Engineering analysis and design of CO2 geothermal power system to provide dispatchable geothermal electricity generation and grid-scale energy storage.
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
With the increase of integration of variable renewable into the grid, grid resilience can be compromised without flexible electricity suppliers. Flexible operation of NPP can expand the scope of integration of new nuclear power plants in regions with high share of renewables. It also provides opportunity to increase profits through participation in ancillary services. In this research, NuScale modules are used as the case study. NuScale is an integrated pressurized water reactor with thermal power of 250 MWth. Having multiple units can provide higher flexibility in changing power levels and supplying the grid with electricity all year long. Additionally, load-following might perturbate the ordered sequence of refueling (every 24 months for NuScale). To maintain the 2 year refueling cycles, the loading patterns will need to be adjusted in a year-to-year basis, resulting in additional unnecessary costs. Another solution is to find the optimal outage schedule. This will also shift the focus of the planned outage to a more optimized predictive outages and maintenance. Results from short-term optimization (i.e., daily participation in energy and ancillary services markets) shows that average commitment to regulation down ancillary service markets during late night and early morning hours can increase revenues. Participating in upward reserves during pre-work commuting hours and early evening hours can also generate additional revenues due to high ramp up of electricity demand. Having multiple units at a single site can also help operate flexibly. Results from long-term optimization show that daily fluctuation in electric power is usually handled by few units while other units operate on base-load profile. It is possible to combine base-load operation with flexible operation to extend component remaining useful life in some units and find optimal outage schedule for the units.
Abstract not provided
Not Available
End-use electrical loads in residential and commercial buildings are evolving into flexible and cost-effective resources to improve electric grid reliability, reduce costs, and support increased hosting of distributed renewable generation. This article reviews the simulation of utility services delivered by buildings for the purpose of electric grid operational modeling. We consider services delivered to (1) the high-voltage bulk power system through the coordinated action of many, distributed building loads working together, and (2) targeted support provided to the operation of low-voltage electric distribution grids. Although an exhaustive exploration is not possible, we emphasize the ancillary services and voltage management buildings can provide and summarize the gaps in our ability to simulate them with traditional building energy modeling (BEM) tools, suggesting pathways for future research and development.
Not Available
In this work, we present the design, construction, and experimental results of a prototype latent heat thermal energy storage system. The prototype consists of a thermal storage tank with 100 kg of the aluminum-silicon eutectic as a phase change material, a valved thermosyphon that controls heat flow from the thermal storage tank to the power block, and thermoelectric generators for conversion of heat to electricity. We tested the prototype over four simulated days, where each day consisted of four phases of operation: charging, discharging, simultaneous charging and discharging, and storage. Our results show three major conclusions. First, the thermal energy storage system was able to receive and distribute heat with small temperature gradients - less than 5 degrees C throughout the thermal storage tank. Second, the valved thermosyphon was able to effectively control heat transfer, demonstrating an on/off thermal conductance ratio of 430. Third, the interfaces between subsystems had small temperature drops: of the ~ 560 degrees C temperature drop from the thermal storage tank to the heat rejection system, ~ 525 degrees C occurred across the power block. This work overcomes the challenges of integrating previously-developed subsystems together, providing a proof-of-concept of this system.
Not Available
Not Available
Cost of energy consumption is one of the biggest operational cost for airports, and it is increasing from time to time as airports expand to support growing number of passengers. Various factors affect the energy consumption including efficiency of airport Heating Ventilation and Air conditioning (HVAC) systems, which in turn depends on the efficiency of individual subsystems. Here, in this paper, we present an optimal scheduling method for the central plant system at Dallas Fort Worth airport, involving chillers, pumps, and a thermal energy storage (TES) system. A model predictive control (MPC) problem is formulated to minimize both energy and demand charge costs while satisfying the cooling needs of the airport. The proposed Mixed-Integer Nonlinear Programming (MINLP) formulation includes performance curve based models for chillers and pumps and a simplified state of charge model for TES. The formulation also includes predictions of cooling load and chilled water return temperature. Simulation results for a month in summer show savings around 10% compared to the baseline. Initial recommendations based on insights from simulation results to the manual operation procedures resulted in significant savings. Field test results show a 7% chiller efficiency improvement.
Not Available
Not Available
Not Available
The relevance of nuclear power plant flexible power operation (FPO) is rising due to increased penetration of variable renewables. Small Modular Reactors (SMRs) such as NuScale are envisaged to have multiple units on one site. This provides opportunities for coordinating FPO between units, but also introduces challenges as common services (e.g., refueling equipment) must be shared between units and fuel loadings may be standardized. It is therefore important to quantify whether FPO with SMRs is economically beneficial. Here, this paper quantifies the economics of FPO on different timescales to analyze refueling outages of such multi-unit SMRs. A 24-h price-taker profit maximization of SMR operation is first solved considering revenues from wholesale power and ancillary service (AS) markets. The results are then used to find the most profitable operation strategy over several years for multiple units at the site accounting for the physics and materials limits on NPP operation, including refueling outages. Results show a small but appreciable participation of nuclear into AS, contributing 4% of revenues. Due to the longer fuel cycle, over a decade of operation the units’ refueling outages drifted by 3 months, ultimately leading to refueling during summer.