Search NASA⌕ Search

SEARCH · Search NASA

Results for “CONTRACTOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Benefits of Lean Management in liquid waste operations - One company's journey - 15402

For Savannah River Remediation, LLC (SRR), Lean Management is the culmination of a number of years of searching for an effective process improvement methodology. SRR formally applies Lean Management as the cornerstone to transforming the way we work and lead. Two foundational principles support all Lean efforts: respect for people and continuous process improvement. Respect for people means we respect the work they do and the knowledge they have attained. Continuous process improvement focuses on continuous because to be successful we must continuously return to the process to refine, improve, and optimize. Like every other US DOE contractor, SRR is faced with challenges to accomplish more with less. Our initial round of Lean events focused on value streams such as Work Planning and Control, Supply Chain, and Tank Closure acceleration. We have completed a first pass through these programs. As a result, in general terms, process times were cut in half, while reducing rework and quality issues significantly. SRR reduced Corrective Maintenance backlogs without any appreciable increase in the workforce. This paper chronicles our search for improvement, what we did right, what we did wrong, and where we go next. In short, we want to challenge the management, contractors, and employees in US DOE complex to take this journey. The work we do is vitally important to our nation, our families, and our future. We owe it to the US DOE mission to do all we can with entrusted facilities, personnel, and taxpayer dollars. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Plan for resolution of technical issues at the Hanford waste treatment and immobilization plant project - 15596

The Waste Treatment and Immobilization Plant (WTP) Project has a number of first-of-a-kind technical challenges that have necessitated expert analysis and testing activities to resolve. Since 2006, the U.S. Department of Energy (DOE) chartered two major WTP technical reviews. Most recently, in 2012, a number of top scientists and engineers conducted a review focused on the design and operability of WTP black cell and hard-to-reach areas. To provide leadership and oversight for resolution of the technical issues, DOE assembled a Design Completion Team composed of personnel from the DOE Office of River Protection (ORP), DOE contractors, and the national laboratories. The Design Completion Team established five technical sub-teams to address specific focus areas. The work of these sub-teams has evolved such that the project is now focused on eight technical issues referred to as T1 to T8. The WTP contractor has developed, and DOE has approved, plans for resolution of these issues. These plans form the basis for the Pretreatment (PT) Facility engineering work that will be performed over the coming years. This work, along with a corresponding update to the PT Facility safety basis, will result in an authorization to resume the engineering work necessary to complete the PT Facility design. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing Risks via Small/Pilot Scale Testing for INL's Integrated Waste Treatment Unit (IWTU) - 19268

In 2005, the THOR steam reforming fluidized-bed reactor (FBR) technology was selected by the U.S. Department of Energy (DOE) as the technology of choice for treatment of sodium- bearing waste (SBW) at the INL. The basis of the process was to use fluidized bed technology to convert an acidic radioactive nitrate-rich liquid waste into a solid carbonate product suitable for long-term disposal and storage. During initial commissioning, as well as subsequent start-ups, the plant faced many operational challenges, such as stagnant/de-fluidized bed, and wall-scale formation. Such operational issues prompted the original contractor to seek expertise in pilot-scale testing, thereby reaching out to Hazen Research Inc. (HRI, Golden, Co). Several tests were conducted, but the results did not seem to address the underlying issues observed in the full-scale plant, as evidenced by continued operational issues. A systematic approach was then taken by the Fluor-Idaho team (new contractor as of June 2016) with respect to solving these technical issues. First, two different bench-scale, 2-inch fluidized bed reactors (stainless-steal and quartz), were utilized to test several theories to better understand the underlying chemical reactions that may be taking place under expected normal operating conditions. Then, the team designed and built an 18-inch FBR unit, mimicking the full-scale main vessel at IWTU - Denitration Mineralization Reformer (DMR). This was used to test various aspects of operational challenges observed at IWTU, namely particle size control, wall-scale growth-rate control, long-term operational stability, process optimization, and process off- gas filtration challenges. An example of information obtained from bench-scale testing, which was then tested during pilot-scale testing, was the phenomena that an addition of 5 vol % of CO{sub 2} gas into the fluidizing gas system nearly eliminated the formation of agglomerates that had typically led to bed de-fluidization. This change proved to be correct in both the pilot and full-scale testing and will be implemented as part of a long-term operational strategy of IWTU. Several other findings that have provided answers with respect to IWTU operational issues will be discussed in this report. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 68: Key EFCOG Actions: Risk Communication, Supply Chain Management, Human Capital and More

Overview on the Energy Facility Contractor Group's (EFCOG) most recent work in partnership with DOE to improve performance and EFCOG's mission is to ensure safety, security, and quality across the US DOE complex. Best practices were highlighted in discussions with US DOE/ NNSA leaders and key project executives. EFCOG's key priorities for 2020 were featured in the panel discussions to include: addressing human capital issues to ensure future mission needs can be met; addressing supply chain issues for nuclear projects; improving the data quality and performance assurance; and improving risk communication and stakeholder relations. EFCOG accomplishes its mission through working groups that provide forums to address common challenges and exchange proven techniques and other management and technical information among member contractors. Panelists with presentations: WM EFCOG Panel Slides (Morgan Smith); EFCOG DOE Supply Chain Initiative (SCI) - Enabling The DOE Mission - (Darrell Graddy); Data Quality and Performance Assurance (JD Dowell); Risk Communication - Different Events - Very Different Responses from the Community (Rick McLeod); Current State of Cybersecurity (Liz Porter)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Special Analyses for the Hanford Integrated Disposal Facility Performance Assessment - 20102

In 2014, the Department of Energy (DOE) Office of River Protection and its contractors began to develop a performance assessment for the near-surface disposal of low-level and mixed low-level waste at the Hanford Site's Integrated Disposal Facility (IDF). The IDF is a doubly-lined landfill that was constructed between 2004 and 2006 to be the disposal facility for the vitrified low-activity waste that will be produced at the Waste Treatment and Immobilization Plant (WTP). IDF is also expected to receive solid secondary waste produced at the WTP and other solid wastes from site activities. The IDF has been in a preoperational state awaiting authorization from DOE and a RCRA permit modification from the State of Washington Department of Ecology to receive waste. Both the Disposal Authorization Statement and permit modification require a performance assessment demonstrating that the system of engineered and natural features will limit releases of radionuclides and hazardous chemicals from the IDF and be protective of human health and the environment. The simulated duration is 10,000 years. Based on the analyses presented in the 2017 Integrated Disposal Facility Performance Assessment, DOE issued a conditional Operating Disposal Authorization Statement for the IDF in June 2018. The long-term performance of the IDF to be protective of human health and the environment was evaluated under the requirements of DOE Order 435.1, Radioactive Waste Management. Computer simulations were performed to evaluate whether or not the IDF would comply with DOE requirements. In the time that has passed since the performance assessment was approved by DOE, new information has been discovered that had not been considered in the performance assessment. Since this new information has not been evaluated, the potential impact of the changes have not been taken into consideration in DoE's disposal authorization. DOE and its contractors follow a change control process to screen and, when necessary, evaluate new information that could potentially impact the conclusions of the completed performance assessment. This paper will describe the change control process and provide two examples of evaluations performed following the change control process. The first example evaluates a new waste form for liquid secondary waste that was not evaluated in the performance assessment. In the performance assessment, liquid secondary waste was assumed to be solidified with grout. A new recommendation to dispose of the liquid secondary waste after drying it to a powder was evaluated. The second example evaluates inventory implications from changes to the flow sheet that estimates the feed composition to the low-activity waste vitrification facility. The changes result in higher strontium concentrations in the vitrified waste stream. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Building Business Network (B-Biz): Addressing Gaps in the High-Performance Building Technology Market, Especially for Underserved Customers

Increased market intelligence and business model innovation is needed to build contractor confidence in high-performance building technologies in order to increase the speed and scale of adoption to meet the U.S. Department of Energy's building stock decarbonization goals. Although there have been important innovations in energy efficiency, affordability, and decarbonization of building technologies, consumers are not purchasing these technologies at the necessary speed and scale partially due to a gap in institutional understanding around barriers contractors face in providing and servicing these technologies. Small businesses in this market must mitigate risk around high-performance building technologies, limiting their opportunities in the market and impacting the rate of adoption. The Building Business Network (B-Biz) aims to provide high-performance building technology solutions to underserved customers by collaborating with local small businesses that provide and service high-performance building technologies in communities with the lowest rates of adoption. This research explores the current market, the importance of business models, and the opportunity to utilize small businesses to address market gaps in underserved communities.

B-Biz↗

Major Modification Determination Process Utilized for Proposed Idaho National Laboratory Projects

Over the past three years, several new projects with the potential for major modifications to existing facilities have been considered for implementation at the Idaho National Laboratory (INL). These projects were designated to take place in existing nuclear facilities with existing documented safety analyses. 10 CFR 830.206 requires the contractor for a major modification to a Hazard Category 1, 2, or 3 nuclear facility to obtain Department of Energy (DOE) approval for the nuclear facility design criteria to be used for preparation of a preliminary documented safety analysis (PDSA), as well as creation and approval of the PDSA, before the contractor can procure materials or components or begin construction on the project. Given the significant effort and expense of preparation and approval of a PDSA, a major modification determination for new projects is warranted to determine if the rigorous requirements of a major modification are actually required. Furthermore, performing a major modification determination helps to ensure that important safety aspects of a project are appropriately considered prior to modification construction or equipment procurement. The projects considered for major modification status at the INL included: treatment and packaging of unirradiated, sodium-bonded highly enriched uranium (HEU) fuel and miscellaneous casting scrap in the Materials and Fuels Complex (MFC) Fuel Manufacturing Facility (FMF); post irradiation examination of Advance Fuel Cycle Initiative (AFCI) fuel in the MFC Analytical Laboratory (AL); the Advanced Test Reactor (ATR) gas test loop (GTL); and the hydraulic shuttle irradiation system (HSIS) at ATR. The major modification determinations for three of the proposed projects resulted in a negative major modification. On the other hand, the major modification determination for the GTL project concluded that the project would require a major modification. This paper discusses the process, methods, and considerations used by the INL for the four major modification determinations. Three of the four major modification determinations discussed herein were completed using the guidance specified in the draft of DOE STD-1189, “Integration of Safety into the Design Process.” DOE-STD-1189 was released as a draft document in March 2007 and provides guidance for integrating safety considerations into the early design activities for constructing new facilities or making modifications to existing nuclear facilities. The fourth major modification determination was prepared prior to the existence of DOE STD-1189 and was evaluated solely by the definition of a major modification given in 10 CFR 830.206. For all four projects, consideration was given to: • Facility hazard categorization change and material inventory • Facility footprint change with the potential to adversely affect credited safety function • New or changed processes resulting in a change to the safety basis • The use of new technology or equipment not approved for use in the facility • The need for new or revised safety basis controls • Hazards not previously evaluated in the safety basis.

10 CFR 830↗

SAFETY AT FLUOR HANFORD (A) CASE STUDY - PREPARED BY THUNDERBIRD SCHOOL OF GLOBAL MANAGEMENT

By November of 1997, Fluor Hanford (Fluor) had been the site manager of the Hanford nuclear reservation for a year. The Hanford site had been established as part of the Manhattan Project in the 1940s that gave birth to the atomic bomb. Hanford produced two thirds of U.S. plutonium during the Cold War period. The Hanford site was half the size of Rhode Island and occupied 586 square miles in southeastern Washington State. The production of plutonium for more than 40 years left a huge legacy of chemical and radiological contamination: 80 square miles of contaminated groundwater; 2,300 tons of spent nuclear fuel stored in underwater basins; 20 tons of plutonium-laced contaminated materials; and 500 contaminated facilities. The cleanup involved a challenging combination of radioactive material handling within an infrastructure constructed in the 1940s and 1950s. The cleanup that began in 1988 was expected to take 30 years or more. Improving safety at Hanford had already proven to be a significant challenge. As the new site manager at Hanford, Fluor Hanford inherited lower- and mid-level managers and thousands of unionized employees, many of whom were second or third generation Hanford employees. These employees had seen many contractors come and go over the years. Some of the managers who had worked with the previous contractor saw Fluor's emphasis on safety as getting in the way of operations. Union-management relations were fractious. Hanford's culture was described as 'production driven-management told everyone what to do, and, if you didn't do it, there were consequences'. Worker involvement in designing and implementing safety programs was negligible. Fluor Hanford also was having trouble satisfying its client, the Department of Energy (DOE). The DOE did not see a clear path forward for performance improvements at Hanford. Clearly, major change was necessary, but how and where should it be implemented?

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SAFETY AT FLUOR HANFORD (B) CASE STUDY - PREPARED BY THE THUNDERBIRD SCHOOL OF GLOBAL MANAGEMENT

One year into the Hanford contract, Fluor had learned a number of hard lessons very quickly. Although the Hanford remediation contract was in many ways a new endeavor for Fluor and a different kind of contract, the organization moved quickly to increase communication with all employees, attack head-on what it considered unsafe and inappropriate safety practices, and strongly inject its own corporate cultural beliefs into the Hanford organization. It wasn't easy, and it didn't happen overnight. From the beginning, Fluor established processes and programs to drive down injury rates. For example, whereas the previous contractor's approach to injuries had been passive, Fluor took a much more aggressive approach to worker injuries. The previous contractor had established a practice of sending injured workers home with the basic directive 'to come back when you are well'. Instead of using outsourced medical assessment, Fluor internalized it and evaluated all claims aggressively. Legitimate claims were quickly settled, and management moved to identify 'repeat offenders' when it came to reportable safety incidents. In the first year of Fluor's management, reportable injuries dropped from 5.37 to 2.99 per 200,000 man-hours. Despite the drop in injury rates, the safety record at Fluor Hanford was not at a level that met either Fluor or the Department of Energy's expectations. Earlier in 1997, Fluor Hanford's proposed safety program was rejected by the DOE. The DOE was not satisfied with Fluor Hanford's proposal for various reasons, including insufficient worker involvement and a lack of accountability. With the need for change clearly established, Fluor Hanford management embarked on a decade-long mission to change the safety culture and improve safety performance. This case describes the key changes and their impact on Fluor Hanford.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Next Generation Waste Tracking: Linking Legacy Systems with Modern Networking Technologies

This report describes results from a preliminary analysis to satisfy the Department of Energy (DOE) objective to ensure the safe, secure, efficient packaging and transportation of materials both hazardous and non hazardous [1, 2]. The DOE Office of Environmental Management (OEM) through Oak Ridge National Laboratory (ORNL) has embarked on a project to further this objective. OEM and ORNL have agreed to develop, demonstrate and make available modern day cost effective technologies for characterization, identification, tracking, monitoring and disposal of radioactive waste when transported by, or between, motor, air, rail, and water modes. During the past 8 years ORNL has investigated and deployed Web 2.0 compliant sensors into the transportation segment of the supply chain. ORNL has recently demonstrated operational experience with DOE Oak Ridge Operations Office (ORO) and others in national test beds and applications within this domain of the supply chain. Furthermore, in addition to DOE, these hazardous materials supply chain partners included Federal and State enforcement agencies, international ports, and commercial sector shipping operations in a hazardous/radioactive materials tracking and monitoring program called IntelligentFreight. IntelligentFreight is an ORNL initiative encompassing 5 years of research effort associated with the supply chain. The ongoing ORNL SmartFreight programs include RadSTraM [3], GRadSTraM , Trusted Corridors, SensorPedia [4], SensorNet, Southeastern Transportation Corridor Pilot (SETCP) and Trade Data Exchange [5]. The integration of multiple technologies aimed at safer more secure conveyance has been investigated with the core research question being focused on testing distinctly different distributed supply chain information sharing systems. ORNL with support from ORO have demonstrated capabilities when transporting Environmental Management (EM) waste materials for disposal over an onsite haul road. ORNL has unified the operations of existing legacy hazardous, radioactive and related informational databases and systems using emerging Web 2.0 technologies. These capabilities were used to interoperate ORNL s waste generating, packaging, transportation and disposal with other DOE ORO waste management contractors. Importantly, the DOE EM objectives were accomplished in a cost effective manner without altering existing information systems. A path forward is to demonstrate and share these technologies with DOE EM, contractors and stakeholders. This approach will not alter existing DOE assets, i.e. Automated Traffic Management Systems (ATMS), Transportation Tracking and Communications System (TRANSCOM), the Argonne National Laboratory (ANL) demonstrated package tracking system, etc

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigating Habitat Value in Support of Contaminant Remediation Decisions: Case Study

Habitat valuation methods were implemented to support remedial decisions for aquatic and terrestrial contaminated sites at the East Tennessee Technology Park (ETTP) on the US Department of Energy (DOE) Oak Ridge Reservation in Oak Ridge, TN, USA. The habitat valuation was undertaken for six contaminated sites: Contractor's Spoil Area, K-901-N Disposal Area, K-770 Scrapyard, K-1007-P1 pond, K-901 pond, and the Mitchell Branch stream. Four of these sites are within the industrial use area of ETTP and two are in the Black Oak Ridge Conservation Easement. These sites represent terrestrial and aquatic habitat for vertebrates, terrestrial habitat for plants, and aquatic habitat for benthic invertebrates. Current and potential future, no-action (no remediation) scenarios were evaluated primarily using existing information. Valuation metrics and scoring criteria were developed in a companion paper, this volume. The habitat valuation consists of extensive narratives, as well as scores for aspects of site use value, site rarity, and use value added from spatial context. Metrics for habitat value were expressed with respect to different spatial scales, depending on data availability. There was significant variation in habitat value among the six sites, among measures for different taxa at a single site, between measures of use and rarity at a single site, and among measures for particular taxa at a single site with respect to different spatial scales. Most sites had aspects of low, medium, and high habitat value. Few high scores for current use value were given. These include: wetland plant communities at all aquatic sites, Lepomid sunfish and waterbirds at 1007-P1 pond, and Lepomid sunfish and amphibians at K-901 pond. Aquatic sites create a high-value ecological corridor for waterbirds, and the Contractor's Spoil Area and possibly the K-901-N Disposal Site have areas that are part of a strong terrestrial ecological corridor. The only example of recent observations of rare species at these sites is the gray bat observed at the K-1007-P1 pond. Some aspects of habitat value are expected to improve under no-action scenarios at a few of the sites. Methods are applicable to other contaminated sites where sufficient ecological data are available for the site and region.

54 ENVIRONMENTAL SCIENCES↗

Decommissioning the Belgonucleaire Dessel MOX plant: presentation of the project and situation end august 2013

Belgonucleaire has been operating the Dessel MOX plant at an industrial scale between 1986 and 2006. During this period, 40 metric tons of plutonium (HM) have been processed into 90 reloads of MOX fuel for commercial light water reactors. The decision to stop the production in 2006 and to decommission the MOX plant was the result of the shrinkage of the MOX fuel market due to political and commercial factors. As a significant part of the decommissioning project of the Dessel MOX plant, about 170 medium-sized glove-boxes and about 1.200 metric tons of structure and equipment outside the glove-boxes are planned for dismantling. The license for the dismantling of the MOX plant was granted by Royal Decree in 2008 and the dismantling started in March 2009. The dismantling works are carried out by an integrated organization under leadership and responsibility of Belgonucleaire; this organization includes 3 main contractors, namely Tecnubel N.V., the THV ('Tijdelijke HandelsVereniging') Belgoprocess / SCK-CEN and Studsvik GmbH and Tractebel Engineering as project manager. In this paper, after having described the main characteristics of the project, the authors review the different organizational and technical options considered for the decommissioning of the glove-boxes; thereafter the main decision criteria (qualification of personnel and of processes, confinement, cutting techniques and radiation protection, safety aspects, alpha-bearing waste management) are analyzed as well. Finally the progress, the feedback and the lessons learned at the end of August 2013 are presented, giving the principal's and contractors point of view. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Using Hygrothermal Modeling to Resolve Practical Low-Slope Roofing Issues

Within building envelope science, the use of tools to model performance of the building envelope has evolved, and designers and scientists today have a myriad of tools available. Hygrothermal modeling is one such tool and, when used correctly, offers designers and forensic investigators important information about the movement of moisture within the building envelope. This traditional use of hygrothermal modeling is maturing as models are validated with field experience, creating a confidence in the modeling tools and their predictive capabilities. Based on this confidence, application of hygrothermal modeling to a more practical application is an evolution whose time has arrived. With changes in materials and methods, the performance of roofing systems can often times no longer be based on experience alone. Roofing contractors have been confounded by the unexplained and unplanned-for presence of moisture in roofing systems. Although hygrothermal modeling can be used to explain where the moisture came from, we propose that it should be used to prevent its occurrence. Unfortunately, more than 70 % of the roofing market is in reroofing, and oftentimes, a designer is not engaged in the roofing system design. Without the expertise of a designer and given that hygrothermal modeling is not well understood by the roofing industry, its adoption as a tool that can prevent problems has not been widely seen. This paper presents an extensive summary of hygrothermal modeling performed for roofing systems and then shows how the modeling can be used to create simple resources for roofing contractors to reduce the potential for moisture condensation at critical locations within a roofing system. The systems modeled have shown a propensity for moisture accumulation, and the use of hygrothermal modeling to eliminate these problems is a practical application of a building science tool that can greatly improve the durability of roofing systems.

Desjarlais, Andre Omer↗

Annual Site Environmental Report: 2010 (ASER)

This report provides information about environmental programs during the calendar year of 2010 at the SLAC National Accelerator Laboratory (SLAC), Menlo Park, California. Activities that overlap the calendar year - i.e., stormwater monitoring covering the winter season of 2010/2011 (October 2010 through May 2011) are also included. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. Under Executive Order (EO) 13423, Strengthening Federal Environmental, Energy, and Transportation Management, EO 13514, Federal Leadership in Environmental, Energy, and Economic Performance, and DOE Order 450.1A, Environmental Protection Program, SLAC effectively implements and integrates the key elements of an Environmental Management System (EMS) to achieve the site's integrated safety and environmental management system goals. For normal daily activities, SLAC managers and supervisors are responsible for ensuring that policies and procedures are understood and followed so that: (1) Worker safety and health are protected; (2) The environment is protected; and (3) Compliance is ensured. Throughout 2010, SLAC continued to improve its management systems. These systems provided a structured framework for SLAC to implement 'greening of the government' initiatives such as EO 13423, EO 13514, and DOE Orders 450.1A and 430.2B. Overall, management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. During 2010, there were no reportable releases to the environment from SLAC operations. In addition, many improvements in waste minimization, recycling, stormwater management, groundwater restoration, and SLAC's chemical management system (CMS) were continued. The following are among SLAC's environmental accomplishments for 2010. To facilitate management and identification of future potential greenhouse gases (GHG) reduction opportunities, SLAC voluntarily completed GHG inventories for calendar year (CY) 2008 and CY 2009 and submitted the results to The Climate Registry. A Lead Management Plan was completed to reduce the potential of lead impacting the environment, and two large legacy tube-trailer modules, each containing 38 tubes of compressed ethane, were reused or recycled by an outside contractor, resulting in hazardous waste avoidance and cost savings of approximately $100,000 in transportation and disposal costs. SLAC continues to make progress on achieving the sustainability goals of EOs 13423 and 13514, which include, but are not limited to reductions in the use of water, energy, and fuel, building to green standards and reductions in GHG emissions. Phase I of the SLAC Advanced Metering project for electrical and natural gas systems was completed. Phase I included the design of the metering system and purchase of the enterprise software. The planning, design, and installation of an advanced water metering system for select buildings, landscape, and process systems were completed. In addition, the last major onsite chiller containing a Class I ozone-depleting substance was taken out of service, and SLAC continued to replace conventional vehicles with electric vehicles. In 2010, there were no radiological impacts to the public or the environment from SLAC operations. The potential doses to the public were negligible and far below the regulatory and SLAC administrative limits. No radiological incidents occurred that increased radiation levels to the public or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. SLAC shipped 2,891 cubic feet of low-level radioactive waste, half of which was legacy waste, to appropriate treatment and disposal facilities for low-level radioactive waste. SLAC also continued its efforts to reduce the inventory of materials no longer needed for its mission by permanently removing 125 sealed radioactive sources from the inventory. Ninety-seven of the sealed sources were returned to the manufacturer, and 28 were sent to Energy Solutions for processing before being sent to the Nevada Test Site for burial. In addition, 87 concrete blocks which had been stored in an area known as the Bone Yard were surveyed for potential surface contamination and volumetric activation prior to off-site release. Based on the comprehensive measurements, all 87 blocks were qualified for release and were disposed of as ordinary materials at a landfill. In 2010, the SLAC Environmental Restoration Program personnel continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The National Criticality Experiments Research Center at the Device Assembly Facility, Nevada National Security Site: Status and Capabilities, Summary Report

The National Criticality Experiments Research Center (NCERC) was officially opened on August 29, 2011. Located within the Device Assembly Facility (DAF) at the Nevada National Security Site (NNSS), the NCERC has become a consolidation facility within the United States for critical configuration testing, particularly those involving highly enriched uranium (HEU). The DAF is a Department of Energy (DOE) owned facility that is operated by the National Nuclear Security Agency/Nevada Site Office (NNSA/NSO). User laboratories include the Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory (LANL). Personnel bring their home lab qualifications and procedures with them to the DAF, such that non-site specific training need not be repeated to conduct work at DAF. The NNSS Management and Operating contractor is National Security Technologies, LLC (NSTec) and the NNSS Safeguards and Security contractor is Wackenhut Services. The complete report provides an overview and status of the available laboratories and test bays at NCERC, available test materials and test support configurations, and test requirements and limitations for performing sub-critical and critical tests. The current summary provides a brief summary of the facility status and the method by which experiments may be introduced to NCERC.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Decommissioning of the Remediation Systems at Waverly, Nebraska, in 2011-2012

The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility in Waverly, Nebraska, from 1952 to 1974. During this time, the grain fumigant '80/20' (carbon tetrachloride/carbon disulfide) was used to preserve stored grain. In 1982, sampling by the U.S. Environmental Protection Agency (EPA) found carbon tetrachloride contamination in the town's groundwater. After an investigation of the contaminant distribution, the site was placed on the National Priority List (NPL) in 1986, and the CCC/USDA accepted responsibility for the contamination. An Interagency Compliance Agreement between the EPA and the CCC/USDA was finalized in May 1988 (EPA 1990). The EPA (Woodward-Clyde Consultants, contractor) started immediate cleanup efforts in 1987 with the installation of an air stripper, a soil vapor extraction system, a groundwater extraction well, and groundwater and soil gas monitoring wells (Woodward-Clyde 1986, 1988a,b). After the EPA issued its Record of Decision (ROD; EPA 1990), the CCC/USDA (Argonne National Laboratory, contractor) took over operation of the treatment systems. The CCC/USDA conducted a site investigation (Argonne 1991, 1992a,b), during which a carbon tetrachloride plume in groundwater was discovered northeast of the former facility. This plume was not being captured by the existing groundwater extraction system. The remediation system was modified in 1994 (Argonne 1993) with the installation of a second groundwater extraction well to contain the contamination further. Subsequently, a detailed evaluation of the system resulted in a recommendation to pump only the second well to conserve water in the aquifer (Argonne 1995). Sampling and analysis after implementation of this recommendation showed continued decreases in the extent and concentrations of the contamination with only one well pumping (Argonne 1999). The CCC/USDA issued quarterly monitoring reports from 1988 to 2009. Complete documentation of the CCC/USDA characterization and remediation efforts, including the quarterly monitoring reports, is on the compact disc inside the back cover of this report. The EPA reported on the progress of the remediation systems in a series of five-year reviews (EPA 1993, 1999, 2004, 2009). These reports and other EPA documentation are also on the compact disc inside the back cover of this report, along with the Woodward-Clyde (1986, 1988a,b) documentation cited. Starting in 2006, the analytical results for groundwater (the only medium still being monitored) showed no carbon tetrachloride concentrations above the maximum contaminant level (MCL) of 5.0 g/L. Because the cleanup goals specified in the ROD (EPA 1990) had been met, the EPA removed the site from the NPL in November 2006 (Appendix A). In 2008 the National Pollutant Discharge Elimination System (NPDES) permit for the remediation system was deactivated, and a year later the EPA released its fourth and final five-year report (EPA 2009), indicating that no further action was required for the site and that the site was ready for unlimited use. In 2011-2012, the CCC/USDA decommissioned the remediation systems at Waverly. This report documents the decommission process and closure of the site.

54 ENVIRONMENTAL SCIENCES↗

Communication of Energy Efficiency Information to Remodelers: Lessons From Current Practice

The effective communication of energy efficiency and building science information to remodeling contractors is achieved through varying formats, timelines, and modes depending on who is delivering the information, who is intended to receive it, and what technical, intellectual,and time resources the recipients have at their disposal. Determining what type of communication is effective does notlend itself to a clearly quantifiable test but rather a qualitative one. That qualitative judgment can be supported by the research of current practices deemed effective for one or more of the following reasons: it has led to the successful completion of a certifying test or other evaluation, it has been widely used for the remodeling industry, it has been considered effective by a sampling ofremodeling contractors, and/or it has proven effective in the field for the BARA team. These criteria were used to create a select list of communications to be further analyzed to determine why they are effective and how less successful formats or strategies can be revised for greater effectiveness.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Seismic Technology Adapted to Analyzing and Developing Geothermal Systems Below Surface-Exposed High-Velocity Rocks Final Report

The objective of our research was to develop and demonstrate seismic data-acquisition and data-processing technologies that allow geothermal prospects below high-velocity rock outcrops to be evaluated. To do this, we acquired a 3-component seismic test line across an area of exposed high-velocity rocks in Brewster County, Texas, where there is high heat flow and surface conditions mimic those found at numerous geothermal prospects. Seismic contractors have not succeeded in creating good-quality seismic data in this area for companies who have acquired data for oil and gas exploitation purposes. Our test profile traversed an area where high-velocity rocks and low-velocity sediment were exposed on the surface in alternating patterns that repeated along the test line. We verified that these surface conditions cause non-ending reverberations of Love waves, Rayleigh waves, and shallow critical refractions to travel across the earth surface between the boundaries of the fast-velocity and slow-velocity material exposed on the surface. These reverberating surface waves form the high level of noise in this area that does not allow reflections from deep interfaces to be seen and utilized. Our data-acquisition method of deploying a box array of closely spaced geophones allowed us to recognize and evaluate these surface-wave noise modes regardless of the azimuth direction to the surface anomaly that backscattered the waves and caused them to return to the test-line profile. With this knowledge of the surface-wave noise, we were able to process these test-line data to create P-P and SH-SH images that were superior to those produced by a skilled seismic data-processing contractor. Compared to the P-P data acquired along the test line, the SH-SH data provided a better detection of faults and could be used to trace these faults upward to the boundaries of exposed surface rocks. We expanded our comparison of the relative value of S-wave and P-wave seismic data for geothermal applications by inserting into this report a small part of the interpretation we have done with 3C3D data across Wister geothermal field in the Imperial Valley of California. This interpretation shows that P-SV data reveal faults (and by inference, also fractures) that cannot be easily, or confidently, seen with P-P data, and that the combination of P-P and P-SV data allows VP/VS velocity ratios to be estimated across a targeted reservoir interval to show where an interval has more sandstone (the preferred reservoir facies). The conclusion reached from this investigation is that S-wave seismic technology can be invaluable to geothermal operators. Thus we developed a strong interest in understanding the direct-S modes produced by vertical-force sources, particularly vertical vibrators, because if it can be demonstrated that direct-S modes produced by vertical-force sources can be used as effectively as the direct-S modes produced by horizontal-force sources, geothermal operators can acquire direct-S data across many more prospect areas than can be done with horizontal-force sources, which presently are limited to horizontal vibrators. We include some of our preliminary work in evaluating direct-S modes produced by vertical-force sources.

15 GEOTHERMAL ENERGY↗