Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operational Assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Select Proliferation Studies on TRISO-fueled, Heat-Pipe-cooled Microreactors

Nuclear microreactors carry the potential to open up new markets for the nuclear industry, as their expected cost competitiveness in non-traditional market segments (e.g., mines, military bases, extraterrestrial surfaces, and remote areas), and their inherent safety features make them deployable when other power sources are unavailable or difficult to exploit. For countries that have not traditionally participated in nuclear power, microreactors represent a clean energy solution [1]. However, their use, especially in non-weapons states, may entail challenges in terms of maintaining international nuclear safeguards [2]. Furthermore, the deployment locations where microreactors may prove most cost competitive would be difficult to access by state and International Atomic Energy Agency (IAEA) inspectors [3]. In addition to the isolated nature of potential deployment sites, the low-power characteristic of microreactors suggests that numerous microreactors would need to be deployed to meet energy demands. That, coupled with the unique physics of many current microreactor designs, opens up a new area of research with respect to nonproliferation and safeguards concerns [2]. Whereas traditional facilities are inspected as isolated cases when looking for signs of diversion or misuse; microreactors may need to be assessed in the context of the entire fleet to which they belong. International safeguards necessitate timely detection of any significant quantities (SQs) of material that are being diverted (e.g., 1 SQ of special nuclear material diverted over the course of a 1-year period) [4]. For low-enriched uranium, the IAEA defines 1 SQ as corresponding to 75 kg of 235U. The purpose of the present paper is to explore the detectability threshold for material diversion in microreactors by relying on critical control drum angles, excess reactivity, and the reactor lifetime as the selected operational parameters. For this assessment, a heat-pipe-cooled microreactor was regarded as the base design. While the conclusions reached in this paper are not readily extendable to the design of actual microreactors, the analysis herein enables conclusions to be drawn regarding the level of accuracy needed for reference calculations in order to detect diversion scenarios by utilizing the selected operational parameters (i.e., mainly control drum angles, critical insertion angle, and the reactor lifetime).

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Overview of the fusion nuclear science facility, a credible break-in step on the path to fusion energy

The Fusion Nuclear Science Facility (FNSF) is examined here as part of a two step program from ITER to commercial power plants. This first step is considered mandatory to establish the materials and component database in the real fusion in-service environment before proceeding to larger electricity producing facilities. The FNSF can be shown to make tremendous advances beyond ITER, toward a power plant, particularly in plasma duration and fusion nuclear environment. A moderate FNSF is studied in detail, which does not generate net electricity, but does reach the power plant blanket operating temperatures. The full poloidal Dual Coolant Lead Lithium (DCLL) blanket is chosen, with alternates being the Helium Cooled Lead Lithium (HCLL) and Helium Cooled Ceramic Breeder/Pebble Bed (HCCB/PB). Several power plant relevant choices are made in order to follow the philosophy of targeted technologies. Any fusion core component must be qualified by fusion relevant neutron testing and highly integrated non-nuclear testing before it can be installed on the FNSF in order to avoid the high probability of constant failures in a plasma-vacuum system. A range of missions for the FNSF, or any fusion nuclear facility on the path toward fusion power plants, are established and characterized by several metrics. A conservative physics strategy is pursued to accommodate the transition to ultra-long plasma pulses, and parameters are chosen to represent the power plant regime to the extent possible. An operating space is identified, and from this, one point is chosen for further detailed analysis, with R = 4.8 m, a = 1.2 m, IP = 7.9 MA, BT = 7.5 T, βN Gr = 0.9, fBS = 0.52, q95 = 6.0, H98 ∼1.0, and Q = 4.0. The operating space is shown to be robust to parameter variations. A program is established for the FNSF to show how the missions for the facility are met, with a He/H, a DD and 5 DT phases. The facility requires ∼25 years to complete its DT operation, including 7.8 years of neutron production, and the remaining spent on inspections and maintenance. The DD phase is critical to establish the ultra-long plasma pulse lengths. The blanket testing strategy is examined, and shows that many sectors have penetrations for heating and current drive (H/CD), diagnostics, or Test Blanket Modules (TBMs). The hot cell is a critical facility element in order for the FNSF to perform its function of developing the in-service material and component database. The pre-FNSF R&D is laid out in terms of priority topics, with the FNSF phases driving the time-lines for R&D completion. A series of detailed technical assessments of the FNSF operating point are reported in this issue, showing the credibility of such a step, and more detailed emphasis on R&D items to pursue. These include nuclear analysis, thermo-mechanics and thermal-hydraulics, liquid metal thermal hydraulics, transient thermo-mechanics, tritium analysis, maintenance assessment, magnet specification and analysis, materials assessments, core and scrape-off layer (SOL)/divertor plasma examinations.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Hydropower Cyber-Physical Configurations

The U.S. Department of Energy’s Water Power Technologies Office funded Pacific Northwest National Laboratory, Argonne National Laboratory, and the National Renewable Energy Laboratory to develop a typology to characterize the variety and pervasiveness of cyber-physical configurations across the nation’s hydropower fleet. Outreach to owners and operators returned configurations for 275 hydropower plants or approximately 12% of the fleet. Components (OT and IT), systems, and connections among systems differed among plants according to function, age, position in the river cascade, and many other factors. Seven cyber-physical configuration types labeled A through I, included from 2 to dozens of plants. They were differentiated by how pervasive data and control connections were among cyber-physical components and how frequently control signals paired with data signals in a feedback loop. The flow of data and control within each type implies what cybersecurity vulnerabilities may exist, and what mitigation actions may be most effective. A self-assessment approach allows plant operators to identify the configuration type similar to their plant and link to the lessons learned and best practices information. The cyber-physical typology reinforces the idea that hydropower facilities vary widely, but it also identifies groups that highlight similarities in how their cyber-physical components interact. This helps address fleetwide cybersecurity needs by identifying a reasonable number of configuration types that share risks, vulnerabilities, and potential mitigations.

13 HYDRO ENERGY↗

The molten salt tritium transport experiment: A pumped fluoride salt loop for hydrogen isotope experimentation

Molten salt reactors (MSRs) and fusion reactors propose to use molten salts as coolants and breeder blanket materials, respectively. Tritium, however, poses safety concerns in both reactor types due to its ability to permeate through reactor materials and potential for environmental release. This manuscript addresses the tritium transport phenomena in molten salts and presents the design and analysis of the Molten Salt Tritium Transport Experiment (MSTTE). MSTTE is a forced-convection fluoride salt loop intended to measure hydrogen isotope permeation through structural materials in a flowing salt system. In the first phase, MSTTE will use FLiNaK salt and deuterium as surrogates for FLiBe and tritium, with future plans to utilize tritium and FLiBe. MSTTE couples a Copenhagen Atomics pumped salt loop with an external test section that introduces hydrogen isotopes into the loop and measures transport phenomena. The Hydrogen Injection System (HIS) controls hydrogen isotope introduction into the molten salt loop. Here, the permeation test section measures the permeation rate through stainless steel tubing in contact with flowing salt. Computational fluid dynamics (CFD) analysis ensures fully developed salt flow in the permeation test section. MSTTE is modeled with MELCOR-TMAP to predict the permeation rate as a function of experimental variables such as source term, salt flow rate, and salt temperature. Results indicate that the source term is the only parameter with a significant effect on the permeation rate. Pressure drop analysis suggests that the loop should operate below 200 LPM to maintain a pressure drop below 200 kPa. Additionally, finite-element analysis assesses thermal stress during loop operation to ensure the experiment's safe design. MSTTE will provide semi-integral data on tritium transport phenomena in molten salts and serve as a testbed for advancing molten salt technology.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Public – Private Partnership to Promote Efficient Manufacturing and Workforce Development (IAC Final Technical Report)

Through delivering ninety (90) energy assessments to small- and medium-sized manufacturing facilities in and around Tennessee, significant understandings were gained through providing detailed energy assessment reports to manufacturers and training seventy-seven (77) engineering students in which thirty-five (35) certified IAC students were recognized by DOE. The robust involvement of Tennessee Valley Authority (TVA), local utility and Tennessee Tech’s Cybersecurity Education, Research, and Outreach Center (CEROC) in majority of assessments made the technical operation very effective where leaded to 40.5% implementation rate of energy recommendations. Other benefits of the award to the public are a dynamic modeling tool capable of analyzing existing cooling towers for energy use optimization was developed and presented to DOE IAC, providing technical assistance to non-participating manufacturers in the form of workshop and training, publishing fifteen (15) peer-reviewed conference and journal papers as well as a book chapter in the area of industrial energy efficiency field, assisting the TVA Magnolia Combined Cycle Power Plant to become the First 50001 Ready Certified Power Plant in the U.S. through briefing them on ISO 50001 and 50001 Ready as well as providing an energy assessment to the plant, assisted the new IAC center at Clemson University with on-site and remote support, and provided assessment and training in unique areas of water, waste water, cyber security and smart manufacturing to our clients, students and community.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Enhancing Short-Term Flexibility through Characterization of HVDC Transmission Systems

Efficient power grid operation hinges on maintaining safety and reliability through adaptable system flexibility standards. However, in a future power grid characterized by extensive renewable energy integration, conventional system flexibility and predetermined requirements may falter under extreme conditions. This paper addresses the formidable challenge of sustaining secure and dependable power grid operations under these circumstances, emphasizing the role of controllable high voltage direct current (HVdc) transmission systems in amplifying overall system flexibility and tackling operational complexities. To quantitatively assess short-term flexibility and its associated economic benefits from HVdc within specific regions, we propose a Power Flow Distribution Factors (PTDFs) based approach. This methodology takes into account both dispatchable generators and HVdc systems, pinpointing their contributions. Through an analysis of the Western Electricity Coordinating Council (WECC) system, we demonstrate the practical application of this approach to scrutinize the impacts of existing and future HVdc lines.

Operational Flexibility, Multi-terminal HVdc, tran↗

Assessing the Optical Performance Impact of Tracking Error in an Operational Concentrated Solar Power Plant Using Monte Carlo Ray-Tracing Simulation

Concentrating Solar Power (CSP) provides firm and dispatchable electricity due to its thermal storage and hybridization capabilities, which supports the decarbonization of our energy supply. Of the various CSP technologies, parabolic trough collectors are the most mature, with over 500 MW operating worldwide. The optical performance of parabolic trough systems is sensitive to tracking error, which is defined as the angular offset of a collector away from the sun position in the transversal plane. Tracking error commonly occurs due to non-continuous adjustment of the trough angle to point toward the sun, but other factors such as gravity, heating, and wind loading can also contribute to tracking error. Researchers have explored the impact of tracking error on optical performance both numerically and experimentally, but existing studies do not include measurements from operational utility-scale power plants. Tilt angle measurements of parabolic troughs at operational utility-scale power plants illustrate spatial variations in optical performance and include various sources of tracking error such as gravity, heating, and wind loading. To fully characterize wind driven loads on parabolic troughs, we are conducting a long-term field measurement campaign at the Nevada Solar One CSP plant located in Boulder City, NV, which has a nominal capacity of 72 MW and 0.5 hours of full-load storage. We record load measurements on four outer trough rows, collecting support structure bending moments, drive torque moments, dynamic accelerations of the spaceframe, mirror displacement, and tilt angles. Using the tilt measurements acquired at 20 Hz frequency, we calculate the deviation between the nominal sun position and the tracker angle. Using a Monte-Carlo ray-tracing simulation software, we assess the impact of the tracker angle deviation on optical performance throughout the diurnal cycle at various spatial locations within the CSP plant. In our view, this first-of-a-kind study will provide important guidance for future trough designs that reduce the impact of various sources of tracking error on performance.

concentrating solar power↗

Slide Test FY 2019 Report

At Los Alamos, the Slide Test was developed in 2019 to investigate whether the mass of a main charge of explosive sliding on a gritty surface, in the absence of impact, is sufficient to heat grit to ignition temperatures in PBX 9501. This is a practical test to address frictional ignition during assembly/disassembly operations at the Pantex Plant. Twenty-seven Slide Tests were performed in total, testing PBX 9501 at various slide velocities, grit diameters, grit patterns, and charge masses. Time-resolved velocimetry of the slide event (from PDV) and spot area of the explosive charge (obtained from image analysis) is reported. High-speed videography is used to diagnose explosive reaction. Eighteen of these tests were performed with a charge mass of 30 lbs at velocities ≤ 4 m s-1 and grit diameters between 75 and 1000 µm. Nine Slide Tests were performed with a 15 lb charge mass at similar parameters. No ignition was observed in any of the tests. These data provide evidence that the mass of a main charge, caused to slide on a surface at the low velocities achievable during routine handling, is insufficient stimulus to heat grit to ignition temperatures. These findings are relevant to risk assessment for explosive handling operations and provide evidence that PBX 9501 is safe within the constraints that were tested. However, because ignitions were not observed in any of the tests, we cannot determine which variables (mass or velocity) dominate the explosive response and to what extent. The absence of observed ignition also precludes the determination of a safety margin. To identify this safety margin, further research would be necessary to define the velocity and/or mass threshold at which ignition occurs.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Microgrid Resilience: A Holistic and Context-Aware Resilience Metric

Microgrids present an effective solution for the coordinated deployment of various distributed energy resources and furthermore provide myriad additional benefits such as resilience, decreased carbon footprint, and reliability to energy consumers and the energy system as a whole. Boosting the resilience of distribution systems is another major benefit of microgrids. This is because they can also serve as a backup power source when the utility grid's operations are interrupted due to either high-probability low-impact events like a component failure or low-probability high-impact events - be it a natural disaster or a planned cyberattack. However, the degree to which any particular system can defend, adapt, and restore normal operation depends on various factors including the type and severity of events to which a microgrid is subjected. These factors, in turn, are dependent on the geographical location of the deployed microgrid as well as the cyber risk profile of the site where the microgrid is operating. Therefore, in this work, we attempt to capture this multi-dimensional interplay of various factors in quantifying the ability of the microgrid to be resilient in these varying aspects. This paper, thus, proposes a customized site-specific quantification of the resilience strength for the individual microgrid's capability to absorb, restore, and adapt to the changing circumstances for sustaining the critical load when a low-probability high-impact event occurs - termed as - context-aware resilience metric. We also present a case study to illustrate the key elements of our integrated analytical approach.

microgrid↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

2022 LANL Radionuclide Air Emissions Report (Rev. 2)

This report describes the emissions of airborne radionuclides from operations at Los Alamos National Laboratory (LANL) for calendar year 2022 and the resulting off-site dose from these emissions. This document fulfills the requirements established by the National Emissions Standards for Hazardous Air Pollutants in 40 CFR 61, Subpart H – Emissions of Radionuclides other than Radon from Department of Energy Facilities, commonly referred to as the Radionuclide NESHAP or Rad-NESHAP. Compliance with this regulation and preparation of this document is the responsibility of LANL’s Rad NESHAP compliance program, which is part of the Environmental Protection and Compliance (EPC) Division. The information in this report is required under the Clean Air Act and is being submitted to the U.S. Environmental Protection Agency (EPA) Headquarters and EPA Region 6. The highest effective dose equivalent (EDE) to an off-site member of the public was calculated using procedures specified by the EPA and described in this report. LANL’s EDE was 0.45 for 2022. The annual limit is 10 millirem per year, established by the EPA in 40 CFR 61 Subpart H. All measured air emissions are modeled to a single location, known as the Maximally Exposed Individual (MEI). During calendar year 2022, LANL continuously monitored radionuclide emissions at 27 “major” release points, or stacks. The Laboratory estimates emissions from an additional 34 “minor” release points using radionuclide usage source terms in lieu of stack monitoring. Also, LANL uses an EPA approved network of air samplers around the Laboratory perimeter to monitor ambient airborne levels of radionuclides. To provide data for dispersion modeling and dose assessment, LANL maintains and operates several meteorological monitoring towers. From these various systems, a comprehensive evaluation is conducted to calculate the MEI dose for the Laboratory. The MEI can be any member of the public at any off-site location where there is a residence, school, business, or office. In 2022, this MEI location was a business at 95 Entrada Drive, located in the eastern end of Los Alamos town site. The primary contributors to the off-site dose at this location are the ambient air data at that location combined with radioactive gas emissions from the LANSCE facility and the collected potential emissions from unmonitored (minor) sources. Overall, the MEI dose in 2022 is similar to that which has been observed in recent years, and it remains well below the EPA’s 10 millirem per year limit. Doses reported to the EPA for the past 10 years are shown in Table E1.

54 ENVIRONMENTAL SCIENCES↗

Notice of Submittal – 2023 Radionuclide Air Emissions Report for Los Alamos National Laboratory

This report describes the emissions of airborne radionuclides from operations at Los Alamos National Laboratory (LANL) for calendar year 2023 and the resulting off-site dose from these emissions. This document fulfills the requirements established by the National Emissions Standards for Hazardous Air Pollutants in 40 CFR 61, Subpart H – Emissions of Radionuclides other than Radon from Department of Energy Facilities, commonly referred to as the Radionuclide NESHAP or Rad-NESHAP. Compliance with this regulation and preparation of this document is the responsibility of LANL’s Rad NESHAP compliance program, which is part of the Environmental Protection and Compliance (EPC) Division. The information in this report is required under the Clean Air Act and is being submitted to the U.S. Environmental Protection Agency (EPA) Headquarters and EPA Region 6. The highest effective dose equivalent (EDE) to an off-site member of the public was calculated using procedures specified by the EPA and described in this report. LANL’s EDE was 0.43 for 2023. The annual limit is 10 millirem per year, established by the EPA in 40 CFR 61 Subpart H. All measured air emissions are modeled to a single location, known as the Maximally Exposed Individual (MEI). During calendar year 2023, LANL continuously monitored radionuclide emissions at 28 “major” release points, or stacks. The Laboratory estimates emissions from an additional 59 “minor” release points using radionuclide usage source terms in lieu of stack monitoring. Also, LANL uses an EPA approved network of air samplers around the Laboratory perimeter to monitor ambient airborne levels of radionuclides. To provide data for dispersion modeling and dose assessment, LANL maintains and operates several meteorological monitoring towers. From these various systems, a comprehensive evaluation is conducted to calculate the MEI dose for the Laboratory. The MEI can be any member of the public at any off-site location where there is a residence, school, business, or office. In 2023, this MEI location was a business at 129 New Mexico State Road 4 (NM-4), located in the northern end of White Rock. The primary contributors to the off-site dose at this location are the ambient air data at that location combined with the collected potential emissions from unmonitored (minor) sources. Overall, the MEI dose in 2023 is similar to that which has been observed in recent years, and it remains well below the EPA’s 10 millirem per year limit. Doses reported to the EPA for the past 10 years are shown in Table E1.

54 ENVIRONMENTAL SCIENCES↗

A High-Assay Low-Enriched Uranium Fuel Transportation Concept

The uranium 235U enrichment commonly used in fuel production for U.S. light water nuclear reactors typically does not exceed 5 wt%. In contrast, many of the currently investigated advanced reactor concepts demand fuel with higher enrichments. This includes high-assay low-enriched uranium (HALEU), characterized by a 235U enrichment of 5 to 20 wt%. The necessity of HALEU transportation in the fuel production cycle leads to new challenges caused by various technical and regulatory hurdles. Current U.S. Nuclear Regulatory Commission–approved transportation package designs for UF6 with enrichments above 5 wt% provide relatively small payloads [=116 kg (250 lb)]. Furthermore, in accordance with 10 CFR 71.55, package design activities for fissile material enriched above 5 wt% need to consider water infiltration in the containment as part of the criticality safety evaluations. This study presents a transportation package concept for HALEU advanced nuclear reactor fuel with a significantly higher payload of up to 376 kg (830 lb) of fissile material per package and up to 1881 kg (4149 lb) of HALEU per legal weight truck. The anticipated chemical form of the transported material is UO2 downblended from available highly enriched uranium. The concept utilizes a combination of existing transportation packaging, 18 inner canisters, and a novel basket design that includes a borated aluminum flux trap. Criticality and shielding evaluations; fundamental structural, confinement, and thermal assessments; and studies on package operations are presented. The results of this study build significant confidence in the technical feasibility of a high-capacity HALEU transportation package concept while demonstrating the concept’s potential to meet U.S. regulatory requirements.

Eidelpes, Elmar↗

AGR 5/6/7 Data Qualification Report for ATR Cycles 162B through 168A

This report provides the qualification status of experimental data for the Advanced Gas Reactor (AGR) 5/6/7 fuel irradiation. AGR-5/6/7 was conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) in support of development and qualification of tri-structural isotropic (TRISO) low-enriched fuel for use in high temperature gas-cooled reactors. The objectives of the AGR-5/6/7 experiments are to: (i) irradiate reference-design fuel particles to support fuel qualification, (ii) establish operating margins for the fuel beyond normal operating conditions, and (iii) provide irradiated-fuel performance data and irradiated-fuel samples for post-irradiation examination (PIE) and safety testing. The test train contains five separate capsules that were independently controlled and monitored. Each capsule contains multiple 12.51-mm-long compacts filled with low enriched uranium carbide/oxide (UCO) TRISO fuel particles. The primary objective of the AGR-5/6 test (Capsules 1, 2, 4, and 5) is to verify successful performance of the reference-design fuel under normal operating conditions. The AGR-7 test (Capsule 3) was designed to explore fuel performance at higher temperatures to demonstrate the capability of the fuel to withstand conditions beyond normal operating conditions in support of plant design and licensing. AGR 5/6/7 will also provide irradiated-fuel performance data on fission-gas release from failed particles during irradiation. The AGR-5/6/7 capsules were irradiated in the ATR northeast flux trap location. The experiment began on February 16, 2018 and ended on July 22, 2020, spanning nine ATR cycles over two and a half years. Thus, the AGR-5/6/7 fuel compacts were irradiated for a total of 360.9 effective full power days. The AGR 5/6/7 experiment was able to remain in the reactor core during all three Powered Axial Locator Mechanism (PALM) cycles (163A, 165A, and 167A) without overheating its fuel compacts. This report includes irradiation monitoring data from nine ATR Cycles: 162B, 163A, 164A, 164B, 165A, 166A, 166B, 167A, and 168A, as stored in the Nuclear Data Management and Analysis System (NDMAS). During irradiation, data records consisted of instantaneous measurements recorded every minute and provided by text files automatically every 2 hours. The AGR 5/6/7 data streams addressed in this report include thermocouple (TC) temperatures, sweep gas data (flow rates [capsule inlet, outlet, and downstream at detector], pressure, and moisture content), and Fission Product Monitoring System (FPMS) data (release rates and release to birth rate ratios [R/Bs]) for each of the five capsules. A total of 94,989,908 TC temperature and sweep gas data records were received and processed by NDMAS for AGR 5/6/7 irradiation. Of these records, 41,593,387 (or 43.7% of the total) met data collection and accuracy requirements and are labeled as Qualified. A total of 57,746,693 TC temperature readings were captured from 54 installed TCs. Among them, 10,034,676 TC temperature records (only 17.4%) were Qualified and 47,701,371 TC temperatures (or 82.6%) are Failed due to 48 TC failures (63.5%) and due to missing values (19.1%). To assess performance of the operational TCs, analysis of daily correlations between TCs found no evidence of virtual junction failure for any TCs. Analyses on control charts of TC temperature differences revealed trending in TC readings for TC2, 4, 5, and 13 in Capsule 3, but there is no conclusive indication of TC drift failure that caused those trends. Therefore, TC control charts are not used to disqualify TC data, but only for users’ consideration. For sweep gas flow rates, a total of 31,519,747 gas flow records (84.4%) are Qualified for use for AGR-5/6/7 experiment; 5,723,468 gas flow records (15.4%) are Failed due mostly to missing values; and 74,641 high sweep gas flow rates (0.2 %) are Trend. A large number of Failed missing TC temperature and gas flow values were caused by an error in the data output script that outputted a ‘NULL’ value when values were unchanged. This problem was fixed during the outage of Cycle 166B, which led to a substantially decreased number of missing values during the last three cycles. Nonetheless, a large amount of non-missing data remained because of the high data acquisition frequency (1-minute) and still provided sufficient data to effectively monitor the experiment as designed. For FPMS data, NDMAS received and processed fission product release and R/B data for nine ATR cycles, when ATR core reached full power during AGR 5/6/7 irradiation. These data consist of 110,388 release rate records and 110,388 R/B records for the twelve radionuclides (Kr 85m, Kr 87, Kr 88, Kr 89, Kr 90, Xe 131m, Xe 133, Xe 135, Xe 135m, Xe 137, Xe 138, and Xe 139) for each of the five capsules. Equivalent numbers of uncertainty records associated the release rates and R/B values were provided. To date, qualification status of the FPMS data stored in the NDMAS dat

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NRAP-Open-IAM Analytical Reservoir Model: Development and Testing

Geological carbon sequestration (GCS) is a key technology for reducing global carbon dioxide (CO 2 ) emissions. Over the last decade, the U.S. Department of Energy has invested in understanding the science base, developing practical implementation methods, and demonstrating secure GCS technologies to mitigate the environmental impacts associated with the atmospheric release of CO 2 . As part of the National Risk Assessment Partnership, a systems-level risk assessment tool, called the NRAP-Open-IAM, has been developed to conduct risk assessment and enable safe operations at a GCS site. The current NRAP-Open-IAM contains a simple reservoir model component that calculates the evolution of CO 2 saturation and fluid pressure in a storage reservoir during CO 2 injection operations. This report presents the development and testing of a new analytical reservoir reduced-order model (ROM), which is extended from an existing semi-analytical model for estimation of CO 2 and brine leakage along legacy wells, and enhances the capability of the NRAP-Open-IAM to simulate more types of reservoir conditions. The developed model is validated against three reference studies, and the results indicate that the new ROM predicts the behavior of the two-phase fluids (brine and injected CO 2 ) well and is applicable to different reservoir simulation boundary conditions (i.e., constant pressure boundary and infinite-acting boundary) without a priori user specification of the boundary type. Sensitivity analysis for a set of model parameters is performed using 4,000 synthetic cases prepared via a fully automated process and using machine-learning-based feature selection. The stochastic analysis identifies gravitational number (i.e., ratio of gravitational forces to viscous force) and distance between the injection well and observation location as the most impactful parameters for matching the pressure and CO 2 saturation, respectively, between the numerical simulations and the ROM. This report details the possible ROM uncertainties and serves as a guide for users to understand the use and limitations of this ROM. The code implementation of the model will be released as a module within the NRAP-Open-IAM.

54 ENVIRONMENTAL SCIENCES↗

How Wrong Can the Operational AEP Uncertainty Estimate Be When We Ignore the Correlations Between the Uncertainty Components?

Calculations of wind farm annual energy production (AEP) on operational data are essential for a variety of financial transactions during the life of wind plants. The AEP estimate is associated with an uncertainty value, which is calculated by combining contributions connected to on-site measurements, long-term reference measurements, losses, regression, windiness adjustment, and wind resource interannual variability. Although very limited documentation on the topic exists, the conventional approach currently used by the wind energy community to assess the uncertainty connected to the operational AEP estimate assume that the different uncertainty components are uncorrelated and therefore calculates the overall uncertainty with a sum of squares approach. In this analysis, we contrast the traditional technique to estimate the overall AEP uncertainty by ignoring the correlation between its different components with a novel Monte Carlo based approach, which can instead take into account the correlation between different uncertainty categories. We consider monthly operational data from 472 wind farms from the Energy Information Administration (EIA) 923 database to assess the difference between the two approaches. Long-term wind speed data needed for the AEP assessment are taken from three reanalysis products: the Modern-Era Retrospective analysis for Research and Applications v2 (MERRA-2), the European Reanalysis Interim (ERA-interim), and the National Centers for Environmental Prediction v2 (NCEP-2). The results of the Monte Carlo approach show that three pairs of AEP uncertainty components do show a statistically significant correlation: the uncertainty connected with wind resource inter-annual variability is positively correlated with the one related to the windiness correction and negatively correlated with the one due to the regression, and the wind measurement uncertainty is positively correlated with the regression uncertainty. All these correlations, which are found between uncertainty components which are not only part of an operational analysis, but also of a wind resource assessment, are currently ignored in the conventional techniques used as industry standard. We further investigate the causes of these correlations, in terms of common dependencies of different uncertainty components on wind resource variability, number of data points, and quality of the regression between wind speed and energy production data. Next, we quantify the error in the current industry standard technique, in terms of the percentage difference in total uncertainty calculated with the two considered approaches, for all the analyzed wind farms. We find a mean absolute percentage difference of about 6%, with the largest differences being greater than 20%. The data clearly confirm that ignoring the actual correlation between the uncertainty components can lead to large errors in the assessment of the operational AEP uncertainty, and the proposed Monte Carlo approach should be preferred.

Monte Carlo↗

Detailed biomass fast pyrolysis kinetics integrated to computational fluid dynamic (CFD) and discrete element modeling framework: Predicting product yields at the bench-scale

Fast pyrolysis is an intricate process due to the variability and anisotropy of lignocellulosic biomass and the complicated chemistry and physics during conversion in a bubbling fluidized bed reactor (BFBR). The complexity of biomass fast pyrolysis lends itself well to computational fluid dynamics (CFD) and discrete element (DEM) analysis, which promises to reduce experimental time and its associated cost. This work investigated switchgrass fast pyrolysis simulated by computational fluid dynamics coupled with a discrete element method to track individual reacting biomass particles throughout a bench-scale BFBR reactor. We accounted for the fast pyrolysis chemistry through a comprehensive reaction scheme with secondary cracking reactions. We performed a three-step reduction for secondary cracking reactions to convert the full cracking scheme into a reduced scheme easily incorporated into our model. We assessed the impact of operational conditions on the steady-state yields of liquid bio-oil, non-condensable gases (NCG), at 550 °C over a range of fluidization numbers (2 – 6 Umf), reported as a ratio to the minimum fluidization velocity (Umf). At steady-state, the volatile bio-oil yield had a range of 49.3–50.4 wt%. Levoglucosan was the primary volatile component present with 21 wt% of the bio-oil while water was the second largest with 20 wt%. The reduction of the secondary reaction schemes did not appreciably affect the overall yields of switchgrass pyrolysis compared to the full secondary scheme.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗