Search NASA⌕ Search

SEARCH · Search NASA

Results for “PHIL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

NASA Langley Systems Analysis & Concepts Directorate Technology Assessment/Portfolio Analysis

Systems analysis develops and documents candidate mission and architectures, associated system concepts, enabling capabilities and investment strategies to achieve NASA s strategic objectives. The technology assessment process connects the mission and architectures to the investment strategies. In order to successfully implement a technology assessment, there is a need to collect, manipulate, analyze, document, and disseminate technology-related information. Information must be collected and organized on the wide variety of potentially applicable technologies, including: previous research results, key technical parameters and characteristics, technology readiness levels, relationships to other technologies, costs, and potential barriers and risks. This information must be manipulated to facilitate planning and documentation. An assessment is included of the programmatic and technical risks associated with each technology task as well as potential risk mitigation plans. Risks are assessed and tracked in terms of likelihood of the risk occurring and consequences of the risk if it does occur. The risk assessments take into account cost, schedule, and technical risk dimensions. Assessment data must be simplified for presentation to decision makers. The Systems Analysis and Concepts Directorate (SACD) at NASA Langley Research Center has a wealth of experience in performing Technology Assessment and Portfolio Analysis as this has been a business line since 1978.

Cavanaugh, Stephen↗

Two Serial Data to Pulse Code Modulation System Interfaces

Two pulse code modulation (PCM) system interfaces for asynchronous serial data are described. One interface is for global positioning system (GPS) data on the NASA Dryden Flight Research Center (DFRC) F-15B (McDonnell Douglas Corporation, St. Louis, Missouri) airplane, tail number 836 (F-15B/836). The other is for flight control computer data on the duPont Aerospace (La Jolla, California) DP-1, a 53-percent scale model of the duPont Aerospace DP-2.

Hamory, Phil↗

Mirror Technology Roadmap

NASA's Mirror Technology Roadmap identifies specific capabilities requiring significant advances in optical fabrication and testing to enable the next generation of large-aperture space telescopes for astronomy and Earth science missions ranging from x-ray to infrared.

Stahl, H. Phil↗

Airborne High Spectral Resolution Lidar Aerosol Measurements during MILAGRO and TEXAQS/GOMACCS

Two1 field experiments conducted during 2006 provided opportunities to investigate the variability of aerosol properties near cities and the impacts of these aerosols on air quality and radiative transfer. The Megacity Initiative: Local and Global Research Observations (MILAGRO) /Megacity Aerosol Experiment in Mexico City (MAX-MEX)/Intercontinental Chemical Transport Experiment-B (INTEX-B) joint experiment conducted during March 2006 investigated the evolution and transport of pollution from Mexico City. The Texas Air Quality Study (TEXAQS)/Gulf of Mexico Atmospheric Composition and Climate Study (GoMACCS) (http://www.al.noaa.gov/2006/) conducted during August and September 2006 investigated climate and air quality in the Houston/Gulf of Mexico region. During both missions, the new NASA Langley airborne High Spectral Resolution Lidar (HSRL) was deployed on the NASA Langley B200 King Air aircraft and measured profiles of aerosol extinction, backscattering, and depolarization to: 1) characterize the spatial and vertical distributions of aerosols, 2) quantify aerosol extinction and optical thickness contributed by various aerosol types, 3) investigate aerosol variability near clouds, 4) evaluate model simulations of aerosol transport, and 5) assess aerosol optical properties derived from a combination of surface, airborne, and satellite measurements.

Ferrare, Richard↗

Quasi-Periodic Variability in NGC 5408 X-1

We report the discovery with XMM-Newton of quasiperiodic variability in the 0.2 - 10 keV X-ray flux from the ultraluminous X-ray source NGC 5408 X-1. The average power spectrum of all EPIC-pn data reveals a strong 20 mHz QPO with an average amplitude (rms) of 9%, and a coherence, Q identical with nu(sub 0)/sigma approximately equal to 6. In a 33 ksec time interval when the 20 mHz QPO is strongest we also find evidence for a 2nd QPO peak at 15 mHz, the first indication for a close pair of QPOs in a ULX source. Interestingly, the frequency ratio of this QPO pair is inconsistent with 3:2 at the 3 sigma level, but is consistent with a 4:3 ratio. A powerlaw noise component with slope near 1.5 is also present below 0.1 Hz with evidence for a break to a flatter slope at about 3 mHz. The source shows substantial broadband variability, with a total amplitude (rms) of about 30% in the 0.1 - 100 mHz frequency band, and there is strong energy dependence to the variability. The power spectrum of hard X-ray photons (greater than 2 keV) shows a "classic" flat-topped continuum breaking to a power law with index 1.5 - 2. Both the break and 20 mHz QPO are detected in the hard band, and the 20 mHz QPO is essentially at the break. The QPO is both strong and narrow in this band, having an amplitude (rms) of 15%, and Q approx. equal to 25. The energy spectrum is well fit by three components, a "cool" disk with kT = 0.15 keV, a steep power law with index 2.56, and a thermal plasma at kT = 0.87 keV. The disk, power law, and thermal plasma components contribute 35, 60, and 5% of the 0.3 - 10 keV flux, respectively. Both the timing and spectral properties of NGC 5408 X-1 are strikingly reminiscent of Galactic black hole systems at high inferred accretion rates, but with its characteristic frequencies (QPO and break frequencies) scaled down by a factor of 10 - 100. We discuss the implications of these findings in the context of models for ULXs, and their implications for the object's mass.

Strohmayer, Tod E.↗

MegaMIR: The Megapixel Mid-Infrared Instrument for the Large Binocular Telescope Interferometer

The Megapixel Mid-infrared Instrument (MegaMIR) is a proposed Fizeau-mode camera for the Large Binocular Telescope operating at wavelengths between 5 and 28 micrometers. The camera will be used in conjunction with the Large Binocular Telescope Interferometer (LBTI), a cryogenic optical system that combines the beams from twin 8.4-m telescopes in a phase coherent manner. Unlike other interferometric systems, the co-mounted telescopes on the LBT satisfy the sine condition, providing diffraction-limited resolution over the 40" field of view of the camera. With a 22.8-m baseline, MegaMIR will yield 0.1" angular resolution, making it the highest resolution wide field imager in the thermal infrared for at least the next decade. MegaMIR will utilize a newly developed 1024 x 1024 pixel Si:As detector array that has been optimized for use at high backgrounds. This new detector is a derivative of the Wide-field Infrared Survey Explorer (WISE) low-background detector. The combination of high angular resolution and wide field imaging will be a unique scientific capability for astronomy. Key benefits will be realized in planetary science, galactic, and extra-galactic astronomy. High angular resolution is essential to disentangle highly complex sources, particularly in star formation regions and external galaxies, and MegaMIR provides this performance over a full field of view. Because of the great impact being made by space observatories like the Spitzer Space Telescope, the number of available targets for study has greatly increased in recent years, and MegaMIR will allow efficient follow up science.

ultraluminous galaxies↗

Ultra Reliability

This viewgraph presentation gives a general overview of NASA's ultra reliability areas. The contents include: 1) Objectives; 2) Approach; 3) Ultra Reliability Areas; 4) Plan Overview; 5) Work Flows; and 6) Customers.

long life↗

The Realities of Managing Complex Space Missions like the James Webb Space Telescope

An overview of the James Webb Space Telescope (JWST) project and its status are presented. The JWST is a deployable infrared telescope with a 6.5 meter diameter segmented, adjustable primary mirror. It has a cryogenic temperature telescope and instruments suited for infrared performance. It will be launched in 2013 on an European Space Agency-supplied Ariane 5 rocket 20 Sun-Earth L2 for a 5-year mission. Compared to other telescopes the JWST: has a 2.7 time longer diameter and 2.7 time longer wavelength capability than the Hubble Space Telescope (HST), 38 times increased sensitivity at K band and 8 times increased sensitivity at H band than the HST NICMOS; and, 8-24 times better angular resolution than the Spitzer. An instrument overview and integration and test flow overview are provided. The JWST project management approach, including organizational chart, program phases, technology status, and project critical path summary, are included. Additionally, project management tools and guidelines are are outlined.

Sabelhaus, Phil↗

Commercial Sensory Survey Radiation Testing Progress Report

The NASA Electronic Parts and Packaging (NEPP) Program Sensor Technology Commercial Sensor Survey task is geared toward benefiting future NASA space missions with low-cost, short-duty-cycle, visible imaging needs. Such applications could include imaging for educational outreach purposes or short surveys of spacecraft, planetary, or lunar surfaces. Under the task, inexpensive commercial grade CMOS sensors were surveyed in fiscal year 2007 (FY07) and three sensors were selected for total ionizing dose (TID) and displacement damage dose (DDD) tolerance testing. The selected sensors had to meet selection criteria chosen to support small, low-mass cameras that produce good resolution color images. These criteria are discussed in detail in [1]. This document discusses the progress of radiation testing on the Micron and OmniVision sensors selected in FY07 for radiation tolerance testing.

Micron↗

Summary of Liquid Propulsion System Needs in Support of the Constellation Program

In January 2004, the President of the United States established the Vision for Space Exploration (VSE) to complete the International Space Station, retire the Space Shuttle and develop its replacement, and expand the human presence on the Moon as a stepping stone to human exploration of Mars and worlds beyond. In response, NASA developed the Constellation Program, consisting of the components shown in Figure 1. This paper will summarize the manned spaceflight liquid propulsion system needs in support of the Constellation Program over the next 10 years. It will address all liquid engine needs to support human exploration from low Earth orbit (LEO) to the lunar surface, including an overview of engines currently under contract, those baselined but not yet under contract, and those propulsion needs that have yet to be initiated. There may be additional engine needs for early demonstrators, but those will not be addressed as part of this paper. Also, other portions of the VSE architecture, including the planned Orion abort test boosters and the Lunar Precursor Robotic Program, are not addressed here as they either use solid motors or are focused on unmanned elements of returning humans to the Moon.

Lorier, Terry↗

Summary of Propulsion System Needs in Support of Project Constellation

In January 2004, the President of the United States established the Vision for Space Exploration (VSE) to return man to the moon and ultimately to extend manned space travel to Mars. This paper will summarize the manned space flight liquid propulsion system needs in support of Project Constellation over the next 10 years. It will include all engine needs to return man to the moon. An overview of engines currently under contract, those baselined but not yet under contract, and those engine needs that hav.e yet to be initiated. Project Constellation includes the components as shown Figure 1. Liquid propulsion systems supporting the manned portion of these elements include the following: the Crew Exploration Vehicle named Orion (crew module reaction control system (CMRCS), service module Orion Main Engine (OME), service module auxiliary RCS, and service module reaction control system (SMRCS)), the Crew Launch Vehicle named Ares 1 (J2X upper stage, first stage roll control system, second stage reaction control system, and the Ares I-X roll control system), the Heavy Lift Launch Vehicle named Ares V (RS68B first stage booster, J-2X upper stage, roll control systems, and the Earth Departure Stage (EDS) (powered by the same Ares V Upper Stage J-2X), and the Lunar Lander named Altair with both descent and ascent stages (lunar orbit insertion and descent main engine, ascent main engine, and attitude control systems for both stages). In addition, there may be additional engine needs for early demonstrators, but those will not be speculated on as part of this paper. Also, other portions of the VSE architecture, including the planned Orion abort demonstrations and the Lunar Precursor Robotic Program, are not addressed here as they either use solid motors or are focused on unmanned precursor missions.

Sumrall, Phil↗

Ares V: Refining a New Heavy Lift Capability

The Ares V cargo launch vehicle represents a significant new national commitment to expand human space exploration beyond low Earth orbit. Viewed more broadly, this new heavy-lift rocket will be an advancement over the national strategic capability lost when the Saturn V program ended more than three decades ago. The Ares V is one of two new launch vehicles being designed by NASA to support U.S. Space Exploration Policy. NASA selected the Ares I crew launch vehicle and the Ares V (Figure 1) during extensive independent and internal architecture and vehicle trade studies to complete the International Space Station, retire the current Space Shuttle fleet, return to the Moon by 2020, and journey to destinations beyond. These vehicles share components derived from the Apollo-era Saturn, Space Shuttle, and contemporary launch vehicle programs to provide safe, affordable, reliable, versatile sustainable space transportation to support national space goals for decades to come.

Creech, Steve↗

Investigation of the NOAA N' S Search and Rescue Antenna Inadvertent Deployment: Type C Mishap

The NOAA N' Search and Rescue Antenna (SRA) inadvertently deployed during a spacecraft rotation on April 14,2007. This rotation was part of a normal operation to configure the spacecraft for additional antenna and the solar array boom deployments. This procedure (red flag written) had been modified to look for a lost metal washer and a thermal blanket button. The modification to the procedure was reviewed and approved by the Lockheed Martin Missiles and Space (LMMS) Material Review Board (MRB) per standard procedures. The flag to the procedure introduced a counter clockwise rotation before the normal clockwise rotation. The antenna was temporally stowed and held in place via lacing cord. The lacing cord broke and allowed the SRA to inadvertently deploy during the clockwise rotation. The SRA broke through a hard stop bracket and damaged an instrument optical sensor radiator panel. The satellite damage appears to be minimal and there were no injuries to personnel. The damage to the Advanced Microwave Sounding Unit (AMSU)-A1 instrument has not been fully assessed. Based on mishap site visits, interviews and data analysis, the Mishap Investigation Team (MIT) identified the underlying causes of the mishap. Event and causal factor tree diagrams were developed, resulting in the identification of the proximate (or direct) cause and root causes of the mishap.

Sabelhaus, Phil↗

James Webb Space Telescope (JWST) Project Status for the AIAA Working Group on Space Simulation

This brief presentation discusses developments in the design of the James Webb Space Telescope (JWST). The JWST master schedule is provided and its system architecture is described. Instruments include the Near Infrared Camaera, Near Infrared Spectrograph, Mid-Infrared Instrument, and the Fine Guidance Sensor. Compared to other telescopes the JWST has a 2.7 longer wavelength than the Hubble Telescope (HST), 38 times better sensitivity at K band that the HST NICMOS, and 8-24 times better angular resolution than the Spitzer Telescope. among other features. Engineering or verification models for all telescope instruments are being assembled and tested in the current year. Currently, good progress continues to be made on critical path items and the JWST is on track for a June 2013 launch.

Sabelhaus, Phil↗

Rescue Shuttle Flight Re-Entry: Controlling Astronaut Thermal Exposure

A rescue mission for the STS-125 Hubble Telescope Repair Mission requires reentry from space with 11 crew members aboard, exceeding past cabin thermal load experience and risking crew thermal stress potentially causing cognitive performance and physiological decrements. The space shuttle crew cabin air revitalization system (ARS) was designed to support a nominal crew complement of 4 to 7 crew and 10 persons in emergencies, all in a shirt-sleeve environment. Subsequent to the addition of full pressure suits with individual cooling units, the ARS cannot maintain a stable temperature in the crew cabin during reentry thermal loads. Bulk cabin thermal models, used for rescue mission planning and analysis of crew cabin air, were unable to accurately represent crew workstation values of air flow, carbon dioxide, and heat content for the middeck. Crew temperature models suggested significantly elevated core temperatures. Planning for an STS-400 potential rescue of seven stranded crew utilized computational fluid dynamics (CFD) models to demonstrate inhomogeneous cabin thermal properties and improve analysis compared to bulk models. In the absence of monitoring of crew temperature, heart rate, metabolic rate and incomplete engineering data on the performance of the integrated cooling garment/cooling unit (ICG/CU) at cabin temperatures above 75 degrees F, related systems & models were reevaluated and tests conducted with humans in the loop. Changes to the cabin ventilation, ICU placement, crew reentry suit-donning procedures, Orbiter Program wave-off policy and post-landing power down and crew extraction were adopted. A second CFD and core temperature model incorporated the proposed changes and confirmed satisfactory cabin temperature, improved air distribution, and estimated core temperatures within safe limits. CONCLUSIONS: These changes in equipment, in-flight and post-landing procedures, and policy were implemented for the STS-400 rescue shuttle & will be implemented in any future rescue flights from the International Space Station of stranded shuttle crews.

Gillis, David B.↗

A Re-programmable Platform for Dynamic Burn-in Test of Xilinx Virtexll 3000 FPGA for Military and Aerospace Applications

Field Programmable Gate Arrays (FPGA) have played increasingly important roles in military and aerospace applications. Xilinx SRAM-based FPGAs have been extensively used in commercial applications. They have been used less frequently in space flight applications due to their susceptibility to single-event upsets. Reliability of these devices in space applications is a concern that has not been addressed. The objective of this project is to design a fully programmable hardware/software platform that allows (but is not limited to) comprehensive static/dynamic burn-in test of Virtex-II 3000 FPGAs, at speed test and SEU test. Conventional methods test very few discrete AC parameters (primarily switching) of a given integrated circuit. This approach will test any possible configuration of the FPGA and any associated performance parameters. It allows complete or partial re-programming of the FPGA and verification of the program by using read back followed by dynamic test. Designers have full control over which functional elements of the FPGA to stress. They can completely simulate all possible types of configurations/functions. Another benefit of this platform is that it allows collecting information on elevation of the junction temperature as a function of gate utilization, operating frequency and functionality. A software tool has been implemented to demonstrate the various features of the system. The software consists of three major parts: the parallel interface driver, main system procedure and a graphical user interface (GUI).

Field Programmable Gate Arrays (FPGA)↗

Ares V: A National Launch Asset for the 21st Century

NASA is designing the Ares V as the cargo launch vehicle to carry NASA's exploration plans into the 21st century. The Ares V is the heavy-lift component of NASA's dual-launch architecture that will replace the current space shuttle fleet, complete the International Space Station, and establish a permanent human presence on the Moon as a stepping stone to destinations beyond. During extensive independent and internal architecture and vehicle trade studies as part of the Exploration Systems Architecture Study, NASA selected the Ares I crew launch vehicle and the Ares V to support future exploration. The smaller Ares I will launch the Orion crew exploration vehicle with four to six astronauts into orbit. The Ares V is designed to carry the Altair lunar lander into orbit, rendezvous with Orion, and send the mated spacecraft toward lunar orbit. The Ares V will be the largest and most powerful launch vehicle in history, providing unprecedented payload mass and volume to establish a permanent lunar outpost and explore significantly more of the lunar surface than was done during the Apollo missions. The Ares V also represents a national asset offering opportunities for new science, national security, and commercial missions of unmatched size and scope. Using the dual-launch Earth Orbit Rendezvous approach, the Ares I and Ares V together will be able to inject roughly 57percent more mass to the Moon than the Apollo-era Saturn V. Ares V alone will be able to send nearly 414,000 pounds into low Earth orbit (LEO) or more than 138,000 pounds directly to the Moon, compared with 262,000 pounds and 99,000 pounds, respectively for the Saturn V. Significant progress has been made on the Ares V to support a planned fiscal 2011 authority-to-proceed (ATP) milestone. This paper discusses recent progress on the Ares V and planned future activities.

Sumrall, Phil↗

The Ares Projects: Progress Toward Exploration

Ares Projects are making great strides toward building a new generation of launch vehicles. Support ISS operations and human exploration of Moon and other destinations. Ares I-X flight test in 2009. Additional testing and development work is in progress. Ares launch vehicles continue on schedule to fulfill this strategic capability for the future. Capabilities will develop in environment of increasing challenges. NASA transitioning from performing space operations to expanding the Nation's frontiers.

Sumrall, Phil↗