Search NASA⌕ Search

SEARCH · Search NASA

Results for “Planning software”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

SLS-PLAN-IT: A knowledge-based blackboard scheduling system for Spacelab life sciences missions

The primary scheduling tool in use during the Spacelab Life Science (SLS-1) planning phase was the operations research (OR) based, tabular form Experiment Scheduling System (ESS) developed by NASA Marshall. PLAN-IT is an artificial intelligence based interactive graphic timeline editor for ESS developed by JPL. The PLAN-IT software was enhanced for use in the scheduling of Spacelab experiments to support the SLS missions. The enhanced software SLS-PLAN-IT System was used to support the real-time reactive scheduling task during the SLS-1 mission. SLS-PLAN-IT is a frame-based blackboard scheduling shell which, from scheduling input, creates resource-requiring event duration objects and resource-usage duration objects. The blackboard structure is to keep track of the effects of event duration objects on the resource usage objects. Various scheduling heuristics are coded in procedural form and can be invoked any time at the user's request. The system architecture is described along with what has been learned with the SLS-PLAN-IT project.

Kao, Cheng-Yan↗

Software reuse in spacecraft planning and scheduling systems

The use of a software toolkit and development methodology that supports software reuse is described. The toolkit includes source-code-level library modules and stand-alone tools which support such tasks as data reformatting and report generation, simple relational database applications, user interfaces, tactical planning, strategic planning and documentation. The current toolkit is written in C and supports applications that run on IBM-PC's under DOS and UNlX-based workstations under OpenLook and Motif. The toolkit is fully integrated for building scheduling systems that reuse AI knowledge base technology. A typical scheduling scenario and three examples of applications that utilize the reuse toolkit will be briefly described. In addition to the tools themselves, a description of the software evolution and reuse methodology that was used is presented.

Mclean, David↗

Repository-Based Software Engineering Program: Working Program Management Plan

Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.

Source record↗

Software Verification and Validation Plan Activities, 2011 – SAPHIRE 8 Quality Assurance

SV&V Updates through FY11 An official update was released in February 2011. This update was to add a new automated test, to revise the SV&V wording to indicate the operational life cycle that SAPHIRE 8 has entered, and to provide design documentation for Inspection Planning Reports (which evolved into the Plant Risk Information e-Book (PRIB)) and Analysis Speed Improvements. Another update to the SV&V will be released in conjunction with this report in September 2011 to include the following: two new automated tests, the inclusion of metrics into the testing regime and references to the addition of the Preliminary Design Review and Critical Design Review processes.

42 ENGINEERING↗

Simulation-to-Flight 1 (STF-1): Automating the Planning, Scheduling, Assessment and Data Processing/Reduction for a Small Satellite

On December 16, 2019, a 3-U CubeSat named STF-1 launched as West Virginia's first spacecraft. This event marked the culmination of a run-up to launch involving the production of the spacecraft, creation/configuration of command and control infrastructure, and the evolution of its co-creation, the NASA Operational Simulator for Small Satellites (NOS3). This event also marked the beginning of a new phase: operations. While plans, procedures, and infrastructure were already in place or started for operations, many lessons were learned during the operations phase, especially during early operations (first month/commissioning phase). Additional plans, procedures, and infrastructure, especially related to communication planning and automated data processing, were created and developed to fill needs for the operation of the STF-1 mission.This paper and presentation will overview the STF-1 operations team's solutions to addressing the many needs of operating a low-earth orbiting CubeSat mission with a single ground antenna that is shared and scheduled with several other missions. The STF-1 operations team deployed a combination of virtualization technologies, ground station technology solutions, collaboration software, custom planning software solutions, and existing ground antenna scheduling solutions to create an effective and efficient CubeSat operations environment. The end-solution satisfied the operations stakeholders, which include NASA, its industry partner TMC Technologies, and four independent professor-student teams at West Virginia University.

CubeSat↗

STF-1 Ground Operations - Automating the Planning, Scheduling, Assessment and Data Processing/Reduction for a Small Satellite

On December 16, 2018, a 3-U CubeSat named STF-1 launched as West Virginia's first spacecraft. This event marked the culmination of a run-up to launch involving the production of the spacecraft, creation/configuration of command and control infrastructure, and the evolution of its co-creation, the NASA Operational Simulator for Small Satellites (NOS3). This event also marked the beginning of a new phase: operations. While plans, procedures, and infrastructure were already in place or started for operations, many lessons were learned during the operations phase, especially during early operations (first month/commissioning phase). Additional plans, procedures, and infrastructure, especially related to communication planning and automated data processing, were created and developed to fill needs for the operation of the STF-1 mission.This paper and presentation will overview the STF-1 operations team's solutions to addressing the many needs of operating a low-earth orbiting CubeSat mission with a single ground antenna that is shared and scheduled with several other missions. The STF-1 operations team deployed a combination of virtualization technologies, ground station technology solutions, collaboration software, custom planning software solutions, and existing ground antenna scheduling solutions to create an effective and efficient CubeSat operations environment. The end-solution satisfied the operations stakeholders, which include NASA, its industry partner TMC2 Technologies, and four independent professor-student teams at West Virginia University.

Suder, Mark↗

RELAP-7 Software Verification and Validation Plan: Requirements Traceability Matrix (RTM) Update and Code Verification Strategy

This document describes the recent progress of the RELAP-7 Software Verification and Validation Plan (SVVP). The RELAP-7 RTM has been updated by adding the validation requirement items, rearranging the requirement items, and introducing the classifier to better describe the RELAP-7 V&V status at a specified point in time. Also, from the perspective of nuclear system code validation, six items from the list of LWR safety-relevant phenomena were identified as validation data gaps. Lastly, motivated by the needs revealed from the previous RELAP-7 IV&V activities, the independent verification plan for RELAP-7 has been established. The verification method, procedure, and verification test coverage suite discussed in this document will be applied to the future work for the RELAP-7 independent verification.

42 ENGINEERING↗

Argonne Reactor Code Software Verification and Validation Plan for the Versatile Test Reactor

This Argonne Reactor Code (ARC) software has taken a pivotal role in the design work of the Versatile Test Reactor. The ARC software itself consists of several independent or semiindependent pieces of software that are used in concert to carry out specific analysis and design objectives. In this report, we discuss the validation that is needed for the ARC software overall and discuss available, usable experimental data and how it relates to the VTR project. We also discuss the verification that is required for the ARC software with respect to its usage in the VTR project and give some concrete examples as to what it must accomplish. A list of goals for the verification and validation work are presented as the general procedure that will be implemented for every individual piece of software in ARC. The ARC software has been continuously developed for over 50 years and many of the features used for the VTR project have thus been rigorously tested for accuracy during that timeframe. The ARC software is presently under source code control and undergoes nightly regression testing of not only the individual pieces, but the interconnected aspects that are common to most analysis projects. Its greatest weakness, from a software verification and validation perspective, is both a lack of documentation and outdated documentation. As an example, much of the previous validation work will require contemporary effort to re-evaluate given the updated base data libraries and modifications to the software that have occurred since. This requires new documentation to be produced to support the usage of the software in the VTR project. The bulk of the ARC software is focused on steady state neutronics and TH behavior of a reactor system. In this regard, we have identified the ZPPR, FFTF, and EBR-II programs as the best candidates for sources of validation data for the VTR project. The ZPPR-15 series in the ZPPR program was chosen as it is the best representation of the VTR fuel form and reactor core layout of all of the ZPPR measurements. Additional support for it comes from the fact that most of the data has already been processed into usable ARC models for VTR validation. The FFTF and EBR-II reactors were both functional reactors that provide reactor scale measurements. FFTF is clearly a closer match to VTR and its startup measurements would be a very valuable validation basis. EBR-II has invaluable burnup related measurements that will play a key role in the ARC software validation work. Each piece of ARC software will require a report detailing the software verification. The validation work will be logically split into the results of modeling each identified experimental resource (ZPPR, EBR-II, FFTF). The intended timeline for the VTR project is to have the ARC software verified and validated by the end of fiscal year 2020. This is incumbent on sufficient funding allocated to V&V activities and no change in programmatic priorities.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

RELAP-7 Software Verification and Validation Plan - Requirements Traceability Matrix (RTM) Part 2: Code Assessment Strategy, Procedure, and RTM Update

This document addresses two subjects involved with the RELAP-7 Software Verification and Validation Plan (SVVP): (i) the principles and plan to assure the independence of RELAP-7 assessment through the code development process, and (ii) the work performed to establish the RELAP-7 assessment plan, i.e., the assessment strategy, literature review, and identification of RELAP-7 requirements. Then, the Requirements Traceability Matrices (RTMs) proposed in previous document (INL-EXT-15-36684) are updated. These RTMs provide an efficient way to evaluate the RELAP-7 development status as well as the maturity of RELAP-7 assessment through the development process.

97 MATHEMATICS AND COMPUTING↗

SU-E-T-372: Evaluation and Comparison of Second-Check Monitor Unit Calculation Software with Pinnacle Treatment Planning System

Purpose: The purpose of this study was to evaluate and compare the accuracy of dose calculation algorithms in the second check software programs Radcalc, Diamond, IMSure, and MUcheck, against the Pinnacle3 treatment planning system (TPS). Methods: Baseline accuracy of the second check software was established by comparison against Pinnacle TPS data using open square fields of 5, 10, 20, 30 and 40cm in a SAD setup. 18 previously treated patients’ files were exported from the Pinnacle3 TPS to each of the four second check softwares, consisting of 146 step and shoot intensity modulated radiotherapy (IMRT) beams and 60 Smart Arcs. Monitor unit (MU) calculated in each of the software were compared with the TPS and the values were represented as a percent difference. Open fields were calculated as a baseline for each software’s accuracy using 5×5, 10×10, 20×20, 30×30, and 40×40 fields. Box plots, Pearson correlation, and Bland-Altman analysis were used for comparison of the results. Results: The baseline accuracy was established to within 0.6%, −1.4%, −0.2%, and −1.0% for Diamond, IMSure,MUcheck, and Radcalc, respectively. In the clinical data, the dose difference represented as mean ± 1 standard deviation were 0.7%±0.1%, −0.3%±0.1%, −1.5%±0.1%, and 0.4%±0.0% for Diamond, IMSure, MUcheck, and Radcalc, respectively Conclusion: The implementation of Clarkson algorithm for the dose calculation between each of the software in question can vary considerably. The currently used second check software, Radcalc has shown the best agreement on average, variance, and smallest percent range from Pinnacle3 TPS values. The closest in average percent difference from the TPS data was the IMSure software, but has significantly larger variance and percent range. The mean percent differences in Diamond and MUcheck were significantly larger than Radcalc and IMSure.

60 APPLIED LIFE SCIENCES↗

Software Verification and Validation Plan Activities, 2011, Project Number: N6423, SAPHIRE Version 8

The SV&V Plan experienced changes over the past year to bring it into the operational software life cycle of SAPHIRE 8 and to maintain its sections on design features. Peer review of the SVVP with the former IV&V members identified the need for the operational use of metrics as a tool for quality maintenance and improvement. New tests were added to the SVVP to verify the operation of the new design features incorporated into SAPHIRE 8. Other additions to the SVVP were the addition of software metrics and the PDR and CDR processes. Audit support was provided for the NRC Technical Manager and Project Manager for the NRC OIG Audit performed throughout 2011. The SVVP is considered to be an up to date reference and useful roadmap of verification and validation activities going forward.

42 ENGINEERING↗

Web Application Software for Ground Operations Planning Database (GOPDb) Management

A Web application facilitates collaborative development of the ground operations planning document. This will reduce costs and development time for new programs by incorporating the data governance, access control, and revision tracking of the ground operations planning data. Ground Operations Planning requires the creation and maintenance of detailed timelines and documentation. The GOPDb Web application was created using state-of-the-art Web 2.0 technologies, and was deployed as SaaS (Software as a Service), with an emphasis on data governance and security needs. Application access is managed using two-factor authentication, with data write permissions tied to user roles and responsibilities. Multiple instances of the application can be deployed on a Web server to meet the robust needs for multiple, future programs with minimal additional cost. This innovation features high availability and scalability, with no additional software that needs to be bought or installed. For data governance and security (data quality, management, business process management, and risk management for data handling), the software uses NAMS. No local copy/cloning of data is permitted. Data change log/tracking is addressed, as well as collaboration, work flow, and process standardization. The software provides on-line documentation and detailed Web-based help. There are multiple ways that this software can be deployed on a Web server to meet ground operations planning needs for future programs. The software could be used to support commercial crew ground operations planning, as well as commercial payload/satellite ground operations planning. The application source code and database schema are owned by NASA.

Lanham, Clifton↗

Formal Methods Specification and Verification Guidebook for Software and Computer Systems: Planning and Technology Insertion - Volume 1

The Formal Methods Specification and Verification Guidebook for Software and Computer Systems describes a set of techniques called Formal Methods (FM), and outlines their use in the specification and verification of computer systems and software. Development of increasingly complex systems has created a need for improved specification and verification techniques. NASA's Safety and Mission Quality Office has supported the investigation of techniques such as FM, which are now an accepted method for enhancing the quality of aerospace applications. The guidebook provides information for managers and practitioners who are interested in integrating FM into an existing systems development process. Information includes technical and administrative considerations that must be addressed when establishing the use of FM on a specific project. The guidebook is intended to aid decision makers in the successful application of FM to the development of high-quality systems at reasonable cost. This is the first volume of a planned two-volume set. The current volume focuses on administrative and planning considerations for the successful application of FM.

Source record↗

ICESat (GLAS) Science Processing Software Document Series: Science Data Management Plan - Volume 2

This document provides the Data Management Plan for the GLAS Standard Data Software (SDS) supporting the GLAS instrument of the EOS ICESat Spacecraft. The SDS encompasses the ICESat Science Investigator-led Processing System (I-SIPS) Software and the Instrument Support Facility (ISF) Software. This Plan addresses the identification, authority, and description of the interface nodes associated with the GLAS Standard Data Products and the GLAS Ancillary Data.

Jester, Peggy L.↗