Search NASA⌕ Search

SEARCH · Search NASA

Results for “INTERCONNECTED POWER SYSTEMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Electric Grid Expansion Planning with High Levels of Variable Generation

Renewables are taking a large proportion of generation capacity in U.S. power grids. As their randomness has increasing influence on power system operation, it is necessary to consider their impact on system expansion planning. To this end, this project studies the generation and transmission expansion co-optimization problem of the US Eastern Interconnection (EI) power grid with a high wind power penetration rate. In this project, the generation and transmission expansion problem for the EI system is modeled as a mixed-integer programming (MIP) problem. This study analyzed a time series creation method to capture the diversity of load and wind power across balancing regions in the EI system. The obtained time series can be easily introduced into the MIP co-optimization problem and then solved robustly through available MIP solvers. Simulation results show that the proposed time series generation method and the expansion co-optimization model and can improve the expansion result significantly after considering the diversity of wind and load across EI regions. The improved expansion plan that combines generation and transmission will aid system planners and policy makers to maximize the social welfare. This study shows that modelling load and wind variations and diversities across balancing regions will produce significantly different expansion result compared with former studies. For example, if wind is modeled in more details (by increasing the number of wind output levels) so that more wind blocks are considered in expansion planning, transmission expansion will be larger and the expansion timing will be earlier. Regarding generation expansion, more wind scenarios will slightly reduce wind generation expansion in the EI system and increase the expansion of other generation such as gas. Also, adopting detailed wind scenarios will reveal that it may be uneconomic to expand transmission networks for transmitting a large amount of wind power through a long distance in the EI system. Incorporating more details of renewables in expansion planning will inevitably increase the computational burden. Therefore, high performance computing (HPC) techniques are urgently needed for power system operation and planning optimization. As a scoping study task, this project tested some preliminary parallel computation techniques such as breaking down the simulation task into several sub-tasks based on chronology splitting or sample splitting, and then assigning these sub-tasks to different cores. Testing results show significant time reduction when a simulation task is split into several sub-tasks for parallel execution.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Operating Reserve Reductions from a Proposed Energy Imbalance Market with Wind and Solar Generation in the Western Interconnection

This paper considers several alternative forms of an energy imbalance market (EIM) proposed in the nonmarket areas of the Western Interconnection. The proposed EIM includes two changes in operating practices that independently reduce variability and increase access to responsive resources: balancing authority cooperation and sub-hourly dispatch. As the penetration of variable generation increaseson the power system, additional interest in coordination would likely occur. Several alternative approaches could be used, but consideration of any form of coordinated unit commitment is beyond the scope of this analysis. This report examines the benefits of several possible EIM implementations--both separately and in concert

14 SOLAR ENERGY↗

Peak Reliability Synchrophasor Program

Realizing the potential of high fidelity, time-synchronized, power system data will build on the existing infrastructure made available by the Western Interconnection Synchrophasor Program (WISP). This project will focus on fully utilizing the data made available by this infrastructure to ensure reliable and efficient operation of the Western Interconnection. The Recipient's objective is to advance the deployment of production-grade software applications that rely on synchrophasor data to enhance the reliability or improve the economic efficiency of bulk power system planning and operations.

99 GENERAL AND MISCELLANEOUS↗

SEIN: Breaking Barriers Resilient Energy System Analysis [Slides]

The Solar Energy Innovation Network (SEIN) is a collaborative research program that supports multi-stakeholder teams in researching and sharing solutions to real-world challenges associated with solar energy adoption. The Breaking Barriers project was selected to participate in the Solar Energy Innovation Network, Round 2, and was led by Groundswell, a D.C.-based clean energy project developer. The Breaking Barriers team included Partnership for Southern Equity, Atlanta University Center campus facility managers and professors, the City of Atlanta's Neighborhood Planning Unit T, and Georgia Power Company. The project aimed to design and construct innovative urban energy resiliency hubs integrating microgrid technology, solar generation, and energy storage in Atlanta colleges and communities. The hubs will help these historically Black colleges and universities (HBCUs) and the energy-burdened broader community in West Atlanta be more resilient, in addition to informing new course curricula at Atlanta University Center campuses. With many possible options for the system's battery size, the Breaking Barriers team needed insight into the relationships between BESS size, economic performance, and resilience at Spelman College's Manley Center. These insights are crucial for entering procurement negotiations with project developers, establishing resilience capabilities that the HBCU campuses can plan around, and guiding the team's fundraising targets. This analysis includes estimates of PV and battery performance, costs, savings, and resilience for multiple battery sizes. In order to provide power during a grid outage, the resilient energy system also needs to be connected to the Manley Center in a safe and island-able manner (electrically isolated from the grid). Analysis of potential electrical configurations and estimated setup costs is key to successfully entering a required interconnection agreement with Georgia Power, as well as informing requests for engineering firms to construct the system. This analysis includes conceptual options and rough order of magnitude cost estimates for electrically interconnecting the resilient energy system to the Manley Center and the grid. The Breaking Barriers team used this analysis to select preferred system characteristics and design for the resilient energy system.

14 SOLAR ENERGY↗

Impact of simultaneous activities on frequency fluctuations — comprehensive analyses based on the real measurement data from FNET/GridEye

Simultaneous human activities such as the Super Bowl game would cause certain impacts on frequency fluctuations in power systems. With the help of FNET/GridEye measurements, this work aims to give comprehensive analyses on the frequency fluctuations during Super Bowl LIV held on Feb. 2, 2020, so as to better understand several phenomena caused by simultaneous activities and help system operation and control. First, recent developments of FNET/GridEye are introduced briefly. Second, the frequency fluctuations of Eastern Interconnection (EI), western electricity coordinating council (WECC), and electric reliability council of Texas (ERCOT) power systems during Super Bowl LIV are analyzed. Third, frequency fluctuations of Super Bowl Sunday and ordinary Sundays in 2020 are compared. Finally, the differences of frequency fluctuations among different years during the Super Bowl and their change trend are also given. Furthermore, several possible explanations including the simultaneity of electricity consumption at the beginning of commercial breaks and the halftime show, the increasing usage of the Internet, and the increasing size of TV screens are illustrated in detail in this work.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Rapid QSTS Simulations for High-Resolution Comprehensive Assessment of Distributed PV

The rapid increase in penetration of distributed energy resources on the electric power distribution system has created a need for more comprehensive interconnection modeling and impact analysis. Unlike conventional scenario-based studies, quasi-static time-series (QSTS) simulations can realistically model time-dependent voltage controllers and the diversity of potential impacts that can occur at different times of year. However, to accurately model a distribution system with all its controllable devices, a yearlong simulation at 1-second resolution is often required, which could take conventional computers a computational time of 10 to 120 hours when an actual unbalanced distribution feeder is modeled. This computational burden is a clear limitation to the adoption of QSTS simulations in interconnection studies and for determining optimal control solutions for utility operations. The solutions we developed include accurate and computationally efficient QSTS methods that could be implemented in existing open-source and commercial software used by utilities and the development of methods to create high-resolution proxy data sets. This project demonstrated multiple pathways for speeding up the QSTS computation using new and innovative methods for advanced time-series analysis, faster power flow solvers, parallel processing of power flow solutions and circuit reduction. The target performance level for this project was achieved with year-long high-resolution time series solutions run in less than 5 minutes within an acceptable error.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hy-DAT: A Tool to Address Hydropower Modeling Gaps Using Interdependency, Efficiency Curves, and Unit Dispatch Models

As the power system continues to be flooded with intermittent resources, it becomes more important to accurately assess the role of hydro and its impact on the power grid. While hydropower generation has been studied for decades, dependency of power generation on water availability and constraints in hydro operation are not well represented in power system models used in the planning and operation of large-scale interconnection studies. There are still multiple modeling gaps that need to be addressed; if not, they can lead to inaccurate operation and planning reliability studies, and consequently to unintentional load shedding or even blackouts. As a result, it is very important thathydropower is represented correctly in both steady-state and dynamic power system studies. In this paper, we discuss the development and use of the Hydrological Dispatch and Analysis Tool (Hy-DAT) as an interactive graphical user interface (GUI), that uses a novel methodology to address the hydropower modeling gaps like water availability and inter-dependency using a database, and algorithms, to generate accurate representative models for power system simulation.

Wang, Dewei↗

High-Efficiency Modular SiC-based Power-Converter for Flexible-CHP Systems with Stability-Enhanced Grid-Support Functions

This project seeks to develop a modular, scalable MV power converter featuring stability-enhanced grid-support functions for future grid-interface applications in flexible combined heat and power (F-CHP) cogeneration plants, being fully compliant with the IEEE Standard 1547, category B—for operation in local areas with high aggregated distributed energy resource (DER) penetration, and also with the IEEE standard for the specification of microgrid controllers, namely IEEE Std 2030.7, with the goal to enable F-CHP systems for both microgrid and standalone applications. Further, the proposed converter will use a modular circuit topology, the MMC, which is scalable both in voltage and current by interconnecting power-cell building blocks, thus flexibly suiting the needs of F-CHP systems in the 1–20 MWe range. Furthermore, the use of 10 kV SiC MOSFET devices will minimize the number of power-cells needed to operate in 2–13.8 kV MV distribution systems, but more importantly, they will render feasible a power conversion efficiency > 98 %, and a power density > 10 kW/l. This is highly relevant given that these are two key performance metrics that will further increase the value of F-CHP systems by shortening the time required to recover their investment costs.

14 SOLAR ENERGY↗

Demonstrating the Transient System Impact of Cyber-Physical Events Through Scalable Transmission and Distribution (T&D) Co-Simulation

Modern power systems become more vulnerable to cyber threats due to their growing interconnectivity, interdependence, and complexity. Widespread deployment of distributed energy resources (DERs) further expands the threat landscape to the grid edge, where fewer cybersecurity protections exist. In this article, a systematic cyber-physical events demonstration, enabled by an integrated transmission, distribution, and communication co-simulation framework, is performed. It analyzes cyber risks to power grid under DER-enabled automatic generation control from different angles. Unlike existing works, the simulation captures millisecond-to-minutes frequency and voltage transient dynamics at a cross-region system scale.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transient Stability Analysis for Offshore Wind Power Plant Integration Planning Studies - Part II: Long Term Faults

Here, this paper addresses the transient stability (also called large-signal stability) analysis of power systems for offshore wind power plant integration planning studies. In particular, this study develops a comprehensive practical methodology to assess transient stability of power systems, including rotor angle stability, voltage stability, and frequency response for large scale power systems. This methodology considers variability of the offshore wind power plants as well as the type of any faulted system' components present and is applicable to the study of both short term and long term faults. Part I of this research discussed the short term faults whereas as Part II, the present paper, discusses long term faults. This research considers the integration of offshore wind power plants into existing power systems and demonstrates the utility of this methodology through the examination of the specific case of integrating 1,000 MW of offshore wind power into the FirstEnergy/PJM service territory using a realistic model of 63k-bus test system that represents the U.S. Eastern Interconnection.

17 WIND ENERGY↗

Transient Stability Analysis for Offshore Wind Power Plant Integration Planning Studies - Part I: Short Term Faults

Power system planning is the process of forecasting load demand and ensuring sufficient generation and reserve capacities over some planning horizon. This process includes investigation of steady-state and dynamic operation of power system of interest. This paper addresses the transient stability (also known as large-signal stability) analysis of power systems for offshore wind power plant integration planning studies. In particular, this study develops a comprehensive practical methodology to assess transient stability of power systems, including rotor angle stability, voltage stability and frequency response for all fault types for large scale power systems. This methodology considers variability of the offshore wind power plants as well as the type of any faulted components present and is applicable to the study of both short term and long term faults, though only short term faults are considered here (long term faults are treated sequentially in a companion paper). Furthermore, this paper considers the integration of offshore wind power plants into existing power systems and demonstrates the utility of this methodology through the examination of the specific case of integrating 1,000MW of offshore wind power into the FirstEnergy/PJM service territory using a realistic model of 63k-bus test system that represents the U.S. Eastern Interconnection.

17 WIND ENERGY↗

Frequency Control and Dynamics (Part 1) [Slides]

This presentation provides an introductory overview of system dynamics and frequency control in electric power systems, with a focus on concepts relevant to small and interconnected grids such as those in Malawi. It explains foundational principles of AC system frequency, the relationship between generation-demand balance and frequency deviations, and the operational limits of generators and end-use equipment. The deck discusses frequency stability within broader system stability classifications and illustrates how inertia and turbine-governor dynamics shape system response to disturbances. It then outlines the tiered approach to frequency control - primary, secondary, and tertiary - detailing the roles, characteristics, timescales, and response mechanisms of each. Special emphasis is placed on hydro and thermal unit behavior, area control error (ACE), automatic generation control (AGC), and the operational implications of interconnecting small systems with larger grids. The material was developed to support Malawi's electricity sector and the establishment of the Southern Africa Battery Energy Storage Center of Excellence (SABESS CoE).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Frequency Control and Dynamics (Part 2) [Slides]

This presentation provides an introductory overview of system dynamics and frequency control in electric power systems, with a focus on concepts relevant to small and interconnected grids such as those in Malawi. It explains foundational principles of AC system frequency, the relationship between generation-demand balance and frequency deviations, and the operational limits of generators and end-use equipment. The deck discusses frequency stability within broader system stability classifications and illustrates how inertia and turbine-governor dynamics shape system response to disturbances. It then outlines the tiered approach to frequency control - primary, secondary, and tertiary - detailing the roles, characteristics, timescales, and response mechanisms of each. Special emphasis is placed on hydro and thermal unit behavior, area control error (ACE), automatic generation control (AGC), and the operational implications of interconnecting small systems with larger grids. The material was developed to support Malawi's electricity sector and the establishment of the Southern Africa Battery Energy Storage Center of Excellence (SABESS CoE).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transient Stability of the US Western Interconnection with High Wind and Solar Generation

The addition of large amounts of wind and solar generation to bulk power systems that are traditionally subject to operating constraints set by transient limitations is the subject of considerable concern in the industry. The US Western Interconnection (WI) is expected to experience substantial additional growth in both wind and solar generation. These plants will, to some extent, displace large central station thermal generation, both coal and gas-fired, which have traditionally helped maintain stability. This paper reports the results of a study that investigated the transient stability of the WI with high penetrations of wind and solar generation. The main goals of this work were to (1) create a realistic, baseline model of the WI, (2) test selected transient stability events, (3) investigate the impact of large amounts of wind and solar generation, and (4) examine means to improve performance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dynamic Simulation Studies of the Frequency Response of the Three U.S. Interconnections with Increased Wind Generation

Utility Systems Efficiencies, Inc. was tasked by Lawrence Berkeley National Laboratory (LBNL) to conduct dynamic simulation studies of the three U.S. interconnections (Eastern, Western, and Texas). The simulations were prepared in support of LBNL's project for the Federal Energy Regulatory Commission to study frequency-response-related issues that must be addressed to operate the power system reliably with large amounts of variable renewable generation. The objective of the simulation studies of each interconnection was to assess the effects of different amounts of wind generation on frequency behavior of each interconnection following a sudden loss of generation. The scenarios created to study these effects considered an operating circumstance in which system load is at or close to its minimum. The event studied was the sudden loss of the largest amount of generation recorded within each interconnection. The simulations calculated the impact of this event on interconnection frequency for three levels of wind generation. In addition to varying the amount of wind generation, the simulations varied the amount of operating reserves between a high level representative of current operating practices and a low level representative of the minimum required by present operating rules.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advanced Techniques for Power System Identification from Measured Data

Time-synchronized measurements provide rich information for estimating a power-system's electromechanical modal properties via advanced signal processing. This information is becoming critical for the improved operational reliability of interconnected grids. A given mode's properties are described by its frequency, damping, and shape. Modal frequencies and damping are useful indicators of power-system stress, usually declining with increased load or reduced grid capacity. Mode shape provides critical information for operational control actions. This project investigated many advanced techniques for power system identification from measured data focusing on mode frequency and damping ratio estimation. Investigators from the three universities coordinated their effort with Pacific Northwest National Laboratory (PNNL). Significant progress was made on developing appropriate techniques for system identification with confidence intervals and testing those techniques on field measured data and through simulation. Experimental data from the western area power system was provided by PNNL and Bonneville Power Administration (BPA) for both ambient conditions and for signal injection tests. Three large-scale tests were conducted for the western area in 2005 and 2006. Measured field PMU (Phasor Measurement Unit) data was provided to the three universities. A 19-machine simulation model was enhanced for testing the system identification algorithms. Extensive simulations were run with this model to test the performance of the algorithms. University of Wyoming researchers participated in four primary activities: (1) Block and adaptive processing techniques for mode estimation from ambient signals and probing signals, (2) confidence interval estimation, (3) probing signal design and injection method analysis, and (4) performance assessment and validation from simulated and field measured data. Subspace based methods have been use to improve previous results from block processing techniques. Bootstrap techniques have been developed to estimate confidence intervals for the electromechanical modes from field measured data. Results were obtained using injected signal data provided by BPA. A new probing signal was designed that puts more strength into the signal for a given maximum peak to peak swing. Further simulations were conducted on a model based on measured data and with the modifications of the 19-machine simulation model. Montana Tech researchers participated in two primary activities: (1) continued development of the 19-machine simulation test system to include a DC line; and (2) extensive simulation analysis of the various system identification algorithms and bootstrap techniques using the 19 machine model. Researchers at the University of Alaska-Fairbanks focused on the development and testing of adaptive filter algorithms for mode estimation using data generated from simulation models and on data provided in collaboration with BPA and PNNL. There efforts consist of pre-processing field data, testing and refining adaptive filter techniques (specifically the Least Mean Squares (LMS), the Adaptive Step-size LMS (ASLMS), and Error Tracking (ET) algorithms). They also improved convergence of the adaptive algorithms by using an initial estimate from block processing AR method to initialize the weight vector for LMS. Extensive testing was performed on simulated data from the 19 machine model. This project was also extensively involved in the WECC (Western Electricity Coordinating Council) system wide tests carried out in 2005 and 2006. These tests involved injecting known probing signals into the western power grid. One of the primary goals of these tests was the reliable estimation of electromechanical mode properties from measured PMU data. Applied to the system were three types of probing inputs: (1) activation of the Chief Joseph Dynamic Brake, (2) mid-level probing at the Pacific DC Intertie (PDCI), and (3) low-level probing on the PDCI. The Chief Joseph Dynamic Brake is a 1400 MW disturbance to the system and is injected for a half of a second. For the mid and low-level probing, the Celilo terminal of the PDCI is modulated with a known probing signal. Similar but less extensive tests were conducted in June of 2000. The low-level probing signals were designed at the University of Wyoming. A number of important design factors are considered. The designed low-level probing signal used in the tests is a multi-sine signal. Its frequency content is focused in the range of the inter-area electromechanical modes. The most frequently used of these low-level multi-sine signals had a period of over two minutes, a root-mean-square (rms) value of 14 MW, and a peak magnitude of 20 MW. Up to 15 cycles of this probing signal were injected into the system resulting in a processing gain of 15. The resulting measured response at points throughout the system was not much larger than the ambient noise present in the measurements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact of Transmission on Resource Adequacy in Systems with Wind and Solar Power: Preprint

Variable generation is on track to become a significant contributor to electric power systems worldwide. Thus, it is important to analyze the effect that renewables will have on the reliability of systems. In this paper we present a new tool being implemented at the National Renewable Energy Laboratory, which allows the inclusion of variable generation in the power system resource adequacy. Thetool is used to quantify the potential contribution of transmission to reliability in highly interconnected systems and an example is provided using the Western Interconnection footprint.

14 SOLAR ENERGY↗

Fault Clearing Operation in Low-Frequency High-Voltage AC Systems

Abstract—Low-frequency high-voltage ac (LF-HVac) system has been proposed as an alternative to HVdc and HVac systems to reduce transmission losses and improve grid flexibility. LF-HVac system employs back-to-back (BTB) converters to interconnect and control the voltage and power interchange between two power grid operating at different frequencies. While there are multiple studies on LF-HVac system in the literature, the fault clearing method in the LF-HVac system has not been analyzed. Therefore, this paper focuses on fault clearing operation in LFHVac system and proposes a novel method to reduce fault current by changing operating frequency of power source and converter. The performance of the proposed method is validated using detailed models of BTB converters developed in PSCAD/EMTDC. The ability to change operating frequency at the onset of a fault condition allows breakers to rapidly clear the fault and recloses. The results obtained by using the proposed method substantially diminish the fault current.

Kim, Woosung↗