Search NASA⌕ Search

SEARCH · Search NASA

Results for “Hourly Load”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Using Dashboards to Improve Energy and Comfort in Federal Buildings

Federal agencies are taking many steps to improve the sustainability of their operations, including improving the energy efficiency of their buildings, promoting recycling and reuse of materials, encouraging carpooling and alternative transit schemes, and installing low flow water fixture units are just a few of the common examples. However, an often overlooked means of energy savings is to provide feedback to building users about their energy use through information dashboards connected to a building?s energy information system. An Energy Information System (EIS), broadly defined, is a package of performance monitoring software, data acquisition hardware, and communication systems that is used to collect, store, analyze, and display energy information. At a minimum, the EIS provides the whole-building energy-use information (Granderson 2009a). We define a ?dashboard? as a display and visualization tool that utilizes the EIS data and technology to provide critical information to users. This information can lead to actions resulting in energy savings, comfort improvements, efficient operations, and more. The tools to report analyzed information have existed in the information technology as business intelligence (Few 2006). The dashboard is distinguished from the EIS as a whole, which includes additional hardware and software components to collect and storage data, and analysis for resources and energy management (Granderson 2009b). EIS can be used for a variety of uses, including benchmarking, base-lining, anomaly detection, off-hours energy use evaluation, load shape optimization, energy rate analysis, retrofit and retro-commissioning savings (Granderson 2009a). The use of these EIS features depends on the specific users. For example, federal and other building managers may use anomaly detection to identify energy waste in a specific building, or to benchmark energy use in similar buildings to identify energy saving potential and reduce operational cost. There are several vendors of EIS technology that provide information on energy and other environmental variables in buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Baseload Nitrate Salt Central Receiver Power Plant Design (Final Report)

The objectives of the work were to demonstrate that a 100 MWe central receiver plant, using nitrate salt as the receiver coolant, thermal storage medium, and heat transport fluid in the steam generator, can 1) operate, at full load, for 6,400 hours each year using only solar energy, and 2) satisfy the DOE levelized energy cost goal of $0.09/kWhe (real 2009 $). To achieve these objectives the work incorporated a large range of tasks relating to many different aspects of a molten salt tower plant. The first Phase of the project focused on developing a baseline design for a Molten Salt Tower and validating areas for improvement. Tasks included a market study, receiver design, heat exchanger design, preliminary heliostat design, solar field optimization, baseline system design including PFDs and P&IDs and detailed cost estimate. The baseline plant met the initial goal of less than $0.14/kWhe, and reinforced the need to reduce costs in several key areas to reach the overall $0.09/kWhe goal. The major improvements identified from Phase I were: 1) higher temperature salt to improve cycle efficiency and reduce storage requirements, 2) an improved receiver coating to increase the efficiency of the receiver, 3) a large receiver design to maximize storage and meet the baseload hours objective, and 4) lower cost heliostat field. The second Phase of the project looked at advancing the baseline tower with the identified improvements and included key prototypes. To validate increasing the standard solar salt temperature to 600 °C a dynamic test was conducted at Sandia. The results ultimately proved the hypothesis incorrect and showed high oxide production and corrosion rates. The results lead to further testing of systems to mitigate the oxide production to be able to increase the salt temperature for a commercial plant. Foster Wheeler worked on the receiver design in both Phase I and Phase II looking at both design and lowering costs utilizing commercial fossil boiler manufacturing. The cost and design goals for the project were met with this task, but the most interesting results had to do with defining the failure modes and looking at a “shakedown analysis” of the combined creep-fatigue failure. A separate task also looked at improving the absorber coatings on the receiver tubes that would improve the efficiency of the receiver. Significant progress was made on developing a novel paint with a high absorptivity that was on par with the current Pyromark, but shows additional potential to be optimized further. Although the coating did not meet the emissivity goals, preliminary testing the new paint shows potential to be much more durable, and potential to improve the receiver efficiency through a higher average absorptivity over the lifetime. Additional coatings were also designed and modeled results meet the project goals, but were not tested. Testing for low cycle fatigue of the full length receiver tubes was designed and constructed, but is still currently undergoing testing. A novel small heliostat was developed through an extensive brainstorming and down select. The concept was then detailed further with inputs from component testing and eventually a full prototype was built and tested. This task met or exceeded the accuracy and structure goals and also beat the cost goal. This provides a significant solar field costs savings for Abengoa that will be developed further to be used in future commercial plants. Ultimately the $0.09/kWhe (real 2009 $) and 6,400 hours goals of the project were met.

14 SOLAR ENERGY↗

BuildingIQ Technology Field Validation

This document describes a field validation and verification of the BuildingIQ Predictive Energy Optimization (PEO) technology based on a five-site study. BuildingIQ describes its PEO technology as a software-as-a-service (SaaS) platform that optimizes commercial building HVAC control for system efficiency, occupant comfort, and cost. It is targeted for use in large, complex buildings, and integrates with the building automation system (BAS) to conduct supervisory control. The PEO algorithm defines optimal space air temperature setpoints that are automatically implemented at the variable air volume (VAV) terminal units when possible, or through supply air temperature and duct static pressure setpoints at the air handling unit (AHU) level. The optimization is built upon a learned predictive model that provides a 24-hour ahead forecast of the building’s power profile, using weather forecasts and historical operational data; this model is updated every 4 to 6 hours. Demand-responsive load reductions may also be implemented.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

BuildingIQ Technology Field Validation

This document describes a field validation and verification of the BuildingIQ Predictive Energy Optimization (PEO) technology based on a five-site study. BuildingIQ describes its PEO technology as a software-as-a-service (SaaS) platform that optimizes commercial building HVAC control for system efficiency, occupant comfort, and cost. It is targeted for use in large, complex buildings, and integrates with the building automation system (BAS) to conduct supervisory control. The PEO algorithm defines optimal space air temperature setpoints that are automatically implemented at the variable air volume (VAV) terminal units when possible, or through supply air temperature and duct static pressure setpoints at the air handling unit (AHU) level. The optimization is built upon a learned predictive model that provides a 24-hour ahead forecast of the building’s power profile, using weather forecasts and historical operational data; this model is updated every 4 to 6 hours. Demand-responsive load reductions may also be implemented.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrated Dynamic Facade Control with an Agent-based Architecture for Commercial Buildings

Dynamic façades have significant technical potential to minimize heating, cooling, and lighting energy use and peak electric demand in the perimeter zone of commercial buildings, but the performance of these systems is reliant on being able to balance complex trade-offs between solar control, daylight admission, comfort, and view over the life of the installation. As the context for controllable energy-efficiency technologies grows more complex with the increased use of intermittent renewable energy resources on the grid, it has become increasingly important to look ahead towards more advanced approaches to integrated systems control in order to achieve optimum life-cycle performance at a lower cost. This study examines the feasibility of a model predictive control system for low-cost autonomous dynamic façades. A system architecture designed around lightweight, simple agents is proposed. The architecture accommodates whole building and grid level demands through its modular, hierarchical approach. Automatically-generated models for computing window heat gains, daylight illuminance, and discomfort glare are described. The open source Modelica and JModelica software tools were used to determine the optimum state of control given inputs of window heat gains and lighting loads for a 24-hour optimization horizon. Penalty functions for glare and view/ daylight quality were implemented as constraints. The control system was tested on a low-power controller (1.4 GHz single core with 2 GB of RAM) to evaluate feasibility. The target platform is a low-cost ($35/unit) embedded controller with 1.2 GHz dual-core cpu and 1 GB of RAM. Configuration and commissioning of the curtainwall unit was designed to be largely plug and play with minimal inputs required by the manufacturer through a web-based user interface. An example application was used to demonstrate optimal control of a three-zone electrochromic window for a south-facing zone. The overall approach was deemed to be promising. Further engineering is required to enable scalable, turnkey solutions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Analyzing the Impact of Future Weather Data on Energy Consumption in Weatherization Assistant

This study supports the mission of the U.S. Department of Energy’s Weatherization Assistance Program (WAP), which aims to increase the energy efficiency of dwellings and reduce their total residential expenditures. Specifically, we examine how projected future climate conditions may affect residential building energy performance by integrating future weather data into the National Energy Audit Tool (NEAT). Since WAP evaluates the cost-effectiveness of retrofit measures over lifespans of up to 30 years, accounting for evolving climate conditions is increasingly important. To reflect future household energy demands, this study replaces historically based Typical Meteorological Year (TMY3) weather inputs with Future Typical Meteorological Year (fTMY) datasets derived from global climate model (GCM) projections. A simulation-based framework was established to enable NEAT analysis under future weather conditions. This workflow involves converting EPW-format weather files into JSON inputs compatible with NEAT and generating degree-hour metrics needed for load calculations. The fTMY dataset used in this study was developed by Oak Ridge National Laboratory through downscaling of six GCMs under different emission scenarios and covers the period from 2020 to 2100. In contrast, the TMY3 dataset is based on historical weather data from 1961 to 1990. Simulations were conducted for benchmark single-family prototype buildings across ASHRAE climate zones 1–7, which cover all regions of the U.S. except the subarctic Zone 8 in northern Alaska, evaluating both heating and cooling loads under TMY3 and fTMY conditions. Four foundation types were tested, while heating systems were standardized, as NEAT does not differentiate thermal energy load by HVAC system type in its load calculations. Results show that fTMY weather input consistently yield lower heating loads and higher cooling loads across most locations, aligning with expected climate warming trends. Notably, colder regions such as zones 6A, 6B, and 7 experience marked reductions in heating load, while warmer and transitional zones, such as 2A (Lufkin, TX) and 3C (San Francisco, CA), have substantial increases in cooling loads. Although this study does not directly assess the performance of retrofit measures under future climate conditions, it provides a critical foundation for doing so. By quantifying shifts in baseline (i.e., pre-retrofit case) energy loads between historical and future weather files, the study highlights the importance of integrating climate-responsive data into audit tools. These findings will inform future efforts to evaluate the long-term effectiveness and cost-effectiveness of weatherization measures under changing climate conditions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Compression creep of filamentary composites

Axial and transverse strain fields induced in composite laminates subjected to compressive creep loading were compared for several types of laminate layups. Unidirectional graphite/epoxy as well as multi-directional graphite/epoxy and graphite/PEEK layups were studied. Specimens with and without holes were tested. The specimens were subjected to compressive creep loading for a 10-hour period. In-plane displacements were measured using moire interferometry. A computer based data reduction scheme was developed which reduces the whole-field displacement fields obtained using moire to whole-field strain contour maps. Only slight viscoelastic response was observed in matrix-dominated laminates, except for one test in which catastrophic specimen failure occurred after a 16-hour period. In this case the specimen response was a complex combination of both viscoelastic and fracture mechanisms. No viscoelastic effects were observed for fiber-dominated laminates over the 10-hour creep time used. The experimental results for specimens with holes were compared with results obtained using a finite-element analysis. The comparison between experiment and theory was generally good. Overall strain distributions were very well predicted. The finite element analysis typically predicted slightly higher strain values at the edge of the hole, and slightly lower strain values at positions removed from the hole, than were observed experimentally. It is hypothesized that these discrepancies are due to nonlinear material behavior at the hole edge, which were not accounted for during the finite-element analysis.

Graesser, D. L.↗

Energy Efficient Engine: High-pressure compressor test hardware detailed design report

The objective of the NASA Energy Efficient Engine program is to identify and verify the technology required to achieve significant reductions in fuel consumption and operating cost for future commercial gas turbine engines. The design and analysis is documented of the high pressure compressor which was tested as part of the Pratt and Whitney effort under the Energy Efficient Engine program. This compressor was designed to produce a 14:1 pressure ratio in ten stages with an adiabatic efficiency of 88.2 percent in the flight propulsion system. The corresponding expected efficiency for the compressor component test rig is 86.5 percent. Other performance goals are a surge margin of 20 percent, a corrected flow rate of 35.2 kg/sec (77.5 lb/sec), and a life of 20,000 missions and 30,000 hours. Low loss, highly loaded airfoils are used to increase efficiency while reducing the parts count. Active clearance control and case trenches in abradable strips over the blade tips are included in the compressor component design to further increase the efficiency potential. The test rig incorporates variable geometry stator vanes in all stages to permit maximum flexibility in developing stage-to-stage matching. This provision precluded active clearance control on the rear case of the test rig. Both the component and rig designs meet or exceed design requirements with the exception of life goals, which will be achievable with planned advances in materials technology.

Howe, David C.↗

Hermetically sealed aluminum electrolytic capacitor

Aluminum electrolytic capacitors are presently not allowed on NASA missions because they outgas water and organic vapors, as well as H2. As a consequence, much larger and heavier packages of tantalum capacitors are used. A hermetically sealed aluminum capacitor has been developed under NASA-MSFC SBIR contracts. This capacitor contains a nongassing electrolyte that was developed for this application so internal pressure would remain low. Capacitors rated at 250 to 540 V have been operated under full load for thousands of hours at 85 and 105 C with good electrical performance and low internal pressure. Electrolyte chemistry and seal engineering concepts will be discussed.

Alwitt, Robert S.↗

Hermetically Sealed Aluminum Electrolytic Capacitor

Aluminum electrolytic capacitors are presently not allowed on NASA missions because they outgas water and organic vapors, as well as H2. As a consequence, for some applications, much larger and heavier packages of tantalum capacitors must be used. A hermetically sealed aluminum capacitor has been developed. This contains a nongassing electrolyte that was developed for this application so internal pressure would remain low. Capacitors rated from 250 V to 540 V have been operated under full load for thousands of hours at 85 and 105 C with good electrical performance and absence of gas generation. Electrolyte chemistry and seal engineering will be discussed, as well as the extension of this design concept to lower voltage ratings.

Alwitt, Robert S.↗

NASA Crew Launch Vehicle Approach Builds on Lessons from Past and Present Missions

The United States Vision for Space Exploration, announced in January 2004, outlines the National Aeronautics and Space Administration's (NASA) strategic goals and objectives, including retiring the Space Shuttle and replacing it with a new human-rated system suitable for missions to the Moon and Mars. The Crew Exploration Vehicle (CEV) that the new Crew Launch Vehicle (CLV) lofts into space early next decade will initially ferry astronauts to the International Space Station and be capable of carrying crews back to lunar orbit and of supporting missions to Mars orbit. NASA is using its extensive experience gained from past and ongoing launch vehicle programs to maximize the CLV system design approach, with the objective of reducing total lifecycle costs through operational efficiencies. To provide in-depth data for selecting this follow-on launch vehicle, the Exploration Systems Architecture Study was conducted during the summer of 2005, following the confirmation of the new NASA Administrator. A team of aerospace subject matter experts used technical, budget, and schedule objectives to analyze a number of potential launch systems, with a focus on human rating for exploration missions. The results showed that a variant of the Space Shuttle, utilizing the reusable Solid Rocket Booster as the first stage, along with a new upper stage that uses a derivative of the RS-25 Space Shuttle Main Engine to deliver 25 metric tons to low-Earth orbit, was the best choice to reduce the risks associated with fielding a new system in a timely manner. The CLV Project, managed by the Exploration Launch Office located at NASA's Marshall Space Flight Center, is leading the design, development, testing, and operation of this new human-rated system. The CLV Project works closely with the Space Shuttle Program to transition hardware, infrastructure, and workforce assets to the new launch system . leveraging a wealth of lessons learned from Shuttle operations. The CL V is being designed to reduce costs through a number of methods, ranging from validating requirements to conducting trades studies against the concept design. Innovations such as automated processing will build on lessons learned from the Shuttle, other launch systems, Department of Defense operations experience, and subscale flight tests such as the Delta Clipper-Experimental Advanced (DCXA) vehicle operations that utilized minimal touch labor, automated cryogen ic propellant loading , and an 8-hour turnaround for a cryogenic propulsion system. For the CLV, the results of hazard analyses are contributing to an integrated vehicle health monitoring system that will troubleshoot anomalies and determine which ones can be solved without human intervention. Such advances will help streamline the mission operations process for pilots and ground controllers alike. In fiscal year 2005, NASA invested approximately $4.5 billion of its $16 bill ion budget on the Space Shuttle. The ultimate goal of the CLV Project is to deliver a safe, reliable system designed to minimize lifecycle costs so that NASA's budget can be invested in missions of scientific discovery. Lessons learned from developing the CLV will be applied to the growth path for future systems, including a heavy lift launch vehicle.

Dumbacher, Daniel L.↗

Combined Dilute Acid and Solvent Based Pretreatment of Agricultural Wastes for Efficient Lignocellulosic Fractionation and Biofuels Production

A true biorefinery for processing lignocellulosic biomass should achieve maximum utilization of all major constituents (cellulose, hemicellulose, & lignin) within the feedstock. In this work a combined pretreatment process of dilute acid (DA) and N-methyl morpholine N-oxide (NMMO) is described that allows for both fractionation and subsequent complete hydrolysis of the feedstocks (corn stover and sugarcane bagasse). During this multi-step processing, the dilute acid pretreatment solubilizes the majority (>90%) of the hemicellulosic fraction, while the NMMO treatment yields a cellulosic fraction that is completely digestible within 48 hours at low enzyme loadings. With both the cellulosic and hemicellulosic fractions being converted into separate, dissolved sugar fractions, the remaining portion is nearly pure lignin. When used independently, DA and NMMO pretreatments are only able to achieve ~80% and ~45% cellulosic conversion, respectively. Mass balance calculations along with experimental results are used to illustrate the feasibility of separation and recycling of NMMO.

09 BIOMASS FUELS↗

Managing Power Systems-Induced Wildfire Risks Using Optimal Scheduled Shutoffs: Preprint

The growing demands for electricity and the increase in extreme weather conditions are putting unprecedented pressure on our electrical grids. Oftentimes, this pressure leads to electrical components failures which might ignite wildfires. This work develops a novel model to balance the reliability of power networks operations and risks of wildfires ignition by optimizing the operational schedule of power transmission networks considering time-varying risk measures that consider exogenous and operational factors. Energy storage systems are considered to deliver power during peak wildfire hours and enable temporal load shifting. The problem is formulated as a mixed-integer linear program that maximizes a weighted sum of the served power demand and the reduction in grid-induced wildfires risk. The results demonstrate the ability of the model to reduce wildfires risks significantly without considerable load shedding.

energy scheduling↗

A Dynamic Model of Refrigerator with Thermal Energy Storage for Demand Flexibility

A refrigerator is an essential appliance for both commercial and residential applications. Thermal (Cold) energy storage can effectively reduce the carbon emission from refrigerators. This preliminary study investigated the demand flexibility of a domestic refrigerator using thermal (cold) energy storage through dynamic modeling and controls. The models include both fresh and frozen compartments, a vapor compression cycle loop, and thermal storage panels. Results show that thermal energy storage can effectively achieve temperature control of the compartments within the 4-hour time window. The load reduction and cost savings (46.3%) were achieved through the TES using TOU rates.

Gao, Zhiming↗

End-Use Savings Shapes Measure Documentation: Dispatch Schedule Generation for Demand Flexibility Measures

This supplemental document describes the methodology used for determining the dispatch timing of various EUSS demand flexibility measures. Demand flexibility measures are designed to reduce/dispatch electricity demand in buildings during especially beneficial/critical times. The method used in this work utilizes predictions of building loads to generate a schedule that reflects the periods when the building's daily peak load occurs to support decision making in demand flexibility measures. The dispatch schedule generation method described in this document creates an hourly schedule that includes a load dispatch (peak) window for each day for a whole year based on load prediction, with options using different prediction methods: perfect prediction, bin-sampling method, fixed schedule, and outdoor air temperature (OAT)-based prediction method. The perfect prediction method performs a simulation to obtain the annual load profile as predicted load, representing the scenario of perfect load prediction. The bin-sampling method (1) categorizes days into representative bins by temperature characteristics, (2) performs simulations on sample days from each of those bins to create representative (or predicted) load, and (3) assigns representative loads for all days in a year based on the bin categorization. The fixed schedule method defines uniform start and end time of peak window with assumed fixed daily peak time, for all days in a season or a year. The OAT-based prediction method uses the statistics of OAT (minimum and maximum) as the indicators of peak load, with specified delay response time from building loads to temperature. Given the load prediction, daily peak periods are determined as a time window with specified length in each day that include the predicted daily peak load and with a secondary rule such as maximizing energy saving potential. The dispatch schedule generation method is not a standalone measure and is intended to be combined with other demand flexibility measures that could leverage the peak schedule and apply demand controls on specific systems or devices for demand response, such as measures described in "Measure Documentation - Thermostat Control for Load Shedding" and "Measure Documentation - Thermostat Control for Load Shifting".

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cost projections for Redox Energy storage systems

A preliminary design and system cost analysis was performed for the redox energy storage system. A conceptual design and cost estimate was prepared for each of two energy applications: (1) electric utility 100-MWh requirement (10-MW for ten hours) for energy storage for utility load leveling application, and (2) a 500-kWh requirement (10-kW for 50 hours) for use with a variety of residential or commercial applications, including stand alone solar photovoltaic systems. The conceptual designs were based on cell performance levels, system design parameters, and special material costs. These data were combined with estimated thermodynamic and hydraulic analysis to provide preliminary system designs. Results indicate that the redox cell stack to be amenable to mass production techniques with a relatively low material cost.

Michaels, K.↗

A Compendium of Wind Statistics and Models for the NASA Space Shuttle and Other Aerospace Vehicle Programs

The wind profile with all of its variations with respect to altitude has been, is now, and will continue to be important for aerospace vehicle design and operations. Wind profile databases and models are used for the vehicle ascent flight design for structural wind loading, flight control systems, performance analysis, and launch operations. This report presents the evolution of wind statistics and wind models from the empirical scalar wind profile model established for the Saturn Program through the development of the vector wind profile model used for the Space Shuttle design to the variations of this wind modeling concept for the X-33 program. Because wind is a vector quantity, the vector wind models use the rigorous mathematical probability properties of the multivariate normal probability distribution. When the vehicle ascent steering commands (ascent guidance) are wind biased to the wind profile measured on the day-of-launch, ascent structural wind loads are reduced and launch probability is increased. This wind load alleviation technique is recommended in the initial phase of vehicle development. The vehicle must fly through the largest load allowable versus altitude to achieve its mission. The Gumbel extreme value probability distribution is used to obtain the probability of exceeding (or not exceeding) the load allowable. The time conditional probability function is derived from the Gumbel bivariate extreme value distribution. This time conditional function is used for calculation of wind loads persistence increments using 3.5-hour Jimsphere wind pairs. These increments are used to protect the commit-to-launch decision. Other topics presented include the Shuttle Shuttle load-response to smoothed wind profiles, a new gust model, and advancements in wind profile measuring systems. From the lessons learned and knowledge gained from past vehicle programs, the development of future launch vehicles can be accelerated. However, new vehicle programs by their very nature will require specialized support for new databases and analyses for wind, atmospheric parameters (pressure, temperature, and density versus altitude), and weather. It is for this reason that project managers are encouraged to collaborate with natural environment specialists early in the conceptual design phase. Such action will give the lead time necessary to meet the natural environment design and operational requirements, and thus, reduce development costs.

Smith, O. E.↗

Full scale phosphoric acid fuel cell stack technology development

The technology development for phosphoric acid fuel cells is summarized. The preparation, heat treatment, and characterization of carbon composites used as bipolar separator plates are described. Characterization included resistivity, porosity, and electrochemical corrosion. High density glassy carbon/graphite composites performed well in long-term fuel cell endurance tests. Platinum alloy cathode catalysts and low-loaded platinum electrodes were evaluated in 25 sq cm cells. Although the alloys displayed an initial improvement, some of this improvement diminished after a few thousand hours of testing. Low platinum loading (0.12 mg/sq cm anodes and 0.3 mg/sq cm cathodes) performed nearly as well as twice this loading. A selectively wetproofed anode backing paper was tested in a 5 by 15 inch three-cell stack. This material may provide for acid volume expansion, acid storage, and acid lateral distribution.

Christner, L.↗