Search NASA⌕ Search

SEARCH · Search NASA

Results for “RADIOACTIVE DECAY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Contaminant Migration Modeling to Support the In Situ Decommissioning of Hardened Nuclear Facilities - 20215

The decommissioning of hardened nuclear facilities provides a unique challenge in balancing current worker dose with exposure to future receptors and media. In situ decommissioning (ISD) is a cost-effective and safe option for the closure of such facilities but requires a detailed understanding of the threat that radioactive and hazardous constituents remaining in the facilities pose to groundwater and surrounding surface water. The Savannah River Site (SRS) extensively employs contaminant migration models within the decommissioning process to develop site-specific removal, grouting, and monitoring strategies in support of safe and effective final end states of nuclear facilities. This work discusses the use of contaminant migration modeling in the ISD process at SRS, including specific examples from the closure of P-Reactor and R-Reactor, Building 235-F, F-Canyon and F/H Laboratory Complex. Migration models developed during the closure of P-Reactor and R-Reactor were divided into four source areas: the reactor vessel, the process area, the disassembly basin, and the purification wing. Each source area was assigned a specific inventory and migration pathway and was then subject to varying hypothetical removal, capping, and grouting schemes. Modeling indicated that groundwater Maximum Concentration Limits (MCLs) might be exceeded if no action was taken for eleven and ten constituents of concern (COCs) at P-Reactor and R-Reactor, respectively. These exceedances could occur in as few as 200 to 500 years. Alternatively, the migration modeling demonstrated that the selected ISD actions reduced contaminant mobility which allowed for significant radioactive decay and resulted in fewer predicted exceedances of groundwater MCLs (five COCs for P-Reactor; eight COCs for R-Reactor). In response to the modeling results for P-Reactor and R-Reactor, effectiveness monitoring programs were developed to target contaminants, specific to each reactor, that may migrate to groundwater. Contaminant migration modeling also revealed that roof collapse was a large factor in the release of COCs to the environment, giving rise to roof improvements, and an inspection and vegetation control program to ensure roof stability over time. Contaminant migration modeling is also aiding in the closure planning for hardened facilities in F Area. Building 235-F housed the Actinide Billet Line, which produced Np-237 billets for irradiation in SRS reactors, and the Plutonium Fuel Form (PuFF) facility that produced Pu-238 heat sources for the space program. As a result of these missions, areas within Building 235-F contain considerable residual amounts of both Pu-238 and Np-237. Contaminant migration modeling of Building 235-F was originally performed in 2012 to identify the feasibility of ISD and the amount of radioactive material removal required to prevent the exceedance of groundwater MCLs. The original model indicated that a 60% reduction in the PuFF facility Pu-238 inventory could keep groundwater concentrations below standards, while Np-237 did not pose a threat to groundwater. However, updates to the model with an emphasis on source impact pathways revealed that, due to the orientation of the source areas relative to groundwater flow, no amount of reasonable removal of Pu-238 would keep groundwater concentrations below MCLs and that Np-237 could be a large contributor to localized MCL exceedances. With this insight, the refined 2019 model is being used to assist in the development of grouting plans specific to each facility source area, where bentonite may be utilized to slow the migration of Pu-238 and its daughter products from the PuFF facility and a reducing grout may decrease Np-237 transport by ensuring the nuclide remains in the less mobile +IV oxidation state. The beginning phases of contaminant migration modeling are underway for F-Canyon and associated facilities using lessons learned from the Reactors and Building 235-F. A contaminant migration pathway, similar to the pathway used for the reactor vessels, is being developed for the hot and warm canyons. The F-Canyon inventories are being spatially refined to identify specific and localized source zones, comparable to Building 235-F, that may impact groundwater. Contaminant migration modeling provides vital input within the ISD process, from facility investigation to post closure effectiveness monitoring, making it a valuable tool in the development of safe and effective end states for hardened nuclear facilities at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Scientific Solutions to Nuclear Waste Environmental Challenges

The Hidden Cost of Nuclear Weapons The Cold War arms race drove an intense plutonium production program in the U.S. This campaign produced approximately 100 tons of plutonium over 40 years. The epicenter of plutonium production in the United States was the Hanford site, a 586 square mile reservation owned by the Department of Energy and located on the Colombia River in Southeastern Washington. Plutonium synthesis relied on nuclear reactors to convert uranium to plutonium within the reactor fuel rods. After a sufficient amount of conversion occurred, the rods were removed from the reactor and allowed to cool. They were then dissolved in an acid bath and chemically processed to separate and purify plutonium from the rest of the constituents in the used reactor fuel. The acidic waste was then neutralized using sodium hydroxide and the resulting mixture of liquids and precipitates (small insoluble particles) was stored in huge underground waste tanks. The byproducts of the U.S. plutonium production campaign include over 53 million gallons of high-level radioactive waste stored in 177 large underground tanks at Hanford and another 34 million gallons stored at the Savannah River Site in South Carolina. This legacy nuclear waste represents one of the largest environmental clean-up challenges facing the world today. The nuclear waste in the Hanford tanks is a mixture of liquids and precipitates that have settled into sludge. Some of these tanks are now over 60 years old and a small number of them are leaking radioactive waste into the ground and contaminating the environment. The solution to this nuclear waste challenge is to convert the mixture of solids and liquids into a durable material that won't disperse into the environment and create hazards to the biosphere. What makes this difficult is the fact that the radioactive half-lives of some of the radionuclides in the waste are thousands to millions of years long. (The half-life of a radioactive substance is the amount of time it takes for one-half of the material to undergo radioactive decay.) In general, the ideal material would need to be durable for approximately 10 half-lives to allow the activity to decay to negligible levels. However, the potential health effects of each radionuclide vary depending on what type of radiation is emitted, the energy of that emission, and the susceptibility for the human body to accumulate and concentrate that particular element. Consequently, actual standards tend to be based on limiting the dose (energy deposited per unit mass) that is introduced into the environment. The Environmental Protection Agency (EPA) has the responsibility to establish standards for nuclear waste disposal to protect the health and safety of the public. For example, the Energy Policy Act of 1992 directed the EPA to establish radiation protection standards for the Yucca Mountain geologic repository for nuclear wastes. The standards for Yucca Mountain were promulgated in 2008, and limit the dose to 15 millirem per year for the first 10,000 years, and 100 milirem per year between 10,000 years and 1 million years (40 CFR Part 197; http://www.epa.gov/radiation/yucca/2008factsheet.html). So, the challenge is two-fold: (1) develop a material (a waste form) that is capable of immobilizing the waste over geologic time scales, and (2) develop a process to convert the radioactive sludge in the tanks into this durable waste form material. Glass: Hard, durable, inert, and with infinite chemical versatility Molten glass is a powerful solvent liquid, which can be designed to dissolve almost anything. When solidified, it can be one of the most chemically inert substances known to man. Nature's most famous analogue to glass is obsidian, a vitreous product of volcanic activity; formations over 17 million years old have been found. Archaeologists have found man-made glass specimens that are five thousand years old.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Regulation of the First British Power Reactor to Enter into an Extended Period of 'Care and Maintenance' - 18028

All eleven of the British first-generation Magnox nuclear power plants have now ceased operating and are in various stages of decommissioning. The Magnox reactors were graphite moderated, using carbon dioxide as the primary coolant. The reactor cores are contained in steel reactor pressure vessels, except for the last two stations which have pre-stressed concrete pressure vessels. All but two of the Magnox reactor stations have been completely de-fueled. The spent fuel removed has been despatched for reprocessing at Sellafield in the north-west of England. On behalf of the UK government the Nuclear Decommissioning Authority (NDA) is responsible for cleaning up the majority of the civil nuclear legacy. The current NDA decommissioning strategy is to prepare the Magnox reactor sites for an extended period of Care and Maintenance (C and M), during which quiescent safe storage will take place (also known as safe enclosure), whereby the cores and associated structures will accrue the benefits of radioactive decay over a period of decades. This will reduce the radiation doses to workers during final dismantling and site clearance. The two Magnox rector units at the Bradwell licensed nuclear site in the south-east of England are the first scheduled to enter this quiescent safe-storage period. This is planned to commence in the second-half of 2018, and is scheduled to last for around 70 years. The Office for Nuclear Regulation (ONR) is the independent regulatory body, responsible for enforcing safety and security requirements at nuclear installations in Great Britain (GB). This paper outlines the national strategic context and how ONR's regulatory regime is applied to nuclear power plant decommissioning. It addresses some of the specific challenges posed at Bradwell during the preparatory works for entry to C and M and how ONR has addressed these. It describes how this will culminate in a regulatory decision on the acceptability of the safety and security of the Bradwell site to enter this new stage of its life cycle. Over the last few years ONR has assessed and inspected various safety aspects of decommissioning, radioactive waste management and other preparations for Bradwell's entry into C and M. Some of the operator's proposals have provided challenges to ONR, particularly where there have been changes to established approaches taken at other sites, as the licensee seeks to minimise its costs. These have included how far to remove redundant structures, systems and components prior to C and M; how to define interim and end-states for fuel cooling ponds and other contaminated areas; and how to treat and store Intermediate Level Waste (ILW), for which there is no geological disposal facility yet available. ONR has begun its final assessment of safety and security justifications supplied by the site licensee, Magnox Ltd (ML). ONR is using its legal powers conferred to it under the site licence conditions to authorise this first-of-a-kind transition into a 70 year period of safe storage. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thermal release of {sup 3}He from tritium aged LaNi{sub 4.25}Al{sub 0.75} hydride

The Savannah River Site Tritium Facilities (SRS-TF) utilizes LANA.75 (LaNi{sub 4.25}Al{sub 0.75})in the tritium process to store hydrogen isotopes. The vast majority of {sup 3}He born from the radioactive decay of tritium stored in LANA.75 is trapped in the hydride metal matrix. The SRS-TF has multiple LANA.75 tritium storage beds that have been retired from service with significant quantities of He-3 trapped in the metal. To support He-3 recovery, the Savannah River National Laboratory (SRNL) conducted thermogravimetric analysis coupled with mass spectrometry (TGA-MS) on a tritium aged LANA.75 sample. TGA-MS testing was performed in an argon environment. Prior to testing, the sample was isotopically exchanged with deuterium to reduce residual tritium and passivated with air to alleviate pyrophoric concerns associated with handling the material outside of an inert glovebox. Analyses indicated that gas release from this sample was bimodal, with peaks near 220 and 490 C. degrees. The first peak consisted of both {sup 3}He and residual hydrogen isotopes, the second was primarily {sup 3}He. The bulk of the gas was released by 600 Celsius degrees. (author)

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Is Entombment an Acceptable Option for Decommissioning? An International Perspective - 13488

Selection of a decommissioning strategy is one of the key steps in the preparation for decommissioning of nuclear facilities and other facilities using radioactive material. Approaches being implemented or considered by Member States include immediate dismantling, deferred dismantling and entombment. Other options or slight modifications of these strategies are also possible. Entombment has been identified in the current International Atomic Energy Agency (IAEA) Safety Standards as one of the three basic decommissioning strategies and has been defined as a decommissioning strategy by which radioactive contaminants are encased in a structurally long lived material until radioactivity decays to a level permitting the unrestricted release of the facility, or release with restrictions imposed by the regulatory body. Although all three strategies have been considered, in principle, applicable to all facilities, their application to some facilities may not be appropriate owing to political concerns, safety or environmental requirements, technical considerations, local conditions or financial considerations. The IAEA is currently revising the decommissioning Safety Standards and one of the issues widely discussed has been the applicability of entombment in the context of decommissioning and its general objective to enable removal of regulatory control from the decommissioned facility. The IAEA recently established a consultancy to collect and discuss experience and lessons learned from entombment projects, to identify regulatory requirements and expectations for applying entombment as a decommissioning option strategy, in compliance with the internationally agreed standards. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quantification of Technetium-99 in Complex Groundwater Matrixes using a Radiometric Preconcentrating Minicolumn Sensor in an Equilibration-based Sensing Approach

A preconcentrating minicolumn sensor for pertechnetate detection in water consists of a packed bed containing a mixture of anion exchange resin and scintillating plastic beads. The column materials are contained in a transparent plastic flow cell placed between two photomultiplier tubes for radiometric detection. Upon retention of pertechnetate anions, the radioactive decay of Tc-99 results in detectable scintillation pulses that are counted in coincidence. In equilibration-based sensing mode, the sample is pumped through the packed bed until complete chromatographic equilibrium is achieved between the activity concentration in the water sample and the concentration on the anion exchange resin. The analytical signal is the observed steady state count rate at equilibrium. The sensitivity is related to a measurement efficiency parameter that is the product of the retention volume and the absolute radiometric detection efficiency. This sensor can readily detect pertechnetate to levels ten times below the drinking water standard of 0.033 Bq/mL. The potential for other anions in natural groundwater and contaminated groundwater plumes to interfere with pertechnetate detection and quantification have been examined in detail, with reference to the groundwater chemistry at the Hanford Site in Washington State. Individual anions such as nitrate, carbonate, chloride and iodide, at natural or elevated concentrations, do not interfere significantly with pertechnetate uptake on the anion exchange resin. Elevated chromate or sulfate anion concentrations can interfere with pertechnetate uptake by the resin, but only at levels substantially higher than typical concentrations in groundwater or contamination plumes. Nevertheless, elevated anion concentrations may reduce pertechnetate uptake and sensitivity of the sensor when present in combination. Chromate is retained on the anion exchange resin from water at ppb levels, leading to an orange stain that interferes with pertechnetate detection by the absorption of scintillation light pulses (color quench). Radioactivity from radioiodine, tritium, and uranium are not expected to create a significant positive bias in groundwater analyses. A method of automated fluidic standard addition is demonstrated that corrects for matrix interferences leading to accurate analyses over a wide range of groundwater compositions.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Direct Mass Measurements to Inform the Behavior of 128m $\mathrm{Sb}$ in Nucleosynthetic Environments

Nuclear isomer effects are pivotal in understanding nuclear astrophysics, particularly in the rapid neutron-capture process where the population of metastable isomers can alter the radioactive decay paths of nuclei produced during astrophysical events. The β-decaying isomer 128m Sb was identified as potentially impactful since the β-decay pathway along the A = 128 isobar funnels into this state bypassing the ground state. Here we report the first direct mass measurements of the 128 Sb isomer and ground state using the Canadian Penning Trap mass spectrometer at Argonne National Laboratory. We find mass excesses of -84564.8(25) keV and -84608.8(21) keV, respectively, resulting in an excitation energy for the isomer of 43.9(33) keV. These results provide the first key nuclear data input for understanding the role of 128m Sb in nucleosynthesis, and we show that it will influence the flow of the rapid neutron-capture process.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Effects of bentonite heating on U(VI) adsorption

Engineered barrier systems designed to isolate high-level radioactive waste utilize bentonite, a montmorillonite rich material, to restrict contaminant transport due to its low hydraulic conductivity and high adsorption capacity. High temperatures (100–200 °C) near waste canisters resulting from radioactive decay may alter the clay's ability to adsorb contaminants. In this study, we examine U(VI) adsorption onto two different bentonite samples subjected to (1) 18 years of in situ heating during an underground experiment and (2) short-term (7-week), high temperature (300 °C) heating in the laboratory. Results show that U(VI) adsorption was lower for field-heated bentonite located closest to the heater, which experienced temperatures of approximately 95 °C, compared to a control sample, which experienced temperatures of approximately 20 °C, over a range of aqueous chemical conditions. On average, K d values for U(VI) adsorption were 31% lower for 95 °C heated samples. By contrast, U(VI) adsorption onto intermediate-heated bentonite (50 °C) was indistinguishable from the adsorption onto the cold-zone (20 °C) sample. U(VI) adsorption onto lab-heated bentonite was also lower than onto control bentonite over the pH range 4.5–8.0, with an average decrease in K d values of 50% after heating. Lower U(VI) adsorption to field-heated bentonite persisted after bentonite was purified to isolate the clay fraction. This allows us to rule out changes in pore-water chemistry or accessory mineral composition as causes of the lower adsorption. No evidence of montmorillonite illitization was observed in the heated samples. While some of the lower U(VI) adsorption in the lab-heated bentonite can be explained by changes in aqueous U(VI) speciation, we propose that lower U(VI) adsorption to field-heated bentonite may be primarily due to changes in the montmorillonite edge structure. The observed changes in U(VI) adsorption to bentonite after heating have implications for U(VI) diffusive transport through engineered barriers and must be considered when designing radioactive waste disposal repositories.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The DISTINCTIVE University Consortium: Theme 2: PuO{sub 2} and Fuel Residues - 18132

The safe and secure management of Pu is a matter of serious international concern, with ∼250 t of separated Pu currently stockpiled worldwide. Nearly 50% of this material is in long-term storage in the UK whilst the British government develops its options for final treatment and disposition. Options for this are: (i) reuse as a fuel in modern reactors (e.g. as MOX fuel or within a fast reactor) prior to disposal; (ii) prompt immobilisation for disposal as soon as is practicable; or, (iii) continued long term storage (prior to disposition). The focus of the work presented here is options (ii) and (iii). The R and D needs of both are now pressing: in option (iii) due to it being the current default; in option (ii) because of a comparative lack of R and D on Pu conditioning and packaging due to policy uncertainty as to whether it would be disposed of in a Geologic Disposal Facility (GDF). Addressing these needs is complicated by Pu's high radioactivity, decay heat and radiotoxicity, nuclear safeguard requirements and, for some UK Pu contaminated materials targeted for disposal, poor inventory. Thus, there is also a critical requirement for underpinning research on characterisation methods for Pu bearing materials. In response to these needs, the DISTINCTIVE Consortium (Decommissioning, Immobilisation and Storage Solutions for Nuclear Waste Inventories, a multi-disciplinary collaboration of 11 universities and 3 key industry partners from across the UK's civil nuclear sector) has been seeking to: - Understand how the structure and properties of PuO{sub 2} change with time in the presence of H{sub 2}O. - Understand the roles these processes play in gaseous product evolution from PuO{sub 2} in storage. - Understand radiation-induced amorphization and dissolution kinetics of Pu waste forms. - Develop novel, fast neutron based radiometric methods for the quantification, isotopic composition assessment and remote imaging of Pu-bearing materials. This paper describes recent progress made towards achieving these objectives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Backfilling of Geological Disposal Facilities - Development of Optimized Backfill Material - 18146

In Belgium, low- and intermediate-level waste (B-waste) will be conditioned in concrete monoliths and high-level waste (C-waste) in so-called Super-containers (SCs). The Belgian radioactive waste management program has focused on the disposal of these waste types in two emplacement fields of a geological disposal facility (GDF). When the disposal waste packages (DWP) have been emplaced, backfilling of the galleries is supposed to be carried out in order to stabilize the galleries, to reduce voids, to guarantee a favourable chemical milieu with regard to the retention of the radionuclides, to minimize a possible gas pressure build-up, to dissipate radioactive decay heat and to enable good conditions for a potential retrieval of the DWP. The current reference solution is to mix the backfill at the surface and then to pump the mixture through pipeline distribution systems into the underground structures. The catalogue of backfill material requirements comprises common, but also different requirements due to the characteristics of the B and C waste packages and differences in the backfilling systems. It was found that two backfill material recipes have to be developed. Different requirements, such as high porosity (low strength and low gas threshold pressure) and high thermal conductivity have contrary consequences for the material. In addition, during backfill production quality variations of the raw materials that influence the backfill material properties can occur. Different lengths of the delivery pipeline may require adjustments of the material composition. In order to consider the practical experiences of backfill material production, one focus of the development programs was to identify compositional ranges that guarantee the respective material property. A combination of the individual 'conformity fields' results in optimal solutions for the standard operating conditions as well as a compositional range that guarantees compliance with the required material specifications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Assessment of a Generic Nuclear Waste Repository in Shale - 18392

A performance assessment (PA) is an important component of a comprehensive safety analysis for a nuclear waste repository. In a PA, probabilistic simulations of the total repository system are performed, and results are evaluated against performance metrics. Uncertainty and sensitivity analyses help prioritize additional research and model development. The United States Department of Energy (DOE) has been developing a state of the art PA simulation software tool-kit, Geologic Disposal Safety Assessment (GDSA) Framework, that couples increasingly higher fidelity models of subsystem processes into total system PA simulations. Over the past several years, PAs of generic repositories in three geologic media (salt, shale, and crystalline rock) have demonstrated ongoing developments in capability. The current PA of a nuclear waste repository in a generic shale formation showcases GDSA Framework, including capabilities in domain discretization (Cubit), multi-physics simulations (PFLOTRAN), uncertainty and sensitivity analysis (Dakota), and visualization (Paraview). The generic shale reference case considers the disposal of 22,000 metric tons heavy metal of commercial spent nuclear fuel (SNF) in a generic shale formation. PA simulations account for the thermal load and radionuclide inventory of the waste form, components of the engineered barrier system including waste package and buffer, and components of the natural barrier system including the host rock shale and underlying and overlying stratigraphic units. Two repository layouts are considered, one for emplacement of waste packages containing 12 pressurized water reactor (PWR) assemblies, and one for 4-PWR waste package emplacement. Model domains are half-symmetry and contain between 7 and 22 million grid cells. Grid refinement captures the detail of individual waste packages, emplacement drifts, access drifts, and shafts. Simulations are run in a high-performance computing (HPC) environment on 512 or 2048 processes. The governing equations describing coupled heat and fluid flow and reactive transport are solved with PFLOTRAN, an open-source, massively parallel multiphase flow and reactive transport code. Additional simulated processes include waste package degradation; waste form dissolution; radioactive decay and ingrowth in aqueous, solid, and adsorbed phases; and a simple biosphere based on a pumping well. Simulations are run to 106 y; dose and radionuclide concentrations are observed within aquifers at a point approximately 5 km downgradient of the repository. Dakota is used to sample likely ranges of input parameters including waste form and waste package degradation rates and properties of engineered and natural materials to quantify uncertainty in predicted concentrations and sensitivity to input parameters. Given the assumptions of the reference case, results of 12-PWR and 4-PWR simulations are very similar. Dose at the pumping well 5-km downgradient of the repository does not exceed 10-9 Sv/y. I-129 is the largest contributor to dose. The dose due to Cl-36, the next largest contributor, is orders of magnitude smaller. At the pumping well, the concentration of I-129 5-km downgradient does not exceed 10-14 mol/L. Rank correlation coefficients indicate that the maximum concentration of I-129 within the aquifer is sensitive to shale (repository host rock) porosity and aquifer permeability. These results affirm that HPC-capable codes can be used to simulate important multi-physics couplings directly in a total system performance assessment of a geologic repository, and can be used in prioritization of future research and model development. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The TRANSCEND University Consortium: Theme 4: Nuclear Materials - 20431

The safe and secure management of Pu is a matter of international concern, with ∼250 t of separated Pu currently stockpiled worldwide. The UK's civil inventory of nuclear materials contains significant stocks of separated Pu from the reprocessing of Magnox and AGR spent fuels. The preferred option for the 138.5 tonnes of Pu is re-use as mixed oxide (MOx) fuel, although 5% is not suitable for re-use and is recommended for direct disposal. However, it will take more than 15 years to implement re-use, requiring that the Pu be kept in interim storage in its current state for that period, i.e. as PuO{sub 2} powder within inert steel storage cans at Sellafield. The focus of the work presented here is thus plutonium storage and the direct disposal of plutonium. The Research and Development needs of both are now pressing: in the case of storage due to it being the current default; in the case of immobilization and disposal because of a comparative lack of Research and Development on Pu conditioning and packaging due to policy uncertainty as to whether it would be disposed of in a Geologic Disposal Facility (GDF). Addressing these needs is complicated by Pu's high radioactivity, decay heat and radiotoxicity, criticality, nuclear safeguard requirements and, for some UK Pu contaminated materials targeted for disposal, poor inventory. Thus, there is also a critical requirement for underpinning research on Pu bearing materials in these two contexts. In response to these needs, the TRANSCEND Consortium (Transformative Science and Engineering for Nuclear Decommissioning, a multi-disciplinary collaboration of 11 universities and 8 key industry partners from across the UK's civil nuclear sector) is seeking to provide technical underpinning to ongoing option development for the UK's civil Pu stockpile. Whilst understanding the behaviour of plutonium during its re-use as MOx is beyond the scope of the TRANSCEND Consortium work plan, the main objectives of the work are: (1) For interim storage: to understand how the surface structure and properties of pristine and radiation damaged PuO{sub 2} change with time in the absence and presence of water; and (2) For immobilization and disposal: to understand the mechanisms of incorporation of Pu into ceramic and glass-ceramic waste-forms, as well as the effect on these of self-induced radiation damage. Each objective is being addressed through separate work packages, the details of which are discussed in this paper. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Radiochemistry as a (rho)R Diagnostic with the RAGS Gas Collection System

Radiochemical diagnostic techniques such as gas-phase capsule debris analysis may prove to be successful methods for establishing the success or failure of ignition experiments at the National Ignition Facility (NIF). Samples in the gas phase offer the most direct method of collection by simply pumping out the large target chamber following a NIF shot. The target capsules will be prepared with dopants which will produce radioactive noble gas isotopes upon activation with neutrons. We have designed and constructed the Radchem Apparatus for Gas Sampling (RAGS) in order to collect post-shot gaseous samples for NIF capsule diagnostics. The design of RAGS incorporates multiple stages intended to purify, transfer, and count the radioactive decays from gaseous products synthesized in NIF experiments. At the moment the dopant of choice is {sup 124}Xe, which will undergo (n,{gamma}) and (n, 2n) reactions to produce {sup 125}Xe and {sup 123}Xe. The half-lives of each are on the order of multiple hours and are suitable for long-term gamma-counting. These isotopes and the rest of the gases evolved in a NIF shot will be drawn through the NIF turbo pumps, past the temporarily shuttered cryo pumps (to aid our collection efficiency), and towards the first main portion of the RAGS system: the pre-cleaner. The pre-cleaner will consist of a water removal system, a series of heated getter cartridges to remove most other impurities such as N{sub 2}, O{sub 2}, CO{sub 2}, etc., and a residual gas analyzer (RGA) to monitor vacuum quality. The noble gases will flow through the precleaner and into the second stage of the system: the cryo collector. This cryo collector consists of a main cryo head for noble gas collection which will operate for approximately five minutes post-shot. Afterwards a valve will close and isolate the pre-cleaner, while the cryo head warms to release the Xe gas to one of two locations - either a second cryo station for in-situ gamma counting, or to a small cooled gas bottle for removal and counting. Additional capabilities of the RAGS system include a noble gas calibration apparatus attached to the NIF target chamber, which will be operated hours pre-shot to determine collection efficiency through the whole RAGS system via the signal detected from the RGA. Also it is possible there will be the addition of a helium puff system to drive the Xe through the pre-cleaner and collection stations. It is also likely that multiple cryo collection stations will be built into the system in the future to fractionate and collect other noble gases such as Kr, Ar, and possibly Ne. A prototype pre-cleaner has been built at Lawrence Berkeley National Laboratory (LBNL) and is in the testing phases. The information learned in this testing will help collaborators at Sandia National Laboratory that are building and delivering the systems that will be deployed at NIF. The LBNL testing so far has demonstrated that radioactive fission gases can be flowed through the system with and without carrier gases of air and/or He, and the activity can be collected on an activated charcoal sample. Further testing in the upcoming months will hopefully yield more information about any presence of Xe in the water removed from the system, and commissioning of a small cryo cooler as well.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Long-term stewardship - surveillance and maintenance at Hanford - 15155

In FY 2015, Hanford's Long-Term Stewardship (LTS) Program is tasked to complete the required entries into five cocooned plutonium production reactors (105-C, 105-D, 105-F, 105-H and 105-N), which sit adjacent to the Columbia River. The first reactor entered in October 2014, the cocooned plutonium production reactor, 105-F, signaled the LTS Program's entry into the Surveillance and Maintenance (S and M) era. Reactor entries at Hanford are conducted at 5-year intervals to assess the condition of the structures and evaluate potential deterioration of the reactor core, shield walls and roof. The cocooned structures are designed to protect the reactor core for up to 75 years while radioactive decay continues, ultimately making the structures safe for demolition and removal. The 105-F entry demonstrates that the LTS program at Hanford is shifting from a program focused on transitioning cleaned up land and waste sites to a program focused primarily on S and M activities. The entry process is carefully planned, choreographed and monitored to ensure safety of the workers and minimize the time the reactor structure is opened. The process includes controlled opening of the reactor, air quality monitoring, structural safety inspections, and radiological clearance. Once the structure is cleared for entry, assessments of the structural integrity and radiologic conditions are completed. Evaluation of the interior temperature and flood monitoring equipment is conducted. Facility visits by regulators and DOE personnel close out the process prior to welding the door closed until the next assessment, five years later. This paper will document execution of the entry work package, identify challenges overcome, and provide video documentation as reference material for future workers and the public. The current LTS program has responsibility for approximately 100,000 acres, over 200 waste sites and six cocooned reactors. Just over 5,600 documents have been identified, indexed and tagged for storage in the LTS document library. The program has successfully completed seven consecutive transitions since July 2011, with six more transitions planned in the next 18 months to support the U.S. Department of Energy Richland Operations Office's (DOE-RL) near-term cleanup objectives to significantly reduce the footprint of active cleanup operations for the River Corridor. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Variation of lead isotopic composition and atomic weight in terrestrial materials (IUPAC Technical Report)

The isotopic composition and atomic weight of lead are variable in terrestrial materials because its three heaviest stable isotopes are stable end-products of the radioactive decay of uranium ( 238 U to 206 Pb; 235 U to 207 Pb) and thorium ( 232 Th to 208 Pb). The lightest stable isotope, 204 Pb, is primordial. These variations in isotope ratios and atomic weights provide useful information in many areas of science, including geochronology, archaeology, environmental studies, and forensic science. While elemental lead can serve as an abundant and homogeneous isotopic reference, deviations from the isotope ratios in other lead occurrences limit the accuracy with which a standard atomic weight can be given for lead. In a comprehensive review of several hundred publications and analyses of more than 8000 samples, published isotope data indicate that the lowest reported lead atomic weight of a normal terrestrial materials is 206.1462 ± 0.0028 (k = 2), determined for a growth of the phosphate mineral monazite around a garnet relic from an Archean high-grade metamorphic terrain in north-western Scotland, which contains mostly 206 Pb and almost no 204 Pb. The highest published lead atomic weight is 207.9351 ± 0.0005 (k = 2) for monazite from a micro-inclusion in a garnet relic, also from a high-grade metamorphic terrain in north-western Scotland, which contains almost pure radiogenic 208 Pb. When expressed as an interval, the lead atomic weight is [206.14, 207.94]. It is proposed that a value of 207.2 be adopted for the single lead atomic-weight value for education, commerce, and industry, corresponding to previously published conventional atomic-weight values.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

25 Years Of Environmental Remediation In The General Separations Area Of The Savannah River Site: Lessons Learned About What Worked And What Did Not Work In Soil And Groundwater Cleanup

The Savannah River Site (SRS) is owned and administered by the US Department of Energy (DOE). SRS covers an area of approximately 900 square kilometers. The General Separation Area (GSA) is located roughly in the center of the SRS and includes: radioactive material chemical separations facilities, radioactive waste tank farms, a variety of radioactive seepage basins, and the radioactive waste burial grounds. Radioactive wastes were disposed in the GSA from the mid-1950s through the mid-1990s. Radioactive operations at the F Canyon began in 1954; radioactive operations at H Canyon began in 1955. Waste water disposition to the F and H Seepage Basins began soon after operations started in the canyons. The Old Radioactive Waste Burial Ground (ORWBG) began operations in 1952 to manage solid waste that could be radioactive from all the site operations, and ceased receiving waste in 1972. The Mixed Waste Management Facility (MWMF) and Low Level Radioactive Waste Disposal Facility (LLRWDF) received radioactive solid waste from 1969 until 1995. Environmental legislation enacted in the 1970s, 1980s, and 1990s led to changes in waste management and environmental cleanup practices at SRS. The US Congress passed the Clean Air Act in 1970, and the Clean Water Act in 1972; the Resource Conservation and Recovery Act (RCRA) was enacted in 1976; the Comprehensive Environmental Response Compensation, and Liability Act (CERCLA) was enacted by Congress in 1980; the Federal Facilities Compliance Act (FFCA) was signed into law in 1992. Environmental remediation at the SRS essentially began with a 1987 Settlement Agreement between the SRS and the State of South Carolina (under the South Carolina Department of Health and Environmental Control - SCDHEC), which recognized linkage between many SRS waste management facilities and RCRA. The SRS manages several of the larger groundwater remedial activities under RCRA for facilities recognized early on as environmental problems. All subsequent environmental remediation projects tend to be managed under tri-party agreement (DOE, Environmental Protection Agency, and SCDHEC) through the Federal Facilities Agreement. During 25 years of environmental remediation SRS has stabilized and capped seepage basins, and consolidated and capped waste units and burial grounds in the GSA. Groundwater activities include: pump and treat systems in the groundwater, installation of deep subsurface barrier systems to manage groundwater flow, in situ chemical treatments in the groundwater, and captured contaminated groundwater discharges at the surface for management in a forest irrigation system. Over the last 25 years concentrations of contaminants in the aquifers beneath the GSA and in surface water streams in the GSA have dropped significantly. Closure of 65 waste sites and 4 RCRA facilities has been successfully accomplished. Wastes have been successfully isolated in place beneath a variety of caps and cover systems. Environmental clean-up has progressed to the stage where most of the work involves monitoring, optimization, and maintenance of existing remedial systems. Many lessons have been learned in the process. Geotextile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive, enhanced natural processes to address groundwater contamination are much more cost effective than pump and treat systems. SRS operated two very large pump and treat systems at the F and H Seepage Basins to attempt to limit the release of tritium to Fourmile Branch, a tributary of the Savannah River. The systems were designed to extract contaminated acidic groundwater, remove all contamination except tritium (not possible to remove the tritium from the water), and inject the tritiated groundwater up-gradient of the source area and the plume. The concept was to increase the travel time of the injected water for radioactive decay of the tritium. The two systems were found to be non-effective and potentially mobilizing more contamination. SRS invested approximately $50 million in construction and approximately $100 million in 6 years of operation. The H Seepage Basin pump and treat system was replaced by a series of subsurface barriers that alters the groundwater velocity; the F Seepage Basin pump and treat system was replaced by subsurface barriers forming a funnel and gate augmented by chemical treatment within the gates. These replacement systems are mostly passive and cost approximately $13 million to construct, and have reduced the tritium flux to Fourmile Branch, in these plumes, by over 70%. SRS manages non-acidic tritiated groundwater releases to Fourmile Branch from the southwest plume of the MWMF with a forest irrigation system. Tritiated water is captured with a sheetpile dam below the springs that caused releases to Fourmile Branch. Water from the irrigation pond is pumped to a filter plant prior to irrigation of approximately 26 hectares of mixed forest and developing pine plantation. SRS has almost achieved a 70% reduction in tritium flux to the Branch from this plume. The system cost approximately $5 million to construct with operation cost of approximately $500K per year. In conclusion, many lessons have been learned in 25 years of relatively aggressive remedial activities in the GSA. Geotextile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive, enhanced natural processes to address groundwater contamination are much more cost effective than pump and treat systems. In water management situations with non-accumulative contaminants (tritium, VOCs, etc.) irrigation in a forest setting can be very effective.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Nature and State of Groundwater Contamination at the Nevada National Security Site: What Have We Learned from Decades of Groundwater Analysis? - 20337

The regulatory framework for remediating radionuclide contamination from underground nuclear testing at the Nevada National Security Site (NNSS) is based on a combination of characterization and modeling studies, monitoring, and institutional controls [1]. Currently, tritium is the largest contributor (∼90%) to the estimated 44.6 million-curie radionuclide inventory resulting from underground testing [2]. Because of its short half-life (12.32 years), its relative contribution reduces below 10% of the total radiologic inventory over the next 120 years as a result of radioactive decay. Although tritium levels are observed well above the Safe Drinking Water Act (SDWA) maximum contaminant levels (MCLs) in groundwater, other radionuclides are well below their MCLs except within the nuclear test near-field (nuclear test cavity and chimney) environment. In fact, most device-derived radionuclides are below their MCL in groundwater even in samples collected from this near-field environment. The distribution of radionuclides following the nuclear detonation greatly influences the availability of potential contaminants for groundwater transport. Tritium is initially distributed in the gas phase, later as tritiated water in steam, and finally as liquid water, and is available to groundwater transport away from the near-field environment. Other radionuclides that are mobile in groundwater are {sup 14}C, {sup 36}Cl, {sup 99}Tc, and {sup 129}I though their radiologic inventory is small when compared to tritium. Many radionuclides (e.g. U, Pu, Am) are incorporated to a significant extent into the melt glass at the bottom of the cavity and are accessible to groundwater primarily through the slow process of glass dissolution. These radionuclides are also adsorbed to the surfaces of the crushed rock within the cavity and chimney which limits their migration in groundwater. Although colloid facilitated transport of radionuclides at the NNSS has been observed [3], radionuclide concentrations decrease with time and migration distances due to desorption and colloid filtration processes. Current studies indicate that radionuclides associated with colloids are unlikely to migrate downgradient from NNSS underground nuclear tests at concentrations above the SDWA MCL [4][5]. The results of over 50 years of sampling, along with an understanding of these post detonation processes, indicate that tritium is the only contaminant of concern downgradient of testing and that even tritium will not exceed its MCL in groundwater after ∼120 years. Although other longer-lived radionuclides may continue to be released slowly from the near-field environment they will likely never reach levels exceeding their MCLs in groundwater downgradient of the NNSS. Groundwater monitoring will continue to verify these observations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bradwell - The first UK Nuclear Site to Enter Care and Maintenance - 18152

Magnox Ltd, a Cavendish Fluor company, is currently decommissioning twelve nuclear sites on behalf of the UK Nuclear Decommissioning Authority (NDA). Ten of these sites are former Power Stations; the other two are closed Research and Development facilities. An overall strategy for decommissioning the Magnox sites has been agreed between Magnox and the NDA. For all but one of these sites the decommissioning strategy involves an extended quiescent period, known as Care and Maintenance (C and M), during which remaining radiological hazards reduce naturally through radioactive decay. After this quiescent period the sites will be restored to an agreed end state through further decommissioning and clearance work. Sites in C and M will not be permanently manned. They will be passively safe such that prompt action will not be required in response to an alarm or fault. Preparing a nuclear site for C and M involves several inter-related strands of work including definition of the intended physical configuration of the site during C and M (the C and M entry state), establishing a safety case to support that configuration, carrying out the physical works needed to deliver the C and M entry state, preparing arrangements and a team to manage the site during C and M and consolidating the knowledge and information needed to support C and M and final clearance of the site. To enter C and M there needs to be a carefully controlled transition of site, personnel and management system into the agreed C and M configuration. Bradwell, a site on the east coast of England, was selected as part of the overall decommissioning strategy for 'early' entry into C and M; Bradwell is scheduled to enter C and M in late 2018, several years in advance of the next scheduled site, with the intent of carrying learning forward from Bradwell to the subsequent sites. Bradwell is now in the final stages of preparation for C and M. Decommissioning commenced on completion of defueling in 2005. A clearly defined C and M entry state was established early in decommissioning and, through interaction with Regulators and internal and external stakeholders, developed as a shared target, thus providing certainty to the scope of the overall decommissioning project. The site has subsequently been systematically decommissioned to meet this target C and M entry state. All legacy waste has been retrieved and packaged into robust disposal containers, the reactor buildings have a new weather envelope, and much of the site is empty space with concrete hardstanding where facilities used to exist and bare rooms where plant used to operate. The remaining radiological and environmental hazards are not significant. During C and M, which is anticipated to last for 70 years, Bradwell will be managed remotely without the requirement for personnel to be present on site, with the possible exception of an ongoing security presence when the site first enters C and M. In terms of UK decommissioning, many of the projects undertaken at Bradwell were first of a kind. The company operates under a programmed organisational and delivery model, which will enable innovation and learning from Bradwell to be carried forward across the whole Magnox fleet. In addition to decommissioning tools and techniques, processes to manage decommissioning, optimise the C and M entry state to reduce the burden on the UK taxpayer and to transition a site into C and M have been developed. This, in addition to taking people from Bradwell and seeding them into Magnox and the broader UK nuclear industry, should help to provide long term cost savings and delivery efficiencies across the entire NDA estate. This paper describes the journey of Bradwell Site through decommissioning and into C and M, highlighting the innovation and challenges that have contributed to the success of delivering the first UK nuclear site into Care and Maintenance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗