transmission-and-Distribution Cosimulation: Preprint

This paper presents a modeling methodology for realistic distribution system simulation and analysis. The methodology involves three major approaches: utility model conversion, feeder load modeling, and feeder model validation. The feeder models obtained from the utility are converted to the format that is more flexible for analysis and algorithm development. The load profiles down to each node are modeled in detail using advanced metering infrastructure data and supervisory control and data acquisition (SCADA) system measured load data. Then the distribution system models are validated by comparing the simulated feeder-head voltage results and SCADA measured voltage data. To better understand the bulk system operations and the interactions between transmission and distribution systems, the modeled realistic distribution systems are integrated into a transmission-and-distribution cosimulation framework to perform the system simulation from the bulk system down to each node in the distribution system.

load modeling↗

Unbundling Smart Meter Services Through Spatio-Temporal Decomposition Agents in DER-rich Environment

Smart meters and the advanced metering infrastructure (AMI) facilitate distribution system operators (DSOs) to gather information on energy consumption at the customer level. With the increasing penetration of building-level intermittent distributed energy resources (DERs) behind the meter, DER information is not available to DSOs. At the same time, smart meter enables users to participate in grid, with real-time information. Information for behind the meter is needed by user to coordinate building level assets for maximum benefits. The concept of unbundled smart meter (USM) needs agents to decompose smart meter measurements to provide service to DSO as well as customers. In this paper, we propose a Spatio-Temporal Decomposition Agent (STDA) for USM based on Artificial Intelligence (AI). STDA can help users optimize their energy usage, help DSO to utilize building assets for the grid operation. The energy usage strategy developed by STDA is suitable for different users, and can be customized by deep learning (DL) models according to the different energy consumption habits of each user. The power prediction performance results of various DL models and evaluation using a set of data from a Hawaii utility is presented. Furthermore, STDA integration with Home Energy management Systems (HEMS) to manage resources is presented and validated. STDA pre-processes the measurements before model training, and provides the spatio-temporal decomposed forecasting.

42 ENGINEERING↗

Package Data for CERF-Data Centers

This dataset contains sample input 100m resolution raster files for running the CERF-DC python package (see https://github.com/IMMM-SFA/cerf_data_centers) at the state level across the CONUS. Due to data availability constraints, some of the items included in this dataset are proxies or assumptions for siting factors used in the model. These are individually noted in the item descriptions and can be exchanged with more detailed information upon availability. Data Descriptions The following raster files are included in the data download: state_siting_region.tif — State areas identified by state FIPS code composite_siting_suitability.tif — Value of 1 indicates suitable siting location, 0 otherwise. The following areas are excluded from siting: Areas within 300m of a federal airport runway Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory Protected Areas Database of the United States (PAD-US) areas Railroads, major roadways, and minor roadways Military areas and training grounds Developed lands Areas >0.8 km (0.5 miles) from developed lands land_value_dollar_per_sqft.tif — USD per square foot (sqft) derived from USDA $/acre land cost personal_property_tax_rate.tif — Personal property tax rate by state. Uses an assumed 0.0125 personal property tax rate for states with personal property tax, 0 for states without personal property tax. real_property_tax_rate.tif — Real property tax rate. Based on county level residential real estate property tax rates. sales_tax_rate.tif — Sales tax rate by state. mechanical_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through mechanical processes based on local water stress and humidity levels. water_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through evaporative (water cooled) processes based on local water stress and humidity levels. distance_to_substation.tif — Distance to nearest substation in hundreds of meters (i.e., value of 1 equals a distance of 100m). Offshore areas have a value of 0. industrial_electricity_rates_dollar_per_kwh.tif — USD/kWh industrial electricity rates. Represents the average industrial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. commercial_electricity_rates_dollar_per_kwh.tif — USD/kWh commercial electricity rates. Represents the average commercial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. data_center_market_locations.tif — Grid cells with positive values represent the centroid of existing data center market clusters. The value of non-zero grid cells represents the number of data centers in the market cluster. All other grid cells have a value of 0. Geospatial Metadata CRS: Albers Equal Area Conic (ESRI:102003) Extent: -2415585.0000000023283064,-1441981.2605773280374706 : 2384414.9999999976716936,1708018.7394226719625294 Dimensions: X: 48000 Y: 31500 Bands: 1 Origin: -2415585.0000000023283064,1708018.7394226719625294 Pixel Size: 100,-100 Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall↗

Package Data for CERF-Data Centers

This dataset contains sample input 100m resolution raster files for running the CERF-DC python package (see https://github.com/IMMM-SFA/cerf_data_centers) at the state level across the CONUS. Due to data availability constraints, some of the items included in this dataset are proxies or assumptions for siting factors used in the model. These are individually noted in the item descriptions and can be exchanged with more detailed information upon availability. Data Descriptions The following raster files are included in the data download: state_siting_region.tif — State areas identified by state FIPS code composite_siting_suitability.tif — Value of 1 indicates suitable siting location, 0 otherwise. The following areas are excluded from siting: Areas within 300 m of a federal airport runway or within an airport area boundary Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory USGS Protected Areas Database of the United States (PAD-US) GAP status 1, 2, or 3 areas US National Parks Wetlands USFWS critical habitats BIA land areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands land_value_dollar_per_sqft.tif — USD per square foot (sqft) derived from USDA $/acre land cost personal_property_tax_rate.tif — Personal property tax rate by state. Uses an assumed 0.0125 personal property tax rate for states with personal property tax, 0 for states without personal property tax. real_property_tax_rate.tif — Real property tax rate. Based on county level residential real estate property tax rates. sales_tax_rate.tif — Sales tax rate by state. mechanical_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through mechanical processes based on local water stress and humidity levels. water_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through evaporative (water cooled) processes based on local water stress and humidity levels. distance_to_substation.tif — Distance to nearest substation in hundreds of meters (i.e., value of 1 equals a distance of 100m). Offshore areas have a value of 0. industrial_electricity_rates_dollar_per_kwh.tif — USD/kWh industrial electricity rates. Represents the average industrial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. commercial_electricity_rates_dollar_per_kwh.tif — USD/kWh commercial electricity rates. Represents the average commercial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. data_center_market_locations.tif — Grid cells with positive values represent the centroid of existing data center market clusters. The value of non-zero grid cells represents the number of data centers in the market cluster. All other grid cells have a value of 0. Geospatial Metadata CRS: Albers Equal Area Conic (ESRI:102003) Extent: -2415585.0000000023283064,-1441981.2605773280374706 : 2384414.9999999976716936,1708018.7394226719625294 Dimensions: X: 48000 Y: 31500 Bands: 1 Origin: -2415585.0000000023283064,1708018.7394226719625294 Pixel Size: 100,-100 Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall↗

A Model-Predictive Hierarchical-Control Framework for Aggregating Residential DERs to Provide Grid Regulation Services: Preprint

This paper develops a hierarchical control fram-ework to aggregate and control behind-the-meter distributed energy resources (DERs), which will be ubiquitous in future distribution systems. Even though the increasing penetration of DERs will strain the power networks in terms of voltage regul-ation and coordination issues with existing transmission-level conventional generators, the distribution-level DERs can also be utilized to help provide flexibility to the power network while providing cost savings to the DER owners. Therefore, this paper develops a model-predictive control strategy to determine the available power flexibility, and to utilize the flexibility in an aggregated form to provide grid regulation services. Numerical simulations performed on the IEEE 37-bus test system demonstrate the efficacy of the proposed approach.

14 SOLAR ENERGY↗

On data-driven energy flexibility quantification: A framework and case study

Building energy flexibility is an important resource for a sustainable and resilient power grid, and an important measure to reduce utility costs for building owners. Quantifying energy flexibility for existing buildings can provide critical insights in optimizing their operation. Data-driven methods for building energy modeling and analytics are gaining popularity due to the increasingly available sensor and meter infrastructure, affordable computational resources, and advanced modeling algorithms. However, their application in quantifying the energy flexibility of real buildings is still limited due to the heterogeneous data types and limited data availability. Here, this study proposes a framework for building-level data-driven energy flexibility quantification that considers different levels of data availability and use cases. Two case studies with real building data collected at different scales were conducted to demonstrate the proposed framework for different purposes.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Behind-the-Meter Solar Accounting in Renewable Portfolio Standards

If a behind-the-meter solar photovoltaic (BTM PV) system is adopted, how does that influence the total amount of renewable electricity in its state in the long run (i.e., after the existence of the generator is reflected in the relevant utility's generation mix)? Would we expect the total amount of renewable generation to increase on a 1:1 basis with the BTM PV's generation? Or could it be something more, or something less? We show in this paper that the answer can depend on two key elements of how BTM PV is accounted for in a state’s renewable portfolio standard (RPS): (1) whether renewable energy certificates (RECs) from BTM PV can be used for RPS compliance, and (2) whether load served by generation from BTM PV counts as load covered by the RPS. These two elements combine into four possible accounting options, and we characterize the implications of each under the simplifying assumptions that the RPS is binding and the BTM PV RECs are used for compliance when allowed. For example, if load served by BTM PV generation counts toward the RPS load and BTM PV RECs cannot be used for compliance, the presence of BTM does not change the amount of RECs that the utility is required to retire, and yet additional RECs will be retired by the BTM PV owner - therefore, the total amount of renewable generation would increase on a 1:1 basis with the BTM PV generation. In contrast, under a common RPS design in which BTM PV RECs can be used for compliance and the load served by BTM PV generation is not covered by the RPS, the presence of BTM PV and transfer of RECs for compliance can actually decrease the total amount of renewable generation in the state, relative to a situation in which there is no BTM PV.

14 SOLAR ENERGY↗

A multi-agent approach to distribution system fault section estimation in smart grid environment

We report that Multi-Agent Systems (MAS) are seen from different areas as one of the paramount trends for the next generation of power systems. Numerous published studies about MAS discuss its utilization in power distribution networks but none focuses on the prior step to restoration and self-healing that is fault section estimation. This paper aims to show how MAS can improve the utilities’ reliability indexes and consumer satisfaction by overcoming the multiple fault section estimation problem. In order to do this, the authors considered using MAS as a means of communication between smart meters. The purpose of smart meters usage is to employ devices that are already present in smart grids, mainly because of their reading and saving data capacity. The proposed method was tested on a radial feeder generated by the authors. The network was built on HYPERSIM, a software platform of OPAL-RT Technologies. The simulation results show that this MAS provides speed, efficiency, and automation for the process of fault section estimation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wave energy converter buoy for Arctic observations

Ocean observation buoys are currently powered-constrained by battery storage capacity or available solar power. Power constraints limit the number of measurements that can be made and the lifetime of the buoys. Ocean surface wave energy could be used for power production, but wave energy converters are not yet commercially available for ocean observation buoys. Here we present the design and testing of a drifting wave energy converter buoy using a pendulum transmission system (PTS). The wave energy converter buoy was designed to operate in Arctic temperatures and wave conditions, but it could be used in areas with warmer temperatures and larger waves. Field tests measured a maximum power production of 5 watts in waves with a significant wave height of 0.42 meters and a ten minute average power production of 37 milliwatts. Power production increased with the energy period and significant wave height. The energy harvesting capabilities of the PTS showed the utility of adding a wave energy conversion device to a drifting ocean observation buoy.

Arctic observations↗

Fort Erie On-Demand Transit Case Study

Rural and smaller-sized communities in North America face unique mobility challenges due to their low population density, lower public transit spending per capita compared to major cities, and a high reliance on private vehicles. In recent years, communities such as Fort Erie, Ontario have restructured or advanced their public transit systems using on-demand services. Fort Erie is a relatively sparsely populated region of 32,901 residents, spread across a land area of 166 square kilometers (64 square miles), for an average population density of 193 residents per square kilometer (500 per square mile). In October 2021, the town implemented a mobility-on-demand system integrated with smartphone software to replace its fixed-route community bus system, which consisted of four buses with three routes, each with a roughly one-hour, one way loop. The new service utilizes a fleet of six minivans, two of which are retrofitted with wheelchair-accessible ramps. The system may require that a passenger requesting a standard van walk up to 400 meters (a quarter mile) to their pickup location to optimize vehicle routing while providing origin-to-destination service. The on-demand system proved effective in providing service, eclipsing pre-pandemic ridership by 40%, decreasing greenhouse gas emissions per ride by 63%, and decreasing the cost per ride to the town by 29%. This report documents both the previous system and the new system in terms of routes, ridership, costs, fuel, and other notable system parameters. This work is part of an ongoing series of case studies on providing small communities with on-demand, right-sized vehicle service coupled with a smartphone application.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Fort Erie Case Study - Transition from Fixed-Route to On-Demand Transit

Rural and smaller-sized communities in North America face unique mobility challenges due to their low population density, lower public transit spending per capita compared to major cities, and a high reliance on private vehicles. In recent years, communities such as Fort Erie, Ontario, have restructured or advanced their public transit systems using on-demand services. Fort Erie is a relatively sparsely populated region of 32,901 residents, spread across a land area of 166 square kilometers (64 square miles), for an average population density of 193 residents per square kilometer (500 per square mile). In October 2021, the town implemented a mobility-on-demand system integrated with smartphone software to replace its fixed-route community bus system, which consisted of four buses with three routes, each with a roughly 1-hour, one-way loop. The new service utilizes a fleet of six minivans, two of which are retrofitted with wheelchair-accessible ramps. The system may require that a passenger requesting a standard van walk up to 400 meters (a quarter mile) to their pickup location to optimize vehicle routing while providing origin-to-destination service. The on-demand system proved effective in providing service, eclipsing pre-pandemic ridership by 40%, decreasing greenhouse gas emissions per ride by 63%, and decreasing the cost to the town per ride by 29%. This report documents both the previous system and the new system in terms of routes, ridership, costs, fuel, and other notable system parameters. This work is part of an ongoing series of case studies on providing small communities with on-demand, right-sized vehicle service coupled with a smartphone application.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗