Advanced Risk Reduction Tool (ARRT) Special Case Study Report: Science and Engineering Technical Assessments (SETA) Program

This special case study report presents the Science and Engineering Technical Assessments (SETA) team's findings for exploring the correlation between the underlying models of Advanced Risk Reduction Tool (ARRT) relative to how it identifies, estimates, and integrates Independent Verification & Validation (IV&V) activities. The special case study was conducted under the provisions of SETA Contract Task Order (CTO) 15 and the approved technical approach documented in the CTO-15 Modification #1 Task Project Plan.

Kirsch, Paul J.↗

Development Activities on Airbreathing Combined Cycle Engines

Contents include the following: Advanced reusable transportation(ART); aerojet and rocketdyne tests, RBCC focused concept flowpaths,fabricate flight weigh, test select components, document ART project, Istar (Integrated system test of an airbreathing rocket); combined cycle propulsion testbed;hydrocarbon demonstrator tracebility; Istar engine system and vehicle system closure study; and Istar project planning.

McArthur, J. Craig↗

IPG Job Manager v2.0 Design Documentation

This viewgraph presentation provides a high-level design of the IPG Job Manager, and satisfies its Master Requirement Specification v2.0 Revision 1.0, 01/29/2003. The presentation includes a Software Architecture/Functional Overview with the following: Job Model; Job Manager Client/Server Architecture; Job Manager Client (Job Manager Client Class Diagram and Job Manager Client Activity Diagram); Job Manager Server (Job Manager Client Class Diagram and Job Manager Client Activity Diagram); Development Environment; Project Plan; Requirement Traceability.

Hu, Chaumin↗

NASA's Advanced Life Support Systems Human-Rated Test Facility

Future NASA missions to explore the solar system will be long-duration missions, requiring human life support systems which must operate with very high reliability over long periods of time. Such systems must be highly regenerative, requiring minimum resupply, to enable the crews to be largely self-sufficient. These regenerative life support systems will use a combination of higher plants, microorganisms, and physicochemical processes to recycle air and water, produce food, and process wastes. A key step in the development of these systems is establishment of a human-rated test facility specifically tailored to evaluation of closed, regenerative life supports systems--one in which long-duration, large-scale testing involving human test crews can be performed. Construction of such a facility, the Advanced Life Support Program's (ALS) Human-Rated Test Facility (HRTF), has begun at NASA's Johnson Space Center, and definition of systems and development of initial outfitting concepts for the facility are underway. This paper will provide an overview of the HRTF project plan, an explanation of baseline configurations, and descriptive illustrations of facility outfitting concepts.

NASA Discipline Number 61-10↗

Cryo Testing of tbe James Webb Space Telescope's Integrated Science Instrument Module

The Integrated Science Instrument Module (ISIM) of the James Webb Space Telescope will be integrated and tested at the Environmental Test Facilities at Goddard Space Flight Center (GSFC). The cryogenic thermal vacuum testing of the ISIM will be the most difficult and problematic portion of the GSFC Integration and Test flow. The test is to validate the coupled interface of the science instruments and the ISIM structure and to sufficiently stress that interface while validating image quality of the science instruments. The instruments and the structure are not made from the same materials and have different CTE. Test objectives and verification rationale are currently being evaluated in Phase B of the project plan. The test program will encounter engineering challenges and limitations, which are derived by cost and technology many of which can be mitigated by facility upgrades, creative GSE, and thorough forethought. The cryogenic testing of the ISIM will involve a number of risks such as the implementation of unique metrology techniques, mechanical, electrical and optical simulators housed within the cryogenic vacuum environment. These potential risks are investigated and possible solutions are proposed.

VanCampen, Julie↗

Navigation for Rendezvous and Orbit Missions to Small Solar-System Bodies

All previous spacecraft encounters with small solar-system bodies, such as asteroids and comets, have been flybys (e.g. Galileo's flybys of the asteroids Gaspra and Ida). Several future projects plan to build on the flyby experience and progress to the next level with rendezvous and orbit missions to small bodies. This presents several new issues and challenges for navigation which have never been considered before. This paper addresses these challenges by characterizing the different phases of a small body rendezvous and by describing the navigation requirements and goals of each phase. Prior to the encounter with the small body, improvements to its ephemeris and initial estimates of its physical parameters, e.g. size, shape, mass, rotation rate, rotation pole, and possibly outgassing, are made as accurately as ground-based measurements allow. This characterization can take place over years...

Helfrich, C. E.↗

Status of NASA's Advanced Radioisotope Power Conversion Technology Research and Development

NASA s Advanced Radioisotope Power Systems (RPS) development program is funding the advancement of next generation power conversion technologies that will enable future missions that have requirements that can not be met by either the ubiquitous photovoltaic systems or by current Radioisotope Power Systems (RPS). Requirements of advanced radioisotope power systems include high efficiency and high specific power (watts/kilogram) in order to meet mission requirements with less radioisotope fuel and lower mass. Other Advanced RPS development goals include long-life, reliability, and scalability so that these systems can meet requirements for a variety of future space applications including continual operation surface missions, outer-planetary missions, and solar probe. This paper provides an update on the Radioisotope Power Conversion Technology Project which awarded ten Phase I contracts for research and development of a variety of power conversion technologies consisting of Brayton, Stirling, thermoelectrics, and thermophotovoltaics. Three of the contracts continue during the current Phase II in the areas of thermoelectric and Stirling power conversion. The accomplishments to date of the contractors, project plans, and status will be summarized.

Wong, Wayne A.↗

NASA Global Hawk Project Overview

This viewgraph presentation reviews the Global Hawk project planning. Global Hawk is the only available system capable of simultaneously meeting the requirements for high altitude (65K ft), long endurance (>31 hours), power (10 KVA), and a large payload capacity (2000 lbs). There are important science data gathering and satellite validation requirements that can only be met with the combination of capabilities provided by the Global Hawk system. Global Hawk will give a unique range, shown in maps, at a high altitude. An overview of the design of the aircraft, and the ground station is given. The flights are scheduled to begin in 2009, and will carry instruments that will be used to validate the Aura satellite data and also be used in hurricane and severe storm research.

DelFrate, John↗

The Next Giant Leap: NASA's Ares Launch Vehicles Overview

The National Aeronautics and Space Administration (NASA)'s Constellation Program is developing new launch vehicles (Ares) and spacecraft (Orion) to send astronauts to the Moon, Mars, and beyond. This paper presents plans, projections, and progress toward fielding the Ares I and Ares V vehicles, and the Ares I-X test flight in 2009. NASA is building on both new research and aeronautical capabilities, as well as lessons learned from almost 50 years of aerospace experience. The Ares Projects Office (APO) completed the Ares I System Requirements Review (SRR) in 2006 and the System Definition Review in autumn 2007; and will focus on the Preliminary Design Review in 2008. Ares I is currently being refined to meet safety, operability, reliability, and affordability goals. The Ares team is simultaneously testing Ares I elements and building hardware for Ares I-X, while the Ares V is in the early design stage, with the team validating requirements and ensuring commonality with Ares I. Ares I and V are key to opening the space frontier for peaceful endeavors.

Cook, Stephen A.↗

Benefits of Using a Mars Forward Strategy for Lunar Surface Systems

This paper identifies potential risk reduction, cost savings and programmatic procurement benefits of a Mars Forward Lunar Surface System architecture that provides commonality or evolutionary development paths for lunar surface system elements applicable to Mars surface systems. The objective of this paper is to identify the potential benefits for incorporating a Mars Forward development strategy into the planned Project Constellation Lunar Surface System Architecture. The benefits include cost savings, technology readiness, and design validation of systems that would be applicable to lunar and Mars surface systems. The paper presents a survey of previous lunar and Mars surface systems design concepts and provides an assessment of previous conclusions concerning those systems in light of the current Project Constellation Exploration Architectures. The operational requirements for current Project Constellation lunar and Mars surface system elements are compared and evaluated to identify the potential risk reduction strategies that build on lunar surface systems to reduce the technical and programmatic risks for Mars exploration. Risk reduction for rapidly evolving technologies is achieved through systematic evolution of technologies and components based on Moore's Law superimposed on the typical NASA systems engineering project development "V-cycle" described in NASA NPR 7120.5. Risk reduction for established or slowly evolving technologies is achieved through a process called the Mars-Ready Platform strategy in which incremental improvements lead from the initial lunar surface system components to Mars-Ready technologies. The potential programmatic benefits of the Mars Forward strategy are provided in terms of the transition from the lunar exploration campaign to the Mars exploration campaign. By utilizing a sequential combined procurement strategy for lunar and Mars exploration surface systems, the overall budget wedges for exploration systems are reduced and the costly technological development gap between the lunar and Mars programs can be eliminated. This provides a sustained level of technological competitiveness as well as maintaining a stable engineering and manufacturing capability throughout the entire duration of Project Constellation.

Mulqueen, Jack↗

The Ares Projects: Building America's Future in Space

NASA's Constellation Program is depending on the Ares Projects to deliver the crew and cargo launch capabilities needed to send human explorers to the Moon and beyond. In 2009, the Ares Projects plan to conduct the first test flight of Ares I, Ares I-X; the first firing of a five-segment development solid rocket motor for the Ares I first stage; building the first integrated Ares I upper stage; continue component testing for the J-2X upper stage engine; and perform more-detailed design studies for the Ares V cargo launch vehicle. Ares I and V will provide the core space launch capabilities needed to continue providing crew and cargo access to the International Space Station (ISS), and to build upon the U.S. history of human spaceflight to the Moon and beyond.

Cook, Stephen A.↗

Space Operations for a New Era of Exploration Launch Vehicles

NASA's Constellation Program is depending on the Ares Projects to deliver the crew and cargo launch capabilities needed to send human explorers to the Moon and beyond. Ares I and V will provide the core space launch capabilities needed to continue providing crew and cargo access to the International Space Station (ISS), and to build upon the U.S. history of human space exploration. Since 2005, Ares has made substantial progress on designing, developing, and testing the Ares I crew launch vehicle and has continued its in-depth studies of the Ares V cargo launch vehicles. The combined Ares I/Ares V architecture has been designed to reduce the complexity and labor intensity of ground operations for America's next journeys beyond low-Earth orbit (LEO). A deliberate effort is being made to ensure a high level of system operability to significantly increase safety and system availability as well as reduce recurring costs for this new launch vehicle. The Ares Projects goal is to instill operability as part of the vehicles requirements development, design, and operations. This simplicity will come from using simpler, proven engine designs, as in the case of the J-2X upper stage engine and RS-68 engine; improving existing hardware, as in the case of the Shuttle-heritage 5-segment solid rocket motor; and using common propulsion and instrument unit elements between Ares I and Ares V. Furthermore, lessons learned while developing Ares I will be applied directly to Ares V operations. In 2009, the Ares Projects plan to conduct the first flight test of Ares I, designated Ares I-X. Ares I-X preparations have already prompted changes to the vehicle stacking and launch infrastructure at Kennedy Space Center (KSC), including removing Shuttle-specific fixtures from the Vehicle Assembly Building (VAB) to accommodate Ares I-style stacking operations, new firing room computers and infrastructure in the VAB Launch Control Center, and new lightning protection system towers at Launch Complex 39B to accommodate the greater height of Ares I-X. In addition to lessons learned from the stacking of Ares I-X, the flight test itself promises to yield important data and operations lessons for assembling, launching, and flying Ares I.

Cook, Stephen A.↗

Integrated Tests and Evaluations

NASA has developed a project plan to address issues related to UAS access to the NAS The plan is being formulated with inputs from our stakeholders. NASA will work with our stakeholders to develop ConOps and a national roadmap to determine key research technologies and policy issues to enable UAS access to the NAS. NASA will use ConOps and roadmap to either validate current NASA research investment areas and make any necessary changes to proposed UAS research portfolio. NASA will conduct integration and testing of key research areas to enable UAS access to the NAS. Use phase I to do detailed test planning for phase II Assist subelements with test planning Assist with documenting test objectives, data and facilities/infrastructure requirements, and detailed test planning Provide facilities/infrastructure to meet test requirements Provide interfaces between tools Develop, document, and execute data handling and dissemination plans Provide a test engineer to facilitate scheduling of facilities, support specific equipment and software needs, track schedule progress, and monitor changes to schedule Provide guidance for alternative facilities or equipment to mitigate risk associated with loss of availability Provide opportunities for subelements to gather data in relevant and increasingly complex environments

Bixby, C. J.↗

Prediction of Gas Lubricated Foil Journal Bearing Performance

This report summarizes the progress in the first eight months of the project. The objectives of this research project are to theoretically predict the steady operating conditions and the rotor dynamic coefficients of gas foil journal bearings. The project is currently on or ahead of schedule with the development of a finite element code that predicts steady bearing performance characteristics such as film thickness, pressure, load, and drag. Graphical results for a typical bearing are presented in the report. Project plans for the next year are discussed.

Carpino, Marc↗

Progress and Prospects toward a Space-based Gravitational-Wave Observatory

Over the last few years there has been much activity in the effort to produce a space-based gravitational-wave observatory. These efforts have enriched the understanding of the scientific capabilities of such an observatory leading to broad recognition of its value as an astronomical instrument. At the same time, rapidly developing events in the US and Europe have lead to a more complicated outlook than the baseline Laser Interferometer Space Antenna (LISA) project plan of a few years ago. I will discuss recent progress and developments resulting from the European eLISA study and the SGO study in the US and prospects looking forward.

Baker, John↗

Timeline as Unifying Concept for Spacecraft Operations

The notion of Timeline has been used informally in spacecraft operations software for some time, but it has not heretofore been formalized and unified either syntactically or semantically. We have formalized and unified the Timeline so that the commonality can be exploited to reduce the cost of developing and using spacecraft operations software. The Timeline can then be used as the common data structure for storage and communications between spacecraft planning and operations software elements.

decision making↗

Earned Value Management (EVM) Implementation Handbook

The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.

Source record↗