Search NASA⌕ Search

SEARCH · Search NASA

Results for “Flybys”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Small Spacecraft Conceptual Design For a Fast Pluto Flyby Mission

The Pluto Fas Flyby mission is a pre-Phase A mission development activity being pursued at the Jet Propulsion Laboratory and funded by NASA's Code SL. Its objective is to conduct first reconnaissace level science at Pluto before its atmospheric collapse in the next two to three decades.

Pluto↗

The Pluto Fast Flyby Mission: Completing the Reconnaissance of the Solar System

The concept of a fast flyby mission to Pluto has been advanced as a means to complete the reconnaissance of the known solar system. In order to acquire data on the Pluto system at the earliest possible time, and within the professional lifetime of investigators now active in the field, concepts are being developed for relatively small spacecraft in the mass range of 70 Kg to 350 Kg with flight times to Pluto of 7 to 13 years. Necessarily, the science complement on such a mission will be very mass and power limited. The challenge will be to define a spacecraft and an instrument package that will maximize the scientific return within these limitations. Cost, of course, will be a major consideration, and funds for new technology development specific to this mission will not be extensive...

Henry, Paul K.↗

Cassini Maneuver Experience Through the Final Targeted Titan Flyby and the Grand Finale

Amassing valuable scientific information about the Saturnian system for 13 years, the Cassini spacecraft is now in the last phase of its mission. The Grand Finale, a series of 22 orbits with Cassini passing through a gap between Saturn’s innermost ring and its upper atmosphere, began after the last targeted Titan flyby on April 22, 2017 and ends with the spacecraft plunging into Saturn on September 15, 2017. This paper reports on the maneuvers performed to achieve the final targeted Titan encounter and the maneuvers used to maintain the Grand Finale orbits.

Wong, Mau C.↗

Architecture of a faul-tolerant and verifiable outer planet flyby

Flyby missions to outer solar system objects require a very high confidence of since there are no second chances. The quantity, quality, and diversity of science measurements to be made in a matter of hours or days must justify the mission cost. Accordingly, the mission architecture must include a high degree of redundancy, large design margins, and an ability to correct or operate through anomalies while at the same time being deterministic enough for confidence in system verification and validation. In this paper we present a system architecture as part of a proposed mission to Triton, called “Trident”.

Mitchell, Karl L.↗

Concept for 2033 Crewed Mars Orbital Mission with Venus Flyby

The 2033 Mars launch period provides a unique opportunity for a round trip mission with a total flight time of only 1.6 years. A concept is presented to perform a crewed Mars orbital mission in 2033 that would minimize development and mission risk by using conventional hypergolic in-space propulsion stages with a common design. The Mars mission vehicle would include a Mars transit habitat, an Orion spacecraft, and chemical propulsion stages. It would be launched by a combination of SLS and commercial rockets to be aggregated in high Earth orbit or at the Lunar Gateway. The crew would launch to the mission vehicle in Orion as the final element in the assembly. After transit to Mars, the crew would spend about 30 days in a high Mars orbit and then return to Earth via a Venus flyby and gravity assist. A sunshade would be deployed for thermal control of the mission vehicle inside 1 AU. The crew would return directly to Earth in the Orion crew module, with the transit habitat being expended. The 2033 mission would not be a “one-off”, but could be a pathfinder for crew transport for landing missions to follow, perhaps starting as early as 2037.

Woolley, Ryan↗

Enabling Multiple Small Satellite Near-Earth Asteroid Flyby Missions Using Small Solid Rocket Kick Stages with Rideshare Opportunities

The large number of Near-Earth Asteroids (NEA’s) provide almost daily launch opportunities to send small rideshare spacecraft to explore our nearest neighbors. Most asteroid missions require large spacecraft with a dedicated launch service. The large delta-V required for an interplanetary trajectory would typically preclude a NEA flyby rideshare unless it was going to the same target body as the primary mission. In this paper, a low-cost, compact, high energy kick stage with 3-axissteeringis proposed that would enable this mission type. This kick stage is compatible with an ESPA ring so that multiple NEA missions can be deployed as rideshares on a single launch.

William W Benson↗

Operational thermal control of Cassini Titan flybys

This paper focuses on the technical thermal control evaluation and strategy, the systems-level approach taken, and lessons learned and recommendations in an operations environment.

Cassini Titan flyby thermal analysis↗