Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Pala Energy Options Analysis (Final Report)

The Pala Energy Options Project scope focused on assessing electric and thermal energy related options for the Pala Band of Mission Indians. Although the assessment also considered options for transportation fuels – including potential for electrification – and other energy uses, initial reviews with PED staff indicated that the most practical and substantial options likely would involve serving current building electric and thermal energy resources and uses. Assessment scope varies by specific options considered; some merited in-depth assessment for immediate action to initiate or advance implementation, while higher level assessments were more appropriate for options that would take longer to implement and would require updated in-depth assessments during project planning and design phases. The primary objectives of the Project were to 1) identify energy resources/loads, 2) assess energy needs and exports, 3) investigate and evaluate supply-side and demand side energy options, and 4) select and prioritize options in an implementation plan.

14 SOLAR ENERGY↗

Logistics planning for phased programs.

It is pointed out that the proper and early integration of logistics planning into the phased program planning process will drastically reduce these logistics costs. Phased project planning is a phased approach to the planning, approval, and conduct of major research and development activity. A progressive build-up of knowledge of all aspects of the program is provided. Elements of logistics are discussed together with aspects of integrated logistics support, logistics program planning, and logistics activities for phased programs. Continuing logistics support can only be assured if there is a comprehensive sequential listing of all logistics activities tied to the program schedule and a real-time inventory of assets.

Cook, W. H.↗

Customer requirements process

Customer requirements are presented through three viewgraphs. One graph presents the range of services, which include requirements management, network engineering, operations, and applications support. Another viewgraph presents the project planning process. The third viewgraph presents the programs and/or projects actively supported including life sciences, earth science and applications, solar system exploration, shuttle flight engineering, microgravity science, space physics, and astrophysics.

Russell, Yvonne↗

United States Space Station technical and programmatic interfaces

This paper describes the design of the U.S. Space Station and explains the control factors used for internal and external interfaces among the various government and contractor participants. It discusses the documentation of the U.S. Space Station Program including the Program Approval Document (PAD), the Program Plans (PPs), the Program Requirements Document (PRD), the Program Definition and Requirements Document (PDRD), the Level III project plans, and the Level III project design requirements documents. It discusses the relationship of Space Station documentation to the international Memoranda of Understanding (MOUs) and the Joint PP, PRD, and PDRD, the interrelationship of the Architectural Control Documents (ACDs), the Baseline Control Document (BCD), and the Interface Requirement Documents (IRDs) and Interface Control Documents (ICDs). Also included are the controlling functions of the various NASA and contractor participants and the international partners.

Carlisle, Richard F.↗

Embedding Agile Practices within a Plan-Driven Hierarchical Project Life Cycle

Organizations use structured, plan-driven approaches to provide continuity, direction, and control to large, multi-year programs. Projects within these programs vary greatly in size, complexity, level of maturity, technical risk, and clarity of the development objectives. Organizations that perform exploratory research, evolutionary development, and other R&D activities can obtain the benefits of Agile practices without losing the benefits of their program’s overarching plan-driven structure. This paper describes application of Agile development methods on a large plan-driven sensor integration program. While the client employed plan-driven, requirements flow-down methodologies, tight project schedules and complex interfaces called for frequent end-to-end demonstrations to provide feedback during system development. The development process maintained the many benefits of plan-driven project execution with the rapid prototyping, integration, demonstration, and client feedback possible through Agile development methods. This paper also describes some of the tools and implementing mechanisms used to transition between and take advantage of each methodology, and presents lessons learned from the project management, system engineering, and developer’s perspectives.

Agile Development↗

Sludge Removal: Success and Partnership with T Plant - 20510

U.S. DOE contractor CH2M Hill Plateau Remediation Company (CHPRC) has safely and efficiently managed the removal of highly radioactive sludge from the 105-K West Reactor fuel storage basin (105- KW Basin) near the Columbia River. In mid-September 2019, sludge retrieval was completed after 21 storage containers were safely loaded with highly radioactive sludge and transported approximately 13 miles from the 105-KW Basin to T Plant, located in the 200 West Area on the Central Plateau of the Hanford Site. Sludge removal represents the last major source term reduction necessary before the K West Reactor and fuel storage basin can transition to closure activities in preparation for final deactivation and demolition. The technical complexity of the sludge retrieval process, coupled with the challenging physical and radiological characteristics of the waste, necessitated a methodical and deliberate approach using unique design and operational solutions to safely conduct the work. This challenge was further complicated by the need to plan and conduct the work in two separate facilities, each subject to the controls and requirements of its own nuclear facility safety basis. The project overcame these challenges through creating an integrated team that actively engaged, communicated and coordinated each phase of the project to ensure successful completion. This paper will cover how these key elements of the Sludge Removal Project led to its success: - Integrating project planning and management; - Lessons learned from design and construction; - Preparing for a successful campaign (lessons learned from testing and start-up); - Lessons learned from operating in two separate facilities, transporting sludge containers on the Hanford Site and ensuring compliance with a range of regulatory and safety basis requirements. The establishment of an integrated group spanning two facilities and multiple organizations created a team capable of overcoming the challenges necessary to successfully plan and execute the sludge retrieval mission. Sharing lessons learned from this successful project can enhance the ability of teams across the DOE complex to successfully plan and execute complex projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Global Threat Reduction Initiative Fuel-Thermo-Physical Characterization Project Quality Assurance Plan

The charter of the Fuel Thermo-Physical Characterization Project is to ready Pacific Northwest National Laboratory (PNNL) facilities and processes for the receipt of unirradiated and irradiated low enriched uranium (LEU) molybdenum (U-Mo) fuel element samples, and to perform analysis to support the Global Threat Reduction Initiative conversion program. PNNL’s support for the program will include the establishment of post-irradiation examination processes, including thermo-physical properties, unique to the U.S. Department of Energy laboratories. These processes will ultimately support the submission of the base fuel qualification (BFQ) to the U.S. Nuclear Regulatory Commission (NRC) and revisions to High Performance Research Reactor Safety Analysis Reports to enable conversion from highly enriched uranium to LEU fuel. This quality assurance plan (QAP) provides the quality assurance requirements and processes that support the NRC BFQ. This QAP is designed to be used by project staff, and prescribes the required management control elements that are to be met and how they are implemented. Additional controls are captured in Fuel Thermo-Physical Characterization Project plans, existing procedures, and procedures to be developed that provide supplemental information on how work is conducted on the project.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Strategies for Successful Energy Project Financing [Slides]

The Energy to Communities (E2C) peer-learning cohort program provides technical assistance to groups of 15 community entities around a common energy topic over the course of 6 months. Every month, participants join a virtual meeting where they hear from experts and exchange strategies and best practices with their peers.This cohort, "Successful Energy Project Implementation" will explore common challenges in implementing energy projects and learn strategies to turn project plans into reality. Each participant will focus on a local energy project or priority as a cornerstone for their learning throughout the series. This presentation focuses on strategies for successful project financing. This workshop is on April 29, 2026.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Project Siting, Permitting, and Community Impacts [Slides]

The Energy to Communities (E2C) peer-learning cohort program provides technical assistance to groups of 15 community entities around a common energy topic over the course of 6 months. Every month, participants join a virtual meeting where they hear from experts and exchange strategies and best practices with their peers.This cohort, "Successful Energy Project Implementation" will explore common challenges in implementing energy projects and learn strategies to turn project plans into reality. Each participant will focus on a local energy project or priority as a cornerstone for their learning throughout the series. This presentation focuses on strategies for successful project financing. This workshop is on April 29, 2026.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

E2C Successful Project Implementation Cohort: Overview of Solar, Microgrid and Resilience Project Development [Slides]

The Energy to Communities (E2C) peer-learning cohort program provides technical assistance to groups of 15 community entities around a common energy topic over the course of 6 months. Every month, participants join a virtual meeting where they hear from experts and exchange strategies and best practices with their peers. This cohort, "Successful Energy Project Implementation" will explore common challenges in implementing energy projects and learn strategies to turn project plans into reality. Each participant will focus on a local energy project or priority as a cornerstone for their learning throughout the series. This presentation overviews the basics of developing solar, microgrid and resilience projects with emphasis on understanding the project development process.

14 SOLAR ENERGY↗

E2C Cohorts: Overview of Project Procurement, Performance Monitoring, and O&M [Slides]

The Energy to Communities (E2C) peer-learning cohort program provides technical assistance to groups of 15 community entities around a common energy topic over the course of 6 months. Every month, participants join a virtual meeting where they hear from experts and exchange strategies and best practices with their peers. This cohort, "Successful Energy Project Implementation" will explore common challenges in implementing energy projects and learn strategies to turn project plans into reality. Each participant will focus on a local energy project or priority as a cornerstone for their learning throughout the series. This presentation is focused on project performance, monitoring, and O&M. This workshop is on May 27.

14 SOLAR ENERGY↗

Overview of Community Solar Project Development [Slides]

The Energy to Communities (E2C) peer-learning cohort program provides technical assistance to groups of 15 community entities around a common energy topic over the course of 6 months. Every month, participants join a virtual meeting where they hear from experts and exchange strategies and best practices with their peers. This cohort, "Successful Energy Project Implementation" will explore common challenges in implementing energy projects and learn strategies to turn project plans into reality. Each participant will focus on a local energy project or priority as a cornerstone for their learning throughout the series. This presentation overviews the basics of developing community solar projects with emphasis on technical scope and ownership structures.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resources for E-Mobility Program Implementation [Slides]

The Energy to Communities (E2C) peer-learning cohort program provides technical assistance to groups of 15 community entities around a common energy topic over the course of 6 months. Every month, participants join a virtual meeting where they hear from experts and exchange strategies and best practices with their peers. This cohort, "Successful Energy Project Implementation" will explore common challenges in implementing energy projects and learn strategies to turn project plans into reality. Each participant will focus on a local energy project or priority as a cornerstone for their learning throughout the series.This presentation overviews the basics of developing electric mobility projects with emphasis on leveraging the right tools to advance technical scoping and program design.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Engaging with Utilities and Key Stakeholders [Slides]

The Energy to Communities (E2C) peer-learning cohort program provides technical assistance to groups of 15 community entities around a common energy topic over the course of 6 months. Every month, participants join a virtual meeting where they hear from experts and exchange strategies and best practices with their peers. This cohort, "Successful Energy Project Implementation" will explore common challenges in implementing energy projects and learn strategies to turn project plans into reality. Each participant will focus on a local energy project or priority as a cornerstone for their learning throughout the series. This presentation overviews the interconnection process for distributed energy resources and how to engage well with utilities. The workshop will be held on March 25, 2026.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The MICE Demonstration of Ionization Cooling

Muon beams of low emittance provide the basis for the intense, well-characterised neutrino beams necessary to elucidate the physics of flavour at the Neutrino Factory and to provide lepton-antilepton collisions at energies of up to several TeV at the Muon Collider. The International Muon Ionization Cooling Experiment (MICE) will demonstrate ionization cooling, the technique by which it is proposed to reduce the phase-space volume occupied by the muon beam at such facilities. In an ionization cooling channel, the muon beam passes through a material (the absorber) in which it loses energy. The energy lost is then replaced using RF cavities. The combined effect of energy loss and re-acceleration is to reduce the transverse emittance of the beam (transverse cooling). A major revision of the scope of the project was carried out over the summer of 2014. The revised project plan, which has received the formal endorsement of the international MICE Project Board and the international MICE Funding Agency Committee, will deliver a demonstration of ionization cooling by September 2017. In the revised configuration a central lithium-hydride absorber provides the cooling effect. The magnetic lattice is provided by the two superconducting focus coils and acceleration is provided by two 201 MHz single-cavity modules. The phase space of the muons entering and leaving the cooling cell will be measured by two solenoidal spectrometers. All the superconducting magnets for the ionization cooling demonstration are available at the Rutherford Appleton Laboratory and the first single-cavity prototype is under test in the MuCool Test Area at Fermilab. The design of the cooling demonstration experiment will be described together with a summary of the performance of each of its components. The cooling performance of the revised configuration will also be presented.

43 PARTICLE ACCELERATORS↗

Community Engagement - A Citizen-Centric Approach to Seeking a Social License - 20017

The long regulatory road has finally been completed-after years of effort a Record of Decision has been signed and a Permit to Construct has been granted or a Permit to Operate has been obtained. But what about the other road that should be taken in parallel-community engagement? Working with the public is not a sequential activity, rather it is a consequential one and needs to be integrated with overall project planning. Unless you have effectively, meaningfully, and patiently engaged with the project's communities of impact, you may find your project trying to obtain a social license or a social license to operate (SLO). The SLO has its origins in the mining industry and its roots in the business model of corporate social responsibility and sustainability. These latter practices are well known to the US DOE and its contractor community. Aspects of the SLO are emerging as individuals and communities are becoming more informed and have increased expectations for being able to influence and shape decisions. When local community issues are not sought out, listened to, or addressed early, and questions are left unanswered, they can become agenda items for larger unaffiliated groups, and project loss (through delays and/or cancellation) can occur. Issues can transition from resolvable to intractable, a type of SLO face-off. Social media campaigns, serial negative media coverage, and protest signs at project sites opposing regulatory decisions already made are no longer anomalies. These types of incidents demonstrate the increasingly delicate relationship between approved regulatory/technical decisions and public acceptance of those decisions. A SLO is not a requirement. However, the building-blocks of a SLO - working with members of affected communities to build understanding, potentially to obtain and maintain community acceptance or even gain approval or support - are evidence of leadership by project sponsors. Actions taken, or not taken, by project sponsors truly have the ability to influence an outcome. While projects are not assured of success or failure, engaging the community in an empowered process is an investment of time and resources toward success for the project and thus for the communities of impact. Authors Note: Extensive literature searches were performed in developing this paper. The majority of the published literature on SLO as a 'movement' was found from sources in Canada, the European Union (Germany and France in particular), South Asia, South Korea, and many Latin American countries. The literature addressed resource development (mining), infrastructure, and energy projects. Articles written by US sources often spoke to origins and structural theory, specific project issues such as Not in My Back Yard (NIMBY) and to protests/demonstrations related to those projects, rather than systemic opposition/conflict phenomena. For these reasons many international SLO experiences and sources are cited in the discussion. The authors recognize these non-US experiences with SLO as having a 'forecast' value to US projects, especially those related to nuclear projects of any type, waste treatment and disposal, energy development (especially fossil fuels as well as alternative sources), mining, and infrastructure. The body of future SLO experiences in the US will shape the future responses to it. (authors)

99 GENERAL AND MISCELLANEOUS↗

PVMapper: Report on the Second Public Opinion Survey

This report has been developed as an integral part of the PVMapper project, funded by the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy’s SunShot program. The objective of the SunShot program is to reduce the total costs of solar energy systems. The scope of PVMapper is to develop a geographic information system (GIS) based project planning tool to identify optimal utility-scale solar facility sites. The specific objectives of the project are to 1) develop the software on an open-source platform; 2) integrate the appropriate data sets and GIS layers; 3) include a measure of social risk and public acceptance; 4) enable customization of variable weights; 5) provide a free and accessible platform for software download; and 6) provide a sustainability plan to ensure future relevance of the software. When completed, PVMapper is intended to be used by solar developers, Authorities Having Jurisdiction (AHJs), and other interested parties. This project supports SunShot’s objective by reducing the non-hardware balance of system costs (“soft costs”) for utility-scale solar project development. In order to accomplish the third project objective – including a measure of social risk and public acceptance within PVMapper – the project team has developed a time-series public opinion survey, administered yearly over the course of the three-year project. This report highlights the results and preliminary analyses from the second survey in this series. While the results of this survey are valuable to both PVMapper and future utility-scale solar development, the time-series design is extremely important. The completion of the series enables the extension of the dataset to much richer information. For example, the research team altered this iteration to sharpen the focus on specific topics (those posing potentially higher risks) and target specific locations in the oversample (such as communities near existing facilities). Using similar approaches for each iteration leads to an increasingly greater amount of detail regarding siting risks. The need for this extended dataset to aid in siting utility-scale solar projects is evident, as developers continue to scale back initial plans due to unidentified or incorrectly quantified social risks. It should be noted that this report provides the complete dataset from the survey, encompassing the wide-ranging responses from all of the survey questions. Although the methods used to integrate these data into PVMapper’s siting algorithms is not the purpose of this report, allusions to integration can be found in the discussions surrounding the design of questions and types of data to be used.

14 SOLAR ENERGY↗

PDCI Wide-Area Damping Control: PSLF Simulations of the 2016 Open and Closed Loop Test Plan

To demonstrate and validate the performance of the wide-are a damping control system, the project plans to conduct closed-loop tests on the PDCI in summer/fall 2016. A test plan details the open and closed loop tests to be conducted on the P DCI using the wide-area damping control system. To ensure the appropriate level of preparedness, simulations were performed in order to predict and evaluate any possible unsafe operations before hardware experiments are attempted. This report contains the result s from these simulations using the power system dynamics software PSLF (Power System Load Flow, trademark of GE). The simulations use the WECC (Western Electricity Coordinating Council) 2016 light summer and heavy summer base cases.

24 POWER TRANSMISSION AND DISTRIBUTION↗