Search NASA⌕ Search

SEARCH · Search NASA

Results for “Checklist”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Building America Case Study: Challenges of Achieving 2012 IECC Air Sealing Requirements in Multifamily Dwellings, Upstate New York (Fact Sheet)

While previous versions of the International Energy Conservation Code (IECC) have included provisions to improve the air tightness of dwellings, for the first time, the 2012 IECC mandates compliance verification through blower door testing. Simply completing the Air Barrier and Insulation Installation checklist through visual inspection is no longer sufficient by itself. In addition, the 2012 IECC mandates a significantly stricter air sealing requirement. In Climate Zones 3 through 8, air leakage may not exceed 3 ACH50, which is a significant reduction from the 2009 IECC requirement of 7 ACH50. This requirement is for all residential buildings, which includes low-rise multifamily dwellings. While this air leakage rate requirement is an important component to achieving an efficient building thermal envelope, currently, the code language doesn't explicitly address differences between single family and multifamily applications. In addition, the 2012 IECC does not provide an option to sample dwellings for larger multifamily buildings, so compliance would have to be verified on every unit. With compliance with the 2012 IECC air leakage requirements on the horizon, several of CARB's multifamily builder partners are evaluating how best to comply with this requirement. Builders are not sure whether it is more practical or beneficial to simply pay for guarded testing or to revise their air sealing strategies to improve compartmentalization to comply with code requirements based on unguarded blower door testing. This report summarizes CARB's research that was conducted to assess the feasibility of meeting the 2012 IECC air leakage requirements in 3 multifamily buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Utilization of the High Flux Isotope Reactor at Oak Ridge National Laboratory

This paper addresses several aspects of the scientific utilization of the Oak Ridge National Laboratory High Flux Isotope Reactor (HFIR). Topics to be covered will include: 1) HFIR neutron scattering instruments and the formal instrument user program; 2) Recent upgrades to the neutron scattering instrument stations at the reactor, and 3) eMod a new tool for addressing instrument modifications and providing configuration control and design process for scientific instruments at HFIR and the Spallation Neutron Source (SNS). There are 15 operating neutron instrument stations at HFIR with 12 of them organized into a formal user program. Since the last presentation on HFIR instruments at IGORR we have installed a Single Crystal Quasi-Laue Diffractometer instrument called IMAGINE; and we have made significant upgrades to HFIR neutron scattering instruments including the Cold Triple Axis Instrument, the Wide Angle Neutron Diffractometer, the Powder Diffractometer, and the Neutron Imaging station. In addition, we have initiated upgrades to the Thermal Triple Axis Instrument and the Bio-SANS cold neutron instrument detector system. All of these upgrades are tied to a continuous effort to maintain a high level neutron scattering user program at the HFIR. For the purpose of tracking modifications such as those mentioned and configuration control we have been developing an electronic system for entering instrument modification requests that follows a modification or instrument project through concept development, design, fabrication, installation, and commissioning. This system, which we call eMod, electronically leads the task leader through a series of questions and checklists that then identifies such things as ES&H and radiological issues and then automatically designates specific individuals for the activity review process. The system has been in use for less than a year and we are still working out some of the inefficiencies, but we believe that this will become a very effective tool for achieving the configuration and process control believed to be necessary for scientific instrument systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

New Whole-House Solutions Case Study: Challenges of Achieving 2012 IECC Air Sealing Requirements in Multifamily Dwellings, Upstate New York

While previous versions of the International Energy Conservation Code (IECC) have included provisions to improve the air tightness of dwellings, for the first time, the 2012 IECC mandates compliance verification through blower door testing. Simply completing the Air Barrier and Insulation Installation checklist through visual inspection is no longer sufficient; the 2012 IECC mandates a significantly stricter air sealing requirement. In Climate Zones 3 through 8, air leakage may not exceed 3 ACH50, which is a significant reduction from the 2009 IECC requirement of 7 ACH50. This requirement is for all residential buildings, which includes low-rise multifamily dwellings. While this air leakage rate requirement is an important component to achieving an efficient building thermal envelope, currently, the code language doesn't explicitly address differences between single family and multifamily applications. In addition, the 2012 IECC does not provide an option to sample dwellings for larger multifamily buildings, so compliance would have to be verified on every unit. With compliance with the 2012 IECC air leakage requirements on the horizon, several of Building America team Consortium for Advanced Residential Building's (CARB) multifamily builder partners are evaluating how best to comply with this requirement. Builders are not sure whether it is more practical or beneficial to simply pay for guarded testing or to revise their air sealing strategies to improve compartmentalization to comply with code requirements based on unguarded blower door testing. This report summarizes CARB's research that was conducted to assess the feasibility of meeting the 2012 IECC air leakage requirements in three multifamily buildings.

air leakage↗

Technology Solutions Case Study: Preventing Thermal Bypass

This project highlights the importance of continuous air barriers in full alignment with insulation to prevent thermal bypasses and achieve high energy performance, and recommends use of ENERGY STAR's Thermal Bypass Inspection Checklist.

air barriers↗

Potential Energy Cost Savings from Increased Commercial Energy Code Compliance

An important question for commercial energy code compliance is: “How much energy cost savings can better compliance achieve?” This question is in sharp contrast to prior efforts that used a checklist of code requirements, each of which was graded pass or fail. Percent compliance for any given building was simply the percent of individual requirements that passed. A field investigation method is being developed that goes beyond the binary approach to determine how much energy cost savings is not realized. Prototype building simulations were used to estimate the energy cost impact of varying levels of non-compliance for newly constructed office buildings in climate zone 4C. Field data collected from actual buildings on specific conditions relative to code requirements was then applied to the simulation results to find the potential lost energy savings for a single building or for a sample of buildings. This new methodology was tested on nine office buildings in climate zone 4C. The amount of additional energy cost savings they could have achieved had they complied fully with the 2012 International Energy Conservation Code is determined. This paper will present the results of the test, lessons learned, describe follow-on research that is needed to verify that the methodology is both accurate and practical, and discuss the benefits that might accrue if the method were widely adopted.

code compliance↗

Potential Energy Cost Savings from Increased Commercial Energy Code Compliance

An important question for commercial energy code compliance is: “How much energy cost savings can better compliance achieve?” This question is in sharp contrast to prior efforts that used a checklist of code requirements, each of which was graded pass or fail. Percent compliance for any given building was simply the percent of individual requirements that passed. A field investigation method is being developed that goes beyond the binary approach to determine how much energy cost savings is not realized. Prototype building simulations were used to estimate the energy cost impact of varying levels of non-compliance for newly constructed office buildings in climate zone 4C. Field data collected from actual buildings on specific conditions relative to code requirements was then applied to the simulation results to find the potential lost energy savings for a single building or for a sample of buildings. This new methodology was tested on nine office buildings in climate zone 4C. The amount of additional energy cost savings they could have achieved had they complied fully with the 2012 International Energy Conservation Code is determined. This paper will present the results of the test, lessons learned, describe follow-on research that is needed to verify that the methodology is both accurate and practical, and discuss the benefits that might accrue if the method were widely adopted.

code compliance, commercial energy code, energy co↗

ASNF Engineering Scale Drying Experiment System Operability Functional Requirements

This checklist specifies the functional requirements for the drying system installed at Holtec International under the scope of INL Contract # 215725, in collaboration with University of South Carolina under INL Contract Number 207046, consistent with the parameters described in INL/EXT-19-56017, Aluminum-clad Spent Nuclear Fuel Engineering Scale Drying Experiment Design. Completion of the ASNF Engineering Scale Drying Experiment Acceptance Criteria for Fabricated Items, INL/MIS-20-58551, is a prerequisite.

36 MATERIALS SCIENCE↗

Building Energy Codes Resource Guide: Code Officials Edition

The Building Energy Codes Resource Guide: Code Officials Edition, designed in partnership with the International Code Council (ICC), is a coordinated collection of useful resources for code enforcement officials. The guide includes practical resources for those conducting plan review and field inspections, including BECP's REScheck™ and COMcheck™ quick reference guides, case studies, and sample inspection checklists. It also includes information from and about ICC's commentaries, workbooks, and code companion materials. Many other helpful items and links to further resources available on the web also are included. Code official associations, and state and local jurisdiction agencies responsible for code administration and enforcement can easily add state and local guidance to this guide for a one-stop resource to support compliance in the field.

Energy efficiency, code compliance, IECC↗

ESPC ESA Training Series: Site-Specific/Stand-Alone Contract Vehicle

This webinar provides instructions and resources for financing distributed energy projects (e.g., on–site renewable energy, storage, and combined heat and power) using an energy savings performance contract (ESPC) energy sales agreement (ESA) through the site–specific/stand–alone contract vehicle. The site–specific/stand–alone contract vehicle is a procurement process using a request for proposal (RFP). Topics covered during the webinar include forming a strong project team, validating the feasibility of the distributed energy project at a site, acquisition planning, RFP development, procurement, proposal evaluation and contract award, and the construction and performance period. This webinar also provides an overview of the resources available in the ESPC ESA Toolkit, such as checklists and templates.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Decommissioning Lines-of-Inquiry for Design Review of New Nuclear Facilities

An independent review of the design of the Salt Waste Processing Facility (SWPF) at Savannah River included a requirement to address the ability to decommission the facility. This paper addresses the lines of inquiry (that were developed for the review and their use in future for reviews of other projects, referred to herein as 'DDLOI'. Decommissioning activities for almost any type of facility are well within the technological state-of-the-art. The major impacts for complications resulting from insufficient consideration during design of a new facility that involves radioactive processes and/or material is the cost of: a) gaining access to high radiation areas and b) dealing with high levels of contamination. For this reason, the DDLOI were developed as a way of raising the awareness of designers and design reviewers to design features that can impede or facilitate ultimate decommissioning. The intent is that this report can be used not only for review, but also by engineers in the early stages of design development when requirements are being assembled. The focus for the DDLOI is on types of facilities that contain nuclear and/or radioactive processes and materials. The level of detail is more specific than would be found in decommissioning plans prepared for regulatory purposes. In commencing this review, the author's could find no precedent for a systematic review of design for decommissioning that included results of a review. Therefore, it was decided to create a report that would provide detailed lines of inquiry along with the rationale for each. The resulting DDLOI report included 21 topical areas for design review. The DDLOI combined the authors' experience in developing baselines for facilities to be deactivated or demolished with prior publications by the U.S. Army and the International Atomic Energy Agency. These two references were found via an Internet search and were the only ones judged to be useful at a field application level. Most others addressed principles or methods but did not have specific recommendations at a detailed design level. The DDLOI not only recommended what reviewers should look for, but also provides the reason as to why each item is important. Overall, the 21 topical areas there are presented in four main sections, which are: - Yard and Exterior Spaces addresses yard areas, underground tunnels, vaults, roofs and siding. - Structures and Interior Spaces addresses interior spaces, use of hazardous materials, placement of large or heavy equipment, and walls and floors designed for shielding. - Systems and Equipment first addresses systems for deactivation, service and utility systems isolation, pipes and ducts, tanks, and crud traps. In addition, DDLOI for laboratories, gloveboxes, and hot cells are included. - Contamination Control addresses the design of, walls, floors, ceilings, sumps, and drains with regard to contamination control. The ability to decontaminate is also included. The final section of the report is a listing of the individual DDLOI topics in a table format, which is designed as a tool that for use as a review checklist. In applying the DDLOI, two cautions are advised: - Designing for the operational mission of the facility is a higher priority than accommodating ease of decommissioning. The recommendations should be considered as preferable design practices when they can be accommodated without compromising the primary design objectives. - The DDLOI should be considered as guidance and not design requirements; noting some will become requirements because they are incorporated in modern building codes. Applying the DDLOI to the SWPF resulted in an overall conclusion that the design for the most part was compatible with the ability to decommission the facility. The most significant recommendation was to completely line the walls of a hot cell with stainless steel that was originally designed with two of its sides as the concrete wall of the building. This recommendation was subsequently incorporated in the design. Future design reviews of nuclear or radioactively contaminated facilities, whether by independent parties or the designers themselves, can benefit from the lines-of-inquiry that are the subject of this paper. The DDLOI, with an example of their use, are in a public domain report, which is freely available from the authors.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chemical interaction matrix between reagents in a Purex based process

The United States Department of Energy (DOE) is the responsible entity for the disposal of the United States excess weapons grade plutonium. DOE selected a PUREX-based process to convert plutonium to low-enriched mixed oxide fuel for use in commercial nuclear power plants. To initiate this process in the United States, a Mixed Oxide (MOX) Fuel Fabrication Facility (MFFF) is under construction and will be operated by Shaw AREVA MOX Services at the Savannah River Site. This facility will be licensed and regulated by the U.S. Nuclear Regulatory Commission (NRC). A PUREX process, similar to the one used at La Hague, France, will purify plutonium feedstock through solvent extraction. MFFF employs two major process operations to manufacture MOX fuel assemblies: (1) the Aqueous Polishing (AP) process to remove gallium and other impurities from plutonium feedstock and (2) the MOX fuel fabrication process (MP), which processes the oxides into pellets and manufactures the MOX fuel assemblies. The AP process consists of three major steps, dissolution, purification, and conversion, and is the center of the primary chemical processing. A study of process hazards controls has been initiated that will provide knowledge and protection against the chemical risks associated from mixing of reagents over the life time of the process. This paper presents a comprehensive chemical interaction matrix evaluation for the reagents used in the PUREX-based process. Chemical interaction matrix supplements the process conditions by providing a checklist of any potential inadvertent chemical reactions that may take place. It also identifies the chemical compatibility/incompatibility of the reagents if mixed by failure of operations or equipment within the process itself or mixed inadvertently by a technician in the laboratories. (aut0010ho.

07 ISOTOPE AND RADIATION SOURCES↗

A Comprehensive Solution for Managing TRU and LLW From Generation to Final Disposition - 13205

A LANL multi-disciplinary team faced the challenge of building and delivering a waste information system capable of managing radioactive, hazardous, and industrial waste from cradle to grave. The result is the Waste Compliance and Tracking System (WCATS) a flexible, adaptive system that has allowed LANL to consolidate its legacy applications into one system, and leverage the advantages of managing all waste types within a single scalable enterprise application. Key functionality required for robust waste operations, include: waste characterization, waste identification, transportation, inventory management, waste processing, and disposal. In order to maintain data quality, field operations such as waste identification, surveillance checklists, wall-to-wall inventory assessments, waste transfers, shipment pickup and receipt, and simple consolidation operations are captured by the operator or technician using mobile computers. Work flow is managed via end-user defined work paths, to ensure that unit operations are performed in the correct order. Regulatory compliance reports and algorithms are provided to support typical U.S. EPA, DOT, NRC, and DOE requirements, including the EPA hazardous waste manifest, NRC LLW manifest, DOE nuclear material at risk, RCRA TSDF inventory rules, and so forth. The WCATS application has allowed LANL to migrate and consolidate its disparate legacy applications. The design and implementation is generalized so that facility owners can customize the user interface, setup facilities and unit operations (i.e., treatment, storage, disposal, characterization, and administrative), define inventory compliance rules, and establish custom work flow requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technology Development: From Idea to Implementation - 12131

There are good ideas and new technologies proposed every day to solve problems within the DOE complex. A process to transition a new technology from inception to the decision to launch a project with baselines is described. Examples from active technology development projects within Savannah River Remediation (SRR) will be used to illustrate the points. The process includes decision points at key junctures leading to preliminary design. At that point, normal project management tools can be employed. The technology development steps include proof-of-principle testing, scaled testing and analysis, and conceptual design. Tools are used that define the scope necessary for each step of technology development. The tools include use of the DOE technology readiness guide, Consolidated Hazards Analysis (CHA) and internal checklists developed by Savannah River Remediation. Integration with operating or planned facilities is also included. The result is a roadmap and spreadsheet that identifies each open question and how it may be answered. Performance criteria are developed that enable simple decisions to be made after the completion of each step. Conceptual design tasks should begin as the technology development continues. The most important conceptual design tasks at this point in the process include process flow diagrams (PFDs), high level Process and Instrumentation Drawings (P and IDs), and general layout drawings. These should influence the design of the scaled simulant testing. Mechanical and electrical drawings that support cost and schedule development should also be developed. An early safety control strategy developed from the CHA will also influence the cost. The combination of test results, calculations and early design output with rough order of magnitude cost and schedule information provide input into the decisions to proceed with a project and data to establish the baseline. This process can be used to mature any new technology, especially those that must be integrated into complicated flow sheets. Then fully informed decisions can be made to usher technology development ideas through project implementation. Examples from active technology development projects, Tank 48 Treatment and Enhanced Chemical Cleaning, are presented. This model for technology development integrates several tools and activities to provide a logical method for maturing new ideas and technologies. It provides a framework to develop a good idea into a full up design/build project. This model defines a set of integrated tasks to mature the technology and define scope, cost and schedule necessary to make business decisions for implementing technology development. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The container database? life-cycle management of container inventories at the Hanford site - 15131

Since 2011 the Department of Energy (DOE) Richland Operations Office (DOE-RL) and their contractor CH2M HILL Plateau Remediation Company (CH2M HILL) have worked together to develop a database that provides life-cycle management and control of all CH2M HILL-managed Department of Transportation (DOT) Type A and Industrial Packaging (IP) container assets at the Hanford Site. This powerful tool provides CH2M HILL with the capability to centrally manage container procurement specifications; maintenance requirements; certificates of conformance; certification and test reports; as-built drawings; and information on container status, location, and ownership; and any special characteristics of container assets. The database was originally developed to provide ready access to Type A and IP container supplier and manufacturer Certificates of Conformance (CoCs) and related certification documentation to support onsite shipments in compliance with the Hanford Site Wide Transportation Safety Document (TSD), DOE/RL-2001-0036, as well as regulatory or other requirements. The information is accessed through active links to these documents within the database itself. The database has grown to include links to external supplementary information to support onsite shipments, such as links to authorized tie downs for each package type, approved packaging and transportation commodities, and approved shipping authorizations, and packaging management procedures and checklists. The database is a living databank that is easily tailored to meet user- and site-specific needs as they are identified. It is currently being expanded to include the inventories of all Hanford contractors, as well as other packaging assets, such as specialty drums and packaging commodities. Each upgrade brings efficiencies and cost savings, not only in container inventory management, but also in the areas of work control, waste packaging, waste transportation, and regulatory compliance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Maintenance of a Comprehensive Radioactive Waste Management Basis - 16349

In accordance with DOE Order 435.1, 'Radioactive Waste Management', radioactive facilities and activities must have a documented basis of operation consisting of procedures, and physical and administrative controls that ensure protection of workers, the public, and the environment. To fulfill this requirement, Department of Energy (DOE) facilities are required to have an approved Radioactive Waste Management Basis (RWMB) which provides assurance that controls are developed, documented, and implemented for management of radioactive waste. The required elements of the RWMB vary with the type of waste management operation or facility and the types of hazards associated with the facility. Therefore, a graded approach is used per DOE guidance. The Idaho National Laboratory Waste Management Program (WMP) has developed and implemented a thorough RWMB for each of its five operational areas in addition to facility specific DOE Order 435.1 compliance tables which served as a tool for developing each RWMB. With approximately 40 facilities generating and/or managing radioactive waste, the WMP has encountered several challenges in keeping RWMBs current and accurate, in addition to ensuring facilities are continually maintaining compliance in evolving conditions in support of programs and projects in a continuously expanding research environment. Prior to initial radioactive waste generation, nuclear facility management must demonstrate compliance via the facility safety basis and approved laboratory-wide and facility specific documents which are then incorporated into the RWMB and subsequently approved by the DOE-Idaho Operations field office designated point of contact. The WMP has incorporated several areas of improvement to its RWMB management strategy to help facilities maintain compliance in new and changing conditions. Improvements included providing ad hoc facility management training for new facility managers, adding a reviewer from the WMP during the environmental checklist process, and performing annual RWMB reviews which involve not only facility management, but also Waste Generator Services support personnel, and other support organizations, as applicable. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fortifying Environmental Compliance Strategies at Hanford - 19541

At the Hanford Site, located near Richland, Washington, the Department of Energy is cleaning up legacy radioactive and mixed-waste generated from the Manhattan Project in the 1940's. A major component of cleaning up the waste is maintaining compliance with federal and state environmental regulations. Environmental compliance is also determined through permits, agreements, and consent orders issued by regulating agencies such as the Washington State Department of Health: Office of Radiation Protection, Washington State Department of Ecology Nuclear Waste Program, and the Environmental Protection Agency. Maintaining compliance at Hanford reduces environmental impacts and addresses violations, or non-compliances. The following strategies improve compliance and support the avoidance of enforcement actions. At Hanford, regulatory agency environmental enforcement actions, and their corrective actions, are tracked to completion using databases maintained by inspection subject matter experts. The databases are used to provide the Department of Energy and contractor management with up-to-date status of regulatory agency activity and the required corrective actions. Trending enforcement actions helps target compliance vulnerabilities. Findings and corrective actions that are entered into the databases are then trended by date, location, responsible contractor, agency, and type of compliance issue. The ability to review previous non-compliances in certain locations of the Site, or by general alleged violation, provides the project's environmental contacts with information on what types of issues to look for on pre-inspection walk downs. Finding non-compliances during pre-inspection walk downs allows the contractor to correct the issue and avoid potential fines from regulating agencies. The walk downs are conducted by environmental specialists and project personnel looking for issues that may be viewed as a compliance problem. Using agency checklists and previous inspection correspondence can help to provide valuable information during pre-inspection activities. Training regulatory agency inspectors on Site security requirements, cultural and ecological standards, and inspection protocols allows for increased efficiency and reduces potential miscommunication between regulatory agencies and the regulated contractors. The training also allows the contractors to give the regulating agencies the up-to-date policies and procedures that will be addressed during the inspection. Hanford has pre-identified inspection coordinators within each contractor to assist in coordinating with Department of Energy personnel, projects, and management prior to the inspections. These inspection coordinators notify affected management, accommodate and escort the regulators to locations they ask to inspect, set up requested interviews, and gather requested information that will need to be cleared for public release. These practices make for positive experiences and interactions with the regulating agency personnel and help reduce and eliminate environmental non-compliances, findings, violations, and fines. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of a bayesian belief network model to reliability assessment of nuclear safety-related software - 207

As the instrumentation and control (I and C) systems in nuclear power plants (NPPs) have been replaced with digital-based systems, the need to incorporate software failures into NPP probabilistic risk assessments has arisen. In order to assess the probability of software failure on demand, a Bayesian belief network (BBN) model was developed which estimates the number of defects and the resulting probability of software failure on demand in nuclear safety-related software. To assess the feasibility of the BBN framework, the BBN model was applied to the prototype Integrated Digital Protection System-Reactor Protection System (IDiPS-RPS) to estimate the number of remaining faults and the software failure probability of a target software. The developmental- and V and V-activities carried out during the IDiPS-RPS development process were evaluated based on the well-defined checklist derived by the V and V team and were estimated based on expert elicitation. In addition, the attribute evaluations and the number of FPs of the target software is provided as the inputs for the BBN model. The application results showed the feasibility of using BBNs for quantifying software failure probabilities and several insights were gained from the applications of the BBN model. The proposed BBN framework can be applied to estimate the software failure probability for other safety-related NPP software and provide an insight on modeling the software development process that involves iterations between different development phases. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗