Results for “Capacity Factor”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Utility-Scale Solar 2014. An Empirical Analysis of Project Cost, Performance, and Pricing Trends in the United States

Other than the nine Solar Energy Generation Systems (“SEGS”) parabolic trough projects built in the 1980s, virtually no large-scale or “utility-scale” solar projects – defined here to include any groundmounted photovoltaic (“PV”), concentrating photovoltaic (“CPV”), or concentrating solar thermal power (“CSP”) project larger than 5 MW AC – existed in the United States prior to 2007. By 2012 – just five years later – utility-scale had become the largest sector of the overall PV market in the United States, a distinction that was repeated in both 2013 and 2014 and that is expected to continue for at least the next few years. Over this same short period, CSP also experienced a bit of a renaissance in the United States, with a number of large new parabolic trough and power tower systems – some including thermal storage – achieving commercial operation. With this critical mass of new utility-scale projects now online and in some cases having operated for a number of years (generating not only electricity, but also empirical data that can be mined), the rapidly growing utility-scale sector is ripe for analysis. This report, the third edition in an ongoing annual series, meets this need through in-depth, annually updated, data-driven analysis of not just installed project costs or prices – i.e., the traditional realm of solar economics analyses – but also operating costs, capacity factors, and power purchase agreement (“PPA”) prices from a large sample of utility-scale solar projects in the United States. Given its current dominance in the market, utility-scale PV also dominates much of this report, though data from CPV and CSP projects are presented where appropriate.

14 SOLAR ENERGY↗

Renewable Energy From Animal Biomass – Farm Methane

The major goal of the project is to develop 2 anaerobic digesters on family farms in rural Vermont. We have accomplished half of that goal, with 1 digester operating on the Gebbie Maplehurst Farm in Greensboro, Vermont. The 2nd digester is planned as a student demonstration unit at Vermont Technical College in Randolph Center, Vermont. That half of the project has not commenced. We will limit our discussion to the Gebbie Maplehurst Farm project. A 150MW generator is installed on the farm and is producing electricity which is being sold as part of the Standard Offer Program within the State of Vermont. The induction generator is the first of its kind manufactured by Martin Machinery of Latham, Missouri. The project is currently generating approximately 15% - 20% of the capacity as shown in appendix I. However, it is anticipated that details will quickly be worked out to increase that capacity factor.

09 BIOMASS FUELS↗

Budget Period 2 Summary Report Part 3: Hywind Maine Project

This project was performed under the Work for Others—Funds in Agreement FIA-14-1793 between Statoil and the Alliance for Sustainable Energy, manager and operator of the National Renewable Energy Laboratory (NREL). To support the development of a 6-MW spar-mounted offshore wind turbine, NREL performed tasks on behalf of Statoil in the following three categories: 1. Design and analysis 2. Wake modeling 3. Concept resource assessment. This document summarizes the work performed in Work Package (WP) 3, where the spatial variability and influence that relevant parameters have on levelized cost of energy (LCOE) were analyzed. The study allows Statoil to identify areas of interest for floating wind technology and the Hywind concept in particular. This report describes the results of a study that NREL conducted to provide targeted insight into the United States (U.S.) offshore wind resource area that Statoil can use for taking strategic decisions about how to commercialize and market the company’s Hywind technology. The report centers on a new spatio-economic methodology that NREL has developed to assess how variability in spatial parameters can influence levelized cost of energy (LCOE) for different technologies. The method combines wind plant performance modeling, economic modeling, and national geospatial data layers to estimate the cost of potential projects using Hywind technology, considering the following parameters: • Water depth • Possible inshore assembly areas • Wind resource • Existing grid features and potential connection points • Wave regime • Environmentally sensitive areas • Seabed conditions • Competitive use areas • Prospective staging ports The scope of the study covers the major offshore regions within the contiguous United States, including the Atlantic Ocean, Gulf of Mexico, Pacific Ocean, and the Great Lakes. The spatio-economic assessment extends to 92 km (50 nm) off of the nearest land mass, consistent with the available data on wind characteristics. The study is restricted to those locations that meet the depth criteria for Hywind technology—defined as water depths between 100 m to 1,000 m—and only considered sites with net capacity factors that exceed 30%.

99 GENERAL AND MISCELLANEOUS↗

On the Path to SunShot. Advancing Concentrating Solar Power Technology, Performance, and Dispatchability

This report examines the remaining challenges to achieving the competitive concentrating solar power (CSP) costs and large-scale deployment envisioned under the U.S. Department of Energy's SunShot Initiative. Although CSP costs continue to decline toward SunShot targets, CSP acceptance and deployment have been hindered by inexpensive photovoltaics (PV). However, a recent analysis found that thermal energy storage (TES) could increase CSP's value--based on combined operational and capacity benefits--by up to 6 cents/kWh compared to variable-generation PV, under a 40% renewable portfolio standard in California. Thus, the high grid value of CSP-TES must be considered when evaluating renewable energy options. An assessment of net system cost accounts for the difference between the costs of adding new generation and the avoided cost from displacing other resources providing the same level of energy and reliability. The net system costs of several CSP configurations are compared with the net system costs of conventional natural-gas-fired combustion-turbine (CT) and combined-cycle plants. At today's low natural gas prices and carbon emission costs, the economics suggest a peaking configuration for CSP. However, with high natural gas prices and emission costs, each of the CSP configurations compares favorably against the conventional alternatives, and systems with intermediate to high capacity factors become the preferred alternatives. Another analysis compares net system costs for three configurations of CSP versus PV with batteries and PV with CTs. Under current technology costs, the least-expensive option is a combination of PV and CTs. However, under future cost assumptions, the optimal configuration of CSP becomes the most cost-effective option.

14 SOLAR ENERGY↗

Utility-Scale Solar 2015: An Empirical Analysis of Project Cost, Performance, and Pricing Trends in the United States

The utility-scale solar sector—defined here to include any ground-mounted photovoltaic (“PV”), concentrating photovoltaic (“CPV”), or concentrating solar power (“CSP”) project that is larger than 5 MWAC in capacity—has led the overall U.S. solar market in terms of installed capacity since 2012. It is expected to maintain its market-leading position for at least another five years, driven in part by December 2015’s three-year extension of the 30% federal investment tax credit (“ITC”) through 2019 (coupled with a favorable switch to a “start construction” rather than a “placed in service” eligibility requirement, and a gradual phase down of the credit to 10% by 2022). In fact, in 2016 alone, the utility-scale sector is projected to install more than twice as much new capacity as it ever has previously in a single year. This unprecedented boom makes it difficult, yet more important than ever, to stay abreast of the latest utility-scale market developments and trends. This report—the fourth edition in an ongoing annual series—is intended to help meet this need, by providing in-depth, annually updated, data-driven analysis of the utility-scale solar project fleet in the United States. Drawing on empirical project-level data from a wide range of sources, this report analyzes not just installed project costs or prices—i.e., the traditional realm of most solar economic analyses—but also operating costs, capacity factors, and power purchase agreement (“PPA”) prices from a large sample of utility-scale solar projects throughout the United States. Given its current dominance in the market, utility-scale PV also dominates much of this report, though data from CPV and CSP projects are also presented where appropriate.

14 SOLAR ENERGY↗

An Improved Global Wind Resource Estimate for Integrated Assessment Models: Preprint

This paper summarizes initial steps to improving the robustness and accuracy of global renewable resource and techno-economic assessments for use in integrated assessment models. We outline a method to construct country-level wind resource supply curves, delineated by resource quality and other parameters. Using mesoscale reanalysis data, we generate estimates for wind quality, both terrestrial and offshore, across the globe. Because not all land or water area is suitable for development, appropriate database layers provide exclusions to reduce the total resource to its technical potential. We expand upon estimates from related studies by: using a globally consistent data source of uniquely detailed wind speed characterizations; assuming a non-constant coefficient of performance for adjusting power curves for altitude; categorizing the distance from resource sites to the electric power grid; and characterizing offshore exclusions on the basis of sea ice concentrations. The product, then, is technical potential by country, classified by resource quality as determined by net capacity factor. Additional classifications dimensions are available, including distance to transmission networks for terrestrial wind and distance to shore and water depth for offshore. We estimate the total global wind generation potential of 560 PWh for terrestrial wind with 90% of resource classified as low-to-mid quality, and 315 PWh for offshore wind with 67% classified as mid-to-high quality. These estimates are based on 3.5 MW composite wind turbines with 90 m hub heights, 0.95 availability, 90% array efficiency, and 5 MW/km2 deployment density in non-excluded areas. We compare the underlying technical assumption and results with other global assessments.

17 WIND ENERGY↗

Marginal Cost Pricing in a World without Perfect Competition: Implications for Electricity Markets with High Shares of Low Marginal Cost Resources

A common approach to regulating electricity is through auction-based competitive wholesale markets. The goal of this approach is to provide a reliable supply of power at the lowest reasonable cost to the consumer. This necessitates market structures and operating rules that ensure revenue sufficiency for all generators needed for resource adequacy purposes. Wholesale electricity markets employ marginal-cost pricing to provide cost-effective dispatch such that resources are compensated for their operational costs. However, marginal-cost pricing alone cannot guarantee cost recovery outside of perfect competition, and electricity markets have at least six attributes that preclude them from functioning as perfectly competitive markets. These attributes include market power, externalities, public good attributes, lack of storage, wholesale price caps, and ineffective demand curve. Until (and unless) these failures are ameliorated, some form of corrective action(s) will be necessary to improve market efficiency so that prices can correctly reflect the needed level of system reliability. Many of these options necessarily involve some form of administrative or out-of-market actions, such as scarcity pricing, capacity payments, bilateral or other out-of-market contracts, or some hybrid combination. A key focus with these options is to create a connection between the electricity market and long-term reliability/loss-of-load expectation targets, which are inherently disconnected in the native markets because of the aforementioned market failures. The addition of variable generation resources can exacerbate revenue sufficiency and resource adequacy concerns caused by these underlying market failures. Because variable generation resources have near-zero marginal costs, they effectively suppress energy prices and reduce the capacity factors of conventional generators through the merit-order effect in the simplest case of a convex market; non-convexities can also suppress prices.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Feasibility Study of Large-Scale Energy Storage in the Earth

Energy storage systems on a large scale are needed when there is a mismatch between electricity generation and demand rates. The mismatch may be due to a variety of reasons: 1. Generation rates of solar are cyclic and are often out of phase with the demand cycles. 2. Generation rates of wind are unpredictable. Furthermore, high-efficiency, low-carbon power plants (e.g., nuclear) typically have high capital cost and low operating cost. Such plants are designed for continuous base-load operation and require a high capacity factor for economic viability (Forsberg, 2017). For these reasons, it is advantageous to be able to store energy when not needed and use it when needed. Our proposed process, called the Air Earth Battery, has been developed to accomplish the task of energy storage and dispatch, using a combination of compressors, expanders, heat exchangers, and subsurface porous, permeable rock formations. This technology utilizes two issued U.S. Patents (Buscheck, 2017a; 2017b), one filed U.S. Patent Application (Buscheck, 2017c), and one filed U.S. Provisional Patent Application (Buscheck and Upadhye, 2018).

25 ENERGY STORAGE↗

DOE-NE Light Water Reactor Sustainability Program and EPRI Long-Term Operations Program – Joint Research and Development Plan, Rev 5

Nuclear power has contributed almost 20% of the total amount of electricity generated in the United States over the past two decades. High capacity factors and low operating costs make nuclear power plants (NPPs) some of the most economical power generators available. Further, nuclear power remains the single largest contributor (nearly 70%) of non-greenhouse gas-emitting electric power generation in the United States. Even when major refurbishments are performed to extend operating life, these plants continue to represent cost-effective, low-carbon assets to the nation’s electrical generation capability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

DOE-NE Light Water Reactor Sustainability Program and EPRI Long-Term Operations Program – Joint Research and Development Plan, Rev 6

Nuclear power has contributed almost 20% of the total amount of electricity generated in the United States over the past two decades. High capacity factors and low operating costs make nuclear power plants (NPPs) some of the most economical power generators available. Further, nuclear power remains the single largest contributor (nearly 70%) of non-greenhouse gas-emitting electric power generation in the United States. Even when major refurbishments are performed to extend operating life, these plants continue to represent cost-effective, low-carbon assets to the nation’s electrical generation capability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

California Time-of-Use (TOU) Transition: Effects on Distributed Wind and Solar Economic Potential

Time-of-use (TOU) retail energy rates price electricity differently by the time of day, thereby communicating to consumers the costs of supplying electricity throughout the day. This study evaluates the impact of Decision D.15.07-001, which mandates a transition to default TOU rates in California, on the economic viability of behind-the-meter distributed wind and solar systems. We assess viability through 'economic potential,' a metric we define as the amount of generation capacity that exceeds a specified rate of return (5.4%) and therefore would be economic to construct; we do not attempt to project deployment or adoption. In addition, we identify cost improvements needed for a robust distributed wind market and the specific counties and sectors with substantial economic potential. Over the scenarios considered, model results indicate realistic pathways to reaching a robust, 1-GW distributed wind market in California though solar economic potential was found to be substantially larger than that of wind. Distributed wind's capacity factor does not appear to be strongly correlated to the periods of peak electricity prices as set by utility's TOU periods. Because of this disassociation and nuances in the billing of tiered electricity, the transition to TOU is projected to moderately decrease distributed wind economic potential and increase that of distributed solar. However, a limitation of this analysis is that it does not factor in the change in rate values as California works toward its goal of 100% renewables. As variable renewable energy penetration increases to meet this goal, our results suggest that wind generation will become increasingly correlated to periods of peak electricity prices. Increased variable renewable penetration, especially of solar, is likely to shift periods of higher electricity demand to later in the evening, and any periodic adjustments in TOU periods to reflect these new periods of demand will positively affect the value of wind generation more than the value of solar generation. High distributed wind capital costs are a significant barrier to large scale adoption; we explore the sensitivity of capital cost reductions on distributed wind economic potential. We find that distributed wind economic potential increases substantially in 2020 for capital costs below 3 dollars/W - particularly for residential- and commercial-scale turbines; capital costs must fall below 2 dollars/W in 2030 to support a significant increase in economic potential, in large part due to the expected continued cost reductions in solar. We identified an upper limit to the state's behind-the-meter distributed wind economic potential at approximately 5 GW. Overall, California exhibits over 1 GW of economic potential for distributed wind by 2030, even with the moderate decrease in potential under TOU. This potential is represented mostly by Southern California, which sees the most notable increase in economic viability as capital expenditure prices decline.

17 WIND ENERGY↗

Impact of Load Following on the Economics of Existing Coal-Fired Power Plant Operations

This report evaluates the effects of increased cold starts on an existing 300 MW coal-fired unit operating and maintenance (O&M) and fuel costs resulting from reduced dispatchability in the market. Component level impacts on equipment are characterized and assessed to estimate changes in O&M costs resulting from 1, 6, and 12 cold starts per year. Report findings discuss the change in both O&M and fuel costs based on different number of cold starts and varying capacity factors. Results are presented in terms of impact to cost of electricity ($/MWh).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Initial Thermal Energy Yield Potential for the Use of Concentrating Solar Power (CSP) for Coal Hybridization in India

The hybridization of concentrating solar power (CSP) with coal-based power generation in India may serve to mitigate fossil fuel use externalities. Assuming parabolic trough systems without storage, this report estimates the upper bound on thermal energy production from India's solar resource to be 633,000 terawatt-thermal (TW th ) annually. Moreover, considering land characteristic constraints, contiguous solar fields (SF) area limitations, and existing coal plant proximity, we produce technical potential estimates. Within 1,000 meters (m) of suitable coal plants, we find the average capacity factor to be 21.1% and the potential for 102,555 gigawatt-hours thermal (GWh th ) aggregated from 25 megawatt thermal (MW th ) CSP SFs. Only about 10% of the land within 1,000 m of each existing coal plant is anticipated to be suitable for hybridization development, and on average this land is expected to support a 43 MW th SF that yields 81 GWh th annually. Chhattisgarh and Tamil Nadu are particularly suited to CSP-coal hybridization and the abundance of suitable land in these states would allow SFs to provide 129 GWh th annually to each coal plant on average. Future research will assess the financial viability of hybridization and explore coal plant optimization strategies that integrate CSP-derived heat (e.g. feedwater heating or potentially coal drying).This study shows significant CSP-coal hybridisation potential for the existing coal plants in India. This preliminary study suggests CSP-coal hybridization may play a supporting role in India's energy system, but it's future is still largely uncertain. This is an area of considerable interest in India, and the methodology could also be adapted for other areas of the world like the United States.

14 SOLAR ENERGY↗

2016 Distributed Wind Market Report

The annual Distributed Wind Market Report documents, analyzes, and characterizes the differences and trends unique to distributed wind applications, including but not limited to, costs, number of deployments, performance and capacity factors, types of turbines used, customer types, domestic and international markets, market drivers and barriers, and local economic impact. Other market reports concentrate only on U.S. wind projects using turbines greater than 100 kW. This report specifically analyzes the distributed wind sector of the market and details the annual U.S. small wind market.

17 WIND ENERGY↗

Visualizing Wind Farm Wakes Using SCADA Data

As wind farms scale to include more and more turbines, questions about turbine wake interactions become increasingly important. Turbine wakes reduce wind speed and downwind turbines suffer decreased performance. The cumulative effect of the wakes throughout a wind farm will therefore decrease the performance of the entire farm. These interactions are dynamic and complicated, and it is difficult to quantify the overall effect of the wakes. This problem has attracted some attention in terms of computational modelling for siting turbines on new farms, but less attention in terms of empirical studies and performance validation of existing farms. In this report, Supervisory Control and Data Acquisition (SCADA) data from an existing wind farm is analyzed in order to explore methods for documenting wake interactions. Visualization techniques are proposed and used to analyze wakes in a 67 turbine farm. The visualizations are based on directional analysis using power measurements, and can be considered to be normalized capacity factors below rated power. Wind speed measurements are not used in the analysis except for data pre-processing. Four wake effects are observed; including wake deficit, channel speed up, and two potentially new effects, single and multiple shear point speed up. In addition, an attempt is made to quantify wake losses using the same SCADA data. Power losses for the specific wind farm investigated are relatively low, estimated to be in the range of 3-5%. Finally, a simple model based on the wind farm geometrical layout is proposed. Key parameters for the model have been estimated by comparing wake profiles at different ranges and making some ad hoc assumptions. A preliminary comparison of six selected profiles shows excellent agreement with the model. Where discrepancies are observed, reasonable explanations can be found in multi-turbine speedup effects and landscape features, which are yet to be modelled.

17 WIND ENERGY↗

Utility-Scale Solar: Empirical Trends in Project Technology, Cost, Performance, and PPA Pricing in the United States (2019 Ed.)

The utility-scale solar sector has led the overall U.S. solar market in terms of installed capacity since 2012. In 2018, the utility-scale sector accounted for nearly 60% of all new solar capacity, and is expected to maintain its market-leading position for at least another six years. More than three-quarters of all states, representing all regions of the country, are now home to one or more utility-scale solar projects. This report—the seventh in an ongoing annual series—provides in-depth data-driven analysis of the utility-scale solar project fleet in the United States. Drawing on empirical project-level data from a wide range of sources, this report analyzes technology trends, installed project prices, operating costs, capacity factors, power purchase agreement (“PPA”) prices, the levelized cost of solar energy (LCOE), and the market value of solar. The report also includes data and observations about completed or recently announced solar+storage projects. Given its current preeminence in the market, utility-scale PV also dominates much of this report, though data from CPV and CSP projects are also presented where appropriate.

14 SOLAR ENERGY↗

Scoping Analysis of Sodium Cooled Fast Spectrum Test Reactor Cores

A team from the national laboratories conducted a study that assessed advanced reactor technology options and the irradiation needs of a broad group of stakeholders. This identified a gap in the fast neutron irradiation capability - the need for a test reactor that can deliver high neutron fluxes of fast neutrons. The study compared fast and thermal neutron irradiation technology options based on technology maturity and the ability to meet strategic objectives, along with pathways to deployment and tradeoffs in mission. It also provided a recommendation on specific technology options to address the current gap in fast neutron irradiation capabilities. In this context, a detailed scope of work was prepared that pertains to a trade study focusing on the core of a fast neutron spectrum test reactor. This report presents the main results obtained by a team of Argonne National Laboratory (ANL) and Idaho National Laboratory (INL) scientists. It aims at developing an overall understanding of how the various areas important to the design and successful operation of such a facility interact with one another. Developing a sense of the relevant sensitivities at a systems level creates an understanding of where and how margins may be available to improve performances (e.g., flux level, capacity factor, and thermal hydraulic limits). Emphasis is given to the reactor (core design options and safety) and its fuel cycle (fuel supply and fabrication, as well as spent fuel management).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Evaluation of Steam Cycle Upgrades to Improve the Competitiveness of U.S. Coal Power Plants (Final Scientific / Technical Report)

Increasing the competitiveness of the existing pulverized-coal utility fleet in the United States may be achieved by decreasing heat rate, via increases in steam cycle efficiency through upgraded steam temperatures and use of latest technology available in steam turbine and blading design. The average net plant efficiency of the US coal-fired fleet is approximately 33% (HHV). Plant efficiency increases to approximately 41.4% (HHV) at 1,350°F (732°C) steam temperature. However, achieving these Advanced Ultra-Super Critical (AUSC) steam conditions requires the use of advanced high-temperature materials. While there has been a significant amount of DOE-funded materials R&D, most of the related design work has focused on new (greenfield) units, rather than on opportunities to retrofit this advanced technology to the existing utility fleet. If technology, based upon the advanced materials required for AUSC steam conditions, may be applied to the existing fleet, using an economically viable retrofit, a higher capacity factor can be expected as a result of the increased plant competitiveness. The Electric Power Research Institute (EPRI) was awarded a project by the US Department of Energy to examine the technical and economic feasibility of a series of steam cycle upgrades to the two most prevalent types of U.S. coal power plants: 2,400 psig (16.6 MPa) subcritical and 3,500 psig (24.1 MPa) supercritical pulverized coal units. The nine upgrade options that were originally being considered included increasing the main and reheat steam temperatures from 1,000°F (538°C) to 1,100°, 1,200°, and 1,350°F (593°C, 649°C, and 732°C) while holding the steam pressures constant at their original design values, and cases where just the main steam or reheat steam temperatures were increased. The objective was to minimize the modifications required to the existing power plant while still providing a significant improvement in heat rate. The upgrade options assumed that the boiler enclosure envelope remained unchanged from each base case, and that all applicable OEM design guidelines for normal commercial units were imposed. For the highest temperature supercritical case, an option of using a low-pressure molten salt loop to transfer heat from the furnace to the steam was examined. The first major task of the work scope was designed to examine the technical feasibility of various upgrade options, while the subsequent work determined economic viability of the technically feasible upgrade options. Prior to evaluating the effect of these increased temperatures, a “base case” model of a subcritical and supercritical PC boiler was created, which was used for comparative purposes. Upgrade options were evaluated at full-load, part-load and dynamic transient conditions. Once the technical feasibility of each upgrade option was evaluated, the economic value of the heat rate improvement of each feasible option was determined by detailed modeling of unit dispatch in several regional power markets. The dispatch model was used to estimate the amount of revenue from power sales the upgraded unit would receive in comparison to a non-upgraded version of the same power plant. As a parallel task to the dispatch analysis, the capital cost of implementing the upgrades was estimated. The capital cost estimates were then compared to the increased revenue estimated by the dispatch modeling to determine the economic attractiveness of each upgrade option. Several upgrade options were determined to be technically feasible. The net present value (NPV) of the costs for steam cycle upgrades considered in this study ranged from approximately $\$$111 to $\$$130 million. The economic modeling results show that the unit dispatch changes resulting from steam cycle upgrades are relatively small, due largely to heat rate (and operating cost) changes being relatively small. Additionally, the cost of each upgrade exceeds the net revenue increases associated with the upgrade case. Note that the breakeven values are higher for subcritical retrofits, but the capital costs for the subcritical upgrades are also slightly higher. In typical new pulverized coal plants, fuel accounts for approximately 25% of the cost of electricity (COE), while capital costs represent around 50% of the COE. Therefore, in order to improve the heat rate by 4% one can only afford to increase the capital cost by 2%, at the same cost of electricity. The conclusion of this study is that without a cost for emitting CO 2 , it will be difficult to pay for significant efficiency improvements on plants firing low cost coals.

01 COAL, LIGNITE, AND PEAT↗