Search NASA⌕ Search

SEARCH · Search NASA

Results for “BEAM MONITORING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Pin diode calibration - beam overlap monitoring for low energy cooling

We were trying to address the question whether or not the Pin Diodes, currently installed approximately 1 meter downstream of the RHIC primary collimators, are suitable to monitor a recombination signal from the future RHIC low energy cooling section. A maximized recombination signal, with the Au+78 ions being lost on the collimator, will indicate optimal Au-electron beam overlap as well as velocity matching of the electron beam in the cooling section.

43 PARTICLE ACCELERATORS↗

A novel digitization scheme with FPGA-base TDC for beam loss monitors operating at cryogenic temperature

Recycling integrators are common current-to-frequency converting circuits for measurements of low current such as that produced by Fermilab's cryogenic ionization chambers. In typical digitization/readout schemes, a counter is utilized to accumulate the number of pulses generated by the recycling integrator to adequately digitize the total charge. In order to calculate current with reasonable resolution (e.g., 7-8 bits), hundreds of pulses must be accumulated which corresponds to a long sampling period, i.e., a very low sampling rate. In our new scheme, an FPGA-based Time-to-Digital Convertor (TDC) is utilized to measure the time intervals between the pulses output from the recycling integrator. Using this method, a sample point of the current can be made with good resolution (>10 bits) for each pulse. This effectively increases the sampling rates by hundreds of times for the same recycling integrator front-end electronics. This scheme provides a fast response to the beams loss and is potentially suitable for accelerator protection applications. Moreover, the method is also self-zero-suppressed, i.e., it produces more data when the beam loss is high while it produces significantly less data when the beam loss is low.

43 PARTICLE ACCELERATORS↗

Development of fast (sub-minute) micro-tomography

An x-ray fast micro-tomography system was developed at medical and imaging beamline BL20B2 in SPring-8. We attempted a 'continuous rotation method' whereby the sample keeps rotating in the beam during the measurement. The image acquisitions are synchronized with the trigger pulses branched from the stepper motor controller. An electron multiplier (EM)-CCD camera (C9100-02, 1000x1000 pixels, 30 fps, 8 {mu}m/pixel, Hamamatsu Photonics) and beam-monitor AA40P (Hamamatsu Photonics) were used as an image detector. The effective pixel size of the detector was 4.9 {mu}m/pixel and the spatial resolution was about 15 {mu}m. The total measurement time for 900 projections has been reduced to 36 s. The reconstruction time was also reduced using GPGPU and SSD system. Using these techniques, preliminary experiment for 4-D (time resolved 3-D) micro-imaging has also been performed.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

X-Ray Monitor for SuperKEKB HER/LER to Monitor Vertical Beam Size Bunch-by-Bunch

The beginning of the period of performance for this grant began after we had designed a Printed Circuit Board (PCB) for biasing and transporting signals from a new, thin Silicon strip sensor made at the Stanford Nanofabrication facility. This complex PCB was manufactured in mid-2017, and then work began on a preamplifier design that would take signals from the sensor and provide sufficient gain while maintaining fidelity, in terms of noise figure and signal speed.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Development of experimental and computational frameworks to predict subcooled flow boiling in the LANL Isotope Production Facility

Cooling is crucial to maintain the integrity of target systems in isotope production facilities. At Los Alamos National Laboratory (LANL)’s Isotope Production Facility (IPF), multiple encapsulated targets are stacked and irradiated in tandem with a 100 MeV, ~250μA proton beam. To facilitate effective heat removal, these stacked targets are separated and cooled via a series of water channels. At these beam currents, this high-energy proton beam heats the target system, likely initiating subcooled flow boiling in the cooling channels. However, in-beam monitoring of the IPF target system is not possible due to the extreme radiation environment, and the necessarily significant shielding. To better understand high-power target performance, we developed ex-situ experimental and computational frameworks to predict the behavior of subcooled flow boiling at IPF. Subcooled flow boiling experiments on Inconel 625 samples under IPF conditions (2 bar pressure, 10 GPM flow rate (i.e., 2249 kg/m 2 /s), 85 K subcooling) revealed that IPF's average operating power is at the early stage of boiling with a heat transfer coefficient of 48,000 W/m 2 /s. The proposed modeling framework enables us to predict a complete boiling curve, i.e., single-phase heat transfer, onset of nucleate boiling, two-phase heat transfer, and critical heat flux (CHF), with specification of input boiling parameters up to intermediate heat flux levels. The estimated CHF under IPF conditions is 5.2 MW/m 2 . Experimental data under reduced conditions (2 bar pressure, 1.5 GPM flow rate (i.e., 337 kg/m 2 /s), 45 K subcooling) served as validation cases for the computational modeling. This computational model can be further extended to more complicated systems replicating the real IPF configuration, for instance, to study void distribution as a function of the incident proton beam profile and coolant velocity profile of multiple cooling channels. Finally, the proposed experimental and computational frameworks provide a means to better understand cooling systems in the isotope production facilities at different accelerators, where in-beam monitoring of the cooling process is not available.

07 ISOTOPE AND RADIATION SOURCES↗

Characterization of the proton beam from an IBA Cyclone 18/9 with radiochromic film EBT2

The use of radiochromic films is widespread in different areas of medical physics like radiotherapy and hadrontherapy; however, radiochromic films have been scarcely used in the characterization of proton or deuteron beams generated in biomedical cyclotrons. In this paper the radiochromic film EBT2 was used to study the beam size and the proton beam energy of an IBA Cyclone 18/9 cyclotron. The results indicate that the beam size can be easily measured at a very low expense; however, an accurate determination of the beam energy might require the implementation of certain experimental improvements.

43 PARTICLE ACCELERATORS↗

DarkLight radiation backgrounds

We report measurements of photon and neutron radiation levels observed while transmitting a 0.43 MW electron beam through millimeter-sized apertures and during beam-on, but accelerating gradient RF-on, operation. These measurements were conducted at the Free-Electron Laser (FEL) facility of the Jefferson National Accelerator Laboratory (JLab) using a 100 MeV electron beam from an energy-recovery linear accelerator. The beam was directed successively through 6 mm, 4 mm, and 2 mm diameter apertures of length 127 mm in aluminum at a maximum current of 4.3 mA (430 kW beam power). This study was conducted to characterize radiation levels for experiments that need to operate in this environment, such as the proposed DarkLight Experiment. We find that sustained transmission of a 430 kW CW beam through a 2 mm aperture is feasible with manageable beam-related backgrounds. We also find that during beam-off, RF-on operation, field emission inside the niobium cavities of the accelerator cryomodules is the primary source of ambient radiation.

43 PARTICLE ACCELERATORS↗

SU-E-T-521: Feasibility Study of a Rotational Step-And-Shoot IMRT Treatment Planning Approach

Purpose: Rotational step-and-shot IMRT (r-IMRT) could improve delivery efficiency with good dose conformity, especially if it can leverage the burst mode of the accelerator where radiation is turned on/off momentarily while the gantry rotates continuously. The challenge for the r-IMRT planning is to minimize the number of beams to achieve a fast and smooth rotational delivery. Methods: Treatment plans for r-IMRT were created using an in-house treatment planning system. To generate the plan using a very few beams, gantry angle was optimized by weighting the beam monitoring unit (MU), and beam shape optimization was a combination of column search with k-means clustering. A prostate case and a head and neck case were planned using r-IMRT. The dosimetry is compared to s-IMRT planned with Varian Eclipse treatment planning system. Results: With the same PTV dose coverage D95=100%, the r-IMRT plans shows comparable sparing as the s-IMRT plans in the prostate for the rectum D10cc and the bladder Dmean, and in the head and neck for the spinal cord Dmax, the brain stem Dmax, the left/right parotid Dmean, the larynx Dmean, and the mandible Dmean. Both plans meet the established institutional clinical dosimetric criteria. The r-IMRT plan uses 19 beam/405 MU for the prostate, and 68 beam/880 MU for the head and neck, while the s-IMRT uses 7 beam/724 MU and 9 beam/1812 MU, respectively. Compared to the corresponding s-IMRT, r-IMRT has a reduction of MUs of 44% for the prostate case and 41% for the head and neck case. Conclusions: We have demonstrated the feasibility of a rotational step and shoot IMRT treatment planning approach that significantly shortens the conventional IMRT treatment beam-on time without degrading the dose comformity.

60 APPLIED LIFE SCIENCES↗

SU-E-T-377: Evaluation of a Novel Transmission Detector as a Reference Chamber for Use in Beam Measurements

Purpose: To evaluate a new transmission chamber for use as a reference chamber in measurements of beam data Methods: We assessed the performance of a new transmission detector, the Stealth Chamber, manufactured by IBA (IBA Dosimetry). The chamber has an active volume of 249 cm{sup 3}, with an attenuation equivalent of <0.5mm Al. We mounted the chamber to a TrueBeam linac (Varian Medical Systems, Palo Alto, CA) such that the active area is perpendicular to the beam direction. We performed PDD and profile measurements on field sizes from 1×1 cm{sup 2} to 10×10 cm{sup 2}, as well as for a 4 mm cone. The field detector was either a CC-13 chamber (IBA Dosimetry) with an active volume of 0.13 cm{sup 3} or an Edge Detector (Sun Nuclear, Melbourne, FL) with an active volume of 0.019 cm{sup 3}. For comparison we repeated all measurements using a CC-13 or CC-01 (active volume 0.01 cm{sup 3} ) chamber as reference detectors (IBA Dosimetry).All scans were acquired using a Blue Phantom2 (IBA Dosimetry) and IBA OmniPro-Accept v7.4.24 software. Results: All measurements with the Stealth Chamber were identical to those with ion reference chambers. For both regular and filter free 6MV beams there was agreement in PDDs and profiles, including the penumbra region, for all field sizes. This was true for the 4mm cone measurement, as well. The deviation between the Stealth and ion chamber measurements was on average 0.3%. Conclusion: The Stealth Chamber gives identical beam data as a conventional ion chamber for all field sizes. The advantage of the Stealth chamber over ion chambers is its efficiency. Once mounted, there is no need to reposition the chamber with varying field sizes. This translates into a huge savings in measurement time, as well as a reduction in potential errors due to reference chamber mispositioning.

43 PARTICLE ACCELERATORS↗