Search NASA⌕ Search

SEARCH · Search NASA

Results for “Payload developer”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

The use of artificial intelligence techniques to improve the multiple payload integration process

A maximum return of science and products with a minimum expenditure of time and resources is a major goal of mission payload integration. A critical component then, in successful mission payload integration is the acquisition and analysis of experiment requirements from the principal investigator and payload element developer teams. One effort to use artificial intelligence techniques to improve the acquisition and analysis of experiment requirements within the payload integration process is described.

Cutts, Dannie E.↗

Earth Observatory Satellite system definition study. Report no. 1: Orbit/launch vehicle tradeoff studies and recommendations

A study was conducted to determine the recommended orbit for the Earth Observatory Satellite (EOS) Land Resources Mission. It was determined that a promising sun synchronous orbit is 366 nautical miles when using an instrument with a 100 nautical mile swath width. The orbit has a 17 day repeat cycle and a 14 nautical mile swath overlap. Payloads were developed for each mission, EOS A through F. For each mission, the lowest cost booster that was capable of lifting the payload to the EOS orbit was selected. The launch vehicles selected for the missions are identified on the basis of tradeoff studies and recommendations. The reliability aspects of the launch vehicles are analyzed.

Source record↗

Communication Platform Payload Definition (CPPD) study. Volume 1: Executive summary

This is Volume 1 (Executive Summary) of the Ford Aerospace & Communications Corporation Final Report for the Communication Platform Payload Definition (CPPD) Study program conducted for NASA Lewis Research Center under contract No. NAS3-24235. This report presents the results of the study effort leading to five potential platform payloads to service CONUS and WARC Region 2 traffic demand as projected to the year 2008. The report addresses establishing the data bases, developing service aggregation scenarios, selecting and developing 5 payload concepts, performing detailed definition of the 5 payloads, costing them, identifying critical technology, and finally comparing the payloads with each other and also with non-aggregated equivalent services.

Hunter, E. M.↗

Communication Platform Payload Definition (CPPD) study. Volume 2: Technical report

This is Volume 2 (Technical Report) of the Ford Aerospace & Communications Corporation Final Report for the Communication Platform Payload Definition (CPPD) Study program conducted for NASA Lewis Research Center under contract No. NAS3-24235. This report presents the results of the study effort leading to five potential platform payloads to service CONUS and WARC Region 2 traffic demand as projected to the year 2008. The report addresses establishing the data bases, developing service aggregation scenarios, selecting and developing 5 payload concepts, performing detailed definition of the 5 payloads, costing them, identifying critical technology, and finally comparing the payloads with each other and also with non-aggregated equivalent services.

Hunter, E. M.↗

Communication Platform Payload Definition (CPPD) study. Volume 3: Addendum

This is Volume 3 (Addendum) of the Ford Aerospace & Communications Corporation Final Report for the Communication Platform Payload Definition (CPPD) Study Program conducted for NASA Lewis Research Center under contract No. NAS3-24235. This report presents the results of the study effort leading to five potential platform payloads to service CONUS and WARC Region 2 traffic demand as projected to the year 2008. The report addresses establishing the data bases, developing service aggregation scenarios, selecting and developing 5 payload concepts, performing detailed definition of the 5 payloads, costing them, identifying critical technology, and finally comparing the payloads with each other and also with non-aggregated equivalent services.

Hunter, E. M.↗

ELaNa - Educational Launch of Nanosatellite Providing Routine RideShare Opportunities

Since the creation of the NASA CubeSat Launch Initiative (NCSLI), the need for CubeSat rideshares has dramatically increased. After only three releases of the initiative, a total of 66 CubeSats now await launch opportunities. So, how is this challenge being resolved? NASA's Launch Services Program (LSP) has studied how to integrate PPODs on Athena, Atlas V, and Delta IV launch vehicles and has been instrumental in developing several carrier systems to support CubeSats as rideshares on NASA missions. In support of the first two ELaNa missions the Poly-Picosatellite Orbital Deployer (P-POD) was adapted for use on a Taurus XL (ELaNa I) and a Delta n (ELaNa III). Four P-PODs, which contained a total eight CubeSats, were used on these first ELaNa missions. Next up is ELaNa VI, which will launch on an Atlas V in August 2012. The four ELaNa VI CubeSats, in three P-PODs, are awaiting launch, having been integrated in the NPSCuLite. To increase rideshare capabilities, the Launch Services Program (LSP) is working to integrate P-PODs on Falcon 9 missions. The proposed Falcon 9 manifest will provide greater opportunities for the CubeSat community. For years, the standard CubeSat size was 1 U to 3U. As the desire to include more science in each cube grows, so does the standard CubeSat size. No longer is a 1 U, 1.5U, 2U or 3U CubeSat the only option available; the new CubeSat standard will include 6U and possibly even 12U. With each increase in CubeSat size, the CubeSat community is pushing the capability of the current P-POD design. Not only is the carrier system affected, but integration to the Launch Vehicle is also a concern. The development of a system to accommodate not only the 3U P-POD but also carriers for larger CubeSats is ongoing. LSP considers payloads in the lkg to 180 kg range rideshare or small/secondary payloads. As new and emerging small payloads are developed, rideshare opportunities and carrier systems need to be identified and secured. The development of a rideshare carrier system is not always cost effective. Sometimes a launch vehicle with an excellent performance record appears to be a great rideshare candidate however, after completing a feasibility study, LSP may determine that the cost of the rideshare carrier system is too great and, due to budget constraints, the development cannot go forward. With the current budget environment, one cost effective way to secure rideshare opportunities is to look for synergy with other government organizations that share the same interest.

Skrobot, Garrett Lee↗

Development of an experiment of opportunity test payload for the space transportation system

This paper describes a means for flying existing Sounding Rocket payloads aboard the Space Shuttle by developing small experiment carriers which become detached from the Orbiter and are later retrieved and reused. An effort is underway at the Goddard Space Flight Center to develop such a carrier which would be flown as an Experiment of Opportunity Payload (EOP). The activity is viewed as a feasibility test, and success will encourage the construction of similar packages for additional sounding rocket experiments, for eventual evolution of p

Shrewsberry, D. J.↗

NASA/ESA CV-990 Spacelab Simulation (ASSESS 2)

Cost effective techniques for addressing management and operational activities on Spacelab were identified and analyzed during a ten day NASA-ESA cooperative mission with payload and flight responsibilities handled by the organization assigned for early Spacelabs. Topics discussed include: (1) management concepts and interface relationships; (2) experiment selection; (3) hardware development; (4) payload integration and checkout; (5) selection and training of mission specialists and payload specialists; (6) mission control center/payload operations control center interactions with ground and flight problems; (7) real time interaction during flight between principal investigators and the mission specialist/payload specialist flight crew; and (8) retrieval of scientific data and its analysis.

Source record↗

CU in space: The University of Colorado get away special payload G-285

The University of Colorado's first Get Away Special was conceived by a dozen science and engineering students in the spring of 1984. Since that time, the project has grown to include over 100 undergraduate and graduate students who have 'provided the experimental objectives, design, construction, integration, testing and management of the payload. Faculty and staff of the university and its affiliated laboratories as well as engineers from local industries have provided many useful suggestions at all stages of development. The principal motivation for developing this payload is to provide university students with the opportunity to participate in space science and engineering beginning at the ground level. At the same time, they are contributing their results from new science and technological discoveries to several disciplines. There are four separate experiments integrated into the /'single payload of G-285 which are supported by internal payload !power, thermal environment control, command land data handling [ facilities and structural subsystems. The four experiments contained in this payload are: a single spectrometer performing i two experiments- one to study night time shuttle glow phenomena in the ultraviolet and the other to observe NO2 concentrations over / equatorial latitudes in the day; a fluids management experiment ' using centrifugation for particle/liquid/vapor separation; and an experiment using Phycomyces fungi to study the gravireceptor mechanism theory. The experiments are supported by a microprocessor, data storage devices, power and thermal control subsystems. All these are located within a sealed aluminum container. The container, a refitted sounding rocket casing, has a top and bottom which bolt to the main body of the rocket section. The top section holds a five inch diameter quartz window through which light enters the spectrometer. A rotating mirror assembly and one of two battery boxes are mounted on the outside of the top section below the interface plane of the MDA. A second battery box is attached to the bottom section of the sealed container. All payload items except the battery boxes and mirror assembly are located inside the sealed rocket section to insure containment and to prevent outgassing of materials. The container will be sealed prior to launch and purged with one atmosphere of argon.

Kent Tobiska↗

Space Tug - Mission and program planning

An additional propulsive stage, carried in the payload bay, will be necessary for delivery of payloads to orbits beyond those which can be reached by the Shuttle alone. The concept of a reusable third stage, or Space Tug, has been under study for several years. Aspects of space tug operations planning are discussed together with payload studies, shuttle third stage program options, expendable stage studies, growth stage studies, and engine studies. Studies concerning reusable space tugs are considered, giving attention to a minimum development cost tug, a direct developed tug for 1983 operational capability, and a phased developed tug. Payload requirements are examined along with shuttle interface requirements, ground operations, and program options.

Wild, J. W.↗

Adaptation of Metal Additive Manufacturing Processes for the International Space Station

The In-Space Manufacturing (ISM) project at NASA Marshall Space Flight Center, in a partnership with the company, Made in Space, has previously investigated 3D printing of polymer materials on-orbit. In recent years, the project has begun exploring the potential for metal additive manufacturing (AM) on future space missions to reduce logistics and enable point-of-use manufacturing for sparing and repair. This presentation will provide an overview of constraints for demonstrating a manufacturing process on the International Space Station (ISS) as well as trades of available metal AM processes and their potential for in-space use. There are currently two processes in development as payloads for an ISS technology demonstration: wire+arc additive manufacturing (the Vulcan payload from Made in Space, Inc.) and bound metal deposition (the Fabrication Laboratory from Techshot, Inc). An update on both of these systems, results to date, and future development efforts will be presented. Relevant modeling work to evaluate operation of certain aspects of the processes in a microgravity environment will also be summarized.

manufacturing↗

Adaptation of Metal Additive Manufacturing Processes for the International Space Station

The In-Space Manufacturing (ISM) project at NASA Marshall Space Flight Center, in a partnership with the company, Made in Space, has previously investigated 3D printing of polymer materials on-orbit. In recent years, the project has begun exploring the potential for metal additive manufacturing (AM) on future space missions to reduce logistics and enable point-of-use manufacturing for sparing and repair. This paper provides an overview of constraints for demonstrating a manufacturing process on the International Space Station (ISS) as well as information on previous trades of available metal AM processes and their potential for in-space use. There are currently two processes in development as payloads for an ISS technology demonstration: wire+arc additive manufacturing (the Vulcan payload from Made in Space, Inc.) and bound metal additive manufacturing (the Fabrication Laboratory from Techshot, Inc). An update on both of these systems, key results to date, and future development efforts will be presented. Relevant modeling work, performed by NASA Ames Research Center, to evaluate operation of certain aspects of the bound metal AM process in a microgravity environment will also be summarized.

in-space manufacturing↗

Goddard's Astrophysics Science Divsion Annual Report 2014

The Astrophysics Science Division (ASD, Code 660) is one of the world's largest and most diverse astronomical organizations. Space flight missions are conceived, built and launched to observe the entire range of the electromagnetic spectrum, from gamma rays to centimeter waves. In addition, experiments are flown to gather data on high-energy cosmic rays, and plans are being made to detect gravitational radiation from space-borne missions. To enable these missions, we have vigorous programs of instrument and detector development. Division scientists also carry out preparatory theoretical work and subsequent data analysis and modeling. In addition to space flight missions, we have a vibrant suborbital program with numerous sounding rocket and balloon payloads in development or operation. The ASD is organized into five labs: the Astroparticle Physics Lab, the X-ray Astrophysics Lab, the Gravitational Astrophysics Lab, the Observational Cosmology Lab, and the Exoplanets and Stellar Astrophysics Lab. The High Energy Astrophysics Science Archive Research Center (HEASARC) is an Office at the Division level. Approximately 400 scientists and engineers work in ASD. Of these, 80 are civil servant scientists, while the rest are resident university-based scientists, contractors, postdoctoral fellows, graduate students, and administrative staff. We currently operate the Swift Explorer mission and the Fermi Gamma-ray Space Telescope. In addition, we provide data archiving and operational support for the XMM mission (jointly with ESA) and the Suzaku mission (with JAXA). We are also a partner with Caltech on the NuSTAR mission. The Hubble Space Telescope Project is headquartered at Goddard, and ASD provides Project Scientists to oversee operations at the Space Telescope Science Institute. Projects in development include the Neutron Interior Composition Explorer (NICER) mission, an X-ray timing experiment for the International Space Station; the Transiting Exoplanet Sky Survey (TESS) Explorer mission, in collaboration with MIT (Ricker, PI); the Soft X-ray Spectrometer (SXS) for the Astro-H mission in collaboration with JAXA, and the James Webb Space Telescope (JWST). The Wide-Field Infrared Survey Telescope (WFIRST), the highest ranked mission in the 2010 decadal survey, is in a pre-phase A study, and we are supplying study scientists for that mission.

Caltech on the NuSTAR mission↗

Scaling Climbing Collaborative Mobile Manipulators for Outfitting a Tall Lunar Tower and Truss Structures

In-space and planetary truss structures like the Tall Lunar Tower (TLT) can greatly benefit from truss climbing collaborative mobile manipulators (C2M2) for outfitting and other servicing tasks. Mobile robotic systems traversing truss structures will allow for improved access to the structure for placing equipment and routing cables after the structure has been assembled. The C2M2 is designed to provide access to the structure through collaborative mobile robotics. A series of gaits are developed allowing the robot to reach any point on the structure and validate the capabilities of the joint configuration. Scaling the system during the design phase is a necessary process given the wide range of trusses in development and payloads which are required for outfitting. The variable features of the system are the actuators and the length of the links connecting the two-degrees of freedom (DOF) modules. A scaling method was developed for determining the range of usable link lengths for a selected actuator in a design environment. The focus of the design is on a six-DOF robot arranged with two-DOF at each end and at the center. Two grippers are mounted at each end for grappling on the truss and holding cargo.

Collaborative Robotics↗

Kennedy Space Center Launch and Landing Support

The presentations describes Kennedy Space Center (KSC) payload processing, facilities and capabilities, and research development and life science experience. Topics include launch site processing, payload processing, key launch site processing roles, leveraging KSC experience, Space Station Processing Facility and capabilities, Baseline Data Collection Facility, Space Life Sciences Laboratory and capabilities, research payload development, International Space Station research flight hardware, KSC flight payload history, and KSC life science expertise.

Wahlberg, Jennifer↗

CubeSat Payloads on NASA’s Space Launch System Pave the Way for Artemis Moon Missions

Preparing for first launch in 2021, NASA’s Space Launch System (SLS) super heavy-lift launch vehicle will usher in a new era of human spaceflight, returning astronauts to the Moon as part of the Artemis program. Although designed to send crew in the Orion spacecraft and large payloads to the Moon and beyond, SLS also provides CubeSats with rideshare opportunities for missions to deep space. The first launch of SLS and Orion, Artemis I, has 13 6U CubeSats manifested. The payloads have been tested and will soon ship to Kennedy Space Center (KSC) to be integrated into commercial off-the-shelf (COTS) dispensers and integrated into the SLS Block 1 vehicle. Leveraging launches for the Artemis program to deploy rideshare smallsats to deep space provides a low-cost opportunity to perform missions that previously would have required a larger spacecraft and a dedicated launch, and offers additional benefits to both NASA and the smallsat community. CubeSats, including those manifested on the Artemis I flight, have a valuable role to play in the Artemis program, providing data to address NASA’s identified Strategic Knowledge Gaps (SKGs) in its plans to permanently establish humanity in deep space. Payload sponsors and developers for the Artemis I CubeSats hail from a variety of NASA industry partners and mission directorates, as well as international space agencies and universities. Several payloads destined for cislunar space will demonstrate propulsion systems and other technologies useful to future exploration. Science missions manifested on the Artemis I flight include characterizing the effects of deep space radiation on living organisms, searching for hydrogen and other volatiles on the Moon’s South Pole, and studying the lunar radiation environment. Three of the payloads were selected through NASA’s Centennial Challenges Program. Those payloads are competing for prize money while meeting specific technical development goals, such as communication with Earth from millions of miles in space. Student involvement in almost half of the Artemis I payload development allows STEM engagement with SLS and NASA’s Artemis program. As the initial vehicle to fly, the SLS Block 1 vehicle will lay the foundation for a generation of human and robotic deep space exploration missions. The Block 1 core stage is undergoing final testing at Stennis Space Center in 2020 before transportation to KSC for integration and launch in 2021. Following the Block 1 vehicle, the Block 1B and Block 2 vehicles will incorporate propulsion system upgrades and other changes to increase lift capability. In addition to sending the Orion vehicle to TLI, SLS can also be outfitted with large-diameter fairings to send robotic probes to deep space. With unparalleled lift, volume and departure energy, SLS is poised to usher in a new generation of spaceflight. In addition to launching Orion and large-volume missions, CubeSats may also be a part of Artemis missions to deep space.

Kimberly Robinson↗

Development of a reclosable clamshell nose fairing for sounding rocket NASA 21.003UI

A reclosable clamshell noise fairing system was developed and successfully flown on a Black Brant VC sounding rocket. The clamshell system involved the design of unique structural and mechanical subsystems to meet the experimenters requirements, withstand environmental conditions of sounding rocket flight and recovery, and be relatively easy to maintain with a clean interface between the experiment detectors and instrumentation section of the payload. The development of the equations of motion of the mechanism are illustrated and results of the test of the Engineering Test Model (ETM) are shown.

Ferragut, N. J.↗

Microgravity science experiment integration - When the PI and the PED differ

This paper addresses issues related to the integration of principal investigators (PIs) and payload-element developers (PEDs) for conducting effective microgravity experiments. The Crystal Growth Furnace (CGF) is used as an example to demonstrate the key issues related to the integration of a PI's sample into a facility run by a different organization. Attention is given to the typical preflight timeline, documentation required for experimental implementation, and hardware deliverables. A flow chart delineates the payload-integration process flow, and PI inputs required for an experiment include equipment and procedure definitions, detailed design and fabrication of the experiment-specific equipment, and specifications of the contract-end item. The present analysis is of interest to the coordination of effective microgravity experiments on the Space Station Freedom that incorporate PIs and PEDs from different organizations.

Baer-Peckham, M. S.↗