Search NASA⌕ Search

SEARCH · Search NASA

Results for “Development Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

A Plan for the Development and Demonstration of Optical Communications for Deep Space

In this article, an overall plan for the development and demonstration of optical communications for deep-space applications is presented. The current state of the technology for optical communications is presented. Then, the development and demonstration plan is presented in two parts: the overall major systems activities, followed by the generic technology developments that will enable them. The plan covers the path from laboratory subsystems demonstrations out to a full-scale flight experiment system for the proposed Mars Communications Relay Orbiter mission.

Lesh, J. R.↗

Optical systems integrated modeling

An integrated modeling capability that provides the tools by which entire optical systems and instruments can be simulated and optimized is a key technology development, applicable to all mission classes, especially astrophysics. Many of the future missions require optical systems that are physically much larger than anything flown before and yet must retain the characteristic sub-micron diffraction limited wavefront accuracy of their smaller precursors. It is no longer feasible to follow the path of 'cut and test' development; the sheer scale of these systems precludes many of the older techniques that rely upon ground evaluation of full size engineering units. The ability to accurately model (by computer) and optimize the entire flight system's integrated structural, thermal, and dynamic characteristics is essential. Two distinct integrated modeling capabilities are required. These are an initial design capability and a detailed design and optimization system. The content of an initial design package is shown. It would be a modular, workstation based code which allows preliminary integrated system analysis and trade studies to be carried out quickly by a single engineer or a small design team. A simple concept for a detailed design and optimization system is shown. This is a linkage of interface architecture that allows efficient interchange of information between existing large specialized optical, control, thermal, and structural design codes. The computing environment would be a network of large mainframe machines and its users would be project level design teams. More advanced concepts for detailed design systems would support interaction between modules and automated optimization of the entire system. Technology assessment and development plans for integrated package for initial design, interface development for detailed optimization, validation, and modeling research are presented.

Shannon, Robert R.↗

STS-87 Day 04 Highlights

On this fourth day of the STS-87 mission, the flight crew, Cmdr. Kevin R. Kregel, Pilot Steven W. Lindsey, Mission Specialists Winston E. Scott, Kalpana Chawla, and Takao Doi, and Payload Specialist Leonid K. Kadenyuk check out the spacesuits for the EVA planned for later during the mission. Mission Control developed plans that may allow Scott and Doi to recapture the Spartan satellite by hand during that EVA.

Source record↗

Requirements Development for the NASA Advanced Engineering Environment (AEE)

The requirements development process for the Advanced Engineering Environment (AEE) is presented. This environment has been developed to allow NASA to perform independent analysis and design of space transportation architectures and technologies. Given the highly collaborative and distributed nature of AEE, a variety of organizations are involved in the development, operations and management of the system. Furthermore, there are additional organizations involved representing external customers and stakeholders. Thorough coordination and effective communication is essential to translate desired expectations of the system into requirements. Functional, verifiable requirements for this (and indeed any) system are necessary to fulfill several roles. Requirements serve as a contractual tool, configuration management tool, and as an engineering tool, sometimes simultaneously. The role of requirements as an engineering tool is particularly important because a stable set of requirements for a system provides a common framework of system scope and characterization among team members. Furthermore, the requirements provide the basis for checking completion of system elements and form the basis for system verification. Requirements are at the core of systems engineering. The AEE Project has undertaken a thorough process to translate the desires and expectations of external customers and stakeholders into functional system-level requirements that are captured with sufficient rigor to allow development planning, resource allocation and system-level design, development, implementation and verification. These requirements are maintained in an integrated, relational database that provides traceability to governing Program requirements and also to verification methods and subsystem-level requirements.

Rogers, Eric↗

Coal gasification systems engineering and analysis. Volume 1: Executive summary

Feasibility analyses and systems engineering studies for a 20,000 tons per day medium Btu (MBG) coal gasification plant to be built by TVA in Northern Alabama were conducted. Major objectives were as follows: (1) provide design and cost data to support the selection of a gasifier technology and other major plant design parameters, (2) provide design and cost data to support alternate product evaluation, (3) prepare a technology development plan to address areas of high technical risk, and (4) develop schedules, PERT charts, and a work breakdown structure to aid in preliminary project planning. Volume one contains a summary of gasification system characterizations. Five gasification technologies were selected for evaluation: Koppers-Totzek, Texaco, Lurgi Dry Ash, Slagging Lurgi, and Babcock and Wilcox. A summary of the trade studies and cost sensitivity analysis is included.

Source record↗

Space Station thermal management system development status and plans

The manned Space Station, as currently designed, contains a baseline thermal management system (TMS) which uses components and subsystems never before employed in manned spacecraft. The basis for the technology used in the TMS design is the result of a long-term TMS Technology Development Plan which was initiated in 1979. Rankin and Marshall (1983) have discussed the history and progress of that plan from its beginnings to early 1983. The present paper is concerned with the status of activities conducted at the NASA Lyndon B. Johnson Space Center (JSC) under this plan since 1983, taking into account also a summary of activities planned for the next several years.

Rankin, J. G.↗

Model Development and Analysis of a High-Fidelity Neutron Transport Sensor: The Quadrupole Detector Concept for Measurement of the Neutron Flux Gradient

Accurate reconstruction of the neutron flux distribution within a reactor core is essential for safe and efficient reactor operation. Traditional power shape synthesis in Light Water Reactors relies on hundreds of in-core detectors. However, this approach becomes impractical for Advanced Reactors and Microreactors due to limited space and harsh environments. To address this challenge, we propose a data-driven methodology that combines high-fidelity modeling with real-time ex-core sensor measurements, enabling the reconstruction of core power distribution while minimizing the reliance on intrusive in-core instrumentation. This project began in FY24 and achieved two initial milestones: (1) the definition of a three-year development plan for a Digital Twin framework and (2) the development of high-fidelity neutronics models of the Purdue University Reactor One (PUR-1) using both MCNP6 and OpenMC. The PUR-1 reactor, a zero-power facility, was selected due to its suitability for neutronics-focused modeling and the availability of experimental data for validation. Both models were benchmarked using neutron flux measurements obtained from irradiated gold foils, which were strategically placed within the core during a dedicated campaign in July 2024. This report marks the continuation and completion of those foundational tasks. The OpenMC model has been refined (improved geometric accuracy, expanded cross-section libraries, and refined sampling) and validated using additional experimental data. An updated sensor design—based on quadrupole configuration—was designed to measure both ex-core flux and its spatial gradient. These measurements will serve as inputs to a neural network-based reconstruction algorithm. Finally, the methodology was demonstrated on a two-dimensional test case representative of the heterogeneous material composition of the PUR-1 reactor core. A neural network implementation of the Kirchhoff-Helmholtz integral equation was employed to solve the boundary value problem using peripheral sensor measurements. The preliminary results confirm the strong potential of the proposed approach for accurate and minimally invasive neutron flux reconstruction.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Study for identification of beneficial uses of Space (BUS). Volume 2: Technical report. Book 1: Development and business analysis of space processed isoenzymes

A separation method to provide reasonable yields of high specificity isoenzymes for the purpose of large scale, early clinical diagnosis of diseases and organic damage such as, myocardial infarction, hepatoma, muscular dystrophy, and infectous disorders is presented. Preliminary development plans are summarized. An analysis of required research and development and production resources is included. The costs of such resources and the potential profitability of a commercial space processing opportunity for electrophoretic separation of high specificity isoenzymes are reviewed.

Source record↗

NASA/JPL Plans for Fundamental Physics Research in Space

In 1998, about 100 researchers met twice to develop plans for the future in this research area. The results of these meetings have been collected in a package titled "A Roadmap for Fundamental Physics in Space". A summary of the Roadmap will be presented along with an overview of the current program. Research is being performed in Low Temperature and Condensed Matter Physics, Laser Cooling and Atomic Physics, and Gravitational and Relativistic Physics. There are currently over 50 investigators in the program of which 8 are being evaluated as potential flight experiments. The number of investigators is expected to grow further during the next selection cycle, planned to start toward the end of this year. In the near future, our investigators will be able to take advantage of long duration experimentation in Space using a suite of different carriers under development.

Isaelsson, Ulf E.↗

Advanced optical sensing and processing technologies for the distributed control of large flexible spacecraft

The objective was to examine state-of-the-art optical sensing and processing technology applied to control the motion of flexible spacecraft. Proposed large flexible space systems, such an optical telescopes and antennas, will require control over vast surfaces. Most likely distributed control will be necessary involving many sensors to accurately measure the surface. A similarly large number of actuators must act upon the system. The used technical approach included reviewing proposed NASA missions to assess system needs and requirements. A candidate mission was chosen as a baseline study spacecraft for comparison of conventional and optical control components. Control system requirements of the baseline system were used for designing both a control system containing current off-the-shelf components and a system utilizing electro-optical devices for sensing and processing. State-of-the-art surveys of conventional sensor, actuator, and processor technologies were performed. A technology development plan is presented that presents a logical, effective way to develop and integrate advancing technologies.

Williams, G. M.↗

Telemetry Tracking & Control (TT&C) - First TDRSS, then Commercial GEO & Big LEO and Now Through LEO

The advent of low earth orbit (LEO) commercial communication satellites provides an opportunity to dramatically reduce Telemetry, Tracking and Control (TT&C) costs of launch vehicles, Unpiloted Aerial Vehicles (UAVs), Research Balloons and spacecraft by reducing or eliminating ground infrastructure. Personnel from the Goddard Space Flight Center's Wallops Flight Facility (GSFC\WFF) have successfully used commercial Geostationary Earth Orbit (GEO) and Big LEO communications satellites for Long Duration Balloon Flight TT&C. The Flight Modem is a GSFC\WFF Advanced Range Technology initiative (ARTI) designed to streamline TT&C capability in the user community of these scientific data gathering platforms at low cost. Making use of existing LEO satellites and adapting and ruggedized commercially available components; two-way, over the horizon communications may be established with these vehicles at great savings due to reduced infrastructure. Initially planned as a means for permitting GPS data for tracking and recovery of sounding rocket and balloon payloads, expectations are that the bandwidth can soon be expanded to allow more comprehensive data transfer. The system architecture which integrates antennas, GPS receiver, commercial satellite packet data modem and a single board computer with custom software is described and technical challenges are discussed along with the plan for their resolution. A three-phase testing and development plan is outlined and the current results are reported. Results and status of ongoing flight tests on aircraft and sounding rockets are reported. Future applications on these platforms and the potential for satellite support are discussed along with an analysis of cost effectiveness of this method vs. other tracking and data transmission schemes.

Morgan, Dwayne R.↗

Artemis: An Overview of NASA’s Activities to Return Humans to the Moon

NASA is well underway in its plans to return humans to the Moon and build long-term infrastructure both in orbit and on the surface. Following the Artemis I and Artemis II flight tests, NASA will begin crewed landings and regular missions to the Moon. Artemis will return value to the American public and the global community, enable groundbreaking scientific discovery, and prepare NASA and its partners for exploration of the solar system. Work on the initial Human Landing System (HLS), procurement activities for future HLS, and work on the initial modules of the lunar-orbiting Gateway are underway. International partnerships are playing a critical role in the planning, development, and execution of these missions. As of December 2021, three international partners have entered agreements to contribute to the Gateway and 14 nations have signed the Artemis accords. A new spacesuit acquisition strategy will stimulate economic growth and meet the growing needs of NASA and emerging customers. Requirements development is underway for an unpressurized lunar surface rover and plans for a pressurized rover, foundation surface habitat, and the Artemis Base Camp are in work. This paper will provide an update on the HLS demonstration missions and the procurement status for HLS services; a comprehensive look at the Gateway’s components and related statuses; a summary of planned surface systems; and an outline of the strategies NASA will use to successfully implement these plans, preparing for humanity's next giant leap: Mars.

Artemis↗

Extended performance solar electric propulsion thrust system study. Volume 1: Executive summary

Several thrust system design concepts were evaluated and compared using the specifications of the most advanced 30 cm engineering model thruster as the technology base. The extensions in thruster performance required for the Halley's comet mission were defined and alternative thrust system concepts were designed. Confirmation testing and analysis of thruster and power-processing components were performed, and the feasibility of satisfying extended performance requirements was verified. A baseline design was selected from the alternatives considered, and the design analysis and documentation were refined. A program development plan was formulated that outlines the work structure considered necessary for developing, qualifying, and fabricating the flight hardware for the baseline thrust system within the time frame of a project to rendezvous with Halley's comet. An assessment was made of the costs and risks associated with a baseline thrust system as provided to the mission project under this plan. Critical procurements and interfaces were identified and defined. Results are presented.

Poeschel, R. L.↗

Extended performance solar electric propulsion thrust system study. Volume 3: Tradeoff studies of alternate thrust system configurations

Several thrust system design concepts were evaluated and compared using the specifications of the most advanced 30 cm engineering model thruster as the technology base. Emphasis was placed on relatively high power missions. The extensions in thruster performance required for the Halley's comet mission were defined and alternative thrust system concepts were designed in sufficient detail for comparing mass, efficiency, reliability, structure, and thermal characteristics. Confirmation testing and analysis of thruster and power-processing components were performed. A baseline design was selected from the alternatives considered, and the design analysis and documentation were refined. A program development plan was formulated that outlines the work structure considered necessary for developing, qualifying, and fabricating the flight hardware for the baseline thrust system within the time frame of a project to rendezvous with Halley's comet. An assessment was made of the costs and risks associated with a baseline thrust system as provided to the mission project under this plan. Critical procurements and interfaces were identified and defined.

Hawthorne, E. I.↗

NASA/JPL Plans for Fundamental Physics Research in Space

In 1998, about 100 researchers met twice to develop plans for the future in this research area. The results of these meetings have been collected in a package titled: A Roadmap for Fundamental Physics in Space. A summary of the Roadmap will be presented along with an overview of the current program.

microgravity↗

Extended performance electric propulsion power processor design study. Volume 1: Executive summary

Several power processor design concepts were evaluated and compared. Emphasis was placed on a 30cm ion thruster power processor with a beam supply rating of 2.2kW to 10kW. Extensions in power processor performance were defined and were designed in sufficient detail to determine efficiency, component weight, part count, reliability and thermal control. Preliminary electrical design, mechanical design, and thermal analysis were performed on a 6kW power transformer for the beam supply. Bi-Mod mechanical, structural, and thermal control configurations were evaluated for the power processor, and preliminary estimates of mechanical weight were determined. A program development plan was formulated that outlines the work breakdown structure for the development, qualification and fabrication of the power processor flight hardware.

Biess, J. J.↗