SEARCH · Search NASA
Results for “Operational Reliability”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
A study of electric transmission lines for use on the lunar surface
The sources for electrical power on a lunar base are said to include solar/chemical, nuclear (static conversion), and nuclear (dynamic conversion). The transmission of power via transmission lines is more practical than power beaming or superconducting because of its low cost and reliable, proven technology. Transmission lines must have minimum mass, maximum efficiency, and the ability to operate reliably in the lunar environment. The transmission line design includes conductor material, insulator material, conductor geometry, conductor configuration, line location, waveform, phase selection, and frequency. This presentation oulines the design. Liquid and gaseous dielectrics are undesirable for long term use in the lunar vacuum due to a high probability of loss. Thus, insulation for high voltage transmission line will most likely be solid dielectric or vacuum insulation.
Propulsion system advances that enable a reusable Liquid Fly Back Booster (LFBB)
This paper provides an overview of the booster propulsion system for the Liquid Fly Back Booster (LFBB). This includes, system requirements, design approach, concept of operations, reliability, safety and cost assumptions. The paper summarizes the findings of the Boeing propulsion team that has been studying the LFBB feasibility as a booster replacement for the Space Shuttle. This paper will discuss recent advances including a new generation of kerosene and oxygen rich pre-burner staged combustion cycle main rocket engines. The engine reliability and safety is expected to be much higher than current standards by adding extra operating margins into the design and normally operating the engines at 75% of engine rated power. This allows for engine out capability. The new generation of main engines operates at significantly higher chamber pressure than the prior generation of gas generator cycle engines. The oxygen rich pre-burner engine cycle, unlike the fuel rich gas generator cycle, results in internally self-cleaning firings which facilitates reusability. Maintenance is further enhanced with integrated health monitoring to improve safety and turn-around efficiency. The maintainability of the LFBB LOX/kerosene engines is being improved by designing the vehicle/engine interfaces for easy access to key engine components.
Lockheed Martin Skunk Works Single Stage to Orbit/Reusable Launch Vehicle
Lockheed Martin Skunk Works has compiled an Annual Performance Report of the X-33/RLV Program. This report consists of individual reports from all industry team members, as well as NASA team centers. This portion of the report is comprised of a status report of Lockheed Martin's contribution to the program. The following is a summary of the Lockheed Martin Centers involved and work reviewed under their portion of the agreement: (1) Lockheed Martin Skunk Works - Vehicle Development, Operations Development, X-33 and RLV Systems Engineering, Manufacturing, Ground Operations, Reliability, Maintainability/Testability, Supportability, & Special Analysis Team, and X-33 Flight Assurance; (2) Lockheed Martin Technical Operations - Launch Support Systems, Ground Support Equipment, Flight Test Operations, and RLV Operations Development Support; (3) Lockheed Martin Space Operations - TAEM and A/L Guidance and Flight Control Design, Evaluation of Vehicle Configuration, TAEM and A/L Dispersion Analysis, Modeling and Simulations, Frequency Domain Analysis, Verification and Validation Activities, and Ancillary Support; (4) Lockheed Martin Astronautics-Denver - Systems Engineering, X-33 Development; (5) Sanders - A Lockheed Martin Company - Vehicle Health Management Subsystem Progress, GSS Progress; and (6) Lockheed Martin Michoud Space Systems - X-33 Liquid Oxygen (LOX) Tank, Key Challenges, Lessons Learned, X-33/RLV Composite Technology, Reusable Cyrogenic Insulation (RCI) and Vehicle Health Monitoring, Main Propulsion Systems (MPS), Structural Testing, X-33 System Integration and Analysis, and Cyrogenic Systems Operations.
Propulsion System Advances that Enable a Reusable Liquid Fly Back Booster (LFBB)
This paper provides an overview of the booster propulsion system for the Liquid Fly Back Booster (LFBB). This includes, system requirements, design approach, concept of operations, reliability, safety and cost assumptions. The paper summarizes the findings of the Boeing propulsion team that has been studying the LFBB feasibility as a booster replacement for the Space Shuttle. This paper will discuss recent advances including a new generation of kerosene and oxygen rich pre-burner staged combustion cycle main rocket engines. The engine reliability and safety is expected to be much higher than current standards by adding extra operating margins into the design and normally operating the engines at 75% of engine rated power. This allows for engine out capability. The new generation of main engines operates at significantly higher chamber pressure than the prior generation of gas generator cycle engines. The oxygen rich pre-burner engine cycle, unlike the fuel rich gas generator cycle, results in internally self-cleaning firings which facilitates reusability. Maintenance is further enhanced with integrated health monitoring to improve safety and turn-around efficiency. The maintainability of the LFBB LOX / kerosene engines is being improved by designing the vehicle/engine interfaces for easy access to key engine components.
ICAROUS: Integrated Configurable Architecture for Unmanned Systems
NASA's Unmanned Aerial System (UAS) Traffic Management (UTM) project aims at enabling near-term, safe operations of small UAS vehicles in uncontrolled airspace, i.e., Class G airspace. A far-term goal of UTM research and development is to accommodate the expected rise in small UAS traffic density throughout the National Airspace System (NAS) at low altitudes for beyond visual line-of-sight operations. This video describes a new capability referred to as ICAROUS (Integrated Configurable Algorithms for Reliable Operations of Unmanned Systems), which is being developed under the auspices of the UTM project. ICAROUS is a software architecture comprised of highly assured algorithms for building safety-centric, autonomous, unmanned aircraft applications. Central to the development of the ICAROUS algorithms is the use of well-established formal methods to guarantee higher levels of safety assurance by monitoring and bounding the behavior of autonomous systems. The core autonomy-enabling capabilities in ICAROUS include constraint conformance monitoring and autonomous detect and avoid functions. ICAROUS also provides a highly configurable user interface that enables the modular integration of mission-specific software components.
Fluor Idaho's Technical and Programmatic Approach That Resolved the Problems with the Integrated Waste Treatment Unit - 19290
The Integrated Waste Treatment Unit (IWTU) is a facility designed to treat approximately 900,000 gallons of radioactive liquid waste, referred to as Sodium Bearing Waste (SBW). IWTU is a Fluidized Bed Steam Reforming process that will be used to treat the SBW to produce a granular sodium carbonate and sodium aluminate product. The product is planned to be managed as remote handled transuranic waste. Construction of the IWTU was completed in 2011 and Critical Decision 4 was achieved in 2012 with the expectation that the treatment of the SBW would be completed in 2012. However, process instabilities and equipment problems prevented the safe and reliable operation of the facility. All of the nonradiological tests of the IWTU had to be stopped prematurely because each time the IWTU was operated, the process would become unstable within a few days of initiating the operation. The instabilities were associated with the primary fluidized bed reaction vessel, the Denitration Mineralization Reformer (DMR). The instabilities included difficulties maintaining fluidization conditions and scale formation within the DMR. Design inadequacies and equipment reliability problems in other parts of the facility also hampered the testing the IWTU. The U.S. Department of Energy (DOE) awarded the Idaho Clean-up contract to Fluor Idaho (Fluor) in 2016. To resolve the issues with the IWTU, Fluor assembled a dedicated team to develop the technical and programmatic strategy to resolve the issues with the IWTU and get it operational. Fluor's approach has successfully resolved the primary issues with the IWTU. As a result of modifications of equipment and operating strategies implemented by Fluor, the core part of the IWTU process now works reliably when processing simulated Sodium Bearing Waste over a wide range of operating conditions. This paper describes Fluor's approach and summarize key steps in the process to resolve the issues with the IWTU. Fluor has used strong fundamentals including a first principles approach and unique program management techniques to solve the technical problems with the IWTU. The successful approach has provided renewed confidence in the IWTU process enabling the troubled project to move forward. Important factors in the success of the project include using a dedicated project team separate from the IWTU line organization, a Technical Review Group, the Chemistry Team and a diverse set of supporting contractors and National Laboratories. Fluor typically used multiple means to validate solutions before testing them in the IWTU. Fluor's successful full-scale demonstration runs of the IWTU confirm the process will reliably produce a compliant, treated waste product over a wide range of operating conditions.
Real-time digital simulation to improve advanced microgrid design
In this study, there are several ways to address energy reliability concerns during an extended power outage. This can include hardening the energy infrastructure to reduce potential loss of power, adding redundant backup systems with larger fuel tanks, and improving generator reliability through better maintenance. While each is valid, they are often expensive to adequately implement. The traditional emergency power approach for decades has been the use of building-tied emergency generators to start up and supply emergency power until the utility can come back on line. Unfortunately, operational experience from many recent extended power outages has shown that emergency backup generators are often mismatched in size with the building energy load, under-maintained such that their operational reliability is well below expected values, and have insufficient fuel to operate for the entire power outage. Here we describe how energy reliability and security can be enhanced with the use of Advanced Microgrids.
NASA product assurance in the 1990s
The objectives of NASA product assurance in the 1990s are identified. They are to provide for personnel safety, and safe and reliable operation of hardware and software during the lifetime of a program or mission. The NASA product assurance program, a multi-discipline effort that focuses on safety, reliability, maintainability, and quality assurance expertise to meet NASA operational requirements is described. This program supports NASA 's unmanned launch vehicles such as satellites and planetary probes, manned spacecraft (such as the Space Shuttle and Space Station Freedom), and ground support equipment.
Connected and Learning Based Optimal Freight Management for Efficiency
The management of the future heterogenous fleet is a complex decision-making problem. The heterogenous fleet is emerging as decarbonization technologies are deployed by fleets toward lowering the freight operation emissions in Medium and Heavy-duty vehicles. Traditionally, in fleets characterized by a homogeneous Diesel Internal Combustion Engine (ICE) powertrain, the process of fleet planning and operational optimization unfolds sequentially without the necessity to account for powertrain and vehicle-specific characteristics during dispatch decisions. Fleets with trucks less than 5 years old tend to maintain stable vehicle efficiency with minimal operational reliability risks for fleet managers. However, the landscape changes with the incorporation of emerging powertrain technologies, which lack extensive operational data and service experiences. This includes technologies like hybrid, Electric, Fuel Cell, or alternative fuel ICE. Operational decisions for fleets featuring heterogeneous powertrain technologies and facing limited access to alternative fueling and charging stations become intricate, requiring careful consideration and optimization at each dispatch. The difference in efficiency characteristics of emerging technologies, their range limitations, and the restricted availability of charging/alternative fueling infrastructure, coupled with sensitivity to driving conditions (e.g., EV range reduction in low temperatures) and their impact on component aging (such as batteries), become pivotal factors influencing the reliable and efficient freight transportation. To make the path toward low emission freight transportation efficient and reliable, an AI-assisted fleet management software is developed in this project to help fleet managers in optimizing both adoption of emerging powertrain decarbonization, connected and automated technologies and also operating the fleet after such technologies are deployed as schematically. Freight transportation requirements are different depending on the cargos to be shipped, customer requirements and regions of operations. This further highlights the need for software and digital solutions to tailor deployment and operation of emerging powertrain, connectivity, and automation technologies toward the specific fleet operation requirements. The fleet management optimizer was also integrated with a model of the fleet to simulate the operation of the fleet over 1 year of the baseline fleet operation (250,000+ shipments) indicating the significance of day-to-day variations on emissions and energy consumption of a freight transportation fleet. The results demonstrate ≥20% improvement in freight efficiency in terms of WTW CO2 per ton-mile of cargo shipments while all fleet operation constraints are enforced, and the cost (CapEx and OpEx) is minimized.
Reinstated JET ICRF ILA: Overview and Results
The works undertaken to reinstate the JET ICRF ILA are reviewed. The vacuum matching capacitors were replaced, an extensive calibration of all the measurements in the RF circuit was carried out, new simulation tools were created and new control algorithms were implemented for the – toroidal and poloidal – phase control of the array as well as for the matching of the second stage. A review of the contribution of the reinstated ILA to the JET programme during the last campaigns is given showing namely that the new controls allowed extending the range of the operation to lower (29MHz) and higher (51MHz) frequencies than previously achieved and allowed more flexible and reliable operation. Operation with coupled power levels up to 2.8MW and voltages up to 40kV was achieved. ILA results on plasma are discussed and emphasis is given to the features of interest for ITER.
Lake Charles CCS Project (Final Technical Report, Phase 2)
In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture and Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO 2 ) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO 2 generated in a large industrial gasification process and sequester the CO 2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials, construction labor, engineering, and other costs. The CCS Project Final Technical Report is based on a Front End Engineering and Design (FEED) study prepared by SK E&C, completed in [June] 2014. Subsequently, Fluor Enterprises completed a FEED validation study in mid-September 2014. The design analyses indicated that the FEED package was sufficient and as expected. However, Fluor considered the construction risk based on a stick-build approach to be unacceptable, but construction risk would be substantially mitigated through utilization of modular construction where site labor and schedule uncertainty is minimized. Fluor’s estimate of the overall EPC project cost utilizing the revised construction plan was comparable to SKE&C’s value after reflecting Fluor’s assessment of project scope and risk characteristic. Development was halted upon conclusion of Phase 2A FEED and the project was not constructed.Transport and Sequestration – The overall objective of the pipeline project was to construct a pipeline to transport captured CO 2 from the Lake Charles Clean Energy project to the existing Denbury Green Line and then to the Hastings Field in Southeast Texas to demonstrate effective geologic sequestration of captured CO 2 through commercial EOR operations. The overall objective of the MVA portion of the project was to demonstrate effective geologic sequestration of captured CO 2 through commercial Enhanced Oil Recovery (EOR) operations in order to evaluate costs, operational processes and technical performance. The DOE target for the project was to capture and implement a research MVA program to demonstrate the sequestration through EOR of approximately one million tons of CO 2 per year as an integral component of commercial operations.
Evaluation of Power Electronic Components and Systems at Cryogenic Temperatures For Space Missions
Power electronic circuits and systems designed for deep space applications and outer planetary exploration are required to operate reliably and efficiently under extreme temperature conditions. This requirement is dictated by the fact that the operational environments associated with some of the space missions would encompass temperatures as low as -183 C. The development and utilization of electronics capable of low temperature operation would not only fulfill the advanced technology requirements, but also would contribute to improving circuit performance, increasing system efficiency, and reducing development and launch costs. These benefits are generally achieved by the improved intrinsic properties of some of the electronic materials at low temperature, reduced device losses, and the elimination of heating elements used in conventional systems at low temperatures. Power electronic circuits are widely used in space power systems in the areas of power management, conditioning, and control. In this work, the performance of certain power electronic components and systems was investigated under low temperature. These include inductors, capacitors, pulse-width-modulation (PWM) controllers, and advanced commercial DC/DC converter modules. Different properties were determined as a function of temperature in the range of 20 C to -140 C, at various current and voltages levels. The experimental procedures along with the experimental data obtained are presented and discussed in this paper.
A reliable liquid helium detector
Detector and indicator system, utilizing commercial perforated germanium cryogenic thermometer as level sensor containing adjustable level discriminator with indicators, operates reliably over pressure range from 50 to 900 mm Hg without electronic adjustments.
CMS Data transfer operations after the first years of LHC collisions
CMS experiment utilizes distributed computing infrastructure and its performance heavily depends on the fast and smooth distribution of data between different CMS sites. Data must be transferred from the Tier-0 (CERN) to the Tier-1s for processing, storing and archiving, and time and good quality are vital to avoid overflowing CERN storage buffers. At the same time, processed data has to be distributed from Tier-1 sites to all Tier-2 sites for physics analysis while Monte Carlo simulations sent back to Tier-1 sites for further archival. At the core of all transferring machinery is PhEDEx (Physics Experiment Data Export) data transfer system. It is very important to ensure reliable operation of the system, and the operational tasks comprise monitoring and debugging all transfer issues. Based on transfer quality information Site Readiness tool is used to create plans for resources utilization in the future. We review the operational procedures created to enforce reliable data delivery to CMS distributed sites all over the world. Additionally, we need to keep data and meta-data consistent at all sites and both on disk and on tape. In this presentation, we describe the principles and actions taken to keep data consistent on sites storage systems and central CMS Data Replication Database (TMDB/DBS) while ensuring fast and reliable data samples delivery of hundreds of terabytes to the entire CMS physics community.
Massive Contingency Analysis with High Performance Computing
Contingency analysis is a key function in the Energy Management System (EMS) to assess the impact of various combinations of power system component failures based on state estimates. Contingency analysis is also extensively used in power market operation for feasibility test of market solutions. Faster analysis of more cases is required to safely and reliably operate today’s power grids with less marginal and more intermittent renewable energy sources. Enabled by the latest development in the computer industry, high performance computing holds the promise of meet the need in the power industry. This paper investigates the potential of high performance computing for massive contingency analysis. The framework of "N-x" contingency analysis is established and computational load balancing schemes are studied and implemented with high performance computers. Case studies of massive 300,000-contingency-case analysis using the Western Electricity Coordinating Council power grid model are presented to illustrate the application of high performance computing and demonstrate the performance of the framework and computational load balancing schemes.
Tritium Laboratory Karlsruhe: administrative and technical framework for isotope laboratory operation
Originally licensed in 1993 the Tritium Laboratory Karlsruhe (TLK) is a unique pilot scale isotope laboratory focused on tritium handling and processing to conduct a variety of scientific experiments and development tasks in view of future fusion power plants. TLK currently operates 15 glove boxes of 125 m{sup 3} total volume in an experimental hall measuring nearly 1500 m{sup 2}. The tritium infrastructure, comprising of the tritium storage system, the tritium transfer system and the isotope separation system, is integrated into TLK as a closed loop system to supply tritium to the experiments. Having a license for handling of up to 40 g of tritium and a closed tritium processing loop, TLK is a unique institute in non-military tritium research. In order to fulfil all requirements regarding the license, a framework of regulations is applied as a basis for the operation of TLK, as well as the setup of new experiments and the design of components. This paper will give an overview on the framework of operation in view of licensing issues, as well as administrative and technical regulations mandatory to legally and reliably operate an isotope laboratory of this scale.
Building the next high voltage dc photogun polarized source for the ILC at JLab
During the ILC Global Design Effort (2007) two 200 kV high voltage photoguns based on an inverted insulator geometry were developed in 2010 and successfully tested at Jefferson Lab (JLab). One of the photoguns has been operated at 130 kV in the CEBAF accelerator for the JLab nuclear physics program. The inverted insulator replaces the electrode support structure, consequently significantly less metal prone to field emission is biased and surfaces contributing to the vacuum load are significantly reduced. Implementing a biased anode, and using a larger laser spot size has made this the state of the art polarized beam source with ~200 C charge lifetime from SSL GaAs photocathodes. However, operating at the design 200 kV voltage has been hindered by field emission at ~190 kV. To reliably operate without field emission requires lengthy conditioning applying 50-100 kV beyond the voltage needed for beam operations, without breakdown or damage to the insulator. Over the past decade, JLab has developed two photoguns with a larger version of the commercial inverted insulators used in the ILC design. One photogun operated at 300 kV for magnetized beam studies, and the concept has been implemented in the BNL polarized photogun. The second photogun has recently been installed in CEBAF to operate at 200 kV field emission free. Higher voltage photoguns help the ILC and CLIC achieve higher bunch charge (2013 TDR), and additionally provide margin for operating with shorter laser pulse length and/or smaller laser spot size (better emittance at higher peak current). Such photogun designs need to reach ~400 kV without breakdown or insulator damage to operate field emission free at > 300 kV. This also allows for direct injection into a SRF booster. JLab submitted a proposal to HEP for developing in partnership with industry an inverted geometry insulator to fit commercial 400 kV cables. This contribution describes JLab experience developing and testing high voltage photoguns, and what is needed to sufficiently condition for voltage levels higher than beam operational voltage.