Search NASA⌕ Search

SEARCH · Search NASA

Results for “Control Account Manager”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Self-Reliability and Motivation in a Nuclear Security Culture Enhancement Program

The threat of nuclear terrorism has become a global concern. Many countries continue to make efforts to strengthen nuclear security by enhancing systems of nuclear material protection, control, and accounting (MPC&A). Though MPC&A systems can significantly upgrade nuclear security, they do not eliminate the "human factor." This paper will describe some of the key elements of a comprehensive, sustainable nuclear security culture enhancement program and how implementation can mitigate the insider threat.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

How extreme rainfall and failing dams unleashed the Derna flood disaster

On September 11, 2023, Storm Daniel unleashed unprecedented rainfall over the Wadi Derna watershed, triggering one of the most devastating floods in modern history, striking Derna, a coastal city in Libya. This study reconstructs the disaster using an integrated modeling approach that combines satellite imagery, hydrologic, hydraulic, and geotechnical simulations, machine learning, eyewitness accounts, and digital elevation data to assess the impact of cascading dam failures. Our findings reveal that the region’s dams, even if structurally sound, would have provided minimal protection against the extreme runoff. However, their failure unleashed a destructive surge wave, amplifying the disaster’s magnitude and devastation. Here, we show that the collapse of aging flood control infrastructures, compounded by inadequate risk assessment and emergency preparedness, dramatically escalated the disaster’s impact. Our findings underscore the urgent need for systematic dam safety evaluations, enhanced flood forecasting, and adaptive risk management strategies that address climate extremes and infrastructure vulnerabilities.

Hydrology↗

Issues about implementation of geometry control to maintain nuclear criticality safety - 14438

The control of the geometry to establish and maintain Nuclear Criticality Safety (NCS) of a fissile unit is usually preferred by licensees and regulators since such a control is based on passive engineering and requires less operating constraints than other methods of control (mass, etc.). Nevertheless, several safety issues are associated with this method of control to ensure the geometry during all the unit lifetime, in normal and abnormal situations, from its manufacturing to its decommissioning. The first issue is to identify the dimensions defining the geometry, taking into account reflectors and mobile equipment, and the interaction conditions of the controlled unit to ensure the subcriticality. Thus, the dimensions important and to be controlled are identified in the NCS assessment. These dimensions are called Nuclear Criticality Safety Dimensions (NCSD) in this paper. Then, the second and the third issues are to define NCSD limits to be respected and to verify the compliance of the actual unit geometry with these limits at each stage of the unit life. Regarding the third issue, the challenges are the practicality of the control, its uncertainty and the management of non-compliances. Finally, the fourth issue is to properly document and record the NCSD and the compliance verification. This paper focuses on the main issues related to the implementation of geometry control on the NCS assessment and suggests advices to fulfill these challenges. (authors)

42 ENGINEERING↗

The Role of Building Codes and Controls in Enhancing Community Resilience

Countries, states, and cities around the world are seeking to enhance power sector resilience through a combination of policy and technology. However, few of these efforts fully incorporate the built environment into power sector planning. Buildings account for more than a third of the global annual energy consumption and more than 60% of the annual electricity consumption. As such, buildings play a critical role in enhancing resilience in the power sector. Buildings can aid in power sector resilience by increasing power system flexibility, shaving and shifting demand, and providing on-site energy generation. All of these strategies require incentives to encourage participation. This paper presents an overview of energy management strategies to better incorporate building design and operation in power sector resilience planning.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Uncertainty and Sensitivity Analysis Methods and Applications in the GDSA Framework (FY2022)

The Spent Fuel and Waste Science and Technology (SFWST) Campaign of the U.S. Department of Energy (DOE) Office of Nuclear Energy (NE), Office of Fuel Cycle Technology (FCT) is conducting research and development (R&D) on geologic disposal of spent nuclear fuel (SNF) and high-level nuclear waste (HLW). Two high priorities for SFWST disposal R&D are design concept development and disposal system modeling. These priorities are directly addressed in the SFWST Geologic Disposal Safety Assessment (GDSA) control account, which is charged with developing a geologic repository system modeling and analysis capability, and the associated software, GDSA Framework, for evaluating disposal system performance for nuclear waste in geologic media. GDSA Framework is supported by SFWST Campaign and its predecessor the Used Fuel Disposition (UFD) campaign.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Role of the Russian Methodological and Training Center in providing Nondestructive Assay Technical Assistance to Russian Enterprises

The Russian Methodological and Training center (RMTC) was initially created to provide not only personnel training in the areas of nuclear material control and accounting (MC&A), but also methodological and technical assistance to the Russian government and nuclear facilities. The goal of the assistance was to promote enhancement of Russian MC&A infrastructure and modernize the MC&A systems at individual enterprises and facilities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Initial Assessment of TeF 6 Adsorption

Research and development that supports the management of off-gases from nuclear fuel reprocessing has historically been focused on the off-gas streams that arise from aqueous reprocessing technology. However, as Gen-IV reactor development pathways move toward deployment, alternative spent nuclear fuel (SNF) processing and disposition pathways have been considered more actively. This work is focused upon aspects of fluoride volatility (FV) processing. The versatility of this method for deployment against multiple types of spent fuel encourages the continued advancement of both the primary separations processes and the secondary processes, including waste treatment, material control and accountability, and engineering designs. Recent work noted that TeF 6 , the most highly volatile fluorinated compound produced during FV processing, did not have a clear abatement technology recommended in the literature. Thus, this work performed scoping tests on activated alumina and copper shot to assess whether they could be used to remove TeF 6 from gas streams that bear F 2 . Previous work on this topic was not well described in the literature and was not performed with excess F 2 in the stream as would be typical of spent fuel processing via FV. To support an understanding of the concentration of TeF 6 contacting the adsorbent beds, a series of preliminary testing identified the TeF 6 production rate and the equilibrium concentration of TeF 6 in the gas stream contacting the adsorbent. Excess F 2 was determined to not affect the ability of activated alumina to remove TeF 6 from the gas stream quickly and completely. A determination of whether excess F 2 affected the distribution depth of Te in the sorbent bed is still pending analysis of the used sorbent. Literature suggests that when activated alumina is near saturation, TeF 6 could migrate from the sorbent bed. Future testing should investigate this possibility. Copper metal did not adsorb TeF 6 in the presence of F 2 across the sorbent temperature range of 50 to 335°C. F 2 was fully removed by the copper bed. Although preliminary thermodynamics would indicate adsorption to be energetically favorable, other factors that impact adsorption (e.g., slow kinetics, excess fluorine on the copper surface, an unfavorable transition state) are likely preventing the adsorption of TeF 6 at an easily measurable rate. The work also investigated TeF 6 production from multiple forms of Te in the temperature range of 100 to 250°C. No previous study had assessed the initial reaction rates for this process. A carefully designed study allowed determination of the activation energy for the production of TeF 6 from Te metal. The substantial amount of data collected during this study merits analysis beyond what is described here. A more in-depth kinetic analysis will be pursued. Additional analytical results will provide the ability to benchmark adsorption coefficients for TeF 6 , understand the distribution of TeF 6 within the alumina bed, and better understand the effect of F 2 partial pressure on Te fluorination. The data from this report, as supplemented by these additional analyses, will be submitted to a peer-reviewed journal.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Plug-in Electric Vehicle Charging Response Characterization for Grid Integration: Implications for Smart Charge Management

The rapid expansion of plug-in electric vehicles (PEVs) has created a unique challenge for electrical grids due to their significant power demand. At the same time, PEVs also create a unique opportunity to ease their own burden on the power grid, as they create a growing fleet of distributed energy resources capable of providing grid services such as demand response, frequency regulation, and renewable balancing. For aggregators and grid operators to effectively integrate PEVs into grid management, it is essential to first understand and characterize how they would respond in such situations. This study examines 25 models of PEVs across 25 makes, spanning model years from 2013 to 2025, to characterize their responses to the basic controls used in vehicle-grid integration (VGI): stopping, starting, and modulating the charge rate. Each vehicle was tested in a controlled laboratory setting to evaluate its performance in response to varying the maximum allowable current via the SAE J1772 control pilot signal, as well as its response to wake-up commands outlined in SAE J1772. Results show measurable differences across vehicle makes in the accuracy, latency, and precision with which PEVs respond to changes in ampacity, as well as varying sleep and wake-up behavior. The test results show that all vehicles respond to changes in ampacity, though with varying accuracy, precision, latency, and resolution. Wake-up behavior also differs across makes and models. These findings indicate that effective grid integration strategies must account for these differences. The results provide a foundation for understanding current vehicle behavior and advancing smart-charging methods while also highlighting the need for further testing, broader standardization, and manufacturer collaboration to ensure the successful integration of PEVs into the electrical grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dynamic Power Distribution System Management With a Locally Connected Communication Network

Coordinated optimization and control of distribution-level assets can enable a reliable and optimal integration of massive amount of distributed energy resources (DERs) and facilitate distribution system management (DSM). Accordingly, the objective is to coordinate the power injection at the DERs to maintain certain quantities across the network, e.g., voltage magnitude, line flows, or line losses, to be close to a desired profile. By and large, the performance of the DSM algorithms has been challenged by two factors: i) the possibly non-strongly connected communication network over DERs that hinders the coordination; ii) the dynamics of the real system caused by the DERs with heterogeneous capabilities, time-varying operating conditions, and real-time measurement mismatches. In this paper, we investigate the modeling and algorithm design and analysis with the consideration of these two factors. In particular, a game theoretic characterization is first proposed to account for a locally connected communication network over DERs, along with the analysis of the existence and uniqueness of the Nash equilibrium (NE) therein. To achieve the equilibrium in a distributed fashion, a projected-gradient-based asynchronous DSM algorithm is then advocated. The algorithm performance, including the convergence speed and the tracking error, is analytically guaranteed under the dynamic setting. In conclusion, extensive numerical tests on both synthetic and realistic cases corroborate the analytical results derived.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Survey of Recent Advances in Transmission Network Switching

Optimal Transmission Switching for electric power networks is a research topic of great interest for both researchers and electric power engineers. Transmission switching is commonly considered a corrective mechanism tool for overloaded networks; however in recent years it has been sought as a means to reduce power loss in the network. Ultimately the objective of this analysis is to provide smart tools for power and economic dispatch planning, allowing utilities and engineers to utilize existing infrastructure as a means of automatic control. The optimization problem is a complex multi-objective search including criteria such as system power loss, equality/non-equality constraints, islanding management, and radial topology configuration in the case of distribution networks. Many optimization methods have been adopted for the transmission switching problem in past years using various heuristic search algorithms. The scope of methodology extends from tried and true methods such as simulated annealing to more modern methods like neural network optimization. Solution benchmarks under consideration commonly include solution state accuracy, computational burden and solution time. The objective of this presentation is to provide a comprehensive account of development in transmission switching methodologies. Benchmarking and testing strategies will be discussed as well as application of the Transmission Expansion Planning Tool in finding transmission switching solutions. Limited Discrepancy Search (LOS) and Probe Discrepancy Search (PDS) Algorithms are compared with more classic optimization strategies, as seen in defining literature and publications in this research field.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Load planning in the dark: RH-TRU waste container load planning at Sandia National Laboratories/New Mexico - 15116

Sandia National Laboratories (Sandia) performed several sets of experiments during the 1970's and 1980's with fresh and irradiated mixed oxide (MOX) and uranium oxide (UO{sub 2}) materials designed to simulate various fuel responses under varying reactor conditions. These research materials were from light water and breeder mixed oxide reactors. The experimental vessels and extraneous piece parts resulting from the experiments were identified as eligible for disposal at the Waste Isolation Pilot Plant (WIPP) as remote-handled (RH) transuranic (TRU) waste. Once Sandia received the approval to dispose at WIPP, discussions began with the Carlsbad Field Office (CBFO) and Nuclear Waste Partnerships, LLC (NWP) to provide Central Characterization Program (CCP) support for certified acceptable knowledge, visual examination, and dose-to-curie for the repackaging effort. In addition to the WIPP support, Sandia was required to prepare a load plan describing the configuration of the parent containers and how they could be repackaged to meet WIPP and other regulatory requirements. However, all of these containers were packaged as material twenty (20) or thirty (30) years ago and the records of the packaging process and configuration were not documented as waste. Therefore, it seemed that the load plans were prepared with limited information regarding parent container configuration, hence in the dark. The design of the Auxiliary Hot Cell Facility (AHCF) in technical area (TA) V, where the repackaging was to take place, along with the shipping requirements for the RH 72-B cask, limited the options for repackaging. This configuration required that 0.114 m{sup 3} (30-gallon) containers be packaged in the hot cell, removed and placed into 0.208 m{sup 3} (55-gallon) containers to mitigate contamination issues. The material had been tracked as accountable nuclear material and Sandia had verified Material Control and Accountability (MC and A) data on each parent container. Based on the MC and A data, scaling factors could be determined and sampling and analysis was not required. However, it meant that parent containers could not be split into two daughter containers, though two or more parent containers could be combined into one daughter. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Prediction of Total Dissolved Gas (TDG) at Hydropower Dams throughout the Columbia

The network of dams throughout the Columbia River Basin (CRB) are managed for irrigation, hydropower production, flood control, navigation, and fish passage that frequently result in both voluntary and involuntary spillway releases. The entrainment of air in spillway releases and the subsequent exchange of atmospheric gasses into solution during passage through the stilling basin cause elevated levels of total dissolved gas (TDG) saturation. Physical processes that affect TDG exchange at hydropower facilities have been characterized throughout the CRB in site-specific studies and at real-time water quality monitoring stations. These data have been used to develop predictive models of TDG exchange which are site specific and account for the fate of spillway and powerhouse flows in the tailrace channel and resultant transport and exchange in route to the downstream dam. Currently, there exists a need to summarize the findings from operational and structural TDG abatement programs conducted throughout the CRB and for the development of a generalized prediction model that pools data collected at multiple projects with similar structural attributes. A generalized TDG exchange model can be tuned to specific projects and coupled with water regulation models to allow for the formulation of optimal water regulation schedules subject to water quality constraints for TDG supersaturation. It is proposed to develop a methodology for predicting TDG levels downstream of hydropower facilities with similar structural properties as a function of a set of variables that affect TDG exchange; such as tailwater depth, spill discharge and pattern, project head, and entrainment of powerhouse releases.

13 HYDRO ENERGY↗

Investigation of the Relationship between Green Design and Project Delivery Methods

The selection of the project delivery method (PDM) for any project is critical--it establishes communication, coordination, and contractual issues between the owner, contractor, and designer. With an increase in the number of green design projects, understanding the relationship between the PDM and green design is paramount to project and contract management. It is reasonable to assume that a positive relationship between green design and design-build (DB) exists since both theoretically are intended to foster an integrated, holistic, and collaborative project. This research examines the relationship between the design-bid-build (DBB), construction management (CM), and DB PDMs and green design with the goal of establishing best practices and identifying potential synergies between them. The research collected information by conducting primarily telephone interviews with approximately twenty-five individuals, including owners, contractors, and designers involved in completed green design projects, mainly in the public sector. The interviews developed a general understanding of the current state of knowledge and experience and not a rigorous quantitative analysis. Upon completion of the interviews, the tabulated results were summarized and green project characteristics and project-PDM interactions emerged. Existing published research was evaluated to reveal aspects of PDMs independent of green design. Best practices were ascertained by combining information from the interviews and published research. Best practices are as follows: (1) Project implementation features--The decision to use DB as PDM on green design or other projects should be based on the specific project features; e.g., well-defined scope and adequate owner staffing. DB will not produce successful results on all projects. (2) Collaboration--Project team collaboration early in the design and construction process is an important aspect of green projects, and collaboration was considered somewhat more important in projects that used DB. (3) Experience--Team experience is important on all green design projects independent of the PDM. Owners should use a 'best value' selection process, which is more prevalent in DB projects, and include team experience as a criterion. The owner's role is critical with DB. (4) Leadership--Leadership is an important feature for all contracting parties involved in green design projects and it is a dominant success factor in DB projects. (5) Scope of work--A well-defined scope of work is important on all projects, independent of the PDM. In DB, improving the scope of work definition by developing a set of documents, typically comparable to the design development phase, as the basis for awarding a contract is called DB bridging. Using contracting techniques such as DB bridging can result in better identification of expected quality and improves the owner's level of control. (6) Funding and Budget--Having adequate funding and budget for the given scope of work is particularly important in a green design project. Public funding restrictions may not allow use of certain PDMs, and the nature of public funding streams may make non-traditional PDMs more difficult. (7) Complexity and Flexibility--Complexity and flexibility is a project feature that is more specific to green design projects and is more frequently associated with DB. (8) Control and Accountability--Control and accountability is a problem associated with DB more than with DBB. It is not specific to green design projects. DB Bridging can be used to offset the lack of control with traditional DB. The use of green design and DB is increasing and understanding the linkage between the two is important. This research has found that while linkages do exist, the owner needs to carefully consider all aspects of a green design project before making the decision of the most appropriate PDM.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluation of Spent Fuel Disposition Crystalline Rocks (FY17 Progress Report)

The objective of the Crystalline Disposal R&D control account is to advance our understanding of long-term disposal of used fuel in crystalline rocks and to develop necessary experimental and computational capabilities to evaluate various disposal concepts in such media.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Designing a Distributed Systems Architecture Testbed for Real-Time Power Grid Systems

Power engineers who are striving to improve real-time attribute of power grid applications are ill equipped with software engineering methods and tools that allow them to rigorously evaluate their designs, taken into account data communication, geographic locations, and high performance computing capacity. This paper presents a technical approach to designing a testbed for embedding real-time monitoring and computation functionalities into the power grid system. The approach focuses on integrating the parallel computational models with the data management infrastructure for near-real time power grid state estimation. We study and summarize various forces and requirements that drive the design decisions in the distributed systems architecture. Given the continental scale of the power grid, it is important for the testbed to be extensible and scalable within a complex topology of physical entities, controlled by an overlaid network of power utilities and regulatory balancing authorities. This paper outlines the technical steps, and software toolkits to develop this testbed.

99 GENERAL AND MISCELLANEOUS↗

An Adaptive Virtual Oscillator Control Structure for Grid-Forming Inverters

The electrical grid is facing unprecedented challenges due to the increasing penetration of inverter-based resources. Grid forming inverters (GFMIs) are a promising technology to address these challenges. Recently, the virtual oscillator based GFMI control is attracting more attention due to its superior performance over other control strategies. In this article, an adaptive control strategy is proposed to provide flexible operation and transition between grid-connected and islanded modes. The controller adapts the virtual oscillator's parameter values depending on the operation mode. It also provides a feedback signal using a measured frequency to account for any steady-state errors and to allow a seamless transition from grid-connected to islanded mode. Finally, to show the feasibility of the proposed controller, this article discusses the simulation results from the implementation of the controller on a single inverter system and on a group of inverters on a large practical utility feeder, the IEEE 13 node feeder, using the DIgSILENT simulation environment.

adaptive control↗

Value Modeling for Enterprise Resilience

Abstract. The idea that resilience is a tangible, measureable, and desirable system attribute has grown rapidly over the last decade beyond is origins in explaining ecological, physiological, psychological, and social systems. Operational enterprise resilience requires two types of measurement. First, the system must monitor various operational conditions in order to respond to disruptions. These measurements are part of one or more observation, orientation, decision, and action (OODA) loops The OODA control processes that implement a resilience strategy use these measurements to provide robustness, rapid recovery and reconstitution. In order to assess the effectiveness of the resilience strategy, a different class of measurements is necessary. This second type consists of measurements about how well the OODA processes cover critical enterprise functions and the hazards to which the enterprise is exposed. They allow assessment of how well enterprise management processes anticipate, mitigate, and adapt to a changing environment and the degree to which the system is fault tolerant. This paper nominates a theoretical framework, in the form of definitions, a model, and a syntax, that accounts for this important distinction, and in so doing provides a mechanism for bridging resilience management process models and the many proposed cyber-defense metric enumerations.

Henderson, Dale L.↗

Will Your Battery Survive a World With Fast Chargers?

Fast charging is attractive to battery electric vehicle (BEV) drivers for its ability to enable long-distance travel and quickly recharge depleted batteries on short notice. However, such aggressive charging and the sustained vehicle operation that result could lead to excessive battery temperatures and degradation. Properly assessing the consequences of fast charging requires accounting for disparate cycling, heating, and aging of individual cells in large BEV packs when subjected to realistic travel patterns, usage of fast chargers, and climates over long durations (i.e., years). The U.S. Department of Energy's Vehicle Technologies Office has supported the National Renewable Energy Laboratory's development of BLAST-V-the Battery Lifetime Analysis and Simulation Tool for Vehicles-to create a tool capable of accounting for all of these factors. We present on the findings of applying this tool to realistic fast charge scenarios. The effects of different travel patterns, climates, battery sizes, battery thermal management systems, and other factors on battery performance and degradation are presented. We find that the impact of realistic fast charging on battery degradation is minimal for most drivers, due to the low frequency of use. However, in the absence of active battery cooling systems, a driver's desired utilization of a BEV and fast charging infrastructure can result in unsafe peak battery temperatures. We find that active battery cooling systems can control peak battery temperatures to safe limits while allowing the desired use of the vehicle.

25 ENERGY STORAGE↗