Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

RAVEN User Manual

RAVEN is a generic software framework to perform parametric and probabilistic analysis based on the response of complex system codes. The initial development was aimed to provide dynamic risk analysis capabilities to the Thermo-Hydraulic code RELAP-7, currently under development at the Idaho National Laboratory (INL). Although the initial goal has been fully accomplished, RAVEN is now a multi-purpose probabilistic and uncertainty quantification platform, capable to agnostically communicate with any system code. This agnosticism includes providing Application Programming Interfaces (APIs). These APIs are used to allow RAVEN to interact with any code as long as all the parameters that need to be perturbed are accessible by inputs files or via python interfaces. RAVEN is capable of investigating the system response, and investigating the input space using Monte Carlo, Grid, or Latin Hyper Cube sampling schemes, but its strength is focused to- ward system feature discovery, such as limit surfaces, separating regions of the input space leading to system failure, using dynamic supervised learning techniques. The development of RAVEN has started in 2012, when, within the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program, the need to provide a modern risk evaluation framework became stronger. RAVEN principal assignment is to provide the necessary software and algorithms in order to employ the concept developed by the Risk Informed Safety Margin Characterization (RISMC) program. RISMC is one of the pathways defined within the Light Water Reactor Sustainability (LWRS) program. In the RISMC approach, the goal is not just the individuation of the frequency of an event potentially leading to a system failure, but the closeness (or not) to key safety-related events. Hence, the approach is interested in identifying and increasing the safety margins related to those events. A safety margin is a numerical value quantifying the probability that a safety metric (e.g. for an important process such as peak pressure in a pipe) is exceeded under certain conditions. The initial development of RAVEN has been focused on providing dynamic risk assessment capability to RELAP-7, currently under development at the INL and, likely, future replacement of the RELAP5-3D code. Most the capabilities that have been implemented having RELAP-7 as principal focus are easily deployable for other system codes. For this reason, several side activates are currently ongoing for coupling RAVEN with soft- ware such as RELAP5-3D, etc. The aim of this document is the explanation of the input requirements, focalizing on the input structure.

97 MATHEMATICS AND COMPUTING↗

Comparison of Probabilistic Forecasts for Predictive Voltage Control

This paper explores predictive cooperative voltage control in distribution systems with highly variable sources such as photovoltaics (PV). The goal is to maintain the voltage profile within the limits despite the fluctuations due to sudden changes in solar power generation. The predictive voltage control method relies on probabilistic solar power and load forecasts to select the optimum Voltage Regulator (VR) taps appropriately. VR taps are selected to minimize the risk of voltage violation. A modified version of the IEEE 123 system is used as the case study. A 100% penetration of solar power is assumed for the distribution system with profiles for solar generation and loads added to the system. Three different probabilistic forecast models (Quantile Regression (QR), Gaussian distribution and volatility forecasting using Generalized Autoregressive Conditional Heteroskedasticity (GARCH)) are explored in this study. The results for the VR taps and Voltage Deviation Index (VDI) are compared to find the most effective forecast model.

Panamtash, Hossein↗

Managing Uncertainty and Flexibility in Day-Ahead Electricity Markets

Net load imbalances from day ahead forecasts can lead to significant grid operations costs and are expected to increase as variable renewable energy adoption grows. We propose a new wholesale market product to manage the risk of net load imbalances called Flexibility Options. This product relies on probabilistic forecasts to estimate flexibility demand and would be co-optimized in the day-ahead market. We also propose stochastic methods that enable DER and flexible load aggregators to participate in flexibility markets while considering the uncertainty in weather and occupant behavior.

day-ahead market↗

Generic Post-Closure Safety Assessment for Deep Borehole Disposal of Heat-Generating Waste - 20451

The deep borehole disposal (DBD) concept for high-activity waste consists of drilling a large-diameter borehole into crystalline basement rock to a depth of about 5,000 m, placing waste packages in the lower portion of the borehole - the waste emplacement zone - and sealing and plugging the upper portion of the borehole with a combination of bentonite, cement plugs, and sand or crushed rock ballast. The waste emplacement zone is several times deeper than typical mined repositories and is well below the typical maximum depth of fresh groundwater resources. Recent work describes a generic reference case for deep borehole disposal of Cs and Sr capsules stored at the Hanford Site. Two scenarios are described: an undisturbed (nominal) scenario, and disturbed scenario, in which a waste package is stuck adjacent to a transmissive fracture zone in crystalline basement. Simulations of the processes affecting radionuclide release and transport in the two scenarios provide the basis for quantitative post-closure performance assessment (PA) of the reference case. This paper presents a probabilistic PA of the stuck waste package scenario, i.e. uncertainties affecting radionuclide mobilization and transport are propagated through 200 realizations of a predictive model to quantify uncertainties in predicted radionuclide concentrations within the borehole and the fracture zone. Simulations predict no radionuclide transport in the borehole to distances greater than 100 m above the stuck waste package. An assumed lateral pressure gradient results in predictions of limited radionuclide transport in the fracture zone at a lateral distance of 200 m from the stuck waste package. These results complement previous results for the nominal scenario and contribute to the development of a generic safety case for DBD. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Inventory and Probabilistic Function of Natural Hazards in the United States: July 19, 2018 - September 18, 2018

The U.S. Department of Energy's National Renewable Energy Laboratory (NREL) developed a standardized risk assessment process that considers the location-specific vulnerabilities and threats (climate-related as well as human-caused) at a site to generate a ranked list of organizational risks and associated mitigation options for reducing those risks. To support this effort, the Southern Climate Impacts Planning Program (SCIPP), a National Oceanic and Atmospheric (NOAA) Regional Integrated Sciences and Assessments (RISA) team, was selected to provide climate science expertise to develop a comprehensive inventory and probabilistic function of natural hazards (e.g., hurricanes, tornadoes, flooding, and sea level rise) for the entire United States by region. The inventory of climate-related hazards and the associated likelihood scores are incorporated into a companion risk assessment tool enabling standardized comparisons of risk at sites across the country.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Tropical Cyclone Super Resolution using conditional diffusion denoising probabilistic model from mesoscale simulation to LES

Accurate modeling of tropical cyclone wind fields is essential for the design, risk assessment, and operational planning of offshore energy infrastructure. While mesoscale simulations are widely used thanks to their computational efficiency, they lack the necessary resolution to capture key features such as wind shear and veer profiles as well as the distribution turbulent kinetic energy (TKE). High-fidelity large-eddy simulation (LES) models on the other hand, can resolve turbulent structures and provide a more accurate representation of the complex wind field, albeit at a higher computational cost. To address this modeling gap, we introduce a two-part generative framework to enhance the resolution and physics-capturing ability of mesoscale simulations. First, a reduced-order model based on Karhunen–Loève (KL) decomposition is used to extract dominant spatial modes from one-dimensional mean wind profiles. A multilayer perceptron (MLP) is trained to map mesoscale mode weights to their LES counterparts, enabling accurate reconstruction of vertical velocity profiles. Second, a conditional Diffusion Denoising Probabilistic Model (DDPM) is developed to super-resolve coarse and low-fidelity mesoscale velocity fields, recovering fine-scale turbulence structures and stress distributions. The framework is evaluated across different tropical cyclone intensity categories defined by the Saffir–Simpson scale and demonstrates strong performance in both interpolation and extrapolation tasks. The generated fields accurately reproduce spatial coherence, stress distributions, and spectral energy characteristics observed in LES data. By bridging the fidelity gap between mesoscale and LES outputs, this approach offers a scalable, data-driven solution for enhancing the representation of tropical cyclone wind fields, enabling more robust offshore energy infrastructure systems design in tropical-cyclone-prone areas.

17 WIND ENERGY↗

ARPA-E PERFORM datasets

Time-coincident load, wind, and solar data including actual and probabilistic forecast datasets at 5-min resolution for ERCOT, MISO, NYISO, and SPP. Wind and solar profiles are supplied for existing sites as well as planned sites based on interconnection queue projects as of 2021. For ERCOT actuals are provided for 2017 and 2018 and forecasts for 2018, and for the remaining ISOs actuals are provided for 2018 and 2019 and forecasts for 2019. There datasets were produced by NREL as part of the ARPA-E PERFORM project, an ARPA-E funded program that aim to use time-coincident power and load seeks to develop innovative management systems that represent the relative delivery risk of each asset and balance the collective risk of all assets across the grid. For more information on the datasets and methods used to generate them see https://github.com/PERFORM-Forecasts/documentation.

5-min data↗

A Comparison of RESRAD and GoldSim Models for Assessing Radiological Dose for a RCRA Landfill - 20418

US Ecology Idaho (USEI) operates a Resource Conservation and Recovery Act (RCRA) Subtitle C, Hazardous Waste Treatment, Storage, and Disposal (TSD) Facility on a 640-acre property in Owyhee County, Idaho. USEI accepts a wide variety of RCRA-exempt low activity radioactive wastes, including naturally occurring radioactive material (NORM) and technologically enhanced NORM (TENORM) (USEI 2009). The performance of the landfill with regard to radiological operating permit requirements was previously assessed using a model constructed with the residual radioactivity (RESRAD) computer program, developed by Argonne National Laboratory for the U.S. Department of Energy (DOE). RESRAD supports the evaluation of several environmental transport pathways related to a radionuclide-contaminated soil source term, but it was not conceived as a model for the evaluation of landfill radiological performance. A more comprehensive and realistic model is desired in order to better support submissions to both the State of Idaho's Department of Environmental Quality as well as the U.S. Nuclear Regulatory Commission. A Performance Assessment (PA) computer model was developed using GoldSim software for the USEI RCRA Subtitle C landfill. The RESRAD computer model was specifically developed for calculating soil cleanup criteria and radiological dose and cancer risk from residual radioactive material in soil. To evaluate site-specific conditions, users may select from among a number of available environmental transport and exposure pathways and modify 'default' parameter values. In GoldSim, a user must construct the model 'from scratch.' However, this modeling is facilitated by a number of specialized elements available in GoldSim to support a radiological mass transport model. These include elements for defining radiological decay and ingrowth, container failure and radiological release, advective and diffusive transport, and other processes. Advantages afforded by the use of RESRAD for modeling radiological dose for a RCRA Subtitle C landfill include ease of use and reasonable flexibility in specifying site-specific conditions. GoldSim allows for considerably more flexibility and site-specificity than RESRAD, including evaluation of potentially relevant environmental transport processes not supported in RESRAD. The probabilistic modeling capabilities of GoldSim also far exceed those of RESRAD. The pros and cons of RESRAD and GoldSim for this modeling problem are explored with a focus on identifying approaches and critical factors in identifying the appropriate platform. The capabilities of RESRAD and GoldSim for mathematically modeling the disposal system will be contrasted and compared. For example, the existing RESRAD radiological safety assessment evaluated potentially complete exposure pathways related to infiltration to groundwater and upwards diffusion of radon. Additional transport pathways identified in the USEI Idaho facility Conceptual Site Model include deposition of radon decay products in cover material, root uptake of radionuclides in disposed wastes by native plants, and mixing of cover material by burrowing animals. Results of the two models and how the different transport and dose pathways affect results will be discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of Point Precipitation Frequency Estimates to Watersheds

This report documents work sponsored by the U.S. Nuclear Regulatory Commission (NRC) at the Oak Ridge National Laboratory (ORNL) as part of the RES project, “Application of Point Precipitation Frequency Estimates to Watersheds.” This project was implemented as part of the Probabilistic Flood Hazard Assessment (PFHA) Research Program. The objective of the PFHA Research Program is to develop tools and guidance on the use of PFHA methods to risk-inform NRC’s licensing of new facilities as well as licensing and oversight of currently operating facilities as they relate to flooding hazards. Many nuclear power plants (NPPs) are located on or near rivers so riverine flooding hazards need to be considered in their design and operation. Probabilistic riverine flood models are important tools for realistic assessment of flooding risks. However, these models require areal estimates of the depth, duration, and frequency of rainfall distributed over the watershed, which are not often available. Point precipitation frequency estimates are more widely available. For example, the National Oceanic and Atmospheric Administration (NOAA) has published NOAA Atlas 14, which provides point precipitation frequency estimates for 5-minute through 60-day durations at average recurrence intervals of 1-year through 1,000-year. The research documented in this report addresses areal reduction factors (ARFs), which can be used to convert the widely available point precipitation frequency estimates, to estimates of areal precipitation frequency over a watershed. The most widely used ARF source is Technical Paper 29 (TP-29) published by the then U.S. Weather Bureau in 1958. However, both the methods and the underlying precipitation data used to produce TP-29 are seriously out of date. For example, due to the small gauge network available at the time of TP-29’s compilation, ARF estimates developed are only for watersheds smaller than about 400 square miles. Due to the relatively short record lengths of precipitation data available, frequency considerations could not be accurately determined. Other factors such as regional climate and seasonality were not addressed. Several newer methods have been published since TP-29 was developed and both the type and quantity of precipitation data have increased significantly, along with computational resources and analytical tools such as geographic information systems. This report reviewed and assessed the available precipitation products and methods for conducting ARF analysis. The work applied up-to-date precipitation data products and analysis methods with a novel watershed-based approach to investigate how ARF estimates vary across different methods, data sources, geographical locations, return periods, and seasons. The overall findings reported here regarding basic ARF trends are in line with other recent studies showing that ARFs decrease with increasing area, increase with increasing duration, and decrease with increasing return period. This study found significant differences among the available ARF methods. This work also found a strong geographical variability across different US hydrologic regions, suggesting that the ARF are specific to regional climate patterns and geographical characteristics and should not be applied arbitrarily to other locations. The results also reveal the importance of data record length, especially for high return level ARFs. The work reported in NUREG/CR-7271 will assist NRC staff in assessing different classes of ARF methods in conjunction with available rainfall data sets. It will also support the development of guidance for application of point precipitation data in PFHAs. It should be noted that the ARF values presented in this report for any location or region were developed for the purposes of comparing methods and investigating the factors that influence ARFs. They should not be considered official and should not be used in leu of a site-specific analysis.

54 ENVIRONMENTAL SCIENCES↗

Human reliability analysis studies from simulator experiments using Bayesian inference

Probabilistic Safety Assessment (PSA) of complex facilities is performed to arrive at the risk posed by them. PSA also accounts for the contribution of the human errors towards the overall risk through Human Reliability Analysis (HRA) in terms of Human Error Probability (HEP). Human operators are part of the system and do not work in isolation. Their performance is influenced by the context in which the actions are performed. As a result, quantification of HEP requires operator performance data under the given context. Some good sources of operator performance data are plant‘s operation data, simulator data and expert judgement. The plant operation data pertaining to HRA is generally sparse. In this situation, a full scope plant simulator provides a good alternative for operator performance data generation. Many of the currently practiced HRA methods have been developed by combining the empirical evidence with expert judgement and contain a lot of uncertainty in their estimates. Bayesian inference is suitable for updating the prior HRA estimates with the simulator evidence to obtain the posterior HEP. Here, posterior HEP has been calculated for postulated accident scenarios in advanced reactor (first of its kind) at design stage, using plant simulator.

97 MATHEMATICS AND COMPUTING↗

Induced seismicity potential based on probabilistic geomechanics for the San Juan Basin CarbonSAFE project

Although geologic carbon sequestration projects have yet to induce — or may never induce — a damaging earthquake, experiences from other deep injection industries such as hydraulic fracturing, enhanced geothermal systems, and saltwater disposal suggest that effective quantitative seismic risk assessment is necessary for deep saline carbon capture and sequestration (CCS) projects. One such imminent CCS project is the San Juan Basin CarbonSAFE Phase III program. We use Monte Carlo probabilistic geomechanical analyses combined with observations of the geologic and operational parameters of the San Juan Basin site and suggest that this project is of low-induced seismic risk. The primary analysis is split into four sections. First, we assess the literature for faults and past seismicity, and at least five faulting scenarios are directly relevant. Second, we develop and calibrate an integrated earth model for the project site. Third, we perform Monte Carlo simulations that consider reasonable uncertainties of the geomechanical parameters. Of five tested faulting scenarios, only one presents high Coulomb failure functions, but fourth, we determine the risk to be low based on the combined lack of historical seismicity, the geologic framework of the faulting scenario, and the presence of saltwater injection at the same depth as the proposed supercritical carbon dioxide injection. The most sensitive parameters in the geomechanical calculations are the fault dip and the coefficient of friction. The least sensitive are the fault strike and the orientation of the maximum horizontal principal stress.

58 GEOSCIENCES↗

Cyber100 Compass [SWR 23-64]

Cyber100 Compass ("Compass") is a unique risk assessment framework that will enable grid system planners to understand and mitigate cybersecurity risk for grids transitioning to high levels of renewable generation, including 100%. The idea for Compass was developed by NREL based on past work on high-renewable grids and a series of discussions with DOE. Compass is part of Cyber100, a portfolio of proposed research activities that would greatly expand understanding of cybersecurity for high-renewable grids. Compass is a desktop application designed with a user-friendly interface. The tool gathers information from users, conducts probabilistic backend calculations, and outputs a series of visualizations to help users understand and analyze their cybersecurity risks based on the unique features of their future grid. Compass will take as inputs the values for different conditions and produce a risk score of the resulting grid. By trying different configurations, system planners can compare the resultant risks against their own risk tolerance and decide which system-of-system controls to implement as they transition toward a 100% renewable grid.

Martin, Maurice↗

Geomechanical Characterization of the Mount Simon Sandstone and Eau Claire Formation of Northern Illinois Basin

The purpose of this paper is to analyze publicly available geomechanical data from two carbon storage sites in the Illinois Basin: the Illinois Basin-Decatur Project (IBDP) in Macon County, IL and the FutureGen2.0 project in Morgan County, IL, cancelled before injection began. This study estimates the magnitudes and directions of the least compressive principal stress gradient using hydraulic fracture-based stress measurement tests, borehole breakouts, and sonic logs in the Eau Claire Formation (primary confining zone) and the Mount Simon Sandstone (targeted reservoir). The range of stresses expected in the underlying Precambrian basement is also investigated. The evaluation of the state of stress is carried out in a probabilistic manner using the State of Stress Analysis Tool (SOSAT) developed under the National Risk Assessment Partnership (NRAP) program. Finally, the paper also provides a discussion on distinctions between fracture initiation pressure, propagation pressure, and fracture closure pressure, given that hydraulic fracture testing results show a significant difference between these three values. The discussion also addresses why the fracture closure pressure should be preferred in injection pressure determinations, a critical point in geological carbon storage projects.

de Toledo Camargo, Julia↗

Panel Session 132: Risk-Informed Approach for Decision Making in WM, D and D and SNF Management: Reasonable Assurance for Safety

Mr. Larry Camper organized a panel of experts to discuss approaches to better make risk-informed decisions in waste management, decommissioning, and the management of Spent Nuclear Fuel (SNF). The audience heard the perspectives from four panelists that addressed issues ranging from the technical basis used to make risk-informed decisions to for developing cleanup criteria and promulgating regulations and safety standards both domestically and abroad. A summary of each of the presentations given by the panelists is provided herein. This WMS BOD featured panel focused on the Risk-Informed Approach for Decision Making in WM, D and D and SNF Management and the Reasonable Assurance for Safety. The panelists addressed and discussed with the audience different approaches used for decision-making, summarizing ongoing probabilistic vs. deterministic approaches, including IAEA graded approach, and discussed policies/approaches to achieve reasonable assurance for safety rather than using absolute assurance. Panelists with presentations: Risk-Informed Decision Making - More than a Motto? (Paul Black); NRC Staff Perspective on Risk-Informed Approach and Reasonable Safety Assurance in D and D and LLW (Rateb (Boby) Abu Eid); Risk-Informed Decision-Making and Illustrative National Academies Studies (Charles Ferguson); IAEA's Revised Safety Guidance on Remediation (Michelle Roberts); NDA Radioactive Waste Strategy - A Risk Informed Approach (James McKinney)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hurricane-induced power outage risk under climate change is primarily driven by the uncertainty in projections of future hurricane frequency

Nine in ten major outages in the US have been caused by hurricanes. Long-term outage risk is a function of climate change-triggered shifts in hurricane frequency and intensity; yet projections of both remain highly uncertain. However, outage risk models do not account for the epistemic uncertainties in physics-based hurricane projections under climate change, largely due to the extreme computational complexity. Instead they use simple probabilistic assumptions to model such uncertainties. Here, we propose a transparent and efficient framework to, for the first time, bridge the physics-based hurricane projections and intricate outage risk models. We find that uncertainty in projections of the frequency of weaker storms explains over 95% of the uncertainty in outage projections; thus, reducing this uncertainty will greatly improve outage risk management. We also show that the expected annual fraction of affected customers exhibits large variances, warranting the adoption of robust resilience investment strategies and climate-informed regulatory frameworks.

54 ENVIRONMENTAL SCIENCES↗

Updates to a Preliminary Probabilistic Performance Assessment Model for Radiological and Chemical Contamination at the West Valley Site, New York - 20420

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States at the WNYNSC. NFS built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (640 metric tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations halted in 1972 and never restarted, leaving behind radioactive and chemical wastes. The U.S. Department of Energy (DOE) was required to complete certain waste management activities under the West Valley Demonstration Project (WVDP) Act of 1980 including decommissioning of WVDP facilities. As collaborating agencies, NYSERDA and the DOE are tasked with making decisions about decommissioning and risk reduction for the West Valley Site. Neptune and Company, Inc. (Neptune) was contracted to develop a probabilistic performance assessment (PPA) model to assist the agencies in their decision making process for decommissioning the WVDP and WNYNSC. One important tool that is needed in order to inform the decision-making process is a science-based model of the West Valley Site that evaluates potential future consequences for human health and the environment. This forms the core of the spatial domain of the West Valley PPA Model. The PPA Model, developed using the GoldSim system modeling software, is a tool intended to provide support for decision making that evaluates uncertainty, in a manner that is transparent, defensible, and robust. The PPA Model includes contaminant transport and health effects components, and is organized around geographically-grouped contaminated facilities. These include the waste disposal areas licensed by the U.S. Nuclear Regulatory Commission and the State of New York, a waste tank farm for storage of high level radioactive waste resulting from reprocessing operations, and several areas contaminated with radioactive and chemical constituents. The PPA Model evaluates contaminant transport from these sources to points of exposure across the site and into receiving surface waters and sediments. Hypothetical people and wildlife could be exposed to contamination at these locations, and the effects of these exposures are evaluated. Contaminant transport processes to be evaluated in the PPA Model include groundwater and surface water transport, contaminant translocation by plants and animals, diffusion, and erosion. The evaluation of exposures to people in this preliminary model is limited to a resident farmer scenario, and ecological assessment is performed at the level of a screening analysis. The results of these preliminary evaluations inform future model developments. PPA Model results are subjected to sensitivity analysis in order to determine those pathways and parameters that are most significant in influencing the results. This information allows analysts and decision makers to focus on those aspects of Site behavior and processes. With this information, the decision makers can drive informed, defensible decisions regarding decommissioning of the Site. This paper includes an update of the information presented at WM2019 [1]. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Probabilistic Assessment of High-Renewables Power Systems: Current Work and Future Directions

In a future with higher penetrations of variable and energy-limited resources, the dominant sources of resource adequacy risk begin to shift from (assumed) independent thermal unit outages to spatially- and temporally-correlated weather-driven phenomena. Traditional resource adequacy assessment and planning methods can be ill-suited to such scenarios. This presentation will highlight aspects of NREL's work in adapting and developing new probabilistic methods and tools in anticipation of the needs of the power system planning exercises of tomorrow.

17 WIND ENERGY↗

Nuclear safety Enhanced: A Deep dive into current and future RAVEN applications

As the horizon of nuclear energy expands with the advent of small modular reactors, IV generation reactors, and fusion reactors, there is a growing perspective that the licensing process could benefit from a more comprehensive approach. Moving beyond traditional deterministic and PRA analysis might pave the way for a novel safety analysis paradigm propelled by the increasing computational power at our disposal. This paper explores different methodologies that can improve the outcomes of nuclear safety analysis. These range from uncertainty quantification techniques, aimed at enhancing the precision of safety margins, to deploying dynamic event trees by driving system code simulations, capturing the potential evolutions of severe accidents. These methodologies introduce innovative dimensions to safety analysis, considering the consequences of postulated events and the dynamics of accident sequences. However, they also bring forth challenges, especially in managing the complexity and sheer volume of potential scenarios. The paper touches upon some strategies to counter these challenges, emphasizing the importance of adaptability and continuous evolution in the face of emerging nuclear safety concerns. Additionally, the paper sheds light on the need for advanced tools to apply these methodologies. Among these tools is RAVEN, an open-source software designed for parametric and probabilistic analyses. Its core components, including distribution, sampler, and reduced order model, enable various applications, from risk assessment and mitigation to dynamic learning and plant control logic simulations.

97 - MATHEMATICS AND COMPUTING↗