Advancing Multi-Hazard Risk and Safety Considerations for Aging Nuclear Facilities (Revision 1)

This project will demonstrate a multi-hazard time-dependent probabilistic risk assessment (PRA) approach for nuclear facilities considering aging-related deterioration of structures. A generic pressurized water reactor (PWR) reactor subjected to seismic mainshock-aftershock sequences considering the aging of the containment structure will be used as a case study to demonstrate the multi-hazard PRA approach. Using advanced modeling and simulation, seismic mainshock-aftershock fragility functions will be simulated for the containment structure considering aging effects. A multi-hazard PRA model for a generic PWR reactor will be built to quantify the multi-hazard core damage frequency (CDF) and large early release frequency (LERF) with explicit time-dependent modeling of event sequences. To date, the cascading impacts of multi-hazards are not adequately accounted for in the PRA models for nuclear facilities. In addition, for both initial and periodic evaluation of facilities to withstand natural phenomena hazards (NPH), deterioration of the SSCs due to aging and other effects is not adequately considered. By advancing multi-hazard considerations accounting for aging effects, this project will contribute to improved understanding of the safety of aging nuclear facilities. Project outcomes such as the multi-hazard CDF and LERF will also allow facility owners to optimize upgrade and retrofit protocols. This project is divided into two components: (1) advanced modeling and simulations; and (2) multi-hazard PRA. For the first component, Idaho National Laboratory’s (INL) Multi-hazard Analysis for STOchastic time-DOmaiN phenomena (MASTODON) and BlackBear codes will be used to simulate the seismic response and damage of a containment structure under cascading mainshock-aftershock sequences with aging effects. Uncertainties related to the seismic inputs, material parameters, and environmental factors such as temperature and humidity will be identified and propagated to the fragility functions. These fragility functions, which consider aging effects, will be time dependent. The second component will take the fragility information from the first component to build a multi-hazard time-dependent PRA model starting from a generic PWR model to evaluate the multi-hazard CDF and LERF and characterize the associated consequences. For this component, OpenPRA Web Application and SAPHIRE code will be used. Events such as the Fukushima Daiichi accident have highlighted the importance of considering the cascading impacts of multi-hazards for PRA. Moreover, many of the reactors in the current nuclear fleet in the United States (US) are already operating well beyond their initially planned design life, and applications for further extensions to operating licenses are being considered. Therefore, considering multi-hazard effects and aging deterioration in the NPH risk assessment process will contribute to the safety of both existing and future nuclear facilities. Outcomes of this project will thus directly benefit the standards DOE-STD-1020-16 and DOE-HDBK-1224-18.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis of Loss-of-Offsite-Power Events 1998–2012

Loss of offsite power (LOOP) can have a major negative impact on a power plant’s ability to achieve and maintain safe shutdown conditions. Risk analyses performed loss of all alternating current power contributes over 70% of the overall risk at some U.S. nuclear plants. LOOP event and subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience from fiscal year 1998 through 2012. Frequencies and durations were determined for four event categories: plant-centered, switchyard-centered, grid-related, and weather-related. The EDG failure modes considered are failure to start, failure to load and run, and failure to run more than 1 hour. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. A statistically significant increase in industry performance was identified for plant-centered and switchyard-centered LOOP frequencies. There is no statistically significant trend in LOOP durations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis of Loss-of-Offsite-Power Events 1998–2013

Loss of offsite power (LOOP) can have a major negative impact on a power plant’s ability to achieve and maintain safe shutdown conditions. Risk analyses suggest that loss of all alternating current power contributes over 70% of the overall risk at some U.S. nuclear plants. LOOP event and subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience during calendar years 1997 through 2013. Frequencies and durations were determined for four event categories: plant-centered, switchyard-centered, grid-related, and weather-related. The emergency diesel generator failure modes considered are failure to start, failure to load and run, and failure to run more than 1 hour. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. No statistically significant trends in LOOP frequencies over the 1997–2013 period are identified. There is a possibility that a significant trend in grid-related LOOP frequency exists that is not easily detected by a simple analysis. Statistically significant increases in recovery times after grid- and switchyard-related LOOPs are identified.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Risk assessment of turbine rotor failure using probabilistic ultrasonic non-destructive evaluations

The study presents a method and application of risk assessment methodology for turbine rotor fatigue failure using probabilistic ultrasonic nondestructive evaluations. A rigorous probabilistic modeling for ultrasonic flaw sizing is developed by incorporating the model-assisted probability of detection, and the probability density function (PDF) of the actual flaw size is derived. Two general scenarios, namely the ultrasonic inspection with an identified flaw indication and the ultrasonic inspection without flaw indication, are considered in the derivation. To perform estimations for fatigue reliability and remaining useful life, uncertainties from ultrasonic flaw sizing and fatigue model parameters are systematically included and quantified. The model parameter PDF is estimated using Bayesian parameter estimation and actual fatigue testing data. The overall method is demonstrated using a realistic application of steam turbine rotor, and the risk analysis under given safety criteria is provided to support maintenance planning.

42 ENGINEERING↗

PWR Station Blackout and External Events Analysis for LWRS/RISMC Project

In the framework of the US-DOE Light Water Reactor Sustainability/ Risk-Informed Safety Margin Characterization (LWRS/RISMC) project, methods, data and tools are being developed with the ultimate scope of improving the safety and operation of the current US nuclear fleet. A set of Industrial Applications (IA) concerning the most relevant safety issues is defined for applying and testing the developed tool kits. The ultimate scope of IA no. 2 is a realistic simulation of natural external hazards that impose threat to a Nuclear Power Plant (NPP). This scope requires the development of a methodology and of a qualified set of tools able to perform advanced risk-informed safety analysis. In particular the methodology should be able to combine results from seismic, flooding and thermal-hydraulic (TH) deterministic calculations with dynamic Probabilistic Risk Assessment (PRA). A so-called Risk Informed Margin Management (RIMM) approach is being used to represent meaningful (i.e., realistic facility representation and simulation) event scenarios and consequences by linking probabilistic simulations to external events physics. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Applied Risk Analysis for Guiding Homeland Security Policy

Risk analysis methods may be qualitative, semi-quantitative, or quantitative; adopt probabilistic and statistical theories; and implement concepts from core disciplines including operations research, reliability engineering, systems engineering, and applied mathematics. These methods continue to develop and evolve and have successfully been applied to address various homeland security mission challenges in recent years. The objective of this book is to: 1) highlight the role of risk analysis for informing homeland security policy decisions, and 2) describe case studies from academia, government, and industry that apply risk analysis methods for addressing challenges within each of the DHS missions.

national security, risk assessment, risk managemen↗

Information and problem report usage in system saftey engineering division

Five basic problems or question areas are examined. They are as follows: (1) Evaluate adequacy of current problem/performance data base; (2) Evaluate methods of performing trend analysis; (3) Methods and sources of data for probabilistic risk assessment; and (4) How is risk assessment documentation upgraded and/or updated. The fifth problem was to provide recommendations for each of the above four areas.

Morrissey, Stephen J.↗

Probabilistic Risk Assessment Procedures Guide for NASA Managers and Practitioners (Second Edition)

Probabilistic Risk Assessment (PRA) is a comprehensive, structured, and logical analysis method aimed at identifying and assessing risks in complex technological systems for the purpose of cost-effectively improving their safety and performance. NASA's objective is to better understand and effectively manage risk, and thus more effectively ensure mission and programmatic success, and to achieve and maintain high safety standards at NASA. NASA intends to use risk assessment in its programs and projects to support optimal management decision making for the improvement of safety and program performance. In addition to using quantitative/probabilistic risk assessment to improve safety and enhance the safety decision process, NASA has incorporated quantitative risk assessment into its system safety assessment process, which until now has relied primarily on a qualitative representation of risk. Also, NASA has recently adopted the Risk-Informed Decision Making (RIDM) process [1-1] as a valuable addition to supplement existing deterministic and experience-based engineering methods and tools. Over the years, NASA has been a leader in most of the technologies it has employed in its programs. One would think that PRA should be no exception. In fact, it would be natural for NASA to be a leader in PRA because, as a technology pioneer, NASA uses risk assessment and management implicitly or explicitly on a daily basis. NASA has probabilistic safety requirements (thresholds and goals) for crew transportation system missions to the International Space Station (ISS) [1-2]. NASA intends to have probabilistic requirements for any new human spaceflight transportation system acquisition. Methods to perform risk and reliability assessment in the early 1960s originated in U.S. aerospace and missile programs. Fault tree analysis (FTA) is an example. It would have been a reasonable extrapolation to expect that NASA would also become the world leader in the application of PRA. That was, however, not to happen. Early in the Apollo program, estimates of the probability for a successful roundtrip human mission to the moon yielded disappointingly low (and suspect) values and NASA became discouraged from further performing quantitative risk analyses until some two decades later when the methods were more refined, rigorous, and repeatable. Instead, NASA decided to rely primarily on the Hazard Analysis (HA) and Failure Modes and Effects Analysis (FMEA) methods for system safety assessment.

Stamatelatos,Michael↗

Probabilistic structural analysis: Introductory remarks

The development of probabilistic structural analysis methodology consists of the following program elements: (1) composite load spectra models, (2) computational probabilistic structural analysis methods, and (3) probabilistic constitutive relationships. The development of the probabilistic structural analysis methodology is a joint program of NASA Lewis in-house and sponsored research. The objective of this session is to illustrate recent progress on the application of this methodology to determine the reliability of structural components for rocket propulsion systems. The session contains descriptions of and progress reports on the following specific activities: (1) The NESSUS computer code, (2) approximate methods, (3) advanced methods, (4) composite load spectra applications, (5) probabilistic fracture mechanisms, and (6) probability of failure and risk analysis. Collectively, the progress to date demonstrates that the structural durability of hot engine structural components can be effectively evaluated in a formal probabilistic/reliability framework.

Chamis, Christos C.↗

RAVEN User Manual

RAVEN is a generic software framework to perform parametric and probabilistic analysis based on the response of complex system codes. The initial development was aimed to provide dynamic risk analysis capabilities to the Thermo-Hydraulic code RELAP-7, currently under development at the Idaho National Laboratory (INL). Although the initial goal has been fully accomplished, RAVEN is now a multi-purpose probabilistic and uncertainty quantification platform, capable to agnostically communicate with any system code. This agnosticism includes providing Application Programming Interfaces (APIs). These APIs are used to allow RAVEN to interact with any code as long as all the parameters that need to be perturbed are accessible by inputs files or via python interfaces. RAVEN is capable of investigating the system response, and investigating the input space using Monte Carlo, Grid, or Latin Hyper Cube sampling schemes, but its strength is focused toward system feature discovery, such as limit surfaces, separating regions of the input space leading to system failure, using dynamic supervised learning techniques. The development of RAVEN has started in 2012, when, within the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program, the need to provide a modern risk evaluation framework became stronger. RAVEN principal assignment is to provide the necessary software and algorithms in order to employ the concept developed by the Risk Informed Safety Margin Characterization (RISMC) program. RISMC is one of the pathways defined within the Light Water Reactor Sustainability (LWRS) program. In the RISMC approach, the goal is not just the individuation of the frequency of an event potentially leading to a system failure, but the closeness (or not) to key safety-related events. Hence, the approach is interested in identifying and increasing the safety margins related to those events. A safety margin is a numerical value quantifying the probability that a safety metric (e.g. for an important process such as peak pressure in a pipe) is exceeded under certain conditions. The initial development of RAVEN has been focused on providing dynamic risk assessment capability to RELAP-7, currently under development at the INL and, likely, future replacement of the RELAP5-3D code. Most the capabilities that have been implemented having RELAP-7 as principal focus are easily deployable for other system codes. For this reason, several side activaties are currently ongoing for coupling RAVEN with software such as RELAP5-3D, etc. The aim of this document is the explanation of the input requirements, focalizing on the input structure.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Exploration of High-Dimensional Scalar Function for Nuclear Reactor Safety Analysis and Visualization

The next generation of methodologies for nuclear reactor Probabilistic Risk Assessment (PRA) explicitly accounts for the time element in modeling the probabilistic system evolution and uses numerical simulation tools to account for possible dependencies between failure events. The Monte-Carlo (MC) and the Dynamic Event Tree (DET) approaches belong to this new class of dynamic PRA methodologies. A challenge of dynamic PRA algorithms is the large amount of data they produce which may be difficult to visualize and analyze in order to extract useful information. We present a software tool that is designed to address these goals. We model a large-scale nuclear simulation dataset as a high-dimensional scalar function defined over a discrete sample of the domain. First, we provide structural analysis of such a function at multiple scales and provide insight into the relationship between the input parameters and the output. Second, we enable exploratory analysis for users, where we help the users to differentiate features from noise through multi-scale analysis on an interactive platform, based on domain knowledge and data characterization. Our analysis is performed by exploiting the topological and geometric properties of the domain, building statistical models based on its topological segmentations and providing interactive visual interfaces to facilitate such explorations. We provide a user’s guide to our software tool by highlighting its analysis and visualization capabilities, along with a use case involving dataset from a nuclear reactor safety simulation.

97 MATHEMATICS AND COMPUTING↗

An Approach to Dynamic Human Reliability Analysis Using the EMRALD Dynamic Risk Assessment Tool

There is a need for research into dynamic human reliability analysis (HRA) (i.e., simulation- or computation-based HRA), as many researchers have emphasized the importance of applying dynamic approaches to probabilistic safety assessments (PSAs). This study proposes the Procedure-based Investigation Method of EMRALD Risk Assessment – Human Reliability Analysis (PRIMERA-HRA), a dynamic HRA approach based on the Event Modeling Risk Assessment Using Linked Diagram (EMRALD) software developed by Idaho National Laboratory (INL). This study suggests how this software can be used to model human actions and evaluate error probabilities. The applicability of this approach is also be investigated in light of an extended loss of AC power (ELAP) scenario. This paper then discusses the major insights derived by comparing this dynamic HRA approach against the static one.

99 GENERAL AND MISCELLANEOUS↗

Analysis of historic fires to determine most frequent challenging events

The fire probabilistic risk assessment framework for nuclear power plants relies on experimental data to determine expected fire behavior or to validate models to predict fire conditions in the plant. To support reducing the uncertainty in this experimental data, a research effort was conducted to identify the most frequent and challenging fire scenarios using historic fire data from nuclear power plants in the United States. To support this effort, an electronic version of the publicly available Updated Fire Event Database developed by Electric Power Research Institute was produced resulting in data on 2111 fire events, 540 events were labelled as being challenging fires with 74.2% of these challenging fire events being due to eleven selected fire types. In conclusion, of these fire types, electrical and electronic equipment, transient combustibles, and liquid fires were the most frequent of the challenging fires. The fire scenario specifics were characterized for each of the eleven selected types and then related to existing fire experiments.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Probability of Failure and Risk Assessment of Propulsion Structural Components

Due to increasing need to account for the uncertainties in material properties, loading conditions, or geometries, a methodology was developed to determine structural reliability and the assess the risk associated with it. The methodology consists of a probabilistic structural analysis by a probabilistic finite element computer code Nonlinear Evaluation of Stochastic Structures Under Stress (NESSUS) and a generic probabilistic material properties model. The methodology is versatile and is equally applicable to high and cryogenic temperature structures. Results obtained demonstrate that the whole issue of structural reliability and risk can be formally evaluated using the methodology developed which is inclusive of uncertainties in material properties, structural parameters and loading conditions. The methodology is described in some detail with illustrative examples.

Shiao, Michael C.↗

Analysis of the Space Propulsion System Problem Using RAVEN

This paper presents the solution of the space propulsion problem using a PRA code currently under development at Idaho National Laboratory (INL). RAVEN (Reactor Analysis and Virtual control ENviroment) is a multi-purpose Probabilistic Risk Assessment (PRA) software framework that allows dispatching different functionalities. It is designed to derive and actuate the control logic required to simulate the plant control system and operator actions (guided procedures) and to perform both Monte- Carlo sampling of random distributed events and Event Tree based analysis. In order to facilitate the input/output handling, a Graphical User Interface (GUI) and a post-processing data-mining module are available. RAVEN allows also to interface with several numerical codes such as RELAP5 and RELAP-7 and ad-hoc system simulators. For the space propulsion system problem, an ad-hoc simulator has been developed and written in python language and then interfaced to RAVEN. Such simulator fully models both deterministic (e.g., system dynamics and interactions between system components) and stochastic behaviors (i.e., failures of components/systems such as distribution lines and thrusters). Stochastic analysis is performed using random sampling based methodologies (i.e., Monte-Carlo). Such analysis is accomplished to determine both the reliability of the space propulsion system and to propagate the uncertainties associated to a specific set of parameters. As also indicated in the scope of the benchmark problem, the results generated by the stochastic analysis are used to generate risk-informed insights such as conditions under witch different strategy can be followed.

97 MATHEMATICS AND COMPUTING↗

Causal CCF Parameter Estimations 2020

This report documents the quantitative results of the causal common-cause failure (CCF) parameter estimations for the failure cause groups “component,” “design,” “environment,” “human,” and “other,” based on CCF data through 2020 in the U.S. Nuclear Regulatory Commission (NRC) CCF database: https://rads.inl.gov/Pages/CCF.aspx. This report utilizes the same data period (2006–2020) and CCF templates as INL/EXT-21-62940, Revision 1, CCF Parameter Estimations, 2020 Update. The 2015 causal CCF prior distributions for the specific failure cause groups (instead of the 2015 generic CCF prior distributions) were used in this report to estimate the associated causal CCF parameters. All the 2015 causal CCF prior distributions and generic CCF prior distributions were developed in INL/EXT-21-43723, Developing Generic Prior Distributions for Common Cause Failure Alpha Factors and Causal Alpha Factors, using CCF data from 1997 to 2015. These quantitative results were developed to support the causal alpha factor model and should be used as appropriate in probabilistic risk assessment (PRA) studies such as the NRC Significance Determination Process for commercial nuclear power plants in the United States.

99 GENERAL AND MISCELLANEOUS↗

Electrical Substation Configuration Effect on Substation Reliability

It is crucial that the U.S. electrical grid be reliable, due to its critical role in the economy and our national defense/security. Many common tasks and industrial operations rely on proper electrical power distribution. In designing new bus systems or evaluating existing ones, the type of configuration employed affects the level of risk, reliability, maintenance, and cost involved. The present work utilizes Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) to perform a probabilistic risk assessment (PRA)-based sensitivity study on substation reliability in regard to different bus configurations. This study examines single bus, main and transfer, breaker and a half, double bus/double breaker, and ring bus configurations applied to busses with different numbers of lines. The case variances, methods, and rankings presented herein can help guide bus configurations for electrical grid design/analysis in the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Approach to Dynamic Human Reliability Analysis using EMRALD Dynamic Risk Assessment Tool

Research for dynamic human reliability analysis (HRA) (a.k.a., simulation-based or computation-based HRA) has been required, as many researchers have emphasized the importance of dynamic approaches to probabilistic safety assessment (PSA). This study proposes the PRocedure-based Investigation Method of EMRALD Risk Assessment – Human Reliability Analysis (PRIMERA-HRA) method, which is an approach to dynamic HRA using the Event Modeling Risk Assessment using Linked Diagram (EMRALD) software developed by Idaho National Laboratory (INL). In this study, how to model human actions using the software and evaluate the error probabilities is suggested. The applicability of this approach will be also investigated through an extended loss of AC power (ELAP) scenario. Then, major insights from this dynamic HRA approach against the static one will be discussed in the paper.

99 GENERAL AND MISCELLANEOUS↗