Search NASA⌕ Search

SEARCH · Search NASA

Results for “Configuration Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Extension of 4-8 Texture Hierarchies to Large Video Processing and Visualization

The purpose of this Techbase was to reduce to practice the tiled 4-8 texture hierarchy for the display of video imagery (i.e. sequences of frames). The immediate intent was to demonstrate its use in the analysis and display of sensor imagery. As sensors are increasing in resolution the physical amount of imagery that needs to be displayed can quickly overwhelm most display systems. For example, a sensor with a horizontal resolution of over 8000 pixels would generate an image over 10 feet wide on a standard 72 DPI display. Breaking an image into tiles, and then decomposing each tile into a multiresolution hierarchy, allows a user (or software) to efficiently select and display only those parts of the image that are of interest to the user. The originator of the idea of 4-8 Texture Hierarchies was Dr. Mark Duchaineau, and we consulted with him in much of our work. We also consulted with Dan Knight, from SequoiaTek Corp., who is a contractor responsible for implementing the viewers for our applications. Most of the code for actual 4-8 Texture Hierarchy generation already existed; a large focus of the Techbase was to determine how to best use what was available for video imagery. The majority of progress was made in specifying and implementing the software framework, which turned out to be rather involved. This framework is to support the creation, storage, and display of images, both tiled and untiled. A first albeit incomplete version was successfully tested in the field in August 2007. The framework structures the process of collecting and processing images conceptually as a pipeline, where work is passed along and a different operation is performed at each stage. In practice, the pipeline is implemented by a group of processes (not threads), or 'workers', each responsible for a specific type of operation. Associated with these workers is a pool of memory (cache). As each process finishes its work, it places the results into the cache and sends a message to the process responsible for the next operation, including in the message an identifier allowing the recipient to locate the data to be worked on. Conceptually this is akin to transferring mail from person to person by placing it into and removing it from a group of mail slots, rather than handing it to the next person directly. So for example, to capture, tile, and store imagery to disk, one worker would be responsible for obtaining an image from an electro-optical sensor. Another would be responsible for breaking the image into tiles, and another for performing a decorrelating transform for entropy reduction and multiresolution representation. Still another would be responsible for compression, and another for storage. To maximize robustness in an experimental environment, we created a manager that could monitor, kill, restart, and configure the entire processing pipeline, including the shared cache and worker processes. In the event of hardware or software failure, individual elements of the pipeline were restored automatically and with minimum data loss. Working with Mark Duchaineau we attempted to determine a set of ideal coefficients for the wavelet used to create the multiresolution hierarchy. While a workable set exists, it produces undesirable artifacts at high levels of loss, so more work needs to be done to identify a more ideal set. The tiler and data structures for tiling and display have been added to the code base we developed. As currently implemented it takes approximately one second to tile and build a multiresolution hierarchy for an 11-megapixel image on a 3.8 GHz Pentium 4. This is too slow for some uses, so some work will probably need to be done to optimize the code. We may be able to leverage commodity graphics processors to gain extra speed. With the advent of quad-core CPUs it may also be possible to get required throughput by tiling the image and then having several processes run in parallel to build the multiresolution hierarchies for the resulting tiles. Additionally, more work needs to be done to define a data format for storing image tiles on disk, as well as retrieving and displaying them. As this functionality is desirable (and required, if we are to make large data easily viewable) we will be spending a lot of time developing this. As a final note, it was recently brought to our attention that Oracle provides an extension to its database technology that provides most, if not all, of the functionality that we are working on as part of this project. We will be investigating this further; if a suitable solution already exists it may be more valuable time-wise to integrate it into projects that require storing and displaying large images.

99 GENERAL AND MISCELLANEOUS↗

An Overview of Renewable Energy Desk Activities for Power Grid Operations and Planning

This document summarizes how grid operators can address gaps in their planning and operations to maintain reliability as they pursue clean energy goals. When transitioning to higher renewable energy levels, many system operators configure a dedicated renewable energy desk to manage variable renewable energy resource operation. Establishing such a desk in the control room can be a key step in the modernization effort. A renewable energy desk in a control room is a specialized hub focused solely on monitoring, predicting, and managing the influx of energy from renewable sources.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Tangible Solutions for Grid Operation Upgrade

Many countries worldwide are setting clean energy targets to decarbonize the energy sector and add higher wind and solar capacities. Given their distributed nature, variable renewable energy (VRE) assets can have unique grid integration considerations, and require grid operation practices to be modernized. When transitioning to higher renewable energy levels, many system operators configure a dedicated renewable energy desk to manage renewable energy resource operation in the system control center. Further, system operation planning is conducted with VRE and load forecasting to enable reliable real-time system operation. NREL has partnered with many system operators in the region to identify appropriate technology and grid modernization solutions. NREL and partners from system operators in the region will present on the challenges and some solutions that have been applied and share best practices such as energy management system upgrades, VRE forecasting framework, grid flexibility improvements, and staff training.

emerging economies↗

Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report. October 1 - December 31, 2009.

Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY 2010 for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 x 2,208); for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 x 2,208); and for the Tropical Western Pacific (TWP) locale is 1,876.8 hours (0.85 x 2,208). The ARM Mobile Facility (AMF) deployment in Graciosa Island, the Azores, Portugal, continues; its OPSMAX time this quarter is 2,097.60 hours (0.95 x 2,208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are the result of downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP locale has historically had a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. Beginning this quarter, the SGP began a transition to a smaller footprint (150 km x 150 km) by rearranging the original and new instrumentation made available through the American Recovery and Reinvestment Act (ARRA). The central facility and 4 extended facilities will remain, but there will be up to 16 surface new characterization facilities, 4 radar facilities, and 3 profiler facilities sited in the smaller domain. This new configuration will provide observations at scales more appropriate to current and future climate models. The TWP locale has the Manus, Nauru, and Darwin sites. These sites will also have expanded measurement capabilities with the addition of new instrumentation made available through ARRA funds. It is anticipated that the new instrumentation at all the fixed sites will be in place within the next 12 months. The AMF continues its 20-month deployment in Graciosa Island, Azores, Portugal, that started May 1, 2009. The AMF will also have additional observational capabilities within the next 12 months. Users can participate in field experiments at the sites and mobile facility, or they can participate remotely. Therefore, a variety of mechanisms are provided to users to access site information. Users who have immediate (real-time) needs for data access can request a research account on the local site data systems. This access is particularly useful to users for quick decisions in executing time-dependent activities associated with field campaigns at the fixed sites and mobile facility locations. The eight computers for the research accounts are located at the Barrow and Atqasuk sites; the SGP central facility; the TWP Manus, Nauru, and Darwin sites; the AMF; and the DMF at PNNL. However, users are warned that the data provided at the time of collection have not been fully screened for quality and therefore are not considered to be official ACRF data. Hence, these accounts are considered to be part of the facility activities associated with field campaign activities, and users are tracked. In addition, users who visit sites can connect their computer or instrument to an ACRF site data system network, which requires an on-site device account. Remote (off-site) users can also have remote access to any ACRF instrument or computer system at any ACRF site, which requires an off-site device account. These accounts are also managed and tracked.

54 ENVIRONMENTAL SCIENCES↗

Simulation of Hydrodynamics at Stratified Reservoirs Using a Staged Modeling Approach

Hydropower reservoirs impounded by high-head dams exhibit complex circulation that confuses the downstream migrating salmon and limits successful collection and passage of fish. Fish passage engineers attempt to modify the hydrothermal behavior at reservoirs through structural and operational modifications and often use hydrodynamic simulations to guide their actions. Simulation of key hydrothermal processes such as (a) development of a stable two-layer stratified system, (b) density-driven currents over a reservoir length scale, and (c) discharge hydraulics near the power generation and fish collection intakes requires highly specialized models applied at differing temporal and spatial scales. A staged modeling approach is presented that uses external coupling of models at varying temporal scales and spatial resolution to simulate the entire hydraulic regime from the mouth of the reservoir at the upstream end to the discharge at the dam. The staged modeling approach is illustrated using a case study where structural modifications were evaluated to improve reservoir stratification and density-driven currents. The model results provided input and valuable insight in the development of a new structure design and configuration for effective fish collection near the forebay of a high-head dam.

13 HYDRO ENERGY↗

Comparison of Deterministic and Statistical Models for Water Quality Compliance Forecasting in the San Joaquin River Basin, California

Model selection for water quality forecasting depends on many factors including analyst expertise and cost, stakeholder involvement and expected performance. Water quality forecasting in arid river basins is especially challenging given the importance of protecting beneficial uses in these environments and the livelihood of agricultural communities. In the agriculture-dominated San Joaquin River Basin of California, real-time salinity management (RTSM) is a state-sanctioned program that helps to maximize allowable salt export while protecting existing basin beneficial uses of water supply. The RTSM strategy supplants the federal total maximum daily load (TMDL) approach that could impose fines associated with exceedances of monthly and annual salt load allocations of up to $1 million per year based on average year hydrology and salt load export limits. The essential components of the current program include the establishment of telemetered sensor networks, a web-based information system for sharing data, a basin-scale salt load assimilative capacity forecasting model and institutional entities tasked with performing weekly forecasts of river salt assimilative capacity and scheduling west-side drainage export of salt loads. Web-based information portals have been developed to share model input data and salt assimilative capacity forecasts together with increasing stakeholder awareness and involvement in water quality resource management activities in the river basin. Two modeling approaches have been developed simultaneously. The first relies on a statistical analysis of the relationship between flow and salt concentration at three compliance monitoring sites and the use of these regression relationships for forecasting. The second salt load forecasting approach is a customized application of the Watershed Analysis Risk Management Framework (WARMF), a watershed water quality simulation model that has been configured to estimate daily river salt assimilative capacity and to provide decision support for real-time salinity management at the watershed level. Analysis of the results from both model-based forecasting approaches over a period of five years shows that the regression-based forecasting model, run daily Monday to Friday each week, provided marginally better performance. However, the regression-based forecasting model assumes the same general relationship between flow and salinity which breaks down during extreme weather events such as droughts when water allocation cutbacks among stakeholders are not evenly distributed across the basin. A recent test case shows the utility of both models in dealing with an exceedance event at one compliance monitoring site recently introduced in 2020.

54 ENVIRONMENTAL SCIENCES↗

Time-Sensitive Quantum Key Distribution (TSQKD)

This is the final report for the Time-Sensitive Quantum Key Distribution (TSQKD) project and summarizes the demonstration and longer-term field testing at an electric utility, EPB of Chattanooga, in Chattanooga, TN. The demonstration was held virtually (due to the COVID pandemic) and successfully executed the tests outlined in a prior report, “Task 10: Develop a QKD Time-Sensitive Networking Test Suite” submitted 9/30/2020. The portable test equipment explained in Task 10 and earlier task reports was tested at GE Research remotely connected with Qubitekk’s QKD equipment in San Diego, CA. Then the equipment was shipped to Qubitekk for physical integration with Qubitekk’s Quantum DataLoc™ Key Server 1570nm (http://qubitekk.com/products/qkd-for-industrial-control-systems-ics/). The portable test equipment was shipped from Qubitekk to EPB for demonstration and extended field testing. A summary of the demonstration and test results are described in this report. The demo and extended field test results are enabled by the NETCONF/YANG IEEE P1913 data management model developed as part of this project (Task 5). The NETCONF/YANG IEEE P1913 data management model demonstrated significant practical utility in providing a common means of monitoring and configuring the QKD system. All data in this report comes from the IEEE P1913 data management model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Adapting Dismantling and Decommissioning Strategies to a Variety of Nuclear Fuel Cycle Facilities - 12237

AREVA has accumulated over 20 years of experience in managing and operating fuel cycle facilities Decontamination and Decommissioning (D and D) projects of many different types and a variety of scales, both as facility owner (at La Hague for example) and as prime contractor to external customers such as the French Atomic Energy Commission (at Marcoule). A specific Business Unit was created in 2008 to capitalize on this experience and to concentrate - in one division - the specific skills required to be successful and cost effective in decommissioning projects. Indeed one of the key lessons learned in the past decades is that decommissioning is a significantly different business as compared to normal operations of a nuclear facility. Almost all the functions of a project need to be viewed from a different angle, challenged and adapted consequently in order to optimize costs and schedule. Three examples follow to illustrate the point: Safety management needs to take into account the ever changing configuration of a plant under D and D (a quite new situation for the authorities). Production of waste is significantly different in term of volume, activities, conditioning and disposal path. Technology is important but technical issues are often less critical than good management and planning. Further examples and lessons learned are developed through reviewing the projects experience basis. AREVA has a long and vast experience in the cleanup and dismantling of a number of very large and complex nuclear facilities. This effort focused initially on AREVA's own plants and is expanding now to other customers. The setup of a specific Business Unit in 2008 to takeover this business allowed concentration of the skills and the lessons learned in a dedicated division so as to provide the best means to optimize safety, performance, costs and schedules. Indeed transitioning from operations to D and D of a nuclear facility is a quantum leap. The assistance from specialized teams can bring significant cost savings. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Basic Data Report for Monitor Well AEC-7 (C-2742) Reconfiguration Activities

The Waste Isolation Pilot Plant (WIPP) is a U.S. Department of Energy (DOE) facility disposing of transuranic and mixed waste under the Hazardous Waste Facility Permit (Permit NM4890139088-TSDF, as amended) issued by the New Mexico Environment Department (NMED). WIPP is located approximately 26 miles east of Carlsbad, New Mexico, in eastern Eddy County (Figure 1-1). Disposal panels are being excavated in the Permian Salado Formation at a depth of approximately 2,150 feet below ground surface (bgs). Over the years a number of groundwater monitor wells have been installed for site characterization and to monitor temporal and spatial changes in groundwater elevation and chemistry at WIPP. Many of the wells used for this purpose were constructed of carbon steel casing that has deteriorated to varying degrees due to corrosion. For some wells, the deterioration has led to failure of the well integrity. In such cases, the well must either be reconfigured or completely plugged, according to regulatory requirements, to prevent commingling of groundwater from different formations. Other wells are nearing the end of their useful life and/or are duplicative of other wells that serve the same purpose. Because of these integrity issues, WIPP has begun a program to plug and abandon wells that are no longer useful for the monitoring program or are redundant, and to reconfigure other wells for future monitoring. One such well is known as AEC-7, which was reconfigured to monitor only the Culebra Member of the Rustler Formation. The New Mexico Office of the State Engineer (OSE) permitted well AEC-7 as C-2742. This well has been part of the far-field monitoring network since 1974. The well was used to obtain water level levations and hydraulic parameters from both the Bell Canyon Formation and the Culebra Member of the Rustler Formation. This basic data report provides a historical account of the well from the original installation to the current configuration.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Leveraging Radiofrequency Identification Success Beyond Hazardous Material Inventory Management at a National Laboratory

Effective inventory management can be overshadowed by conflicting priorities in organizational procedures, particularly in research-focused institutions such as national laboratories that handle expensive, delicate, and hazardous materials. Here, this study investigated the potential of radiofrequency identification (RFID) technology, currently used for hazardous chemical inventory, in applications with higher metal interference and absorption, specifically pressure release device (PRD) compliance and nuclear container management, at Lawrence Livermore National Laboratory (LLNL). This study was done to document best practices to enhance inventory identification speeds for inventory reconciliation and inventory recall and to explore optimal configurations for RFID implementation compared to traditional manual methods of equipment management. Tests were conducted to determine the ideal RFID tag orientation (read at angles of 0°, 90°, and 270°), various container layouts (linear, separated, curved, operational), and ID methods such as manual, barcode, and RFID performing three trials per method per orientation. Results indicated that 0° was the optimal read angle for minimizing metallic interference, and the operational and curved arrangements significantly outperformed the linear and separated configurations in read speed. 3D printed mounts were developed and tested, increasing the read range of the RFID reader by up to 235% in cases of high metallic interference. The RFID technology demonstrated an average speed increase of 65% over a simplified manual identification, which supports the conclusion that RFID is a more efficient method for large hazardous inventory management and equipment reconciliation. Additionally, capturing meta-data, such as location and date, can be used to query for inventory recall and automated updating of record information.

42 ENGINEERING↗

Learning to Predict and Improve Build Successes in Package Ecosystems

Software has become increasingly complex, with a typical application depending on tens or hundreds of packages. Finding compatible versions and build configurations of these packages is challenging. This paper presents a method to learn the likelihood of software build success, and techniques for leveraging this information to guide dependency solvers to better software configurations. We leverage the heavily parameterized package recipes from the Spack package manager to produce a training data set of builds, and we use Graph Neural Networks to learn whether a given package configuration will build successfully or not. We apply our tool to the U.S. Exascale Computing Project’s software stack. We demonstrate its effectiveness in predicting whether a given package will build successfully. We show that our technique can be used to improve the solutions generated by dependency solvers, reducing the need for developers to find working builds by trial and error.

97 MATHEMATICS AND COMPUTING↗

REFERENCE CASES FOR USE IN THE CEMENTITOUS PARTNERSHIP PROJECT

The Cementitious Barriers Partnership Project (CBP) is a multi-disciplinary, multi-institution cross cutting collaborative effort supported by the US Department of Energy (DOE) to develop a reasonable and credible set of tools to improve understanding and prediction of the structural, hydraulic and chemical performance of cementitious barriers used in nuclear applications. The period of performance is >100 years for operating facilities and > 1000 years for waste management. The CBP has defined a set of reference cases to provide the following functions: (i) a common set of system configurations to illustrate the methods and tools developed by the CBP, (ii) a common basis for evaluating methodology for uncertainty characterization, (iii) a common set of cases to develop a complete set of parameter and changes in parameters as a function of time and changing conditions, (iv) a basis for experiments and model validation, and (v) a basis for improving conceptual models and reducing model uncertainties. These reference cases include the following two reference disposal units and a reference storage unit: (i) a cementitious low activity waste form in a reinforced concrete disposal vault, (ii) a concrete vault containing a steel high-level waste tank filled with grout (closed high-level waste tank), and (iii) a spent nuclear fuel basin during operation. Each case provides a different set of desired performance characteristics and interfaces between materials and with the environment. Examples of concretes, grout fills and a cementitious waste form are identified for the relevant reference case configurations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Secondary battery management

A method of managing a battery system, the battery system including at least one battery cell, at least one sensor configured to measure at least one characteristic of the battery cell, and a battery management system including a microprocessor and a memory, the method comprising receiving by the battery management system, from the at least one sensor at least one measured characteristic of the battery cell at a first time and at least one measured characteristic of the battery cell at a second time. The battery management system estimating, at least one state of the battery cell by applying a physics-based battery model, the physics based battery model being based on differential algebraic equations; and regulating by the battery management system, at least one of charging or discharging of the battery cell based on the at least one estimated state.

25 ENERGY STORAGE↗

Route-vehicle road load management and/or operator notification thereof

A vehicle may include a controller configured to control the vehicle to operate in an active control mode or a passive control mode. In the passive control mode, the controller may provide a feedback indicator on a human machine interface. In the active control mode, the controller may provide a control command to an engine control unit.

42 ENGINEERING↗

Assessing Risk and Driving Risk Mitigation for First-of-a-Kind Advanced Reactors

Planning and decision making amidst programmatic and technological risks represent significant challenges for projects. This presentation addresses the four step risk-assessment process needed to determine clear path forward to mature needed technology and design, license, and construct advanced nuclear power plants, which have never been built before, including Small Modular Reactors. This four step process has been carefully applied to the Next Generation Nuclear Plant. STEP 1 - Risk Identification Risks are identified, collected, and categorized as technical risks, programmatic risks, and project risks, each of which result in cost and schedule impacts if realized. These include risks arising from the use of technologies not previously demonstrated in a relevant application. These risks include normal and accident scenarios which the SMR could experience including events that cause the disablement of engineered safety features (typically documented in Phenomena Identification Ranking Tables (PIRT) as produced with the Nuclear Regulatory Commission) and design needs which must be addressed to further detail the design. Product - Project Risk Register contained in a database with sorting, presentation, rollup, risk work off functionality similar to the NGNP Risk Management System . STEP 2 - Risk Quantification The risks contained in the risk register are then scored for probability of occurrence and severity of consequence, if realized. Here the scoring methodology is established and the basis for the scoring is well documented. Product - Quantified project risk register with documented basis for scoring. STEP 3 - Risk Handling Strategy Risks are mitigated by applying a systematic approach to maturing the technology through Research and Development, modeling, test, and design. A Technology Readiness Assessment is performed to determine baseline Technology Readiness Levels (TRL). Tasks needed to mature the technology are developed and documented in a roadmap. Product - Risk Handling Strategy. STEP 4 - Residual Risk Work off The risk handling strategy is entered into the Project Risk Allocation Tool (PRAT) to analyze each task for its ability to reduce risk. The result is risk-informed task prioritization. The risk handling strategy is captured in the Risk Management System, a relational database that provides conventional database utility, including data maintenance, archiving, configuration control, and query ability. The tool's Hierarchy Tree allows visualization and analyses of complex relationships between risks, risk mitigation tasks, design needs, and PIRTs. Product - Project Risk Allocation Tool and Risk Management System which depict project plan to reduce risk and current progress in doing so.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

XCPU2 process management system

Xcpu2 is a new process management system that allows the users to specify custom file system for a running job. Most cluster management systems enforce single software distribution running on all nodes. Xcpu2 allows programs running on the cluster to work in environment identical to the user's desktop, using the same versions of the libraries and tools the user installed locally, and accessing the configuration file in the same places they are located on the desktop. Xcpu2 builds on our earlier work with the Xcpu system. Like Xcpu, Xcpu2's process management interface is represented as a set of files exported by a 9P file server. It supports heterogeneous clusters and multiple head nodes. Unlike Xcpu, it uses pull instead of push model. In this paper we describe the Xcpu2 clustering model, its operation and how the per-job filesystem configuration can be used to solve some of the common problems when running a cluster.

97 MATHEMATICS AND COMPUTING↗

Battery management based on internal optical sensing

A battery management system includes one or more fiber optic sensors configured to be disposed within an electrochemical battery. Each fiber optic sensor is capable of receiving input light and providing output light that varies based on the input light and an amount of free or dissolved gas present within the battery. A detector detects the output light and generates an electrical detector signal in response to the output light. Battery management circuitry determines the state of the battery based at least in part on the detector signal.

Raghavan, Ajay↗

Safely Managing CNL's Shutdown Prototype Power Reactors - 30 years of Experience - 19157

Canadian Nuclear Laboratories (CNL) has over 30 years of experience managing three prototype power reactors from shutdown through storage with surveillance and into preparation from final decommissioning. CNL is responsible for the safe storage with surveillance of three prototype power reactors; Nuclear Power Demonstration (NPD), Gentilly-1(G1) and Douglas Point (DP). Each of the Canadian prototype power reactor sites have been maintained using different post shutdown management strategies, which were based on the site location, configuration, and intended designation of the respective sites. This paper will discuss the post shutdown strategies employed at the three sites, including details of their shutdown strategy, current conditions, and experience gained from the period of storage with surveillance. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗